- Attached to
- J030--Diesel Generator Service
- Solicitation number
- 36C24227Q0163
About this file
This is a Statement of Work (SOW) for diesel generator service and maintenance at the James J. Peters VA Medical Center in Bronx, New York. The contract requires the contractor to provide comprehensive inspection, testing, maintenance, and repair services for nine diesel generators over a six-month performance period. Services include one annual preventive maintenance visit, one semi-annual preventive maintenance visit, fuel-quality testing and analysis, and emergency repair services as needed. The contractor must supply all labor, supervision, personnel, tools, equipment, materials, and documentation necessary to perform the work. All work must comply with NFPA 70, NFPA 99, NFPA 101, NFPA 110, OSHA requirements, manufacturer recommendations, and applicable VA policies. The five generator models specified include Kohler, Cummins, Generac, and WhisperWatt units. Annual maintenance must occur within 30 days of contract award, and semi-annual maintenance must occur within the final 30 days of the performance period.
The SOW details specific preventive maintenance tasks including oil and filter changes, battery inspection and replacement, fuel system maintenance, coolant analysis, electrical inspections, and diagnostics of the Power Logic Control System (PLC) controlling the 4160-volt generators. The contractor must designate 24/7 emergency points of contact with on-site response times of two hours for life-safety emergencies, eight hours for urgent non-life-safety issues, and routine timeframes for non-critical repairs. Minor repairs costing under $250 in materials and requiring less than two hours of labor are included at no additional cost; all other repairs require written authorization from the Contracting Officer. The contractor must have at least five years of experience with PLC Square D equivalent logic systems and provide written service reports in PDF format within 48 hours of completion. Work must be coordinated with facility personnel to minimize disruption to patient care, and normal work hours are Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24227Q0163.docx | DOCX document |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
TITLE: DIESEL GENERATORS SERVICE CONTRACT
1. GENERAL
The Contractor shall provide all labor, supervision, personnel, tools, equipment, materials, and documentation required to inspect, test, maintain, and repair all nine (9) diesel generators at the James J. Peters VA Medical Center (JJP VAMC).
The Contractor shall have documented experience maintaining emergency and standby power systems and shall perform all work in accordance with NFPA 70, NFPA 99, NFPA 101, NFPA 110, OSHA requirements, manufacturer recommendations, and applicable VA policies and directives.
The Contractor shall provide the following services: (1) one annual preventive maintenance service; (2) one semi-annual preventive maintenance service; (3) fuel-quality testing and analysis; and (4) emergency repair services, as required. Emergency repair services shall be performed in accordance with Section 9.
When performing any work on generators, there must be a back-up generator in place in case normal power is lost during the inspection. The Contractor shall immediately report to the COR any condition that may affect the reliability or readiness of the emergency power system and shall recommend appropriate corrective actions.
2. PERIOD OF PERFORMANCE
The period of performance shall be for one six-month period.
Annual maintenance shall occur with 30 days of contract award and semi-annual maintenance shall occur within the final 30 days of the performance period.
3. LOCATION
James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx, New York 10468
4. STANDARDS
NFPA 110, Standard for Emergency and Standby Power Systems NFPA 70, National Electrical Code (NEC) NFPA 99, Health Care Facilities Code NFPA 101, Life Safety Code OSHA 29 CFR 1910, General Industry Standards OSHA 29 CFR 1910.147, Control of Hazardous Energy (Lockout/Tagout) OSHA 29 CFR 1910 Subpart S, Electrical Safety OSHA 29 CFR 1910.132-138, Personal Protective Equipment (PPE) VHA Directive 1028, Facility Electrical Power Systems
5. GENERATORS
Kohler Power Systems Model No. 500REOZT Serial no. 500REOZT14014319 WhisperWatt Diesel Model No. DCA-70SSIU4F Cummins Model No. NT855GS2 Serial No. 30113950 Cummins Model No. KTA19GS2 Serial No.311321 #1 Generac Model # 11897220100 Serial No. 2108384 #2 Generac Model # 11897220100 Serial No. 2108823 #3 Generac Model # MB600/ 18.1L 600kW Serial No. 00000TBD #4 Generac Model # 11897220100 Serial No. 2108822 #5 Generac Model # 11897220100 Serial No. 2108821 or 2108824
6. MATERIALS, PARTS AND SUPPLIES:
The Contractor shall provide all labor, supervision, personnel, tools, equipment, materials, supplies, and documentation necessary to perform scheduled preventive maintenance, testing, and authorized repairs. The firm-fixed price shall include all labor, parts, materials, supplies, lubricants, and consumables required for scheduled preventive maintenance.
7. PREVENTIVE MAINTENANCE AND INSPECTIONS
a. Annual and semi-annual services shall be applied to every generator specified in the Scope of Work.
b. Preventive (Scheduled) Maintenance:
i. The Contractor shall obtain all parts, materials, and supplies necessary to perform scheduled maintenance, also known as preventive maintenance (PM), and the Contractor shall be responsible for the cost of all manufacturer/industry standard PM replacement parts/materials/lubricants. The contractor shall ensure that the level of PM (tasks, frequency, etc.) is adequate to preserve the manufacturer’s warranty on the systems/equipment, and that contractor personnel and subcontractors that are used to perform PM during the warranty period are qualified by the systems/equipment manufacturer where necessary to preserve the warranty on the systems/equipment. The contractor will also ensure that all PM complies with applicable codes and standards specifically NFPA 110 and NFPA 70. The contractor shall provide written information to the COR and CO outlining manufacturer PM tasks to be incorporated into each RPIE item’s PM schedule.
ii. The contractor shall furnish all material, labor, supervision, tools and equipment necessary to provide a full PM program, including all inspections, adjustments, tests, troubleshooting, parts replacement and repairs necessary to keep the equipment in continuous use at their initial performance ability as originally specified by the equipment manufacturer, and as modified thereafter. All adjustments, repairs and modifications must be in strict compliance with regulatory agencies. Services shall be completed by component mechanics with documented qualifications, which should include training and experience on the specific type of equipment. All work performed shall be journeyman level in accordance with good commercial practice in the medical care industry.
iii. The contractor shall maintain a PM service record for each piece of equipment in a conspicuous place. This service record shall list each piece of equipment, showing schedule of manufacturer's recommended frequency of inspection of each component. Entries shall be made to indicate the status of schedule items of maintenance work performed. The PM service record should be always kept up to date and must be initialed and dated by the contractor's employee to indicate that the work has been accomplished. The service record shall be available anytime for review at the COR's request.
iv. The contractor shall be responsible for the installation of signs and/or barricades related to equipment and/or systems as deemed necessary by the COR. This includes the use of "out of service" signs.
v. The contractor shall contact the COR or his/her designee when first arriving at the facility. The COR shall accomplish first response to reports of inoperative equipment when contacted.
c. PM Schedules and Manuals:
i. Annual maintenance shall occur with 30 days of contract award and semi-annual maintenance shall occur within the final 30 days of the performance period.
ii. The contractor shall review the manufacturer’s requirements for scheduled maintenance for the systems/equipment and provide a PM program to the COR within 45 days of contract award for review and approval.
iii. All tests or inspections that will remove the equipment from normal operation shall be scheduled a minimum of forty-eight (48) hours in advance with the COR.
iv. The contractor shall be responsible for establishing an effective system for accomplishing maintenance, including a backlog listing of work to be accomplished. The scheduling system and backlog listing shall be available for inspection by the COR at any time.
v. The Contractor shall provide the PM schedule to the COR and keep this schedule updated with any equipment changes as they occur. PM Schedule shall be in accordance with manufacturer’s recommendation, Joint Commission requirements, and other applicable industry standards.
vi. *NOTE: It will be the responsibility of the contractor to assign additional personnel as required to complete inspections, repairs, and adjustments on time within the specified time limits.
vii. The contractor shall provide Operations and Maintenance (O&M) Manuals for any new equipment they install.
d. Semi-Annual PM Service
i. For each generator identified in the SOW, the Contractor shall follow the manufacturer’s model-specific operation and maintenance manual and checklist and submit a report documenting all maintenance tasks completed and inspections performed on each unit.
ii. The contractor shall check generator oil levels. The oil in each generator shall be flushed and replaced only once during the life of this contract, preferably during annual PM unless conditions dictate otherwise.
iii. All generators shall be cleaned of all dirt and dust. All ventilation needs to be vacuumed and cleaned.
iv. All generator batteries need to be inspected per manufacturer specs. When needed, contractor shall replace batteries with the same type battery rating Ah, model, etc. All battery replacements shall be handled in accordance with the procedure outlined in Section 8.
v. All terminals on the generator batteries shall be cleaned and a protective coating shall be applied if necessary.
vi. Check battery post, cables, charger for loose connections, corrosion and proper operation. Correct as necessary.
vii. All generator filters (oil, air, fuel, etc) shall be changed once during the life of this contract. If additional replacements are required, notify the COR.
viii. Parts shall be lubricated as necessary.
ix. Piping shall be inspected for completeness and joints shall be inspected for tightness.
x. Contractor shall check all fuel lines’ associated valves.
xi. Contractor shall prime all lines once during the life of this contract.
xii. Contractor shall maintain any injectors as necessary per manufacturer recommendations.
xiii. Contractor shall check all fuel supply levels.
xiv. All water and sediment shall be drained from diesel fuel lines if equipped.
xv. All air inlets and outlets shall be checked and cleaned of debris.
xvi. Contractor shall inspect all conductors for damage, corrosion and proper connection and correct as necessary.
xvii. Contractor shall check engine drive belts for wear, cracking, etc.
xviii. Units shall be visually inspected for leaks, wear, damage, etc.
xix. Contractor shall start and exercise unit full rated as per manufacturer recommendations looking for leaks, loose connections or components, abnormal operating conditions, error codes.
xx. Contractor shall initiate automatic start and transfer load of unit. Observe for abnormal operation. Perform this work as per manufacturer’s recommendations.
xxi. Contractor shall verify generator, engine and base frame are suitably grounded.
xxii. Contractor shall check all coolant levels and replace coolant as necessary based on manufacturer’s recommendations/ total hourly operation.
xxiii. All diagnostics shall be checked for error codes and safety devices shall be tested (alarms, shutdowns, etc.).
xxiv. Any replacement parts shall be approved by inhouse electrical foreman and/or maintenance controller before proceeding.
xxv. All work shall be performed by authorized generator service company with the capability to communicate and make parameter changes to the Power Logic Control System (PLC).
xxvi. All work performed on the Emergency Generator equipment and accessories shall comply with the requirements of the latest edition of the National Electric Code (NEC), NFPA, and the original equipment manufacturer (OEM). The (OEM) and NEC requirements as well as the list below shall be used as a guide to establish that equipment is operating safely.
xxvii. All work to be coordinated with Electrical Foreman and/or Maintenance Controller which include but not limited to the following:
· Analyze Coolant for Proper Antifreeze Percent %
· Analyze Conditioner SCA Level/Add Additional SCA as Needed (Max 2 Quarts)
· Re-Torque Hose Clamps
· Test Day Tank Alarms
· Clean Primary Fuel Filter (if screen type)
· Check and Record Battery Cells Electrolyte Specific Gravity
· Inspect Turbocharger for Seal Leakage and Excessive End Play Clearance (if accessible)
· Check for and Tighten Loose Terminals on the Generator Set and Generator Control Panel
· Check Tightness of Relays in the Generator Control Panel
· Test Safeties and Pre-alarms on Control and Annunciator Panels
· Take Oil Sample (after operational checks)
· Inspect Air Cleaner Seal for Pliability and Sealing
· Clean or Replace Inlet Filters (During Annual PM Only) for Day Tank
· Inspect for Excessive Dirt Accumulation in the Control Panel and Clean as Needed
· Check Rotor Air Gap for Correct Clearances.
· Inspect Rotor and Stator for Damage and Excessive Oil and/or Dirt Build Up
· Inspect Coupling and Guards for Loose or Missing Parts
· Check Tightness of Generator Leads and Voltage Regulator Control Wiring
· Strap and Tape any Wiring or Generator Leads that Have Rubbing or Worn Insulation
· Inspect Brushes and Slip Rings or Rotating Rectifiers
· Clean and Adjust Voltage Droop Potentiometer
· Clean Crankcase Breather, Inspect Hose and Connections
· Check and Record Battery Voltage Dip Level During Overcrank Test for Minimum Voltage Required to Maintain Controls During Starting
· Record Field Voltage During Generator No-Load Run for Base Line
· Check and update all program logic systems associated to all generator systems.
xxviii. Reports: In addition to the COR, a complete report shall be sent to the Maintenance Controller/Foreman and the Electrical Foreman, after each inspection giving detailed conditions of equipment, repairs, all maintenance items on maintenance schedule checked and performed and any recommendations or repairs needed.
e. Annual PM Service The contractor shall perform all semi-annual PM services and the following:
i. Change engine oil using superior grade oil
ii. Change engine oil filters
iii. Change primary and secondary fuel filters
iv. Lubricate fan drive with bearing lubricant
v. Lubricate governor linkage with bearing lubricant
vi. Lubricate generator bearing with bearing lubricant
f. Fuel-Oil Testing
i. The Contractor shall perform fuel-quality testing once during the life of this contract using appropriate ASTM test methods and provide a written laboratory report for each fuel-storage tank. Testing shall evaluate, at a minimum:
· Water content by Karl Fischer
· Microbial growth
· Flash point
· Sulfur content
· Distillation at 50 and 90 percent
· Visual appearance
· Water and sediment
· Copper-strip corrosion
· Cetane index
· API gravity by hydrometer
ii. Testing shall comply with the applicable edition of NFPA 110, ASTM D975, manufacturer recommendations, and requirements of the Authority Having Jurisdiction. The Contractor shall immediately report unacceptable results to the COR and provide recommended corrective actions.
8. REPAIR SERVICES
a. Minor repairs (Included – No Additional Cost) Minor repairs are work that can be completed during a scheduled maintenance visit without interrupting patient care, procuring special order parts, or requiring a contract modification. To qualify as a minor repair, all three of the following conditions must be met:
i. The cost of parts does not exceed $250.00 in materials per occurrence (inclusive of all components replaced during a single visit or task);
ii. Labor time does not exceed two (2) hours beyond the scheduled maintenance time; and
iii. Work falls within one or more of the following categories:
· Replacement of belts, filters, hoses, or batteries.
· Fluid top-offs If any of these three conditions above cannot be met, the work shall not be performed as a minor repair. The contractor shall instead document the conditions and follow the notification and authorization procedures in Paragraph 8.b.
b. Repairs requiring authorization For non-emergency repairs not covered by the sections above, the Contractor shall submit a detailed cost estimate that itemizes parts and labor hours to the CO/COR within 72 hours of finding the issue. Contractor shall not proceed with such work, without the written consent of the CO, usually in the form of a contract modification.
c. All work will be conducted in a manner that will provide minimal disruption.
d. All replacement parts shall be new Original Equipment Manufacturer (OEM) parts. OEM-approved equivalent parts may be used only when approved in writing by the COR.
e. The Contractor shall ensure that service personnel have the training, experience, and qualifications necessary to maintain and repair the specific generators and associated equipment covered under the contract.
f. Repair Labor Rates Labor rates for repairs shall be in accordance with labor rates established in the contract’s CLIN structure. Overtime or holiday rates shall apply when the circumstances requiring after-hours work are beyond the contractor’s control and the CO had provided prior written authorization for the overtime or holiday rate. The contractor is not entitled to overtime or holiday rates without prior written CO authorization.
g. Davis Bacon Act Applicability The applicability of the Davis-Bacon Act (DBA) to any individual repair shall be determined by the CO at the time of repair authorization. As a general threshold, repairs that exceed $2,000.00 and require 32 hours or more of on-site labor are likely to be subject to DBA wage determinations and applicable construction clauses, which will be identified in the contract modification authorizing the work.
h. The Contractor shall not make any repairs, alterations or additions to the equipment that incur additional expenses without prior written approval from the CO.
9. EMERGENCY SERVICES AND REPAIR
a. The Contractor shall designate a primary and alternate emergency point of contact and provide current contact information to the COR within two business day of contract award. These POCs should be qualified technical personnel with access to manufacturer technical support resources and shall be reachable 24 hours a day, 7 days a week. Any change to emergency contact information shall be reported to the COR in writing within 24 hours of the change.
b. Response time:
If a problem cannot be resolved remotely, the Contractor shall arrive on site within required on-site response time. Response times are measured from the time the Contractor receives notification from the VA (COR, designated VA staff, or VA switchboard) to the time a qualified technician arrives on-site at the JJP VAMC, ready to perform work. Response times are not measured from contractor departure.
| Emergency Classification |
| Definition |
| Required On-Site Response Time |
| Life-Safety Emergency |
| Any failure or degradation of the emergency power system that presents an immediate risk to patient safety, including but not limited to: failure of the generator to start or assume load upon loss of utility power; loss of emergency power to life-safety loads (emergency lighting, fire alarm, egress); fuel leak, fire, or smoke at the generator set; or loss of emergency power to ICU, operating room, or other critical care areas. |
| Within 2 hours of notification |
| Urgent (Non-Life-Safety) |
| System fault or component failure that does not present an immediate patient safety risk but requires prompt attention to prevent escalation, including: battery charger or starting battery failure where the generator can still start; fuel day tank or fuel transfer pump malfunction; controller or annunciator malfunction that does not affect automatic operation; or a failed cycle or test that prevents required testing. |
| Within 8 hours |
| Routine Repairs |
| Non-critical issues that require unscheduled service but do not affect system performance or patient safety, including: minor fuel or coolant seepage without fire or environmental hazard; minor exhaust leaks; non-functioning cooling louvers or fan in a stable condition; or intermittent non-critical alarms that clear on their own. |
| See Section 8 |
c. If the equipment cannot be repaired during the initial visit, the Contractor shall submit a written emergency repair proposal that itemizes parts and labor hours within 24 hours of the site assessment. Repairs outside the preventive maintenance or minor repair scope shall not begin without written authorization from the Contracting Officer (CO), following technical review by the COR.
i. In life-safety emergencies where immediate action is required to protect patient welfare and there is insufficient time to obtain prior written authorization, the Contractor is authorized to take stabilizing actions only (actions necessary to prevent immediate patient harm or system failure) and shall notify the COR by phone immediately. A follow-up written authorization from the CO shall be obtained before any further repair work proceeds. The Contractor assumes financial risk for any stabilization labor performed without subsequent CO authorization.
10. REPORTS AND DOCUMENTATION
a. Written service reports including annual testing and fuel-analysis shall be delivered to the COR by email in PDF format within 48 hours after completion of the service or testing.
b. Each service report or completed work order shall include, as applicable:
· Maintenance, repair, or battery replacement services, performed.
· Annual inspection services and reporting
· Annual fuel analysis and reporting
· Semi-annual inspection services and reporting
· Repair services and reporting (as required)
· Battery inspection and replacement services and reporting, as required by test results and manufacturer recommendations
· All program, diagnostic repairs to all associated logic systems
11. SCHEDULE
a. To the maximum extent practicable, the Contractor shall perform work during normal business hours.
b. Normal business hours are defined as Monday through Friday, 8:00 a.m. to 4:30 p.m. excluding federal holidays and any other day specifically declared by the President of the United States.
c. Other hours are considered non-business hours.
d. Federal holidays and national holidays observed by the VA medical center include New Years Day, Martin Luther King Jr Day, Presidents Day, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.
e. All work must be coordinated around the standard operations of the medical center to minimize impact to patient care.
f. Emergency services are exempted from the M–F 8AM–4:30PM work hours restriction.
12. PERFORMANCE REQUIREMENTS
a. The existing 4160-volt generators and associated power distribution network is controlled by a single Power Logic Control System (PLC) located in the 4160 V network room. This PLC controls the generator operation as well as automatic switching of the 4160 V circuit breakers. It also controls load shedding of the 480 V circuit breakers in the network switchgear. It is the "brains" of the entire medium voltage power distribution network; vital to its proper operation and it is potentially a critical single point of failure that could cripple the ability to provide Emergency power to the hospital. Contractors must have 5 years or more experience with programming and maintaining PLC Square D equivalent Logic Systems.
b. The services provided shall meet or exceed minimum requirements set forth by Occupational Safety and Health Administration (OSHA), NFPA 110 (levels 1 and 2), The Joint Commission (TJC), manufacturer recommendations, and as outlined in the SOW. As mandated by the TJC, electric power is identified as a mission-critical resource. Facilities must have fully operational and functional emergency generators in the event of a utility failure or catastrophic events.
c. Highly functional and efficient data and voice communications are critical for successfully performing the contract requirements. The Contractor must be capable of sending and receiving e-mails and faxes, communicate with the Project Manager, communicate with field maintenance staff to determine locations and relay service-related messages, and send/receive electronic data files.
13. PERMITS AND RESPONSIBILITIES
The Contractor shall, without additional expense to the Government be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and Municipal laws, codes, and regulations in connection with the prosecution of the work. The Contractor shall be similarly responsible for all damages to persons or property. The Contractor shall take proper safety precautions to protect the worksite, the workers, the public and the property of others. Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work.
14. QUALITY ASSURANCE PLAN
a. The ability to successfully provide the number and types of services required over an extended period of time requires a good Quality Assurance Plan. The required preventive maintenance services shall be delivered within the normal working hours (8A-4:30P), while meeting the quality standards required. Emergency calls and associated repairs can be at any time of the day as required to restore the generators to proper function. The Contractor shall identify the methods and procedures to be used to ensure that the quality standards are met for maintaining the generators. The Contractor shall identify the key staff members who will carry out the requirements.
b. The Contractor shall provide a highly qualified project manager with strong support from corporate management as this shall be essential to successfully performing these requirements over an extended period of time. The assigned project manager shall identify the organizational structure proposed to direct these operations. The plan shall identify the manager designated to meet with the Contracting Officer, at the Government’s convenience, for scheduled and impromptu meetings to discuss contractual issues if necessary.
15. ADMINISTRATION
a. Facility Orientation: An initial orientation of the facilities will be conducted by the COR at the start of the contract. The contractor shall be responsible for conducting orientation for new employees thereafter.
b. Accident Reporting: In the event an accident occurs on the Department of Veterans Affairs property or involving Government personnel or property, the Contractor shall contact the VA Police immediately. A report shall be provided to the Contracting Officer and COR in writing that shall include the following: (1) the time and date of occurrence; (2) the place of occurrence; (3) a list of personnel directly involved; (4) a narrative or description of the accident to include chronological order of the accident and circumstances; and (5) corrective action to prevent future occurrences.
c. Security Requirements: Upon entering JJP-VA Medical Center the contractor and/or contractor employees will be required to show proof of identity (must have a valid photo ID) as well as pass through a security screening. All Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards, and VA policies as VA personnel, including the Privacy Act, 5 U.S.C. Vendors should always be escorted in the VA office buildings. The contractor will be accompanied by designated government personnel and shall sign in upon arrival.
File details come from the government source that posted it. Updated .