REPAIR FLOORS & RENOVATE X-RAY ROOM #3: INSTALL HCHT PROJECT
562-17-313
TABLE OF CONTENTS
| SECTION | TITLE | ||
| 1.0 | SCOPE OF WORK | ||
| 2.0 | GENERAL | ||
| 3.0 | PROPOSED SCHEMATIC DESIGN SCHEDULE AND SUBMISSION REQUIREMENTS | ||
| 4.0 | PROPOSED PRELIMINARY DESIGN AND DESIGN DEVELOPMENT SCHEDULE | ||
| 5.0 | PRELIMINARY DESIGN AND DESIGN DEVELOPMENT SUBMISSION | ||
| 5.1 | FIRST SUBMISSION OF PRELIMINARY DESIGN | ||
| 5.2 | FINAL DESIGN DEVELOPMENT SUBMISSION | ||
| 6.0 | PROPOSED CONSTRUCTION DOCUMENT SCHEDULE | ||
| 7.0 | CONSTRUCTION DOCUMENT SUBMISSIONS | ||
| 7.1 | MINIMUM REQUIREMENTS FOR SECOND SUBMISSION (95%) OF CONSTRUCTION DOCUMENTS | ||
| 7.2 | MINIMUM REQUIREMENTS FOR THIRD SUBMISSION (100%) CONSTRUCTION DOCUMENTS | ||
| 7.3 | MINIMUM REQUIREMENTS FOR FINAL SUBMISSION (CONSTRUCTION | ||
| BID DOCUMENTS) | |||
| 8.0 | CONSTRUCTION PERIOD SERVICES |
1.0 SCOPE OF WORK
A. The A/E shall develop all Space Programs, Schematic Design, Design Development, Construction Documents, Construction Administration Services, Technical Specifications, and Cost Estimates, for the "REPAIR FLOORS & RENOVATE X-RAY ROOM #3; INSTALL HCHT PROJECT” at VAMC, Erie, PA.
B. The project shall consist of the necessary alterations to renovate the existing first floor Radiology Area to provide one (1) radiology fluoroscopy room, two (2) sonography rooms/ toilets; replace finishes in Control Room for CT-Scans 1 & 2; replace radiation shielding and finishes in CT-Scan #1. Design intent is for the radiology suite to have been completely renovated and compliant with current VA guidelines with the same level of finish of the current waiting room and X-ray room #1. Project to include, but not limited to:
a. Complete demolition of X-ray room #3 and associated toilet room and contents in its entirety and design space to conform to the requirements as set forth by Siemen’s Medical Solutions for the installation of a YSIO Radiofluoroscopy Unit.
b. Remove and replace flooring, remove drywall ceiling and replace with lay-in ceiling; patch and paint and replace cabinetry throughout Sonography rooms and associated toilet rooms.
c. Remove and replace flooring, lead shielding (flooring only), remove drywall ceiling and replace with lay-in ceiling, patch and paint and replace cabinetry throughout CT Room #1 and CT Control Rooms.
d. Installation of new LED light fixtures throughout.
e. Asbestos testing and investigation to be done in areas where demolition will occur.
f. Roof leak investigation above affected areas to be done and to incorporate any noted deficiencies.
g. Project shall include equipment planning and site preparation, work with manufacturer and equipment representatives for delivery and installation of equipment, necessary improvements to the physical structure and also addressing documented deficiencies in the area.
See attached sketch VA-A-100 dated 10/26/2018.
C. Site Work – A/E shall include construction plan including documentation of site restrictions as necessary to complete this work.
D. The project to provide all necessary modifications to VAMC existing building structure, mechanical, electrical, and plumbing work E. All above work shall be in accordance with NEC, EPA, and VAMC regulations.
F. Not Used.
G. A/E shall be responsible to review existing conditions surrounding the area planned for development. This shall include all existing utilities and structures.
H. A/E shall be required to provide a computer 3D model and prepare various 3D renderings to present to the VA throughout the design phase to adequately represent material, site conditions, lighting, and etc.
I. A/E shall develop a phasing plan and documents for project award which will be based upon available funding of $1,100,000.
J. All work shall be coordinated with the upcoming and current projects to prevent any duplication of efforts. New design shall be accomplished in accordance with latest VAMC guidelines, codes and specifications.
K. All designs shall comply with applicable sections of VA publications, "Planning Criteria for Medical Facilities", H-08-9; and "Equipment Guide List", H-08-5; also NFPA, OSHA, ANSI, JCAHO, VA Standards and other applicable Federal, State and Local code requirements, including BC. A/E will be responsible for complete functional design and provide biddable documents meeting all the requirements.
L. Applicable chapters of VA Master Construction Specifications will be prepared by the A/E, including any necessary adaptations. VA Construction Standards JH-08-3,VA HVAC Design Manual, VA Sustainable Design and Energy Reduction Manual, and, ASHRAE Standards 90.1-2007, shall apply to specific design requirements. Particular attention is called to CD4, "Symbol Identification of Contract Drawings", and CD5, "Contract Drawings Requirements". Equipment symbols shall be in accordance with Handbook H-08-6, "Standard Drawing Details". Handbook H-08-4 shall be utilized to the greatest extent practicable.
M. The A/E shall carefully review all requirements of the latest edition of the Accreditation Manual for Hospitals, of the Joint Commission of Accreditation of Hospitals, with respect to design and operating requirements and report all conflicting conditions in writing.
N. Project Schedule is 205 days to complete Space Programs, Schematic Design, Design Development, Construction Documents, Technical Specifications, and Cost Estimates of Construction. Completion of Construction Administration Services will be dependent upon award of Construction Contract.
| Phase |
| Duration (Days) |
| Total Elapsed Duration (Days) |
| SD-1 |
| 20 |
| 20 |
| VA Review |
| 10 |
| 30 |
| SD-2 |
| 15 |
| 45 |
| VA Review |
| 10 |
| 55 |
| DD-3 |
| 20 |
| 75 |
| VA Review |
| 10 |
| 85 |
| DD-4 |
| 20 |
| 105 |
| VA Review |
| 10 |
| 115 |
| CD-5 (95%) |
| 20 |
| 135 |
| VA Review |
| 10 |
| 145 |
| CD-6 (100%) |
| 20 |
| 165 |
| VA Review |
| 10 |
| 175 |
| CD-7 (Final) |
| 10 |
| 185 |
| VA Review |
| 20 |
| 205 |
| 2.0 | GENERAL | |
| A. | The A/E will be given the Criteria for the project, and appropriate orientation by the VAMC offices of Engineering Service and VISN Contracting. The A/E shall prepare all necessary drawings. The degree of completion and the stages of submission shall be as hereinafter specified. The VAMC will provide all standard details, master specifications, design criteria, etc. | |
| B. | A/E discussion with the VA Medical Center personnel concerning requirements will be arranged by and participated in by appropriate Engineering and Contracting Service personnel. The A/E shall participate, when required, with the appropriate Project Chief and Project Engineering and other Services in review of project scope, design review comments, etc. | |
| C. | The floor plans for the structural, HVAC, plumbing and electrical drawing shall be at the same scale as the architectural drawings to facilitate checking. | |
| D. | In each submission, the A/E shall re-submit the material specified in the prior submission, revised according to the comments made by the VAMC at the prior review. | |
| E. | The A/E shall pay particular attention to the fact that during the construction document stage, plans are not subject to change at the request of the VA Medical Center staff without the approval of the Chief, Engineering Service, 138, and Contracting Officer, Acquisition and Materiel Management Service, 90C. | |
| F. | Drawings showing architectural and other features of the affected building are available in files of the Engineering Service, VA Medical Center. The drawings are not to be expected to be accurate in all respects, and the Architect-Engineer is to verify all features affecting the project by field investigation. | |
| G. | The A/E shall design all systems to maximize energy conservation and comply with requirements of VA HVAC Design Manual, VA Sustainable Design and Energy Reduction Manual, and ASHRAE Standards 90.1-2007. | |
| H. | The A/E shall provide written certification from a Certified Industrial Hygienist as to the mitigation of asbestos contamination. Copies of reports from previous asbestos surveys will be made available for review and guidance. | |
| I. | The A/E shall develop the project utilizing Building Information Modeling "BIM" and Computer Aided Design “CAD” software. Submittal drawings shall be full size plots suitable for half size reproduction. CAD Arch. files are available of the existing building. | |
| J. | A/E shall utilize BIM software to develop architectural design drawings, renderings, construction documents, and record drawings at completion of construction. At each scheduled submittal date the A/E shall submit to the VA, A list of the submitted files that shall include, The Model, 3D Views, Facility Data, and CAD Data Files. | |
| K. | BIM Model minimum requirements shall be developed to include the systems described below as they would be built and the processes of installing them, and to reflect final as-built conditions. The deliverable model at the interim design stage and at the final design stage shall be developed to include as many of the systems described below as are necessary and appropriate at that design stage. | |
| 1. | At a minimum the Model shall include but not be limited to the following; Architectual/Interior Design, Square Footage/Volume including Room Names and Numbers, Architectural Schedules, Walls and Curtainwall Sizes, Shapes, and Material Data. Doors, Windows, Louvers, Roof, Floors, Ceilings, Vertical Circulation, Architectural Specialties and Woodwork, Signage, Schedules, Furniture, Equipment, Structural, Foundations, Shafts and Pits, Mechanical, HVAC, Plumbing, Electrical/Telecommunications, Power and Lighting, Exterior Building Information, Fire Protection/Alarms, and Civil Engineering Data. | |
| L. | The VA has ownership of the rights at the date of Closeout Submittal to all CAD files, BIM Model, and Facility Data developed for the Project. The VA may make use of this data following any deliverables. | |
| M. | For preparation of project specifications the VAMC will provide master specifications available at the VA website (http:/www.va.ww.va.gov./facmgt)in "Word" format. The A/E shall supply copies of the specification files to be electronically transported to the CO for incorporation into the VA specification booklet. | |
| N. | Symbol Identification of Contract Drawings: |
| X | - Project Title Sheet |
| 1 (numbered only) | - Architectural Drawings |
| DE | - Architectural Miscellaneous Detail |
| S | - Structural Drawings (if required) |
| P | - Plumbing Drawings |
| E | - Electrical Drawings |
| H | - HVAC Drawings |
| Prints - Black line on white background, "E" Size (30" x 42") (Full size) – Half size 15”x21” |
| Reproducibles - May be mylar photocopies, "E" Size (30" x 42") |
| Electronic Media – CD-ROM. – Revit Architecture 2011. |
| Drawing Data Information - Shall list all basic information including but limited to the following: File names, fonts, layer names/types color, blocks used, hatches, etc. |
3.0 PROPOSED SCHEMATIC DESIGN SCHEDULE AND SUBMISSION REQUIREMENTS
A. The first schematic design submission shall be submitted within twenty (20) days after award of contract and shall include six (6) sets of:
a. Three schematic design options (prints) (5) ½ size sets and (1) full size set. All three schematic design options are to be within programmed budget amount.
b. Preliminary scope of work.
c. Narrative description for all SMEPT systems.
d. Cost Estimate for schematic designs and options to be considered.
| B. | The first submission shall include site plan and 3D massing model (Sketchup) views of each layout. Consideration for site access, arrangement of spaces/connections, massing, and scale of addition to existing medical center shall be addressed. |
| B. | There will be a ten (10) day review of the first submission by VAMC. |
| C. | The second SCHEMATIC design submission shall be submitted fifteen (15) days after receipt of the VA review comments from the first schematic design submission and shall include (5) ½ size sets of drawings and (1) full size set. |
| D. | There will be a ten (10) day review of the second submission by VAMC. |
| E. | A/E shall note that the above schedule is for guidance only. This schedule may be adjusted to meet the needs of the VA Medical Center for obligation of funds and other consideration. The above proposed design schedule includes government review time. |
| 4.0 | PROPOSED PRELIMINARY DESIGN AND DESIGN DEVELOPMENT SCHEDULE |
| A. | The first preliminary design submission shall be submitted within twenty (20) days after review comments from schematic design phase are received and shall include six (6) sets of: |
| - Preliminary drawings (prints) (5) ½ size sets and (1) full size set. | |
| - Preliminary cost estimate utilizing. | |
| - Preliminary scope of work | |
| B. | There will be a ten (10) day review of the first submission by VAMC. |
| C. | The final design development submission shall be submitted twenty (20) days after receipt of the VA review comments from the preliminary design submission and shall include (5) ½ size sets of drawings and (1) full size set. This final design development should include: Final VA user group approved plans and locations, - Fire Protection Plans, Phase in and proposed sequences of construction in each phase. Plans at this stage should include site, exterior elevations for review and comment along with mechanical – electrical. |
| D. | There will be a ten (10) day review of the second submission by VAMC. |
| E. | A/E shall note that the above schedule is for guidance only. This schedule may be adjusted to meet the needs of the VA Medical Center for obligation of funds and other consideration. The above proposed design schedule includes government review time. |
5.0 PRELIMINARY DESIGN SUBMISSION AND DESIGN DEVELOPMENT SUBMISSION.
There will be one (1) submission of preliminary design documents and one (1) submission of design development documents. The requirement for each design submission is described below.
| 5.1 | FIRST SUBMISSION - PRELIMINARY DESIGN DOCUMENTS |
| A. | Site Planning |
| If project requires the modification of the existing VA campus site the preliminary plans should show how existing area will be modified paving, proposed site enclosure (fencing – screen walls, gates/security requirements, landscaping, exterior lighting, etc. Submit a sketch to show relocation of all required parties in the project area, to new locations within the Hospital. The A/E, with support from the project COTR will coordinate a move plan for all people within the existing space to new locations. The move plan will be graphically documented by the A/E as part of the base scope of work. | |
| B. | Architectural |
| 1. | Submit, as a minimum, a single line layout for all floors, penthouses, and roof areas with double line exterior walls at scale of not less than 1/8" = 1'-0". These drawings will show all rooms, doors (shown with a slash), corridors, electrical closets and equipment rooms, signal and telephone closets, mechanical shafts and space, and all vertical circulation, e.g., stairs, conveyors, elevators (personal and service), and automatic conveyances. |
| 3. | Show the overall exterior dimensions for determining the total gross area of the buildings. |
4. Label each room or space with its name and the required net area of the designed net area. Names on drawings shall be the same as those used in the Space Plan. The area figures will appear in fractional form,e.g.,400/390.Spacesprovided but not called for in the Space Plan (such as mechanical rooms) shall be indicated as: -/390. The designed net area shall exclude such circulation space within the room as is permitted by the space planning criteria. Plan shall also note all dimensions to finished wall.
5. When the project includes more than one service or activity, as identified in the Space Summary Sheets of the Master Plan or Space Program, each activity shall be labeled and its boundaries indicated with a heavy or distinctive line. In addition to the name, this labeling shall include the Activity Code Number. When a service is fragmented or scattered in various locations, then each piece of it shall be similarly outlined and identified.
6. Submit a separate 1/8" scale plan for each floor to show the building's fire protection features. The plan shall show, as a minimum, smoke barrier partitions, fire partitions, sprinklered areas, location of fire extinguisher cabinets, exit paths to the outside and the occupancy of each fire section. Submit exit calculations for each floor which justify the number of exits provided.
7. Show the structural grid pattern with expansion joints, if used. (indicate existing and new column lines and column numbers )
8. Show locations of special seismic structural features, if required. (If required)
9. Submit a title sheet with drawing index and department index (Revise as necessary for each review).
10. Show location of solar collector panels if included.
| C. | Functional |
| Submit a written explanation to justify any substantial variations from the Space Plans or Criteria. | |
| D. | Space Control |
Submit a report of the total gross areas for the buildings, per instruction in paragraph CP4, Supplement A to SF 252, Special Provisions. Compare and contrast existing space, proposed Medical Center Space Program, and Space Program required by VACO as designated in 7610.
E. Structural
1. Submit cost estimates for each system. Include foundation and fireproofing costs in estimate. The A/E shall assess the economics of each structural system with due consideration of the systems cost effective on the entire building assembly.
2. Show column and shear wall locations.
| F. | Heating, Ventilating and Air Conditioning |
| 1. | Provide block load calculations for HVAC of each building. Describe the building elements (walls, windows, roof, etc.), occupancies and internal loads. Size central equipment (chillers, converters, pumps, etc.). |
| 2. | Describe major functional areas such as administrative, patient bedrooms and ambulatory with distinct and different HVAC requirements that may necessitate individual HVAC treatment. Describe for each of the above functional areas proposed HVAC systems that will be included in the economic analysis. |
| 3. | Provide a written description of the three (3) HVAC and central refrigeration systems to be compared through an economic analysis. Demonstrate the rationale for choosing the candidate systems. Provide documentation of any computerized methodology that will be used for the economic analysis. |
| 4. | Provide a brief description of the parameters that will be used in the economic analysis for each of the HVAC and Central refrigeration systems. Reference the source of all data. |
| 5. | Provide a written description of energy conserving concepts to be analyzed for feasibility. Demonstrate rationale for the proposed concepts. Provide a brief description of the parameters that will be used in the feasibility analysis for each of the candidate energy conserving concepts. Reference the source of all data. |
| 6. | Provide a brief description of existing HVAC and Central refrigeration systems that will interact with the proposed new systems. Describe the impact of the existing systems on the new systems and the impact the new systems will have on the existing systems with respect to overall system capacity and ability to handle the new loads, system re-balancing needs, controls interface, etc. |
| 7. | Provide a brief description of the methods to be used in sizing ducts and piping. |
| 8. | Provide plans showing the location of any proposed new chillers, cooling towers and any outside piping distribution for water and steam. |
9. Show on plans the location and size of all mechanical rooms. Provide a block outline of the mail elements (equipment) in each mechanical room.
10. Provide a brief description of the fire and safety aspects of the HVAC systems. Describe the fire and smoke zones and address in principle the fire and safety control systems. Show smoke partitions clearly delineated on the mechanical drawings.
| 11. | For any alterations of existing buildings, determine whether asbestos abatement is required and provide the preliminary findings on the presence of asbestos. | |
| G. | Steam Generation | |
| 1. | Submit estimated heating and process steam load and also the capacity and present minimum and maximum demands of the existing boiler plant and capability of existing steam supply and condensate return distribution systems to handle new loads. |
| H. | Plumbing and Sanitary | |
| 1. | Describe basis for design and submit description of proposed systems. | |
| 2. | Provide plumbing layout for work required in existing buildings. | |
| I. | Electrical | |
| 1. | Furnish a report describing the systems proposed, including appropriate facts to support the designer's decisions including the basic assumptions and points of interconnections with the existing electrical systems. Submit preliminary square foot load calculations for both normal and emergency. Calculations should be broken down into lighting, receptacles, power (X-ray, elevator, etc.), and mechanical. Provide assessment of the impact of the renovated construction to the existing distribution system. Include current demand loading (H.V. switchgear and primary feeder) and projected load of new construction. | |
| 2. | Provide a sheet for all symbols. | |
| 3. | On a plan show any proposed and existing underground electrical circuitry, telephone service, or inter-building signal system (fire alarm, CCTV, radio and security systems), as required. | |
| 4. | Submit an elementary one-line diagram of the proposed electrical system. Include high voltage and low voltage switchgear, transformers and low voltage main and/or distribution panels, branch panels and representative methods of feeding 277/480 volt, 120/208 volt, and emergency panels. Show size of any electrical device which will be reused. Locate all electrical and signal closets on floor plans. | |
| 5. | For projects involving patient rooms, submit typical power and lighting layouts for representative rooms. | |
| 6. | Submit a list of the specialty areas that the designer will layout for the design development submission, such as: Lab Equipment. | |
| 7. | Submit a report of the fire alarm items. | |
| 8. | Submit a sample lighting calculation. Describe the proposed method of short-circuit calculation. Describe the method by which voltage drop and demand will be calculated. | |
| J. | Cost Estimating | |
| The A/E shall present a cost estimate, utilizing the BIM software, predicated on the assessment made during the preliminary design phase. A comparison will be shown between the A/E's, the construction Consultant's, and the VA's budget cost estimate. |
| 5.2 | SECOND SUBMISSION - DESIGN DEVELOPMENT DOCUMENTS | |
| A. | Architectural | |
| 1. | Submit final 1/8" scale design development plans with all of the revisions from the first submission incorporated into the plans. This includes the fire plans and exit calculations. The 1/16" scale preliminary floor plans should show net program area of each room with the designed net area. Outline and label activities or services as required for first submission. | |
| 2. | Submit 1/8" scale floor plans for each floor showing all plumbing fixtures, program room codes (from Space Plan), room names, room numbers, door locations and swing, and the net program area over the designed net area (which will not be shown on the working drawings). Outline and label activities and services, as required for the first submission. | |
| 3. | Show schematic sections, as needed, to define that building concept. | |
| 4. | Submit elevations at all significant sides of the building in sufficient detail for the VA to judge its appearance. All significant materials, including their colors, must be indicated. This includes rooftop mechanical equipment and any architectural screens. | |
| 5. | Submit a sample sheet of filled out finished Interior Finish schedule forms. The Medical Center will provide Interior Design input, review, and approval. | |
| B. | Transport Systems | |
| Provide recommendations for new transport systems necessary to complete this project. | ||
| C. | Heating, Ventilating and Air Conditioning | |
| 1. | Provide complete economic analysis of the three approved HVAC and central refrigeration systems. Provide completed feasibility analysis of the approved energy conserving concepts. Provide full documentation of the computerized methodology and full explanation of all coded and abbreviated terms. Make recommendations for the preferred system. | |
| 2. | Provide updated calculations for block load for each building, sizing of central equipment, and all air handling units with psychometric charts. Provide calculations for pumps, fans, duct mains, water mains, steam mains and steam converters. Provide catalogue cuts of all central equipment and air handling units. | |
| 3. | Provide the following for the recommended systems: |
a. Plans with complete single line diagrams for ductwork and piping showing sizes of mains. Include flow diagrams for air, water and steam.
b. Schematics of the control systems with an outline of the sequence of operation. Include main aspects of fire and safety controls.
c. Plans showing all mechanical rooms and chiller rooms with block diagrams of all major equipment. Provide typical samples of plans and sections in 1/4" scale.
| D. | Steam Generation | ||
| 1. | Describe the basis for design including present and future fuel costs which will be used in subsequent computations. Submit a written description of proposed fuel systems for final economic and energy analysis of best fuel or fuels. | ||
| 2. | Develop probable steam demand for building heat losses and ventilation (including humidification) based on "block building" calculations. Provide estimate of steam lead reduction due to heat recovery devices on HVAC systems. Submit a separate estimate of steam requirements for each of the following process steam loads, to the extent proposed for the new building(s). (Show total connected load and diversity for each.) | ||
| Domestic hot water heating | |||
| Laundry hot water heating, if applicable | |||
| Laundry equipment, if applicable | |||
| Sterilization equipment if applicable | |||
| Kitchen equipment if applicable | |||
| Therapeutic pool water heating if applicable | |||
| E. | Plumbing and Sanitary | ||
| 1. | Show and identify all plumbing fixtures. Show location of pumps, compressors, tanks, therapeutic pool equipment, and other major central plumbing equipment. | ||
| 2. | Complete plumbing layout for work required in existing buildings including pipe sizes and plumbing fixture identification. | ||
| 3. | Identify smoke partitions, fire alarm zones and fire sprinkler zones on plumbing drawings. | ||
| F. | Electrical | ||
| 1. | Show preliminary sizes of major components of the electrical one-line and riser diagrams, including high voltage and normal and emergency distribution equipment. | ||
| 2. | Provide preliminary updated load calculations. | ||
| 3. | Show tentative locations of primary distribution, switchgear/switchboard, engine-generator sets, unit substations/ pad mount transformer, manholes, and other major items. Indicate the electrical equipment (panel boards, transformers, etc.) to be installed in the proposed electrical closets based on the preliminary riser. Show fire alarm risers and locate fire alarm devices. | ||
| 4. | On typical floor plan indicate location and type of lighting fixtures to be used in each space. Show special features such as under floor raceways, power outlets, exit lights, fire alarms and signal system devices, and panel boards. Show typical circuitry of branch circuits including receptacles, lighting and power for one major representative area. | ||
| 5. | Electrical drawings shall show fire alarm zones and smoke partitions. | ||
| 6. | All drawings shall show room designations. | ||
| 7. | Existing or demolition work shall be shown by dashed lines. | ||
| G. | Sustainable Design & Energy Efficiency |
Submit LEED® Silver Certification checklist. Submit narrative addressing how the design will meet Federal Mandates for sustainability and energy efficiency. Submit ASHRAE 90.1 Compliance Forms for Chapter 5-Envelope, Chapter 6-HVAC, Chapter 7-Water Heating, Chapter 9-Lighting, and Appendix G-Performance Rating and refined ASHRAE 90.1-2007 base-case energy model and as-designed energy model, including all assumptions used, targeting compliance with the 30% energy reduction goal, or exceeding the goal. Submit refined indoor and outdoor water use analysis. Submit lighting calculations including computer-generated point-to-point photometric analysis and narrative for all proposed lighting controls including use of occupancy sensors, daylight harvesting and other energy-conserving strategies as appropriate. Submit preliminary commissioning specifications.
| H. | Cost Estimating |
| Final DD submission cost estimate shall be developed with the BIM software. |
| 6.0 | PROPOSED CONSTRUCTION DOCUMENT SCHEDULE | |
| A. | The first working drawing submission is to be a 95% Construction Document Submission, and shall be submitted within twenty (20) days after VA approval of Final Design Development Submission. This submission shall include four (6) sets. | |
| -Construction drawings (5) 1/2size sets (1) Full size set. | ||
| -Marked-up/edited specifications – 2 copies | ||
| -Cost estimates utilizing the BIM software. | ||
| -Scope of work | ||
| -Phasing plan | ||
| -Drawing files on CD-ROM (If requested) |
B. There will be a ten (10) day review of the 95% submission by VAMC C. The second working drawing submission is to be a 100% Construction Document Submission, and shall be submitted within twenty (20) days after VA approval and comments of the 95% submission. This submission shall include six (6) sets of:
| -Construction drawings prints (5) ½ size sets (1) full size set |
| -Marked-up/edited specifications ( 2 copies ) |
| -Cost estimates |
| -Scope of work |
| -Phasing plan |
| -Drawing files on CD-ROM (If requested) |
D. There will be a ten (10) day review of the 100% submission by VAMC.
| G. | The final design submission shall be submitted within ten (10) days after receipt of the first review comments and shall include six: | |
| -Construction drawings prints (5) 1/2size sets (1) Full size set | ||
| -Edited specifications ( 2 copies ) | ||
| -Detailed final cost estimates | ||
| -Detailed scope of work | ||
| -Detailed phasing plan | ||
| -Specifications and drawing files on CD-ROM (If requested) | ||
| H. | There will be a twenty (20) day review of the final submission by the VAMC and VACO. Any additional comments shall be incorporated into final documents. Provide six (6) sets of copies/prints submitted within fourteen (14) days as follows: | |
| -Final construction drawings (6 sets). Bid Drawings & Specs, (4) ½ size sets, (2) Full size sets. | ||
| -Final edited specifications ( 3 copies) | ||
| -Final cost estimates | ||
| -Final detailed scope of work | ||
| -Specifications and drawings on CD-ROM (complete with all drawing data info.) | ||
| H. | A/E shall note that the above schedule is for guidance only. This schedule may be adjusted to meet the needs of the VA Medical Center for obligation of funds and other considerations. The above proposed design schedule is exclusive of government review time. |
| 7.0 | CONSTRUCTION DOCUMENTS SUBMISSION |
| A. | There will be a first (95%) – second (100%) –and final submission of construction documents. The requirements of each submission are described below. |
| 7.1 | MINIMUM REQUIREMENTS FOR FIRST (95%) SUBMISSION OF CONSTRUCTION DOCUMENTS | |
| A. | General | |
| 1. | Contract drawings and all related documents shall be fully coordinated, and ready for reproduction for bidding and construction purposes at this review. | |
| 2. | The A/E shall deliver the original working drawings to the Contracting Officer for signature after review and approval of the review material. The working drawings shall bear the seal of the Registered Architect, Registered Landscape Architect, or Professional Engineers for the design and the principal CIH on project. | |
| 3. | The A/E shall make any changes to the working drawings, calculate any specifications identified as necessary during the Second Submission review conference. | |
| B. | Calculations |
Assemble complete computations and engineering data including basis of design, systems narratives, equipment selections, pipe and duct sizing. Recapitulations, from which the basic heat load calculations served, sound attenuation for high pressure systems and computations and like data for this submission. Provide a separate volume for each discipline with an index and numbered pages, bound with removable metal fastenings.
| C. | Specifications | |
| 1. | When the drawings and specifications are nearing completion, the A/E shall furnish the VA with a brief description of work for inclusion in the Invitation for Bids. | |
| 2. | Submit original, photocopies of VA Master Specification sections to marked-up suit the project requirements and, also, four (4) copies of any sections originated by the A/E. Editing and marked-up of Master Specifications shall easily identify modifications, deletions, and insertions. Specifications shall be typed after the review. | |
| D. | Architectural | |
| Submit completed plan, elevations, details and schedules. | ||
| E. | Heating, Ventilation and Air Conditioning (HVAC) | |
| 1. | The drawings and calculations shall be complete. | |
| 2. | Duct sizing and pipe sizing computations shall be complete with system layout and tabulated data. | |
| 3. | Show complete equipment schedules. | |
| 4. | Show complete control diagrams. | |
| 5. | Details, elevations, sections and legends on the drawings are to be completed. Show a section of each critical point in corridors indicating the location and space allocation intended for all ducts, piping, and larger conduits regardless of trade. | |
| F. | Structural | |
| Include all structural plans, elevations, sections, details, schedules, and general notes necessary to complete the drawings. | ||
| G. | Plumbing and Sanitary | |
| 1. | Submit complete drawings. | |
| 2. | All piping shall be drawn and all pipes sized. | |
| 3. | Submit legend, notes, details, plan views and sized riser diagrams, equipment, etc. | |
| H. | Electrical | |
| 1. | Submit complete electrical plans. | |
| 2. | On drawings, show outlets circuited, all motor outlets, complete riser diagrams, switchboards, panels, and feeders. Show panel and switchboard schedules for all equipment with sizes of mains and branches determined. | |
| 3. | On detail drawings, show symbols, lighting fixture details and construction details. | |
| 4. | Electrical floor plans shall be complete with panel location and major components located. | |
| I. | Sustainable Design and Energy Efficiency |
Submit final documentation demonstrating LEED® Silver Certification. Where proposed Credits will not achieve all federally-mandated strategies for sustainability and energy efficiency, submit documentation showing compliance with federally-mandated strategies. Submit final ASHRAE 90.1-2004 base-case energy model and as-designed energy model based on the Construction Documents, including all assumptions used, demonstrating compliance with the 30% energy reduction goal. Submit final models for all other systems. Submit final commissioning specifications.
| J. | Phasing | |
| Complete phasing and bid alternates information in written form and/or chart form. | ||
| K. | Estimating | |
| 1. | Follow the same general instructions as first working drawings submitted. | |
| 2. | Furnish additional details to the estimator, as design progresses, to show sub-headings under each major numerical heading. | |
| 3. | Show unit quantity, unit measure, unit cost, and total cost of labor and material for sub-heading. | |
| 4. | Show a subtotal of labor and material for each sub-heading. | |
| 5. | Show taxes and insurance on labor. | |
| 6. | Show sub-total of the total cost. | |
| 7. | Show applicable sub-contractor's mark-up as a percentage of cost. | |
| 8. | Show total cost of each sub-heading. | |
| 9. | Show total estimated cost of each major heading. | |
| 10. | Show summary of major headings. | |
| 11. | Provide Data Sheets. | |
| 12. | See Section F-8 of requirements for first submission of working drawings for site estimate requirements. | |
| L. | Asbestos Abatement | |
| 1. | Drawings shall be complete and show containment areas, suggested location(s) of decontamination facilities, negative pressure (HEPA) units, building/site access routes, all piping/equipment requiring stripping of asbestos contaminate insulation, rounded-off quantities, etc. | |
| 2. | Specifications shall be completed. | |
| 3. | Show phasing as it relates to rest of the project. | |
| M. | Comments | |
| Incorporate all comments shown on the 65% design review. |
| 7.3 | MINIMUM REQUIREMENTS FOR SECOND (100%) SUBMISSION OF CONSTRUCTION DOCUMENTS | ||
| A. | General | ||
| 1. | Contract drawings and all related documents shall be completed, fully coordinated, and ready for reproduction for bidding and construction purposes at this review. | ||
| 2. | The A/E shall deliver the original working drawings to the Contracting Officer for signature after review and approval of the review material. The working drawings shall bear the seal of the Registered Architect. Registered Landscape Architect, Professional Engineers for the design and the principal CIH on project. | ||
| 3. | The A/E shall make any changes to the working drawings, calculate any specifications identified as necessary during the Second Submission review conference. | ||
| B. | Calculations | ||
| Assemble complete computations and engineering data including basis of design, systems narratives, equipment selections, pipe and duct sizing. Recapitulations, from which the basic heat load calculations served, sound attenuation for high pressure systems and computations and like data for this submission. Provide a separate volume for each discipline with an index and numbered pages, bound with removable metal fastenings. | |||
| C. | Specifications | ||
| 1. | When the drawings and specifications are nearing completion, the A/E shall furnish the VA with a brief description of work for inclusion in the Invitation for Bids. | ||
| 2. | Submit original, photocopies of VA Master Specification sections to marked-up suit the project requirements and, also, four (4) copies of any sections originated by the A/E. Editing and marked-up of Master Specifications shall easily identify modifications, deletions, and insertions. Specifications shall be typed after the review. | ||
| D. | Architectural | ||
| 1. | Submit completed plan, elevations, details and schedules. | ||
| E. | Heating, Ventilation and Air Conditioning (HVAC) | ||
| 1. | The drawings and calculations shall be complete. | ||
| 2. | Duct sizing and pipe sizing computations shall be complete with system layout and tabulated data. | ||
| 3. | Show complete equipment schedules. | ||
| 4. | Show complete control diagrams. | ||
| 5. | Details, elevations, sections and legends on the drawings are to be completed. Show a section of each critical point in corridors indicating the location and space allocation intended for all ducts, piping, and larger conduits regardless of trade. | ||
| F. | Structural | ||
| Include all structural plans, elevations, sections, details, schedules, and general notes necessary to complete the drawings. | |||
| G. | Plumbing and Sanitary | ||
| 1. | Submit complete drawings. | ||
| 2. | All piping shall be drawn and all pipes sized. | ||
| 3. | Submit legend, notes, details, plan views and sized riser diagrams, equipment, etc. | ||
| H. | Electrical | ||
| 1. | Submit complete electrical plans. | ||
| 2. | On drawings, show outlets circuited all motor outlets, complete riser diagrams, switchboards, panels, and feeders. Show panel and switchboard schedules for all equipment with sizes of mains and branches determined. | ||
| 3. | On detail drawings, show symbols, lighting fixture details and construction details. | ||
| 4. | Electrical floor plans shall be complete with panel location and major components located. | ||
| I. | Phasing | ||
| 1. | Complete phasing and bid alternates information in written form and/or chart form. | ||
| J. | Estimating | ||
| 1. | Follow the same general instructions as first working drawings submitted. | ||
| 2. | Furnish additional details to the estimator, as design progresses, to show sub-headings under each major numerical heading. | ||
| 3. | Show unit quantity, unit measure, unit cost, and total cost of labor and material for sub-heading. | ||
| 4. | Show a subtotal of labor and material for each sub-heading. | ||
| 5. | Show taxes and insurance on labor. | ||
| 6. | Show sub-total of the total cost. | ||
| 7. | Show applicable sub-contractor's mark-up as a percentage of cost. | ||
| 8. | Show total cost of each sub-heading. | ||
| 9. | Show total estimated cost of each major heading. | ||
| 10. | Show summary of major headings. | ||
| 11. | Provide Data Sheets. | ||
| 12. | See Section F-8 of requirements for first submission of working drawings for site estimate requirements. | ||
| K. | Asbestos Abatement | ||
| 1. | Drawings shall be complete and show containment areas, suggested location(s) of decontamination facilities, negative pressure (HEPA) units, building/site access routes, all piping/equipment requiring stripping of asbestos contaminate insulation, rounded-off quantities, etc. | ||
| 2. | Specifications shall be completed. | ||
| 3. | Show phasing as it relates to rest of the project. | ||
| L. | Comments | ||
| 1. | Incorporate all comments shown on the 95% design review. |
| 7.3 | MINIMUM REQUIREMENTS FOR FINAL SUBMISSION | |
| A. | General | |
| 1. | Complete any corrections noted from the second submission. | |
| 2. | Contract drawings and specifications and all related documents shall be completed, fully coordinated and ready for reproduction for bidding and construction purposes. | |
| 3. | The A/E shall deliver the original working drawings and specifications to the Contracting Officer. This shall be in the form of a hard copy and CD-ROM of the BIM Model. | |
| 4. | When requested, the A/E shall deliver fifteen (15) reproduced drawings and specifications to the Contracting Officer. The sets shall be collated, bound and ready to issue for bids. The Contracting Officer will provide the legal portion (front section) of the specification prior to reproduction. The fifteen (15) sets of construction documents are in addition to necessary review submissions. | |
| 5. | Submit a final cost estimate utilizing the BIM software of construction costs for the project, estimating to further clarify changes or modify previous estimates based on projected construction award date. | |
| 6. | The A/E shall provide a final written certification on the drawings form a Certified Industrial Hygienist as to the mitigation of asbestos for the project. | |
| 7. | A/E interior designer shall submit final finish board or 3-ring binder of finish samples labeled with manufacturer’s data and referenced to finish schedule. Coordinate with VA Interior Designer on submission requirements. | |
| 8. | Architect to provide a minimum of 3 renderings of the project from the street showing, the addition and enough of the existing architecture and site to express the design and how that it complements the existing architecture. Renderings shall accurately reflect materials, textures, light and shade, and site context. |
| 8.0 | CONSTRUCTION PERIOD SERVICES | |
| A. | Contract Procurement | |
| 1. | Attend contractor's Pre-Bid site visit and respond with recommendations to any questionable items. If necessary, develop amendments or assist with project procurement. A written response is required. | |
| 2. | Attend two (2) pre-construction meetings, after award of construction contract, and once prior to start of each phase. | |
| B. | Submittal Review | |
| 1. | The A/E firm shall review all construction materials and equipment and change orders proposed by the contractor for use in construction of this project. All submittals and change order proposals will be reviewed for compliance with the specifications and reasonable costs and returned to Engineering Service within five (5) calendar days after receipt. | |
| 2. | Commissioning of the mechanical, electrical, plumbing, fire protection, lighting, and other building systems shall be implemented to verify the intent of the design by inspecting and testing the systems as outlined in the LEED® Reference Guide and per applicable ANSI/ASHRAE Standards. | |
| C. | Site Visits (In addition to site visits listed in Item ‘A’ above) | |
| 1. | The A/E shall visit the site at the request of the Contracting Officer to answer technical questions and/or provide clarification to documents due to errors or omissions at no additional cost to the government. These such meetings will not count against required meetings set fourth below. | |
| 2. | Attend and assist with site inspections at the 25%, 50%, 85%, and final inspection of percent complete for all project phases. | |
| 3. | Spot checking of contractors progress based on six (6) site visits when requested by the VAMC contracting officer. These meetings may also be used to answer technical questions and/or develop minor changes due to site conditions, etc. This is in addition to item C.1 and C.2 above for a total of ten (10) site visits with VA discretion on who/how many/what design trade attends each site visit. | |
| D. | As Built Drawings | |
| 1. | The A/E shall modify design drawings based on marked drawings supplied by the contractor and are to be verified by the A/E in field. As-Builts to include all addendums and Bulletins issued by the VA and the A/E during construction. The changes shall be incorporated into the final BIM Model with the revision documented on the title block as appropriate. These changes shall be bubbled and dated. The A/E is to reformat the drawings based on the VA layering system before final submission. The A/E will receive these required layer standards under a separate cover. A reproducible hardcopy and the electronic model of the “As-Builts” are to be submitted to the COTR on CD-ROM. Any approved shop drawings with major differences from contract drawings, supplemental agreements processed change orders, etc., shall be incorporated. The A/E shall obtain master INDUS drawings and revise/update per VA PG-18-4 VA CAD standards and the VA National CAD Standard Application Guide. |
PRIVACY TRAINING
A. VA Privacy and Information Security Awareness and Rules of Behavior Course (text version) must be completed by all contractors and subcontractor employees assigned to VA accounts prior to delivery of service and annually thereafter as long as the contract is in place.
B. The contractor shall provide to the VA COTR a copy of the completed training certificate(s).
- - - END OF SCOPE - - -