Brine pump 36C24226R0027 RFI.pdf

PDF 47 KB Posted

Attached to
Y1DA--Bulk Salt Brine Pumping System Federal contract opportunity
Solicitation number
36C24226R0027
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a Request for Information (RFI) for a VA (Veterans Affairs) project involving a Bulk Salt Brine Pump system. The RFI provides detailed electrical specifications and answers to key technical questions about the project. Specifically, the document confirms that electrical drawings will be provided, the panel location is on C level in room C-132, and the power requirements include 208V single-phase for the pump and 120V for the disconnect control. The project will utilize an existing panel with available space for new breakers, and all controls will be noted on the provided prints. Contractors are directed to reference the "561-24-600 Brine Details For Reference" attachment for additional technical information about the control panel and associated equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Bulk Salt Brine Pumping System, newest first.
File Type Posted
36C24226R0027 0003_1.docx DOCX document
561-24-600 Brine Details for Reference.pdf PDF
36C24226R0027 0002_1.docx DOCX document
36C24226R0027 0001_1.docx DOCX document
Bulk Salt Brine Site Visit.pdf PDF
Brine Pit.pdf PDF
C Level.pdf PDF
Wage Determinations NJ20250031 9-19-2025.pdf PDF
Ground fl. and C level Brine system.pdf PDF
S02 852.219-75 Limitation on Subcontracting Blank.pdf PDF
Buy American Certificate Blank.pdf PDF
36C24226R0027.pdf PDF
36C24226R0027_2.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24226R0027 Bulk Salt Brine Pump RFI’s.

RFI Questions & Answers

1. Will the VA be issuing electrical drawings (power plans, panel schedules, one-line diagrams, or details) for this project?

- Yes, info is on print provided

2. What is the designated power source and panel location for the brine system equipment?

- Panel location is on C level C-132 mechanical rm.

3. Voltage / phase requirements for:

- 208V single phase for pump 120V for disconnect for control

• Brine pumps 1

- 208V

• Control panel

- See :561-24-600 Brine Details For Reference” attachment for more information.

• Any associated controls or accessories?

- All controls noted on prints

4. Is there an existing panel with available capacity, or is a new breaker/panel expected to be provided by the Contractor?

- Existing panel with available space for new breakers.