36C24226Q0560 0001.docx
DOCX document 41 KB Posted
- Solicitation number
- 36C24226Q0560
About this file
This is an Amendment to Solicitation (Standard Form 30) for solicitation 36C24226Q0560, issued by the Department of Veterans Affairs Network Contracting Office on June 1, 2026, with an effective date of June 4, 2026. The amendment extends the receipt deadline for offers to June 18, 2026, at 2:00 PM EDT and introduces three substantive changes: a mandatory site visit scheduled for Wednesday, June 10, 2026, requiring vendors to pre-register via email to Dolores.Sachuk-Thompson@va.gov (drop-ins will not be accepted); an updated Table 1 specifying water quality routine testing frequencies; and notification that equipment must be installed by July 1, 2026, or an alternate plan for minimal service disruption must be submitted. Acknowledgement of this amendment is required with quote submissions, and failure to acknowledge will result in the response being deemed non-responsive and removed from competition.
The underlying solicitation 36C24226Q0560 is a Request for Quotation (RFQ) for the lease of reverse osmosis critical water treatment systems for the Sterile Processing Service at Brooklyn and Manhattan VA Medical Centers. This is a small business set-aside acquisition. The updated Table 1 details comprehensive water quality testing requirements across both facilities, including monthly testing for pH, conductivity, total alkalinity, total hardness, bacteria, and endotoxin in critical water systems, with specific sampling locations at treatment endpoints and points-of-use equipment (decon sinks, scope sinks, ultrasonic cleaners, and washer-disinfectors). Additional quarterly testing is required for total organic carbon and ionic contaminants (aluminum, chloride, copper, iron, manganese, nitrate, phosphate, sulfate, silicate, and zinc), along with utility water and steam condensate testing at specified frequencies. Brooklyn and Manhattan facilities have different numbers of sampling points, reflecting different equipment configurations, with Manhattan requiring significantly more samples annually due to expanded equipment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0560 0002.docx | DOCX document | |
| 36C24226Q0560_2.docx | DOCX document | |
| 2015-4187 05132026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-04-2026 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 To all Offerors/Bidders
36C24226Q0560 06-01-2026
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-18-2026 2:00PM EDT See CONTINUATION Page X
ONE
The purpose of this amendment is as follows: 1) Provide a site visit on Wednesday, June 10, 2026. Vendor MUST pre-register via email to Dolores.Sachuk-Thompson@va.gov to receive a time and place to meet. Drop ins will NOT be accepted. 2) Update Table 1 - please see attached. 3) Extend the solicitation due date to Thursday, June 18, 2026, at at 2:00PM ET. Should you be awarded this requirement, equipment must be to installed or an alternate plan for minimum disruption in service for a 7/1/2026 start date.
Acknowledgement of this amendment is required with your quote submission. If you do not acknowledge all amendments to this solicitation, your response will be considered non-responsive and removed from competition.
Dolores Sachuk-Thompson Contracting Officer TABLE 1: Water Quality Routine Testing Frequency for Critical Water, Utility Water, AER Final Rinse, and Steam Condensate for each (Brooklyn and Manhattan) of the Medical Centers will be:
| Water Quality Measurement |
| Source |
| Sampling Site(s) |
| # of Samples per event |
| Sampling Frequency |
| # of Samples per year |
MANHATTAN & BROOKLYN
| pH |
| Critical Water |
| 1. After the last treatment step at the water generation system |
2. At the point the distribution loop enters the processing area or first POU on the distribution loop
| 2 |
| Monthly |
| 24 |
| Conductivity |
| Critical Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Monthly |
| 12 |
| Total Alkalinity |
| Critical Water |
| 1. After the last treatment step, storage tanks |
2. At the point the distribution loop enters the processing area or first POU on the distribution loop
| 2 |
| Monthly |
| 24 |
| Total Hardness |
| Critical Water |
| 1. After the last treatment step |
2. At the point the distribution loop enters the processing area or first POU on the distribution loop
| 2 |
| Monthly |
| 24 |
BROOKLYN
| Bacteria |
| Critical Water |
| 1. Loop out point |
2. Loop return point
3. Each location of point-of-use in department (subject to change):
a. Decon Sink
b. Scope Sink
c. Unity Ultrasonic
d. Washer-Disinfector #1
e. Washer-Disinfector #2
| 7 |
| Monthly |
| 84 |
| Endotoxin |
| Critical Water |
| 1. Water storage tank |
2. Loop out point
3. Loop return point
4. Each location of point-of-use in department (subject to change):
a. Decon Sink
b. Scope Sink
c. Unity Ultrasonic
d. Washer-Disinfector #1
e. Washer-Disinfector #2
| 8 |
| Monthly |
| 96 |
MANHATTAN
| Bacteria |
| Critical Water |
| 4. Loop out point |
5. Loop return point
6. Each location of point-of-use in department (subject to change):
a. Decon Sink #1
b. Decon Sink #2
c. Decon Sink #3
d. Decon Sink #4
e. Scope Sink #1
f. Scope Sink #2
g. Caviwave PRO Ultrasonic #1
h. Caviwave PRO Ultrasonic #2
i. Caviwave PRO Ultrasonic #3 Comment by Ugbala, Chimzy B.: Ok Comment by Watts, Blesila: NY - will eventually have 4 ultrasonic
j. Caviwave PRO Ultrasonic #4
k. Washer-Disinfector #1
l. Washer-Disinfector #2
m. Washer-Disinfector #3
| 15 |
| Monthly |
| 156 |
| Endotoxin |
| Critical Water |
| 5. Water storage tank |
6. Loop out point
7. Loop return point
8. Each location of point-of-use in department (subject to change):
a. Decon Sink #1
b. Decon Sink #2
c. Decon Sink #3
d. Decon Sink #4
e. Scope Sink #1
f. Scope Sink #2
g. Caviwave PRO Ultrasonic #1
h. Caviwave PRO Ultrasonic #2
i. Caviwave PRO Ultrasonic #3
j. Caviwave PRO Ultrasonic #4
k. Washer-Disinfector #1
l. Washer-Disinfector #2
m. Washer-Disinfector #3
| 16 |
| Monthly |
| 168 |
MANHATTAN & BROOKLYN
| Total Organic Carbon (TOC) |
| Critical Water |
| 1. After the last treatment step |
2. At the point the distribution loop enters the processing area or first POU on the distribution loop
| 2 |
| Quarterly |
| 8 |
Ionic Contaminants
· Aluminum
· Chloride
· Copper
· Iron
· Manganese
· Nitrate
· Phosphate
· Sulfate
· Silicate
· Zinc
| Critical Water |
| 1. After the last treatment step |
2. At the point the distribution loop enters the processing area or first POU on the distribution loop
| 2 |
| Quarterly |
| 8 |
| pH |
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
| Conductivity |
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
| Total Alkalinity |
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
| Total Hardness |
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
BROOKLYN
| Bacteria |
| Utility Water |
| 1. Each location of point-of-use in department (subject to change): |
n. Decon Sink
o. Scope Sink
p. Unity Ultrasonic
q. Washer-Disinfector #1
r. Washer-Disinfector #2
| 5 |
| Quarterly |
| 20 |
MANHATTAN
| Bacteria |
| Utility Water |
| 2. Each location of point-of-use in department (subject to change): |
a. Decon Sink #1
b. Decon Sink #2
c. Decon Sink #3
d. Decon Sink #4
e. Scope Sink #1
f. Scope Sink #2
g. Caviwave PRO Ultrasonic #1
h. Caviwave PRO Ultrasonic #2
i. Caviwave PRO Ultrasonic #3
j. Caviwave PRO Ultrasonic #4
k. Washer-Disinfector #1
l. Washer-Disinfector #2
s. Washer-Disinvector #3
| 13 |
| Quarterly |
| 44 |
| Total Organic Carbon (TOC) |
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
Ionic Contaminants
· Aluminum
· Chloride
· Copper
· Iron
· Manganese
· Nitrate
· Phosphate
· Sulfate
· Silicate
· Zinc
| Utility Water |
| 1. At the point the distribution loop enters the processing area or first POU on the distribution loop |
| 1 |
| Quarterly |
| 4 |
BROOKLYN
| pH |
| Steam |
| 1. Steam Sterilizer Cooler Sample Port |
| 1 |
| Quarterly |
| 4 |
| Conductivity |
| Steam |
| 1. Steam Sterilizer Cooler Sample Port |
| 1 |
| Quarterly |
| 4 |
| Total Alkalinity |
| Steam |
| 1. Steam Sterilizer Cooler Sample Port |
| 1 |
| Quarterly |
| 4 |
| Total Hardness |
| Steam |
| 1. Steam Sterilizer Cooler Sample Port |
| 1 |
| Quarterly |
| 4 |
| Ionic Contaminants |
| Steam |
| 1. Steam Sterilizer Cooler Sample Port |
| 1 |
| Quarterly |
| Bacteria |
| Automated Endoscope Reprocessor |
| 1. Medivator #27 Right Basin |
2. Medivator #27 Left Basin
3. Medivator #28 Right Basin
4. Medivator #28 Left Basin
| 4 |
| Monthly |
| 48 |
| Endotoxin |
| Automated Endoscope Reprocessor |
| 1. Medivator #27 Right Basin |
2. Medivator #27 Left Basin
3. Medivator #28 Right Basin
4. Medivator #28 Left Basin
| 4 |
| Monthly |
| 48 |
MANHATTAN
| pH |
| Steam |
| 2. Steam Sterilizer Cooler Sample Port |
| 2 |
| Quarterly |
| 8 |
| Conductivity |
| Steam |
| 2. Steam Sterilizer Cooler Sample Port |
| 2 |
| Quarterly |
| 8 |
| Total Alkalinity |
| Steam |
| 2. Steam Sterilizer Cooler Sample Port |
| 2 |
| Quarterly |
| 8 |
| Total Hardness |
| Steam |
| 2. Steam Sterilizer Cooler Sample Port |
| 2 |
| Quarterly |
| 8 |
| Ionic Contaminants |
| Steam |
| 2. Steam Sterilizer Cooler Sample Port |
| 2 |
| Quarterly |
| 8 |
| Bacteria |
| Automated Endoscope Reprocessor |
| 5. Medivators #1 Right Basin |
6. Medivators #1 Left Basin
7. Medivators #2 Right Basin
8. Medivators #2 Left Basin
9. Medivators #3 Right Basin
10. Medivators #3 Left Basin
| 6 |
| Monthly |
| 72 |
| Endotoxin |
| Automated Endoscope Reprocessor |
| 1. Medivators #1 Right Basin |
2. Medivators #1 Left Basin
3. Medivators #2 Right Basin
4. Medivators #2 Left Basin
5. Medivators #3 Right Basin
5. Medivators #3 Left Basin
| 6 |
| Monthly |
| 72 |