36C24419B0056-005.pdf
PDF 1017 KB Posted
- Solicitation number
- 36C24419B0056
About this file
36C24419B0056 S02 693-CSI-300 GE Site Planning Info Room 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419B0056-0002000.docx | DOCX document | |
| 36C24419B0056-0002000.docx | DOCX document | |
| 36C24419B0056-0001001.pdf | ||
| 36C24419B0056-0001000.docx | DOCX document | |
| 36C24419B0056-0001000.docx | DOCX document | |
| 36C24419B0056-0001001.pdf | ||
| 36C24419B0056-002.pdf | ||
| 36C24419B0056-004.pdf | ||
| 36C24419B0056-006.pdf | ||
| 36C24419B0056-003.pdf | ||
| 36C24419B0056-005.pdf | ||
| 36C24419B0056-007.pdf | ||
| 36C24419B0056-001.docx | DOCX document | |
| 36C24419B0056-006.pdf | ||
| 36C24419B0056-007.pdf | ||
| 36C24419B0056-003.pdf | ||
| 36C24419B0056-004.pdf | ||
| 36C24419B0056-002.pdf | ||
| 36C24419B0056-001.docx | DOCX document | |
| 36C24419B0056-000.docx | DOCX document | |
| 36C24419B0056-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Equipment Details (1) 06 - A4 - Equipment Details (2) 07 - A5 - Delivery 08 - S1 - Structural Notes 09 - S2 - Structural Layout
Wilkes Barre, Pennsylvania
Kirk Lynch
PRECISION 600FP
GSP
GE Healthcare
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /17RF-M076198-FIN-00-A.DWG
610-724-7491
Kirk.lynch@med.ge.com
GSP 5756081-1EN
USA
1/4"=1'-0"
4562814
21/Jun/2019
Wilkes Barre VA Medical Center
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -
Drawn by Verified by PIM Manual
SheetFormat
Concession
Scale DateFile Name
RevS.O. (GON)
A3
REV DATE MODIFICATIONS
A 21/Jun/2019 Final Study based on DC-200300
FINAL STUDY
10 - S3 - Structural Details (1) 11 - S4 - Structural Details (2)
12 - M1 - HVAC
13 - E1 - Electrical Notes 14 - E2 - Electrical Layout 15 - E3 - Electrical Elevations 16 - E4 - Interconnections 17 - E6 - Power Requirements
GENERAL SPECIFICATIONS
· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.
· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.
· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.
· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.
· Dimensions apply to finished surfaces of the room.
· Actual configuration may differ from options presented in some typical views or tables.
· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.
· The equipment layout indicates the placement and interconnection of the indicated equipment components.
There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.
· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.
· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.
CUSTOMER RESPONSIBILITIES
· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.
· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.
RADIO-PROTECTION
· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.
DISCLAIMER
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
DATE NAME SIGNATURE
Customer Name: PMI Name:
GON/SO Number: Field Service Name:
Equipment: Country/City or City/State:
Site Visit Date for SRC: SRC Status:
Site Ready Checks at Installation
General Site Planning
Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.
Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and spacing has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.
Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.
Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.
Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special handling (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.
System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out Tag Out is available.
System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed if needed.
Adequate room illumination installed and working.
Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.
HVAC systems Installed, and the site meets minimum environmental operational system requirements.
Network outlets installed and computer network available and working.
Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)
Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.
Customer supplied countertops where GE equipment will be installed are in place.
Specific for CT & X-ray
Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory approval for installation obtained.
PMI Signature:
Customer Signature:
FS Signatature: optional
GLOBAL SITE READINESS CHECKLIST (DI)
DOC1809666 Rev. 6
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center C2 - Disclaimer - Site Readiness 02-
ENVIRONMENTAL SPECIFICATIONS
MAGNETIC INTERFERENCE
· Digital flat panel must be located in ambient static magnetic fields of less than 1 gauss to guarantee specified imaging performance.
· X-Ray tubes must be located in ambient static magnetic fields of less than 10 gauss to guarantee specified performance.
· System electronics must be located in ambient static magnetic fields of less than 10 gauss to guarantee data integrity.
· Operators console equipment must be located in ambient static magnetic fields of less than 10 gauss to obtain specified geometric linearity.
· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE healthcare installation project manager prior to making changes.
· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE healthcare installation project manager can supply a reference list of rigging contractors.
· New construction requires the following;
1. Secure area for equipment,
2. Power for drills and other test equipment,
3. Capability for image analysis,
4. Restrooms.
· Provide for refuse removal and disposal (e.g. crates, cartons, packing)
· It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the vibration specification.
CUSTOMER SITE READINESS REQUIREMENTS
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center A1 - General Notes 03
The GE HPI Technical Support Group is an additional resource that can provide answers for general GE product siting questions and can be reached at (877)-305-9677 or mail to:HPITechCOE@ge.com
For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center A2 - Equipment Layout 041/4"=1'-0"
BY ITEM DESCRIPTION
MAX
HEAT
OUTPUT
(btu)
WEIGHT
(lbs)
A 1 Aero DR access point (location to be determined by field at install) - 2
A 2 Aero DR controller (ADR) - 37
A 3 Aero DR docking station/battery charger - 15
A 4 Aero DR interface unit (I/F) - 24 A 5 Generator control panel (GCP) - 17
A 6 Live reference monitor (LRM) - 17
A 7 Main processing unit (MPU) - 44
A 8 Partial system UPS (UPS) - 39
A 9 Aero DR generator interface unit (GIB) - 15
A 10 DST-100S Rails - -
A 11 Flouro control cabinet (GCU) - 238
A 12 Generator control cabinet (XRC) 7507 901
A 13 Overhead tube support (OTC) - 895
B 14 Power distribution unit (PDU) - 202
A 15 Precision 600FP table (TBL) 1239 4168
A 16 Monitor suspension - one monitor (MS) - -
A 17 Systems cabinet (RCU-SYS) - 421
A 18 Table cable stand (TCS) - 24
A 19 Table control unit (TCU) - 130
A 20 Vertical wall stand - 414
A 21 TIMMS 2000 on cart (TPC) - 200
A 22 Super noise reduction filter - -
B 23 Main disconnect panel - -
C 24 Minimum opening for equipment delivery is 47.25 in W x 78.75 in H, contingent on a 63
in. corridor width
C 25 Counter top for equipment- provide grommeted openings as required to route cables
C 26 Control wall, to ceiling, with lead glass viewing window
The following shots are NOT available in this layout
72" Shot to chest unit below table top
Exam room height
Finished floor to ceiling height 9'-0"
R/F EXAM
ROOM
CONTROL ROOM
LEGEND
A GE Supplied C Customer/contractor supplied and installed
B GE Supplied/contractor installed D Available from GE E Existing/Reinstall
1'-9"
1' -9
8'-2"
1'-10"
2'-0"0'-10"
2'-6"
0' -1
0"
3' -9
3' -8
9' -6
10'-1"
6' -5
'-1
8' -3
10'-1"2'-4"
0'-5"
23 4
X-RAY DIAGNOSTIC TABLE
[19.7 in]
[23.6 in]
[1
.8 in
[12.8 in]
[19.4 in]49
[1
9.
in
[8 2.
in
[3
1.
in
[3 1.
in
[4
1.
in
[32.8 in]
[27.2 in]
[19.7 in]
[82.7 in]
[3 5.
in
[20 .5 in 9.
in
[20 in]
[13.7 in]
[17.6 in]
[3 3.
in
[30.1 in]
SCALE 1:50
PLAN VIEW FRONT VIEW SIDE VIEW
PLAN VIEW FRONT VIEW SIDE VIEW
NOT TO SCALE
Center of gravity
SYSTEMS CABINET (SYS)
[22.44 in]
[1 5.
in
[22.44 in] 400
[15.75 in]
[11.14 in]
[3 0.
in
[7 4.
in
[7.09 in]
PLAN VIEW FRONT VIEW SIDE VIEW
NOT TO SCALE
Center of gravity
VERTICAL BUCKY STAND (VBS)
[23.5 in]
[3.5 in]
[7 0.
in
[1 3.
in
[2
3.
in
136.8 [5.38 in]
[8 2.
in
PLAN VIEW FRONT VIEW SIDE VIEW
NOT TO SCALE
Center of gravity
TABLE CONTROL UNIT (TCU)
[17.72 in]
[9 .4 in
[17.72 in] 240
[9.45 in]
[9.37 in]
[2 6.
in
] 12
[4 9.
in
[5.55 in]
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center A3 - Equipment Details (1) 05
PLAN VIEW FRONT VIEW SIDE VIEW
NOT TO SCALE
Center of gravity
GENERATOR CONTROL CABINET (XRC)
[43.9 in]
[1 5.
in
[43.9 in]
[15.75 in]
[18.9 in]
[2 3.
in
[7 4.
in
PLAN VIEW FRONT VIEW SIDE VIEW
NOT TO SCALE
Center of gravity
FLUORO CONTROL CABINET (GCU)
[26.38 in]
[1 5.
in
[26.38 in]
[15.75 in]
[13.19 in] 50
[1
9.
in
[5 3.
in
]19
[7 4.
in
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center A4 - Equipment Details (2) 06
THE CUSTOMER/CONTRACTOR SHOULD:
· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.
· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.
· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.
· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.
DELIVERY
Route must satisfy the following requirements:
Width of corridor: 1600mm [63 in] or more Width of opening: 1200mm [47 in] or more
SHIPPING WEIGHTS AND CONTENTS
PACKAGE DESCRIPTION
WEIGHT
kg lbs
DIAGNOSTICS TABLE
GANTRY, BODY, IMAGING DEVICE, BEAM LIMITING DEVICE 1650 3637.6
CONTROL CABINET 60 132.3
SYSTEM CABINET 190 418.9
COVERS, CABLES 160 352.7
HIGH-VOLTAGE GENERATOR
X-RAY HIGH-VOLTAGE GENERATOR CABINET 450 992.1
CONSOLE, CABLES 100 220.5
PULSED FLUOROSCOPY CONTROL UNIT 185 407.9
DONGLE POSITIONING
DONGLE DEFAULT LOCATION AND ADJUSTING RANGE:
· Dongle shall be positioned at the wall of detector insertion direction.
· B is the best position which is in the middle of the wall.
· The height requirement of dongle is 30cm lower than the ceiling.
· Position "A" to "C" (around ±1m) are acceptable locations for dongle.
· There shall be no obstructions in the path between dongle and detector applications.
C
B
A
Pos 2
Pos 1 Pos 3
Pos 4
Detector insertion direction
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center A5 - Delivery 07
STRUCTURAL NOTES
· Methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.
· All units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan for suggested locations.
· Control walls shall be constructed to minimum 2130mm (7'-0") high.
· Dimensions are to finished surfaces of room.
· Customers contractor must provide all penetrations in post tension floors.
· Customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.
· Customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.
· It is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit".
· Different anchor types are used to install the components of the system. Refer to Structural Requirements Section(s) of the Pre-Installation Manual for each anchor requirement.
· Refer to the Structural Requirements Section for the required minimum embedment.
· The ground surface must be flat and leveled, maximum tolerance for leveling is ±1.5 mm per 1 m (0.2 in per 10 feet). A grout pad provided by the contractor is required to meet this specification. The maximum pad thickness is 6.3 mm (0.25 in).
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center S1 - Structural Notes 08
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center S2 - Structural Layout 091/4"=1'-0"
ITEM DESCRIPTION
(GE SUPPLIED / CONTRACTOR INSTALLED)
1 Area occupied by GE supplied table baseplate
2 Area occupied by GE supplied wall stand baseplate
3 Support backing for wall stand, locate as shown
(CONTRACTOR SUPPLIED & INSTALLED)
4 Support backing, locate as shown.
Unistrut or equivalent support in ceiling for fastening cable drape rail with nylon trollies.
Supports to run continuous with no fittings extending below face of unistrut channel, run wall to wall, be parallel, square, and in the same horizontal plane, flush with the finished ceiling.
Rails are mounted to these supports every 2'-2" and require 50 lbs. per bolt load. Methods of support that permit attachment to structural steel or through bolts in the concrete should be favored. Do not use screw anchors in direct tension.
Unistrut or equivalent support in ceiling for fastening ceiling supported equipment. Supports to run continuous with no fitting extending below face of unistrut channel, run wall to wall, be parallel, square, and in the same horizontal plane, flush with the finished ceiling. Locate as dimensioned. Methods of support that permit attachment to structural steel or through bolts in concrete should be favored.
R/F
EXAM
ROOM
CONTROL
ROOM
2'-2"
7' -5
3'
-9
6'-1"
9'-9"
4'-11"
0'-4"
1' -6
2'
-7
4' -4
11 16
4' -9
9 16
0'-8" 1'-3" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-1"
6 6 6 6
TABLE ANCHORING
TABLE STAND
NOT TO SCALE
The floor bearing the system is recommended to be concrete and the thickness to be determined by a Structural Engineer to properly support the equipment loads. The supplied anchors require a minimum implanting depth of 77 mm (3.03 in) into the concrete. If sufficient implantation depth of the anchor into the concrete cannot be obtained, work on the floor using M16 bolts to secure the assembly to the floor.
TABLE CENTER
TILT CENTER
(8) M12 ANCHOR BOLTS IN BASE.
STRUCTURAL ENGINEER OF RECORD
TO SPECIFY ANCHORING HARDWARE.
ALL ANCHORING HARDWARE IS TO
BE SUPPLIED BY
CUSTOMER/CONTRACTOR.
(4) M6 ANCHOR BOLTS IN BASE.
STRUCTURAL ENGINEER OF RECORD
TO SPECIFY ANCHORING HARDWARE.
ALL ANCHORING HARDWARE IS TO
BE SUPPLIED BY
CUSTOMER/CONTRACTOR.
FOOT ENDHEAD END
CABLE STAND
BASE PLATE
[4.1 in]
[6.6 in]
[5 .7 in
[7 .4 in
[.8 in ] 30
[1.2 in]
[2 in]
[7.1 in]
[32.3 in]
[2 in]
[43.3 in]
[11 in]
[28.3 in] in
[7 .1 in
[1 1.
in
[6
.3 in
] 820 [32.3 in]
[11 in]
[5 .9 in
[1 3.
in
[1 in
[2 8.
in
[4 .7 in
[1 9.
in
FLOOR MOUNTING NOTES
All dimensions are mm[in] The table must not be installed on a wooden floor The floor must use concrete with a load strength of at least 1760 N/cm² [2560 PSI] over the entire floor surface The depth of concrete must be at least 130 mm [5.125 in] The levelness slope in the longitudinal direction should be less than 1mm over 1100mm run [0.0625 over 45 in] The levelness slope in the lateral direction should be less than 1mm over 713mm run [0.0625 over 28 in] Evenness of floor under base should be less than 1mm [0.03937 in] Removal force of the anchor bolts should be at least 12kN If epoxy leveling of the floor is required for the floor mounted equipment, it will be the responsibility of the contractor to supply and perform this task with assistance of GE. The epoxy base must have a cure rating of 15,000 PSI minimum
WALLSTAND ANCHORING
254mm [10 in]
3m m [8 in
216mm [8.5 in]
5m m [6
.5 in m m
[.7 in ]19mm
[.75 in]
(4) Ø12.7 [Ø1/2 in] Thru
Scale 1:10
102mm [4.02 in]
51mm [2.01 in] m m [.7 in
WALL BACKING
· Customer/contractor to supply and install wallstand backing plate.
· Wallstand backing attached to a minimum of 3 studs for support and stability of the wall stand.
[8 in
BASEPLATE
Ø8 [Ø5/16 in] Thru
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center S3 - Structural Details (1) 10
TOP OUTSIDE
EDGE OF RAIL
TOP OUTSIDE
EDGE OF RAIL
NOTE:
A. ALL DIMENSIONS ARE
MM [IN]
B. LENGTH SHOWN ON
DETAIL IS OVERALL
SHIPPED LENGTH.
ACTUAL LENGTH MAY
NEED TO BE MODIFIED
PER DIMENSIONS ON
PG 2.
(2) 18" ACCESS PANELS
REQUIRED IF RAILS ARE
INSTALLED ON A HARD
CEILING. A MIN. OF 12"
VERTICAL CLEARANCE ABOVE
PANELS REQUIRED FOR
SERVICING EQUIPMENT.
AREA IN WHICH ANY
CEILING MOUNTED
FIXTURE MUST BE
FLUSH WITH THE
FINISHED CEILING.
AREA MUST REMAIN
FREE OF ANY CEILING
MOUNTED FIXTURES
SUCH AS LIGHTS,
VENTILATION, AND
FIRE SPRINKLERS.
[49.17]
[204.57]
[49.17]
[49.17]
[49.17]
[3 6.
[1 2.
[4 0.
[2 4.
[3.94]
[4 0.
[5 7.
FI
N
AL
L
O
CT
AI
O
N O
F
DR
AP
E
RA
IL
T.
B.
D.
A
T
TI
M E
O F
IN
ST
AL
LA
TI
O
N
OTS SUSPENSION RAILS MOUNTING SPECIFICATIONS
DETAIL 2
NOT TO SCALE
DETAIL 1
NOT TO SCALE
UNISTRUT CHANNEL
LONGITUDINAL RAIL
TRANSVERSE CARRIAGE
DESIGNED, SUPPLIED, &
INSTALLED BY OTHERS.
SUPPLIED & INSTALLED BY GEHC
UNISTRUT CHANNEL
LONGITUDINAL RAIL
153.0[6.02]
99.4 [3.91]
.4
[1 .1
2]
.5 [3
.5 2]
1462[57.56]
(TOP OUTSIDE EDGE OF RAIL)
1338[52.68]
(TOP INSIDE EDGE OF RAIL)
1300[51.18]
(INSIDE BOLT LOCATIONS)
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center S4 - Structural Details (2) 11
HEAT DISSIPATION DETAILS
ROOM DESCRIPTION kW BTU
IN-USE IN-USE
Exam Room Precision 600FP Table 0.36 1239
Generator Control Cabinet 2.22 7507
TOTAL 2.582 8746.000
TEMPERATURE AND HUMIDITY SPECIFICATIONS
OPERATING ENVIORNMENTAL CONDITIONS
AIR RENEWAL
According to local standards.
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.
Ambient Temperature 10°C to 35°C (50°F to 95°F)
Relative Humidity 30% to 85% (No Condensation)
Atmospheric Pressure 700 hPa to 1060 hPa
Illuminance 1000 lx or less
Atmosphere Do not install the system in a location where the operating environmental conditions specified above are not satisfied. Also, do not install the system in a location where it may be exposed to the following:
• Flammable Gases
• Corrosive Gases
• Steam
• Dripping Water
• Excessive Dust
• Salty Air
• Direct Sunlight
• Excessive Shock or Vibration
• Excessive Line Voltage Fluctuation
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center M1 - HVAC 12
CABLE MANAGEMENT
Removable coverplate
DUCT ON THE FLOOR
NOT TO SCALE
Removable coverplate
VERTICAL DUCT ON WALL
ELECTRICAL NOTES
· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.
· Conduit and duct runs shall have sweep radius bends
· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.
· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.
· All ductwork must meet the following requirements:
1.Ductwork shall be metal with dividers and have removable, accessible covers.
2.Ductwork shall be certified/rated for electrical power purposes.
3.Ductwork shall be electrically and mechanically bonded together in an approved manner.
4.PVC as a substitute must be used in accordance with all local and national codes.
· All openings in access flooring are to be cut out and finished off with grommet material by the customers contractor.
· General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.
· 10 foot pigtails at all junction points.
· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.
1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.
1.1. Aluminum or solid wires are not allowed.
2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.
3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.
4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.
5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.
6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.
Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except mr). Do not mount lights directly above areas where ceiling mounted accessories will be parked.
7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).
8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.
9. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.
10. The maximum point to point distances illustrated on this drawing must not be exceeded.
11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with the supervision of a GE representative. The GE representative would be required to identify the physical connection location, and insure proper handling of GE equipment.
12. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.
CONNECTIVITY REQUIREMENTS
Broadband Connections are necessary during the installation process and going forward to ensure full support from the Engineering Teams for the customers system. Maximum performance and availability for the customers system is maintained and closely monitored during the lifetime of the system. Proactive and reactive maintenance is available utilising the wide range of digital tools using the connectivity solutions listed below:
· Site-to-Site VPN/GE Solution
· Site-to-Site VPN/Customer Solution
· Connection through Dedicated Service Network
· Internet Access - connectivity for InSite 2.0
The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate document).
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center E1 - Electrical Notes 13
B C
A
D E
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center E2 - Electrical Layout 141/4"=1'-0"
Conduit Legend
Above Ceiling
Below Floor
ITEM QTY Outlet Legend for GE Equipment
System emergency off (SEO), (recommended height 1.2m [48"] above floor)
X-Ray room warning light control panel
X-Ray ON lamp (L1) - 24V
Door interlock switch (needed only if required by state/local codes) Duplex hospital grade, dedicated wall outlet 120-v, single phase power
Network outlet
Additional Conduit Runs (Contractor Supplied and Installed)
From To Qty Size
In. mm Warning light controller Warning light 1 1
2 13 Warning light controller Generator control cabinet 1 1
2 13 Warning light controller 120-V 1 phase power AS REQ'D AS REQ'D
MDP / PDU Feeder 1 AS REQ'D AS REQ'D
Door interlock switch Generator control cabinet 1 1 2 13
Emergency off Generator control cabinet 1 1 2 13
Emergency off Partial UPS 1 1 2 13
Systems cabinet Partial UPS 1 1 2 13
Aero DR interface unit Aero DR access point 1 3 4 20
Aero DR generator interface unit Aero DR interface unit 1 3
4 20
ELECTRCAL LAYOUT ITEM LIST
1 Power Distribution Unit 2 10" x 3 1/2" Surface floor duct with minimum 2 dividers
3 18" x 3 1/2" Surface wall duct with minimum 2 dividers
4 24" x 6" Surface wall duct with minimum 2 dividers 5 10" x 3 1/2" Flush wall duct with minimum 2 dividers
6 4" x 4" x 4" box attached to duct (TIMS Readiness kit - Field verify location)
7 Flush J-Box for Access Point; size per local code
8 Flush J-Box for Wall Stand; size per local code
9 Box above ceiling; size per local code
10 Box below floor; size per local code
11 One 1 1/2" cnd
12 One 2 1/2" cnd
13 Main Disconnect Panel
Surface wall duct
Surface floor duct
1'-5"
7'-0"
1'-4"
4'-11"
3' -9
2' -0
0'-3"
3'-0"
2'-2"
33 4
B
A C
ED
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center E3 - Electrical Elevations 151/4"=1'-0"
± 0'-0"
+9'-0"
5' -0
2' -0
T.
B.
D.
1' -0
T.
B.
D.
3' -0
T.
B.
D.
1'
-0
1' -6
± 0'-0"
+9'-0"
± 0'-0"
+9'-0"
± 0'-0"
+9'-0"
3/18m 9.8/59ft
INTERCONNECTIONS
CONTROL
EXAM
TPC
TCU
XRC
PDU
MPU
RCU
SYS
TCS
OTC
VBS
GCP
I/F
GCU
TBL
UPS
ADR
GIB
MS
4m 13.1ft
9/14m 29.5/45.9ft
12m 39.4ft
20m 65.6ft
15m 49.2ft
12/22m 39.4/72.2ft
11/21m 36.1/68.9ft
18m 59ft
18m 59ft
4m 13.1ft
18m 59ft
18m 59ft
14m 45.9ft
14m 45.9ft
13/17m 42.6/55.7ft
16m 52.5ft
9/14m 29.5/45.9ft
14m 45.9ft
11/21m 36.1/68.9ft
9.5/14.5m 31.2/47.6ft
1.6m 5.25ft
14.9m 48.9ft 14.3m
47ft
17.5m 57.4ft
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center E4 - Interconnections 16
· Power supply should come into a power distribution box (PDB) containing the protective units and controls.
· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.
· There must be discrimination between supply cable protective material at the beginning of the installation
(main low-voltage transformer side) and the protective devices in the PDB.
SUPPLY CHARACTERISTICS
· Power input must be separated from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...)
· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.
GROUND SYSTEM
· Equipotential : the equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE units are located.
CABLES
· Power and cable installation must comply with the distribution diagram below.
· All cables must be isolated and flexible.
· Cable color codes must comply with standards for electrical installation.
Case PDB furnished by GE : The cables for signals and remote control (Y, SEO, L...) will go to PDB with a pigtail length of 1.5m, and will be connected during installation. Each conductor will be identified and isolated (screw connector).
CABLEWAYS
The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:
· Protecting cables against water (cableways should be waterproof)
· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts)
· Protecting cables against temperature shocks
· Replacing cables (cableways should be large enough for cables to be replaced) metal cableways should be grounded.
POWER REQUIREMENTS
POWER SUPPLY 200/220/380/400/415/440/480V ± 10%, THREE-PHASE + G
FREQUENCIES 50/60Hz ± 1Hz
POWER DEMAND 86kVA
MAXIMUM LINE RESISTANCE 200/220V 0.054 Ω or less
380V 0.10 Ω or less
400V 0.11 Ω or less
415V 0.12 Ω or less
440V 0.14 Ω or less
480V 0.16 Ω or less
POWER DISTRIBUTION
MDP Main Disconnect Panel XRC Generator Control Cabinet SEO Emergency OFF button (Control Room), located 1.50m
(4.9') above floor XRLC Warning Light Control XRL1 Warning Light DLK1 Door Interlock Switch (needed only if required by state/local codes) PDU Power Distribution Unit UPS Uninterruptible Power Supply
UPS
XRLC
DLK1
Main 480 V Three Phase Supply Ground cable (PE)
XRC
Cable SUPPLIED BY
CUSTOMER
Equipment SUPPLIED BY GE
Equipment SUPPLIED BY
CUSTOMER
Cable SUPPLIED BY GE
XRL1
14 Black 14 White 14 Green
14 Black 14 White
14 Black 14 Green 14 White
2 - NO. 14 Black
14 Black 14 White 14 Green
1 phase power
14 White 14 Red
*Black (3) *Green (1)
* Wire sized per the feeder tables in the PIM
*White (1)
PDU
*Black (3) *Green (1)MDP
14 Black 14 White SEO
DateRev /17RF-M076198-FIN-00-A.DWG A 21/Jun/2019PRECISION 600FPWilkes Barre VA Medical Center E6 - Power Requirements 17
| Sheets and Views |
| RF-M076198-FIN-00-A-C1 - Cover Sheet |
| OLE1 |
| RF-M076198-FIN-00-A-C2 - Disclaimer - Site Readiness |
| OLE1 |
| RF-M076198-FIN-00-A-A1 - General Notes |
| OLE1 |
| RF-M076198-FIN-00-A-A2 - Equipment Layout |
| OLE1 |
| RF-M076198-FIN-00-A-A3 - Equipment Details (1) |
| OLE1 |
| RF-M076198-FIN-00-A-A4 - Equipment Details (2) |
| OLE1 |
| RF-M076198-FIN-00-A-A5 - Delivery |
| OLE1 |
| RF-M076198-FIN-00-A-S1 - Structural Notes |
| OLE1 |
| RF-M076198-FIN-00-A-S2 - Structural Layout |
| OLE1 |
| RF-M076198-FIN-00-A-S3 - Structural Details (1) |
| OLE1 |
| RF-M076198-FIN-00-A-S4 - Structural Details (2) |
| OLE1 |
| RF-M076198-FIN-00-A-M1 - HVAC |
| OLE1 |
| RF-M076198-FIN-00-A-E1 - Electrical Notes |
| OLE1 |
| RF-M076198-FIN-00-A-E2 - Electrical Layout |
| OLE1 |
| RF-M076198-FIN-00-A-E3 - Electrical Elevations |
| OLE1 |
| RF-M076198-FIN-00-A-E4 - Interconnections |
| OLE1 |
| RF-M076198-FIN-00-A-E6 - Power Requirements |
| OLE1 |
File details come from the government source that posted it.