Brine pump 36C24226R0027 RFI.pdf
PDF 47 KB Posted
- Attached to
- Y1DA--Bulk Salt Brine Pumping System Federal contract opportunity
- Solicitation number
- 36C24226R0027
About this file
This document is a Request for Information (RFI) for a VA (Veterans Affairs) project involving a Bulk Salt Brine Pump system. The RFI provides detailed electrical specifications and answers to key technical questions about the project. Specifically, the document confirms that electrical drawings will be provided, the panel location is on C level in room C-132, and the power requirements include 208V single-phase for the pump and 120V for the disconnect control. The project will utilize an existing panel with available space for new breakers, and all controls will be noted on the provided prints. Contractors are directed to reference the "561-24-600 Brine Details For Reference" attachment for additional technical information about the control panel and associated equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24226R0027 0003_1.docx | DOCX document | |
| 561-24-600 Brine Details for Reference.pdf | ||
| 36C24226R0027 0002_1.docx | DOCX document | |
| 36C24226R0027 0001_1.docx | DOCX document | |
| Bulk Salt Brine Site Visit.pdf | ||
| Brine Pit.pdf | ||
| C Level.pdf | ||
| Wage Determinations NJ20250031 9-19-2025.pdf | ||
| Ground fl. and C level Brine system.pdf | ||
| S02 852.219-75 Limitation on Subcontracting Blank.pdf | ||
| Buy American Certificate Blank.pdf | ||
| 36C24226R0027.pdf | ||
| 36C24226R0027_2.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24226R0027 Bulk Salt Brine Pump RFI’s.
RFI Questions & Answers
1. Will the VA be issuing electrical drawings (power plans, panel schedules, one-line diagrams, or details) for this project?
- Yes, info is on print provided
2. What is the designated power source and panel location for the brine system equipment?
- Panel location is on C level C-132 mechanical rm.
3. Voltage / phase requirements for:
- 208V single phase for pump 120V for disconnect for control
• Brine pumps 1
- 208V
• Control panel
- See :561-24-600 Brine Details For Reference” attachment for more information.
• Any associated controls or accessories?
- All controls noted on prints
4. Is there an existing panel with available capacity, or is a new breaker/panel expected to be provided by the Contractor?
- Existing panel with available space for new breakers.