This Statement of Work (SOW) details medical gas and vacuum system repair services for the James J. Peters V.A. Medical Center in the Bronx, New York. The comprehensive repair project involves addressing 51 medical gas outlet deficiencies, 7 zone valve box issues, 5 area alarm panel problems, and 10 source system deficiencies across multiple building locations. Specific repair requirements include replacing faceplates, repairing hoses, installing gas identification labels, replacing o-rings, flushing/cleaning outlets, and relocating pressure switches.
The contract is set for performance from July 21, 2025 to September 5, 2025, with work to be conducted during normal business hours (Monday-Friday, 8:00am to 4:30pm). The project requires contractors to be qualified per ASSE 6040 and 6030 standards, and to provide documentation certifying compliance with NFPA-99, Compressed Gas Association, and The Joint Commission Organization requirements. This is currently a Sources Sought Notice under Solicitation Number 36C24225Q0751, with potential set-aside considerations for service-disabled veteran-owned, veteran-owned, women-owned, HUB Zone, 8(a), or small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225Q0751.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1. Title: Medical Gas and Vacuum System Repair
2. General:
2.1. The Contractor shall provide all labor, tools, material, and special equipment necessary to perform repairs on the facility medical air and medical vacuum systems and associated equipment at the James J. Peters V.A. Medical Center Campus located at 130 West Kingsbridge Road, Bronx, New York 10468. These repairs are necessary to bring the medical air and vacuum systems and equipment into compliance.
2.2. At the completion of all repairs, the Contractor must provide documentation certifying compliance with current National Fire Protection Association (NFPA) - 99 (Health Care Facilities Code latest edition), Compressed Gas Association (CGA) and The Joint Commission Organization (TJC) - latest edition or other applicable current recommendations.
3. Conformance Standards:
3.1. This requirement is for the repairs of medical piped gas and vacuum systems. All services provided under this contract shall be performed in conformance with the NFPA, CGA and ASSE specifications and regulations. (www.nfpa.org) (www.asse.org) (www.cganet.com)
· NFPA 5.1.14.2 Maintenance of Medical Gas, Vacuum, WAGD, and Medical Support Gas Systems.
4. Contractor Qualifications:
4.1. Persons maintaining these systems shall be qualified to perform these operations. Appropriate qualification shall be demonstrated by either or both of the following:
4.1.1. Credentialing to the requirements of ASSE 6040, Professional Qualification Standard for Medical Gas Maintenance Personnel.
4.1.2. Credentialing to the requirements of ASSE 6030, Professional Qualification Standard for Medical Gas Systems Verifiers.
5. Scope:
5.1. Contractor shall repair the following medical air and vacuum system items, listed in the chart below as identified in the latest annual medical air and vacuum inspection report.
5.2. Abbreviation Chart
| Abbreviation |
| Term |
| O |
| Oxygen |
| A |
| Air |
| V |
| Vacuum |
| STA |
| Station |
5.3. Outlets
ITEM #
DEVICE #
ROOM NUMBER
STA #
GAS
OUTLET DEFICIENCY
DESCRIPTION OF REPAIR REQUIRED
| 1 |
| 8 |
| ICU BED 1 |
| 2 |
| A |
| FUNCTION FAIL |
| REPLACE FACIA |
| 2 |
| 26 |
| ICU BED |
| 1 |
| A |
| CRACKED FACIA |
| REPLACE FACIA |
| 3 |
| 10 |
| ICU BED 1 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 4 |
| 111 |
| ICU BED 10 |
| 1 |
| A |
| GAS FLOW FAIL |
| REPLACE / REPAIR HOSE |
| 5 |
| 134 |
| ICU RM 12 |
| 1 |
| O |
| CRACKED OUTLET |
| REPLACE FACIA |
| 6 |
| 142 |
| ICU RM 12 |
| 2 |
| A |
| CRACKED OUTLET |
| REPLACE FACIA |
| 7 |
| 170 |
| ICU RM 15 |
| 1 |
| O |
| CRACKED OUTLET |
| REPLACE FACIA |
| 8 |
| 173 |
| ICU RM 15 |
| 2 |
| O |
| CRACKED OUTLET |
| REPLACE FACIA |
| 9 |
| 179 |
| ICU RM 15 |
| 4 |
| A |
| CRACKED OUTLET |
| REPLACE FACIA |
| 10 |
| 180 |
| ICU RM 15 |
| 4 |
| O |
| CRACKED OUTLET |
| REPLACE FACIA |
| 11 |
| 196 |
| ICU RM 17 |
| 2 |
| O |
| CRACKED OUTLET |
| REPLACE FACIA |
| 12 |
| 230 |
| ICU BED 20 |
| 1 |
| A |
| GAS FLOW FAIL |
| REPLACE / REPAIR HOSE |
| 13 |
| 256 |
| 8B-02 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 14 |
| 274 |
| 8B-04 |
| 1 |
| V |
| LOW FLOW |
| FLUSH / CLEAN OUTLET |
| 15 |
| 275 |
| 8B-04 |
| 1 |
| V |
| LOW FLOW |
| FLUSH/CLEAN OUTLET |
| 16 |
| 277 |
| 8B-05 |
| 1 |
| O |
| MISSING GAS ID LABEL |
| INSTALL NEW GAS ID LABEL |
| 17 |
| 301 |
| 8B-07 |
| 1 |
| O |
| FADED GAS ID LABEL |
| INSTALL NEW GAS ID LABEL |
| 18 |
| 333 |
| 8B - 10 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 19 |
| 371 |
| 8B - 15 |
| 1 |
| O |
| LEAK |
| REPLACE O RINGS |
| 20 |
| 372 |
| 8B - 15 |
| 1 |
| O |
| LEAK |
| REPLACE O RINGS |
| 21 |
| 386 |
| 8B - 16 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 22 |
| 453 |
| 7C - 04 |
| 1 |
| A |
| BLACK FACE PLATE |
| INSTALL PROPER GAS ID TAG |
| 23 |
| 456 |
| 7C - 05 |
| 1 |
| A |
| BLACK FACE PLATE |
| INSTALL PROPER GAS ID TAG |
| 24 |
| 550 |
| 7B-11 |
| 1 |
| A |
| BLACK FACE PLATE |
| INSTALL PROPER GAS ID TAG |
| 25 |
| 630 |
| ISO BED 7 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 26 |
| 719 |
| RECOVERY 6 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 27 |
| 747 |
| RECOVERY 10 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 28 |
| 765 |
| RECOVERY 13 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 29 |
| 771 |
| OR 1 |
| 1 |
| V |
| NO FLOW |
| FLUSH AND PURGE OUTLET |
| 30 |
| 780 |
| OR 1 |
| 3 |
| V |
| NO FLOW |
| FLUSH AND PURGE OUTLET |
| 31 |
| 791 |
| OR 2 |
| 2 |
| V |
| LEAK |
| INSTALL GAS ID LABEL |
| 32 |
| 805 |
| OR 3 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 33 |
| 806 |
| OR 3 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 34 |
| 872 |
| OR 7 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 35 |
| 873 |
| OR 7 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 36 |
| 879 |
| OR 7 |
| 3 |
| V |
| LEAK |
| REPLACE O RINGS |
| 37 |
| 930 |
| 2D-38B |
| 1 |
| O |
| MISSING GAS ID LABEL |
| REPLACE GAS ID LABEL |
| 38 |
| 956 |
| 2D-13 |
| 5 |
| V |
| LEAK |
| REPLACE O RINGS |
| 39 |
| 959 |
| 2D-13 |
| 6 |
| V |
| LEAK |
| REPLACE O RINGS |
| 40 |
| 989 |
| 2C-42 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 41 |
| 1017 |
| C2-52 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 42 |
| 1107 |
| 11-B |
| 1 |
| A |
| LEAK |
| REPLACE O RINGS |
| 43 |
| 1109 |
| 11-B |
| 2 |
| O |
| LEAK |
| REPLACE O RINGS |
| 44 |
| 1133 |
| 1D - 104 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 45 |
| 1145 |
| 1D-108 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 46 |
| 1172 |
| 1D-120 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 47 |
| 1199 |
| 1D-134 |
| 2 |
| V |
| LEAK |
| REPLACE O RINGS |
| 48 |
| 1228 |
| 1E-108 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 49 |
| 1234 |
| 1E-112 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 50 |
| 1276 |
| 1E - 134 |
| 1 |
| V |
| LEAK |
| REPLACE O RINGS |
| 51 |
| 1377 |
| 2A-20F |
| 1 |
| O |
| LEAK |
| REPLACE O RINGS |
5.4. Zone Valve Boxes
ZONE VALVE LOCATION
ZVB DEFICIENCY
DESCRIPTION OF REPAIR REQUIRED
ICU ENTRANCE
MED AIR GAUGE OUT OF CALIBRATION
REPLACE GAUGE
ICU ENTRANCE
OXYGEN GAUGE OUT OF CALIBRATION
REPLACE GAUGE
CORRIDOR BETWEEN 7B-11 & 7B-12
ROOM LABELS INCORRECT
ADD ROOM 7B-62 TO LABELING
CORRIDOR BETWEEN 7C-12 & 7C-11
ZVB NEEDS TO BE RELABELED
RELABEL ZVB WITH PROPER ROOM NUMBERS LABEL
CORRIDOR BETWEEN 7C-12 & 7C-11
ZVB NEEDS TO BE RELABELED
RELABEL ZVB WITH PROPER ROOM NUMBERS LABEL
OUTSIDE 1C-46
ZVB NEEDS TO BE RELABELED FADED
RELABEL ZVB WITH ROOM NUMBERS LABEL
ACROSS 1D-127
ROOM LABELS INCORRECT
ADD PRO A,B,C TO LABELING
5.5. Area Alarm Panels
ALARM PANEL LOCATION
AAP DEFICIENCY
OUTSIDE 7B - 64
LABELING FADED
RELABEL ROOM NUMBERS
OUTSIDE 1E-104
PANEL NOT FUNCTIONAL
TROUBLESHOOT AND TEST PANEL
OUTSIDE 1E-134
PANEL NOT FUNCTIONAL
TROUBLESHOOT AND TEST PANEL
OUTSIDE 1A-06
RELABEL ROOM AND GAS NUMBERS
INSIDE 2D-09
RELABEL ROOM NUMBERS
5.6. Source Systems
SOURCE SYSTEM AND LOCATION
SOURCE SYSTEM DEFICIENCY
1&2
OXYGEN HIGH PRESSURE SWITCH
HARD TO ACCESS
RELOCATE PRESSURE SWITCH FOR BETTER ACCESS
OXYGEN LOW PRESSURE SWITCH
RELOCATE PRESSURE SWITCH FOR BETTER ACCESS
MED AIR HIGH PRESSURE SWITCH
RELOCATE PRESSURE SWITCH FOR BETTER ACCESS
MED AIR LOW PRESSURE SWITCH
RELOCATE PRESSURE SWITCH FOR BETTER ACCESS
OXYGEN HIGH PRESSURE SWITCH
DID NOT FUNCTION AS DESIGNED
REPLACE PRESSURE SWITCH
| OXYGEN LOW PRESSURE SWITCH |
| DID NOT FUNCTION AS DESIGNED |
| REPLACE PRESSURE SWITCH |
MED AIR SYSTEM MAIN BLDG
BROKEN FLEX LINE
REPLACE FLEX LINE
| MED AIR SYSTEM CLC BLDG |
| DESSICANT SYSTEM |
| PERFORM TIMED OVERHAUL |
MED AIR SYSTEM CLC BLDG
REGULATORS
IN NEED OF TIMED OVERHAUL
MED VACUUM SYSTEM CLC BLDG
FAILING CHECK VALVE
REPLACE CHECK VALVES
6. Place of Performance:
Department of Veterans Affairs James J. Peters VA Medical Center 130 W Kingsbridge Road Bronx, NY 10468
7. Period of Performance:
July 21, 2025 – September 5, 2025
8. Safety Requirements:
8.1. In the performance of this contract, the Contractor shall take such safety precautions as OSHA may determine to be reasonably necessary to protect the lives and health of occupants of the building.
9. Reporting Requirements:
9.1. The Contractor shall be required to report to the Facilities Management Office (Building 100, room GC -100), or the designated location, prior to any start of work during normal working hours.
9.2. When the service is complete, the Contractor shall document services rendered on a legible field service report.
9.3. The Contractor shall log out at the Facilities Management Office, (or designated location), and submit the field service report to the Contracting Officer Representative (COR) for a signature, during normal working hours.
10. Inspection:
10.1. VA personnel and the Contractor shall inspect any work that is performed and agree on the condition and any existing damage or failures prior to beginning work. A final inspection for quality assurance will take place after completion of the work by VA personnel prior to acceptance.
11. Days and Hours of Operation:
11.1. All work shall be performed during normal business hours.
11.2. Normal business hours are Monday-Friday 8:00am to 4:30pm excluding the following federal holidays
11.3. Federal Holidays:
New Year’s Day Martin Luther King Jr’s. Day President’s Day Memorial Day Juneteenth Fourth of July Labor Day Columbus Day Veteran’s Day Thanksgiving Christmas Day
12. Additional Work
12.1. Should any other repairs be found during the performance of this contract that are outside the scope included herewith, the contractor shall provide a quote to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) or designated alternate point of contact. The Government will review the recommended repairs and decide on need, timeline and mechanism for completing the repair.
12.2. Any additional work outside of this Statement of Work are not authorized, unless approved through a modification to the contract by the CO. No one aside from the CO has the authority to obligate funds for the VA.