This is a Presolicitation Notice for fire and smoke door replacement at the Northport VA Medical Center. The Department of Veterans Affairs Network Contracting Office is seeking qualified contractors for the removal and replacement of door 200-3-1 and associated frames at Building 200, Unit 31, located at 79 Middleville Road, Northport, NY 11768. The procurement is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBC) under NAICS code 236220 with a small business standard of $45 million. The anticipated solicitation will be posted on or about November 19, 2026, with a response deadline of December 8, 2026 at 10:00 AM Eastern Time. The magnitude of construction is estimated between $20 million and $50 million, and a 20% bid bond is required with proposals. Solicitation materials will be available on SAM.gov in electronic format only.
The scope of work includes removal and replacement of fire-rated doors and frames, reconstruction of masonry or sheetrock walls, painting with Benjamin Moore products, installation of fire-rated hardware per specifications, and compliance with NFPA 80 standards and VA requirements. The contractor must complete all work within 180 calendar days from the Notice to Proceed, with work to begin no later than 10 days after award. Work shall be performed Monday through Friday between 7:00 AM and 3:30 PM EST, excluding federal holidays, with after-hours work estimated from Friday 5:00 PM through Monday 8:00 AM. All contractor personnel must comply with VA infection control, fire department penetration requirements, hot work permits, safety precautions, and privacy training. The contractor shall maintain certified payroll and daily logs, provide weekly project meetings, and furnish a one-year warranty on installed components. The Point of Contact is Contract Specialist Julius Blue at julius.blue@va.gov, with Les Griffith (lester.griffith@va.gov) serving as the project POC.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presolicitation Notice Presolicitation Notice
| SUBJECT* |
| Smoke Barrier Door Replacement B200 Unit 31 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 10548 |
| SOLICITATION NUMBER* |
| 36C24227B0012 |
| RESPONSE DATE/TIME/ZONE |
| 12-08-2026 10AM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| Z1DA |
| NAICS CODE* |
| 236220 |
| PLACE OF PERFORMANCE |
| NORTHPORT VA MEDICAL CENTER |
Building 200, Unit 31 Main Entrance
79 Middleville Road
NORTHPORT N.Y.
| POSTAL CODE |
| 11768 |
COUNTRY
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 2 James J. Peters VA Medical Center 2094 Albany Post Rd.
Bronx NY 10468-3904
POINT OF CONTACT*
Contract Specialist Julius Blue julius.blue@va.gov
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| julius.blue@va.gov |
| EMAIL DESCRIPTION |
| Department of Veterans Affairs |
DESCRIPTION
Pre-Solicitation Notice 36C242-28-AP-0057 FIRE SMOKE DOOR REPLACEMENT ****THIS NOT A SOLICITATION**** THIS PRE-SOLICITATION NOTICE IS TO INFORM YOU THAT THE NORTHPORT VA MEDICAL CENTER, LOCATED AT 79 MIDDLEVILE ROAD NORTPORT, NY 11768, WILL BE POSTING A SOLICITATION ON OR ABOUT NOVEMBER 19, 2026, FOR THE FIRE SMOKE DOOR REPLACEMENT. The Northport VA Medical Center (VAMC) will be soliciting for the FIRE SMOKE DOOR REPLACEMENT. This procurement is 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220. The small business standard is $45 Million. The magnitude of construction is between $20,000,000 and $50,000,000. A 20% Bid Bond must be submitted with the proposal. Information regarding the scheduled site visit will be stated in the Solicitation. Solicitation materials consisting of the Information for Proposal Details, Specifications, Drawings and Contract Forms will be available on https://beta.sam.gov in electronic format only. The POC for this project will be Les Griffith and can be reach lester.griffith@va.gov
SCOPE OF WORK
NORTHPORT VA MEDICAL CENTER
FIRE AND SMOKE DOOR REPLACEMENT
BUILDING 200, Unit 31 MAIN ENTERANCE
General Information
Contractor shall supply all labor, tools, materials, supplies, and supervision to perform all work to renovate door 200-3-1 in this project as stated in Exhibit B (Master Door List) Door 200-3-1 at the Department of Veterans Affairs Medical Center, 79 Middleville Road, N.Y. 11768 All meetings, inspections or work schedules must be coordinated and pre-approved prior to commencing by COR Ron Bass. All work shall be performed in a safe and reliable manner. The contractor shall examine all work required and specified to determine the full scope of work prior to any estimate given to the COR.
Scope
The contractor shall remove and replace all frames and doors at the entrance to Unit 31. Work shall include the reconstruction of the masonry or sheetrock walls that the doors are enclosed in, tape, spackling, two (2) coats of Benjamin Moore Primer and one (1) coat of Benjamin Moore Super Hide Eggshell Paint. Paint on doors and frames shall be Benjamin Moore Alkyd semi-gloss. All paint colors on doors and walls shall remain the same (match existing), all door hardware (i.e., cylindrical hardware, door closers, panic hardware) shall be as per Exhibit B. All frames shall be H/M welded, and fire rated, all doors shall be H/M B-Labeled fire rated and be bored for 93K Best locking system or Van Duprin panic hardware with 4-1/2” x 4-1/2” (inch) ball bearing hinges. All doors shall have 5”x 20” (inch) view panels (safety glass), doors shall have installed LCN 1461 door closers. Door magnet “articulated” plates shall be removed and replaced on new door. All doors / Frames must comply to FNPA 80 including the installation and compliance shall be verified by the COR.
See Exhibit A for VA Specifications, Exhibit B for Master Door List, Exhibit C for floor plans and Exabit D for door measurements. Contractor to use Exhibits A, B, C, and D for bidding purposes and add 5% for unknown field conditions. Contractor is to estimate labor for after hours: Friday beginning 5:00PM to Monday 8:00 AM. Contractor to verify all field dimensions prior to ordering materials and commencing work.
The proposal shall be in writing, original and one (1) copy, an itemized breakdown (i.e., number of hours, trades, task, unknown field conditions, and materials) and each of the trades/ areas listed as separate line items.
Compliance Contractor shall comply with all Infection Control requirements.
Contractor shall comply with all VAFD (VA Fire Department) penetration requirements including obtaining permits as required through fire rated assemblies (including floor slabs).
The contractor shall comply with all Hot Work permits.
Hot work permit is defined as operations including, but not limited to, cutting, welding, thermal welding, brazing, soldering, grinding, thermal spraying, thawing pipes or any similar situation. If such work is required, the contractor must notify the VA. and the VAFD no less than one (1) day in advance of such work. The VAFD will inspect the work area and issue a HOT WORK PERMIT, authorizing the performance of such work.
Contractor to comply with all VA requirements for work in healthcare facilities in the proximity of patient care areas.
Contractor shall perform work in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of the structure.
All flammable liquids will be kept in approved safety containers. Only the amount necessary for immediate work shall be allowed in the building. Flammable liquids must be removed from the building at the end of the day. Contractor shall supply the VA all MSDS sheets for any chemicals dry or liquid.
All tools, materials and personal property shall be always secured. The job site shall be cleaned daily, and all debris shall be removed, the Government shall inspect the job site without notice. The contractor shall be responsible for safety precautions, including warning signs and barricades during renovation and or having adequate personal on hand to insure a safe working environment.
Contractor to comply with NFPA 80 and VA specifications See Exhibit A.
Contractor to provide all close out documentation no later than 30 days prior to completion of project.
Upon acceptance of closeout documentation by the VA contractor can apply for final payments.
Inspection, Safety and Security
The COR will perform required inspections in the presence of the contractor personnel, prior to the contractor personnel leaving the facility. No invoices will be processed for payment prior to the completion of COR inspection.
Request for interruption of any services may be approved by the COR, however contractors shall first make a request in writing (email, letter, etc.) requesting any interruption of any service two weeks in advance. All work to take place on nights and weekends. There shall be no live electrical work at any time.
Contractors shall be responsible to plan and coordinate all work with the COR who will coordinate and provide access. Contractors are responsible for safety, record keeping, security monitoring, and inspection of area. Maintain Certified Payroll and Daily Logs.
Contractors shall provide the COR with a list of contractor staff participating in the work and shall submit in writing an ID request with company name, address, telephone number, name of each individual contractor employee and position title, SS# (by fax), home address, copy of OSHA 10 hour; see VA Specification section 01 00 00 General Requirements for a complete list of required documents.
The contractors shall designate a competent person refer to specification 01 35 26, Safety Requirements for Training documentation. All contractor personnel and its sub-contractors must ware face masks all the time while on VA property.
Performance Period:
All Submittals must be approved by VA prior to beginning work. Work will begin after issuance of Notice to Proceed. The contractor is to begin work no later than 10 days of NTP. Contractor has 15 calendar days after NTP to submit for approval all products to be used during the project to the COR. The total project duration from NTP will be 180 days.
DELIVERY
Contractor must deliver components of the system as stated in this solicitation within 15 days of award notice to Northport VAMC, 79 Middleville Rd, Northport, NY 11768 and notify COR.
If contractor desires to use a Conex box for material storage on site, the location of Conex box will be coordinated with COR.
Upon receipt, the Government will inspect items for condition and acknowledge condition within 1 week of receipt.
Standard FOB Destination is required.
PLACE OF PERFORMANCE
Department of Veterans Affairs VA Medical Center Northport NY 79 Middleville Rd., Northport, NY 11768 Buildings 200 Unit 31
Contractors shall be responsible to plan and coordinate all work with the COR who will coordinate and provide access. Weekly project meetings will be setup for the duration of the project with the contractor and the COR. Contractors are responsible for safety, record keeping, security monitoring, and inspection of area. Maintain Certified Payroll and Daily Logs.
The contractor shall verify all field measurements and quantities prior to within 15 days of NTP.
All work shall be performed following all DVA, FEDERAL ADA, NFPA, NEW YORK, local municipal codes, and requirements. All work shall be performed as described herein and as specified in the body of the contract documents.
HOURS OF OPERATIONS
Contractor shall perform work Monday through Friday between the hours of 7:00 AM - 3:30 PM EST, excluding Federal holidays, and any other day specifically declared by the President of the United States. For working outside the hours as defined in this contract, the vendor shall give 14-day notice to the Contracting Officer Representative (COR) so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. All work to be coordinated around an operational medical center to minimize impact to patient care.
Federal Holidays and National Holidays observed by the VA Hospital are:
| New Years’ Day | Labor Day | |
| Martin Luther King Day | Columbus Day | |
| President’s Day | Veteran’s Day | |
| Memorial Day | Thanksgiving Day | |
| Independence Day | Christmas Day |
Juneteenth
NOTICE TO PROCEED
Contractor shall begin work promptly after the date of award. Work is to be completed no later than 180 days from the date of award. The Contracting Officer Representative must be notified within 24 hours of any identified event that will delay the work.
WARRANTY
The contractor shall provide a warranty on the integrity of parts and equipment installed supporting the Medical Gas Delivery and Vacuum System of NPVAMC. The warranty period shall be for one (1) year after completion of work.
SAFETY PRECAUTIONS
a. The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. The contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthy working conditions for its employees.
b. The contractor shall assume the responsibility to guard against the cause of fires and/or explosions and to protect Government Property.
c. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants.
d. No flammable liquids shall be stored or used in the medical center.
e. The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction, upon completion of project permits will be returned to COR for filing as appropriate.
f. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.
Information Security/Privacy/ Records Management
a. This contract does not involve access to VA patient/employee information and does not involve access and/or connection to the VA information system.
b. VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information.
c. The Department of Veterans Affairs and VAMC must comply with all applicable privacy and confidentiality statutes and regulations. One of the requirements in VA is to have all personnel trained annually on privacy requirements. “Privacy” represents what must be protected by VA in the collection, use, and disclosure of personal information whether the medium is electronic, paper or verbal.
d. This document (20939 training) satisfies the “basic” privacy training requirement for a contractor, volunteer, or other personnel only if the individual does not use VA sensitive information or protected health information (PHI) in any form such as electronic or paper or have access to any VA computer system.
e. The Contracting Officer Representative (COR/ COTR/ Project Manager) is responsible for obtaining this training from the contractor and to maintain according to the Records Control Schedule (RCS 10-1).