36C24227B0009 Fire Alarm Replacement.pdf

PDF 718 KB Posted

Attached to
Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC
Solicitation number
36C24227B0009_1
Issued by

About this file

Fire Alarm System Replacement – Sealed Bid Solicitation

This is a sealed bid Invitation for Bids (IFB) issued by the Department of Veterans Affairs for fire alarm system replacement and upgrade work at the VA Hudson Valley Health Care System's Montrose Campus in New York. Solicitation number 36C24227B0009 is set aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, with a construction magnitude between $2,000,000 and $5,000,000. Bidders must be registered in SAM as verified/certified SDVOSB entities and submit the annual Vets4212 Report. The NAICS code is 561621 (Business and Professional Services) with a $25 million size standard. Sealed bids are due December 22, 2026, at 10:00 AM EST via email to Daniel Barone at Daniel.barone@va.gov, with bid opening conducted online via Microsoft Teams. Bidders must provide a bid bond, acknowledgement of all amendments, completed FAR 52.225-2 Buy American Certificate, FAR 52.219-14 Limitation of Subcontracting Certificate, and proof of VETS 4212 compliance. The contract requires performance within 550 calendar days from Notice to Proceed, with work hours typically 8:00 AM to 4:30 PM Eastern Time. A mandatory pre-bid site visit is scheduled for November 24, 2026, at 10:00 AM EST at Building 16, Engineering Conference Room.

The scope requires installation of a complete, fully intelligent addressable fire alarm system utilizing latest NOTIFIER model equipment by Honeywell, compatible with existing systems at the medical center. The contractor must provide all materials, labor, supervision, and programming; coordinate work scheduling to minimize shutdowns; replace fire alarm circuit breakers with red lockable types; install new fire alarm control panels in designated buildings; interface with fire barrier doors, elevators, HVAC systems, and sprinkler systems; and provide a detailed installation schedule. The work must comply with NFPA 72, all applicable federal/state/local codes, and VA specifications. Shop drawings stamped by a New York professional engineer require approval before work begins. The contractor must provide a 5-year Testing, Maintenance and Repair agreement (Guaranteed Period Services) commencing after the 1-year installation warranty period, with repair service available within 24 hours and all work performed by NICET Level 2+ certified technicians. Three alternate bids allow deductions for excluding the New CLC Building, the New CLC Building and Building 7B, or installing the FACP in an alternative location in Building 24. Bids must remain valid for 120 calendar days after the due date, and the successful bidder must present evidence of general liability insurance without asbestos exclusions prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 62

36C24227B0009 X 11-18-2026

620-27-1-2543-0001 620-22-110

36C242

Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose NY 10548-1454

Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose NY 10548

Barone, Daniel daniel.barone@va.gov

The Contractor shall furnish all materials, supplies, equipment, personnel and supervision for Project # 620-22-110 Fire Alarm Replacement - Campus Wide in accordance with the drawings and specifications at the VA Hudson Valley Health Care System, Montrose Campus.

Completion Time: 550 Calendar Days from Notice to Proceed.

This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside procurement.

In order to be eligible for award, Contractor must be registered in SAM (www.sam.gov) with a Unique Entity Identifier and verified/certified as a SDVOSB in the Small Business Searchhttps://search.certifications.sba.gov/ at the time of bid offer submission and before award of this procurement. Offerors must submit their annual Vets4212 Report.

The North American Industry Classification System Code (NAICS) is 561621 - Business size is $25 million.

Magnitude of Construction: Between $2,000,000.00 and $5,000,000.00.

Contractor will be responsible to coordinate and schedule work and shall be expected to plan work typically during duty hours of 8am to 4:30pm eastern time except as noted in the general conditions and as approved by the CO. Work shall comply with VA specifications and regulations, all applicable Federal, State and Local codes, including specific regulations related to working at the VA Montrose Campus.

A pre-bid site visit is scheduled for Tuesday, November 24th at 10:00am EST. Prospective bidders shall meet at Building 16, Engineering Conference Room, 2094 Albany Post Road, Montrose, New York, 10548.

Note: NO OTHER SITE VISITS WILL BE ALLOWED. INTERESTED BIDDERS ARE STRONGLY ENCOURAGED TO ATTEND.

To preserve the integrity of the procurement process, all questions and request for information must be submitted in writing to Daniel.barone@va.gov. Questions must be received no later than 12/8/2026 by 12:00pm EDT.

The bids are due on Tuesday, December 22, 2026 at 10:00am EDT. ONLYEMAIL BIDS to Daniel.barone@va.gov will be accepted.

The bid opening will be held online via Microsoft Teams on December 22, 2026 at 10:00am EDT. Details are on page 17.

The bids shall include copies of the original bid bond.

VAAR 852.219-75 Limitations on Subcontracting Certificate is a separate requirement. Document Attached to solicitation.

FAR 52.225-2 Buy American Act Certificate is a separate requirement. Document Attached to solicitation.

These signed certificates must be received with the bid.

RFO 26.201-1(b) The contracting officer must not award a contract for construction to the firm that designed the project or to the firm’s subsidiaries or affiliates, unless approved by the agency head.

NOTE: CONTRACTORS MUST ACKNOWLEDGE ALL SOLICIATION AMENDMENTS.

10 550 x x 52.211-10

X 10 days

1 10AM EST

12-22-2026

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

620-3670162-2543-854200-3220-XXXXXXXX

36C242

Department of Veterans Affairs Network Contracting Office 2 Franklin D. Roosevelt VA Medical Center 2094 Albany Post Road Montrose NY 10548

Tungsten Network http://www.tungsten-network.com/us/en /veterans-affairs

1-877-489-6135

Daniel Barone Contracting Officer

36C24227B0009

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

BID PRICING SHEET

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 BID OPENING INFORMATION

2.2 Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

2.2 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025)

(DEVIATION)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (NOV 2025) (DEVIATION)

2.4 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)

2.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.6 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

2.8 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY

REFERENCE (JAN 2008)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025)

(DEVIATION)

3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2025) (DEVIATION)

3.3 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND

CERTIFICATIONS (NOV 2025) (DEVIATION)

GENERAL CONDITIONS

4.1 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)

4.2 52.219-27 NOTICE OF SET-ASIDE FOR, OR SOLE-SOURCE AWARD TO, SERVICE-

DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) CONCERNS ELIGIBLE

UNDER THE SDVOSB PROGRAM (NOV 2025) (DEVIATION)

4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV

2025) (DEVIATION)

4.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

4.5 52.223-20 AEROSOLS (MAY 2024)

4.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS

(DEVIATION APR 2026)

4.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (NOV 2025) (DEVIATION)

4.8 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

4.9 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (DEVIATION) (NOV 2025)

4.10 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.13 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR 2026)

(DEVIATION)

Fire Alarm System Replacement and Upgrade at Montrose Campus

Project No. 620-22-110

Scope of Work

The contractor shall provide all new material, equipment, Supervision, labor and programming to accomplish the work as described in the contract documents and provide a complete working fire alarm system for Project 620-22-110, Fire Alarm System Replacement and Upgrade at the Montrose Campus of the Hudson Valley Health Care System, New York.

Work shall comply with all VA Contract documents, VA SOP’s, Class A wiring per NFPA 72, all applicable Federal, State, Local codes including specific regulations related to working at the VA Medical Center at Montrose, NY.

Contractor shall be responsible for completing the work within the contractual period of performance, and within the work hours as defined in the contract.

Contractor shall be responsible for coordinating and scheduling work to minimize to short duration any shutdowns. Phasing shall be coordinated with the VA COR to ensure minimal shutdowns during construction. See associated phasing documentation associated with the Construction Documents.

Contractor Trades:

• NICET Level 2 and higher Fire alarm technicians

• Journeyman or licensed Electricians

The Bidding Contractors shall inspect the areas of work prior to bidding. It is also critical that the Bidding Contractors review, complete the required info and sign the Spec section 010000, (1.4) as part of the Bid document.

Scope of Work for the Base Bid includes the following description of work, any amendments issued prior to the Bid opening and as defined in the contract documents but not limited to the following:

A. All buildings’ fire alarm systems, as noted in the contract documents, will be upgraded using this design. The fire station (Building 19) will serve as the master location, the boiler plant (Building 20) shall be the second master location. Each building will have its own fire alarm control panel (FACP), with new devices to initiate and alert the building, site, and master alarm stations of a fire alarm emergency.

B. The primary site Master Fire Alarm Control Station shall be located within the Fire Department (Building 19). This master control station shall include a networked computer connected to each fire alarm panel in all buildings. The computer should monitor all devices and display notifications from each building's fire alarm control panel.

Additionally, a second master monitoring station shall be located at the Boiler Plant (Building 20). This station shall ensure seamless communication with the main fire alarm control panel, enabling system operation, status monitoring, and emergency response from this location within the campus.

C. The campus fire alarm design intent shall ensure centralized and effective control of the campus-wide system. The equipment provided at the Fire Department (Building 19), and the Boiler Plant (Building 20) shall include manual voice communication capabilities and fire alarm graphics. These features will allow emergency personnel to manage alarms, provide voice instructions, and visually monitor the system for quick and accurate responses during emergencies. The following table was developed in coordination with the Montrose Fire Alarm Department, which identified the occupancy classification for each building on campus. The fire alarm system design is based on this occupancy data.

D. The contractor shall provide a fully intelligent addressable fire alarm system that connects to the existing fiber optic loop, interconnects all buildings per the design documents, and includes new fire alarm panels and devices. The system shall be installed in accordance with NFPA 72, Osha, and VA contract documents. Device location and wiring runs shown on the drawings are for reference only unless specifically dimensioned.

Clarifying the requirement for the non-proprietary fire alarm systems, the new system should be flexible, allowing maintenance and modification by qualified personnel. This includes ensuring that any changes or services can be performed without proprietary limitations, which is critical for ease of maintenance and operational flexibility across the system's lifecycle. The table on the drawings and specs lists the building’s involved with this project and their occupancy type.

E. The contractor shall provide a detailed schedule outlining major milestones and activities necessary to complete the fire alarm system installation. This schedule shall include, but not be limited to, submittal preparation, procurement, device installation, wiring, testing, and final commissioning.

F. The contractor shall replace the existing fire alarm circuit breaker with a red, lockable type for all buildings on campus. Where the building is identified as healthcare, the fire alarm panel disconnect shall be connected to the life safety electrical panel (Buildings 4, 6, 7, 14 and 15. All other buildings shall be connected to normal power panels, if not already connected.

G. The contractor shall provide a new Fire alarm system consisting of new fire alarm panels and system components. The Fire alarm system shall be the latest “NOTIFIER” model by HONEYWELL and compatible with the Medical

Center’s NOTIFIER fire alarm system and the newly installed Fire alarm system in the: CLC” building.

Each building's fire alarm control panel will interface with the following systems within each building:

· Fire Barrier Door Magnets

· Elevator System

· HVAC System

· Fire sprinkler systems, through the water flow valve at each floor’s standpipe

· Each local Fire Alarm panel shall have its own microphone to alert the building’s occupants during Fire Department testing H. All existing fire alarm equipment, devices and sub-systems that are not shown to be reused shall be removed. All existing fire alarm conduits and wirings not reused shall be removed.

I. Existing equipment including door holders, valve tamper switches and waterflow/pressure switches may be reused only as specifically indicated on the drawings and provided the equipment complies with the following:

1. Meets this specification section

2. Is UL listed approved

3. Is compatible with new equipment being installed

4. Is verified as operable through contractor testing and inspection

5. Is warranted as new by the contractor.

J. Shunt Trip Breaker Power Supply Requirements

In accordance with VA policy and NFPA standards, the elevator power supply shall include a dedicated, supervised power supply for the shunt trip breaker. This separate power supply must ensure reliable operation of the shunt trip function under all conditions, including primary power outages or system disruptions.

The following requirements apply:

1. The dedicated power supply shall be monitored continuously to ensure operability and compliance with life safety standards.

2. The system design must include redundancy measures to prevent failures in the shunt trip function during emergencies.

3. All connections and components must comply with the National Electrical Code (NEC), NFPA 70, and VA design guidelines.

4. The system shall be tested to verify functionality during fire alarm and emergency scenarios.

Installation of a backup power supply ensures the safety and integrity of elevator operations and ensures VA design standards for critical systems are followed. All associated documentation and approvals must be submitted to the Contracting Officer prior to installation.

120 VAC duct smoke detectors, waterflow/pressure switches, and valve tamper switches used by the Contractor shall be equipped with an addressable interface device compatible with the new equipment being installed.

K. Existing reused wiring and conduit shall be covered as new equipment under the Warranty specified herein. Existing fire alarm devices and equipment shall be surrendered to the VA COR upon device removal or removed from site as per the VA COR’s instructions.

L. Contractor shall provide a 5-year Testing, maintenance and repair agreement (M&R) for the new fire alarm system installed in this project. This 5-year Agreement will be covered under the Guaranteed Period Services (GPS) and the tasks under this agreement is listed at the end of this document. Repair service shall be provided within 24 hours of request by the

VA fire department and shall include all new parts and labor. The 5-year M&R shall commence after the expiration of the initial Installation warranty period, which would be 1 year after acceptance by the VA Fire department.

All work shall be performed by licensed and certified NICET technicians and authorized by the Fire Alarm system manufacturer.

M. Basic Performance:

1. Alarm and trouble signal from each building fire alarm control panel shall be digitally encoded by UL listed electronic devices onto a multiplexed communication system.

2. Response time between alarm initiation (contact closure) and recording at the main fire alarm control unit (appearance on alphanumeric read out) shall not exceed 5 seconds.

3. The signaling line circuits (SLC) between building fire alarm control units shall be wired Style 7 in accordance with NFPA 72. Isolation shall be provided so that no more than one building can be lost due to a short circuit fault.

4. Initiating device circuits (IDC) should be wired Style C in accordance with NFPA 72.

Signaling line circuits (SLC) within buildings shall be wired Style 4 in accordance with NFPA 72. Individual signaling line circuits shall be limited to covering 22,500 square feet (2,090 square meters) of floor space or 3 floors whichever is less.

5. Notification appliance circuits (NAC) shall be wired Style Y in accordance with

NFPA 72.

N. Floor plans shall include the following: Provide locations of all devices

(with device number at each addressable device corresponding to control unit programming), appliances, panels, equipment, junction/terminal cabinets/boxes, risers, electrical power connections, individual circuits and raceway routing, system zoning; number, size, and type of raceways and conductors in each raceway; conduit fill calculations with cross section area percent fill for each type and size of conductor and raceway. Only those devices connected and incorporated into the final system shall be on these floor plans. Do not show any removed devices on the floor plans. Show all interfaces for all fire safety functions.

O. Coordination drawings: Provide locations for fire alarm devices, in which the following items are shown and coordinated with each other and as specified in the specifications.

P. Riser diagrams: Provide, for the entire system, the number, size and type of riser raceways and conductors in each riser raceway and number of each type of device per floor and zone.

Show door holder interface, elevator control interface, HVAC shutdown interface, fire extinguishing system interface, and all other fire safety interfaces. Show wiring Styles on the riser diagram for all circuits. Provide diagrams both on a per building and campus wide basis.

Q. Detailed wiring diagrams: Provide for control panels, modules, power supplies, electrical power connections, auxiliary relays and annunciators showing termination identifications, size and type conductors, circuit boards, LED lamps, indicators, adjustable controls, switches, ribbon connectors, wiring harnesses, terminal strips and connectors, spare zones/circuits.

Diagrams shall be drawn to a scale sufficient to show spatial relationships between components, enclosures and equipment configuration.

R. Shop Drawings: Provide shop drawings stamped by a NY state registered professional engineer for review and approval by the VA. No work shall begin unless the shop drawings have been approved. Refer to the specs for more details.

Shop drawings must include but are not limited to the following:

SYSTEM INFORMATION

Device legend to include Make, Model, Temperature rating, candela rating Wiring Legend to include Wire type, size and conduit size Complete riser detail for each building Detailed list of all addresses used for each alarm device. This information shall be provided in a manner to display the device identification number, type of device, location of the device and the location description of the device as it will be displayed on the fire alarm control panel (FACP)

A zoned fire alarm system shall include the zone identification of each zone to be displayed at the fire alarm control panel (FACP)

Power connections Battery calculations Voltage drop calculations Interface of all fire safety functions Sequence of operation

PLAN INFORMATION

Floor plan indicating use of all rooms.

Location of fire alarm control panel (FACP), Remote annunciator and headend equipment

Location of the fire sprinkler system, fire department connection including horn/strobe unit

Location and details of all tamper switches, flow switches, shunt trips, control relays, etc.

Location of all elevators and elevator equipment rooms Location of all duct detectors and remote test switch Location of partitions, fire wall and/or area separation walls and rating classifications Location of all electromagnetic door holders and associated smoke detectors shall be indicated. The ceiling on either side of these doors shall also be provided Location of all initiation devices shall be indicated. Include point-to – point wiring and the circuit number between devices All candela ratings shall be indicated on the plans next to the device.

Manufacture data sheets shall be provided with all fire alarm plans.

Pre-test notification required: Before any fire alarm testing, notify all affected parties including building occupants, the alarm monitoring company, the local fire department, and the AHJ. Failure to provide notification can result in unnecessary emergency responses, occupant panic, and potential fines or penalties.

CONFLICTS BETWEEN NATIONALLY RECOGNIZED STANDARDS AND VA

REQUIREMENTS:

Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, it should be brought to the attention of VA.

The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system campus wide.

Guaranteed Period Services (GPS): The Service agreement shall include all new parts, labor and programming for the duration of the service agreement.

Provide separate line-item in the Base bid for cost of the Guaranteed Period services (GPS). The GPS shall be for Base Year with a 4-year option at the discretion of the VA. The GPS agreement will commence at the end of the Warranty period.

Provide adequate Liability Insurance coverage and the VA shall be named as additional Insured.

All work shall be performed by NICET certified technicians and certified by the fire alarm equipment manufacturer.

Provide commitment for a dedicated NICET certified technician to perform Inspections, testing, maintenance and repair for the fire alarm equipment.

The NICET certified technician must respond to all service and trouble related issues within 24 hours the request is made by the VA fire department

All new fire alarm equipment, programming and credentials shall be VA’s property.

The VA fire department shall have access and control of all administrative functions including login and passwords. This must be provided by the service vendor.

All work shall comply with NFPA 72, Chapter 14, Osha requirements and VA specifications and contract documents.

GUARANTEED PERIOD SERVICES (GPS) TASKS:

The following tasks shall be performed at a minimum:

• Inspection, testing, maintenance and repair shall comply with NFPA 72 and VA contract documents

• Correct all troubles and supervisory signals

• Provide Testing and calibration of all field devices as per the VA and manufacturer's guidelines

• Provide Programming for new devices and removal or relocation of existing devices

• Provide documentation of updates, including as-built drawings showing the changes made during the year

• Cleaning, calibration and sensitivity testing of all field devices as per manufacturer’s recommendations and VA contract documents

BID DOCUMENTS: Refer to Specification 01 00 00 for details.

The winning bidder shall provide a detailed bid breakdown by each building, which shall include the FACP and associated field devices, wiring and programming. Refer to Specification 01 00 00 (1.4) for more details.

V. ALTERNATE BIDS: Refer to Specification 01 00 00 for details.

· Alternate 1: Remove all fire alarm system work associated with the New CLC Building from the Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with this building. This alternate does not remove the site work and fiber optic work shown on FA-FO-01.

· Alternate 2: Remove all fire alarm system work associated with the New CLC Building and Building 7B from the Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with these buildings. This alternate does not remove the site work and fiber optic work shown on FA-FO-01.

· Alternate 3: In Building 24, instead of installing the new Fire Alarm Control Panel (FACP) in the new switchgear room, Room #2, install the new FACP in the same room/space, Room #1, as the existing FACP. Deduct all labor, materials, conduit, wiring, mounting, and associated work required for installation in the new switchgear room.

PERIOD OF PERFORMANCE:

The Construction contract completion time shall be no more than 550 calendar days from Notice to Proceed (NTP) which includes 30 days for contractor closeout.

SECTION 01 32 00

CONSTRUCTION DOCUMENTATION

PART 1- GENERAL

1.1 DESCRIPTION:

A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that

VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility

Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.

1.2 REQUIREMENTS:

A. Contractor shall accomplish and complete the following tasks upon award of contract:

1. Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR

NLT 14 days from contract award.

2. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.

3. The access request shall be in writing and include a list of staff. The list shall include the following information:

• Full Name

• Company Name

• Email Address

• Role/Position on the project (i.e., Project manager, site super)

4. Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days.

5. Upon successful completion of training, contractor shall submit certificates of completion to

COR NLT 2 Business days.

B. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.

C. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.

D. The contractor shall only use the ACC platform for all contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.

E. Contractor must inform the COR of any staff changes NLT 2 business days from the change.

Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.

F. Contractor submission requirements cannot be accepted for work to begin without meeting all

ACC Platform requirements outlined herein, including completing required ACC platform training.

- - - E N D - - -

BID PRICING SHEET

IFB No.: 36C24227B0009

Project No. & Title: 620-22-110 Fire Alarm Replacement Campus Wide at the Montrose VAMC

Bids providing less that 120 Calendar Days of Government Acceptance after the date bids are due will not be considered and will be rejected.

The bidder agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation if this bid is accepted by the Government in writing within 120 calendar days after the date bidders are due.

BASE BID

Item I: The contractor shall provide all new material, equipment, Supervision, labor and programming to accomplish the work as described in the contract documents and provide a complete working fire alarm system for Project 620-22-110, Fire Alarm System Replacement and Upgrade at the Montrose Campus of the Hudson Valley Health Care System, New York.

Base Bid Price Item I $ ___________________________

ALTERNATE BIDS: Refer to Specification 01 00 00 for details.

Alternate 1: $ ___________________________

Remove all fire alarm system work associated with the New CLC Building from the Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with this building. This alternate does not remove the site work and fiber optic work shown on FA-FO-01.

Alternate 2: $ ___________________________

Remove all fire alarm system work associated with the New CLC Building and Building 7B from the Base Bid. Deduct all labor, materials, devices, wiring, programming, and testing associated with these buildings. This alternate does not remove the site work and fiber optic work shown on FA-FO-01.

Alternate 3: $ ___________________________

In Building 24, instead of installing the new Fire Alarm Control Panel (FACP) in the · new switchgear room, Room #2, install the new FACP in the same room/space, Room #1, as the existing FACP. Deduct all labor, materials, conduit, wiring, mounting, and associated work required for installation in the new switchgear.

Note, according to the project specifications: the project schedule submittal shall be submitted 10 days after contract award. All critical submittals must be submitted within 30 days from the date of the Notice to Proceed. All pre-construction submittals must be approved prior to scheduling the construction kickoff meeting. NO SITE WORK MAY OCCUR UNTIL AFTER THE CONSTRUCTION KICK-OFF

MEETING IS HELD.

The Contract period of performance for Base Bid construction shall be 550 calendar days from Notice to Proceed (NTP) which includes 30 days for contractor closeout.

Offers shall provide a complete package to include the completed bid sheet along with the following to be determined responsive, responsible, and considered for award:

☐ Bid Bond and associated documents on correct forms (IAW FAR 28.106-1);

☐ Acknowledgement of all amendments.

☐ Completed/Signed FAR 52.225-2 Buy America Certificate (Attached);

☐ Completed/Signed FAR 52.219-14 Limitation of Subcontracting Certificate (Attached);

☐ Proof of compliance with Veterans' Employment and Training Service (VETS) 4212 Federal Contractor Reporting.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 BID OPENING INFORMATION

In accordance with FAR 14.202-8, the government is authorizing electronic bids on this solicitation. ALL bids shall be emailed to Daniel Barone, Contracting Officer at Daniel.barone@va.gov and timestamped by December 22, 2026at 10AM EST prior to the bid opening time. The bids shall include copies of a bid bond. The bid opening shall take place on Tuesday, December 22, 2026 at 10AM EST. No hand-carried or mailed bids will be accepted.

The bid opening will take place via Microsoft Teams conference call. To access the conference, please access:

Join: https://teams.microsoft.com/meet/2267536633161759?p=m2BqppnM5lfu9ECGE8 Dial in by phone +1 347-566-4838,,437333104# United States, New York City Find a local number Phone conference ID: 437 333 104#

2.2 Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:

Offerors are hereby notified that under New York Consolidated Laws, Chapter 60 - Tax, Article 28

- Sales and Compensating Use Taxes, Part 3 – 1116 (2), the United States of America, any of its agencies and instrumentalities, is immune from taxation when it is the purchaser, user, or consumer, or when it sells services or property of a kind not ordinarily sold by private persons.

Pursuant to Chapter 60, Article 28, Part 3-1115(17), a contractor’s purchase of such building and construction materials within New York to be incorporated into the real property belonging to the U.S. Department of Veterans Affairs (VA) is subject to the exemption from the New York State sales and compensating use taxes. To take advantage of the tax exemption the successful offeror under this solicitation must complete ST-120.1 “Contractor Exempt Purchase Certificate” when it purchases construction materials for this contract and keep on file as required by the state of New York tax laws.

Notwithstanding FAR 52.229-3, all bids received in response to this solicitation are presumed to reflect this tax exemption, and therefore should not include the New York’s state sales and compensating use taxes on sales of materials for incorporation into VA real estate under this contract.

mailto:Daniel.barone@va.gov https://teams.microsoft.com/meet/2267536633161759?p=m2BqppnM5lfu9ECGE8 tel:+13475664838,,437333104 https://dialin.teams.cloud.microsoft/14a86cbc-ba2a-4dde-a83a-5b9e20685e48?id=437333104

(a) Bidding materials consisting of Invitation for Bids, drawings, specifications and contract forms will be available on https://www.sam.gov/ in electronic format only by searching for solicitation number 36C24227B0009. All interested parties (subs & primes) should register at https://beta.sam.gov/ as an “Interested Vendor” so that others will know of our interest in participating in this procurement. A Bidder’s mailing list WILL NOT BE prepared by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at SAM.gov/. Paper copies of the amendments will NOT be individually mailed. By registering to “Receive Notification”, you will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Bidders are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of bids.

(b) If bid exceeds $150,000 a bid bond must be submitted. A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(c) If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.

(d) If the bid is between $30,000 - $150,000. The bidder to whom award is made will be required to furnish a Payment Bond, Standard Form 25A or alternative payment protection which conforms to the requirements set forth in FAR Clause 52.228-13, Alternative Payment Protections, as noted in the General Conditions of this Specification. Copies of the Standard Form of Payment Bond may be obtained upon application to the Issuing Office.

DESCRIPTION OF WORK: GENERAL CONSTRUCTION: The contractor shall provide all new material, equipment, Supervision, labor and programming to accomplish the work as described in the contract documents and provide a complete working fire alarm system for Project 620-22-110, Fire Alarm System Replacement and Upgrade at the Montrose Campus of the Hudson Valley Health Care System, New York.

Magnitude of Construction: $2,000,000.00 and $5,000,000.00 https://www.sam.gov/ https://beta.sam.gov/

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this provision-

Economically disadvantaged women-owned small business (EDWOSB) concern means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127, and the concern is certified by SBA or an approved third-party certifier in accordance with 13 CFR 127.300. It automatically qualifies as a women-owned small business concern eligible under the WOSB Program.

HUBZone small business concern means a small business concern that meets the requirements described in 13 CFR 126.200, is certified by the Small Business Administration (SBA) and designated by SBA as a HUBZone small business concern in the Small Business Search (SBS) (13 CFR 126.103).

Service-disabled veteran-owned small business (SDVOSB) concern eligible under the SDVOSB Program means an SDVOSB concern that is designated in the System for Award Management (SAM) as certified by the Small Business Administration (SBA) in accordance with 13 CFR 128.300.

Small business concern—

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (b) of this provision.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

Small disadvantaged business concern, means a small business concern that-

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by one or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States, and

(2) The management and daily business operations of which are controlled (as defined at 13 CFR 124.106) by individuals who meet the criteria in paragraph (1) of this definition.

Women-owned small business (WOSB) concern eligible under the WOSB Program (in accordance with 13 CFR part 127) means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States, and the concern is certified by SBA or an approved third-party certifier in accordance with 13 CFR 127.300.

(b)(1) The North American Industry Classification System (NAICS) code for this acquisition is 561621.

(2) The small business size standard is $25 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce (i.e., nonmanufacturer), is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(c) Representations.

(1) The offeror represents as part of its offer that—

(i) It [ ] is, [ ] is not a small business concern; or

(ii) It [ ] is, [ ] is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [The offeror shall enter the name and unique entity identifier of each party to the joint venture: _________________.]

(2) [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents that it [ ] is, [ ] is not, a women-owned small disadvantaged business concern.

(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The offeror represents as part of its offer that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The offeror shall enter the name and unique entity identifier of each party to the joint venture: _________________.]

(4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The offeror represents as part of its offer that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The offeror shall enter the name and unique entity identifier of each party to the joint venture: _________________.]

(5) SDVOSB joint venture eligible under the SDVOSB Program. [Complete only if the offeror is certified as a SDVOSB concern.] The offeror represents as part of its offer that it [ ] is, [ ] is not a SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The offeror shall enter the name and unique entity identifier of each party to the joint venture: _________________.]

(6) HUBZone joint venture eligible under the HUBZone Program. [Complete only if the offeror is a HUBZone small business concern.] The offeror represents, as part of its offer, that it [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The offeror shall enter the name and unique entity identifier of each party to the joint venture:

_________________.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.

(d) Notice.

Under 15 U.S.C. 645(d), any person who misrepresents a firm's status as a business concern that is small, HUBZone small, small disadvantaged, service-disabled veteran-owned small, economically disadvantaged women-owned small, or women-owned small eligible under the WOSB Program in order to obtain a contract to be awarded under the preference programs established pursuant to section 8, 9, 15, 31, and 36 of the Small Business Act or any other provision of Federal law that specifically references section 8(d) for a definition of program eligibility, will be—

(1) Punished by imposition of fine, imprisonment, or both;

(2) Subject to administrative remedies, including suspension and debarment; and

(3) Ineligible for participation in programs conducted under the authority of the Act.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (NOV 2025) (DEVIATION)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)

(a) Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them. (b) The copy of any protest must be received in the office designated above within one day of filing a protest with the GAO.

(END OF PROVISION)

2.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Provision)

2.6 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

(End of Provision)

2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any VAAR Acquisition Regulation (48 CFR Chapter FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Provision)

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT—REGISTRATION

(DEVIATION)

NOV 2025

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEVIATION) NOV 2025

52.214-4 FALSE STATEMENTS IN BIDS APR 1984

52.214-5 SUBMISSION OF BIDS (DEVIATION) NOV 2025

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND

WITHDRAWALS OF BIDS (DEVIATION)

NOV 2025

52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984

52.214-19 CONTRACT AWARD—SEALED BIDDING—

CONSTRUCTION

AUG 1996

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE APR 1991

52.214-35 SUBMISSION OF…