This document is an amendment to a solicitation for Sensitive Document Destruction Services for the Department of Veterans Affairs, Veterans Integrated Service Network 2. The key details are:

The purpose of this amendment is to respond to vendor questions and provide a revised Statement of Work. The revised Statement of Work outlines the requirement for collection and destruction of sensitive documents from VA Medical Centers and associated Community Based Outpatient Clinics and Home Based Primary Care locations. The contractor must ensure secure transport and destruction of all documents, provide free-of-charge locked consoles and totters, and meet specific bin/tote requirements at each facility. Requirements include passing background checks, providing destruction certificates, and adhering to work hours and invoicing procedures. The contract also includes a Quality Assurance Surveillance Plan and contractor personnel security requirements.

View the file

Other files

File Type Posted
36C24225Q0012.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) Various By VISN 2 Location None Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24225Q0012 09-18-2024

X X X

X The purpose of this Amendment 0001 is to respond to vendor questions, and provide a revised Statement of Work as a result of the vendor questions. The responses are included in Schedule A attached hereto where the revised Statement of Work is also attached.

*All other terms and conditions remain unchanged.

Michelle Harsch Contracting Officer

CONTINUATION PAGE

SCHEDULE A.1

1. BIN Requirements for Canandaigua VAMC/Rochester OP Clinic – 23 Gallon bins now specifies 32 Gallon bins.

2. Rome & Binghamton CBOCs are now listed under “monthly” pickups in the Statement of Work to coincide with CLINS 0004, 1004, 2004, 3004 and 4004 in the B.3 Price Schedule.

B.2 STATEMENT OF WORK (Revised)

1. Requirement Collection and destruction of sensitive documents from the VA Medical Centers located in Buffalo, Batavia, Albany, Bath, Canandaigua and Syracuse to include associated off-site Community Based Outpatient Clinics (CBOC) and Home Based Primary Care (HBPC) as listed at the following locations:

Serviced Weekly:

VA Medical CenterVA Medical CenterVA Medical Center
3495 Bailey Avenue76 Veterans Avenue113 Holland Ave
Buffalo, New York 14215Bath, New York 14810Albany, New York 12208

VA Medical Center 800 Irving Ave Syracuse, New York 13210

Serviced bi-Weekly: (Every other Week)

VA Medical Center 222 Richmond Avenue Batavia, New York 14020

Canandaigua VA Medical Center VA Rochester Outpatient Clinic 400 Fort Hill Avenue 260 Calkins Road Canandaigua, New York 14424 Henrietta, New York 14632

Serviced Monthly:

VA CBOC – Niagara Falls 2201 Pine Avenue Niagara Falls, New York 14301

Buffalo Vet Center 2929 Union Rd Cheektowaga, NY 14227

VA Offices at Apple Tree Business Park 2875 Union Road, Suite 3500 Cheektowaga, NY 14227

Binghamton CBOC 425 Robinson Street Binghamton NY 13904

Rome CBOC 125 Brookley Road, Building 510 Rome, NY 13441

Bi-monthly service to be performed at these locations (Service once every 8 weeks):

PRRC Day Treatment Center 2963 Main St.

Buffalo, NY 14214

Packard Building VA Clinic 1325 Main Street Buffalo, NY 14209-1988

VA HBPC – Springville 27 Franklin St., Suite 7 Springville, New York 14141

VA HBPC – Jamestown 610 West 3rd Street Jamestown, New York 14701

Olean VA Clinic 465 North Union Street Olean, NY 14760-2658

2. Scope Description of Services: Contractor shall ensure that document information/material is secure from the point of pick-up to the point of destruction; ALL documents must be destroyed beyond recognition. The Contractor shall also be required to make pick-ups as requested for large volumes of documents for destruction; boxes of documents needing destruction on an as needed basis. The day(s) of pick-up shall be agreed upon by the Contracting Officer’s Representative (COR) and the Contractor. A schedule of service dates shall be provided to the COR at commencement of the contract. The COR for each medical center shall provide a listing of console and totter locations to be serviced, and other materials for destruction on the day of pick up. Contractor shall use the checklist of sensitive bins for each site for every service checking off all locations that have been serviced. This checklist shall be kept current by both the COR and Contractor.

Technicians servicing this contract are required to pass background checks performed by the Government at the Contractor’s expense to include VA training BEFORE commencement providing service under this contract. Training certificates for the associated contractor technician must be provided to COR representative at each medical center location.

Each VISN facility shall have the opportunity to increase and/or decrease the number of bins utilized as needed.

· Contractor shall provide secured/locked consoles and totters free of charge, as needed.

· Contractor shall work with COR representatives in keeping the listing of consoles and totes current.

· If bins are removed from the facility the contractor shall fill out “Bins removed” form below with how many totes/consoles are leaving the facility at each site. This form shall be left with the COR representative or designee at end of day’s service.

· Contractor shall provide servicing of consoles and totters per instructions of COR.

· Contractor must be able to destroy materials regularly placed in consoles and totters of the following mixed type:

· Paper of any color, envelopes, labels

· Paper clips, staples, pharmacy pill containers, binding left on disposed paper

Contractor shall destroy materials regularly placed in consoles and totters in a manner as prescribed by Risk Management Framework for VA Information Systems – tier 3: VA Information Security Program; and VA Directive 6371, Destruction of Temporary Paper Records.

Final Destruction is the process through which temporary paper records are pulped, macerated, shredded or otherwise destroyed to a degree that definitively ensures that they are not readable or reconstructable to any degree. An original Certificate of Final Destruction, signed in ink, must be provided to the COR representative at each site after each shredding service and shall include the number of bins serviced and the total pounds shredded. Sensitive documents picked up from the VA must go directly to the point of destruction with no other stops. The contractor must provide written notification to the COR representative should there be stops before the point of final destruction. If there are any stops, the truck and contents must be secured.

The contactor shall destroy all material on the same day of pick up or provide written notification to the COR justifying why destruction is delayed and what the contractor has put in place to protect the material (electronic mail is acceptable). In no case shall the contractor hold any material for more than 24 hours. The contractor must have a process in place to ensure that the truck is always locked, and the number of stops is limited when VA materials are on-board.

Contractor-Owned Supplies/Equipment:

The Contractor shall provide all sites covered by this contract totters and consoles at no cost to the Government. The VAMCs shall be allowed to increase or decrease the number of totters or consoles as needed. If an extra bin is needed for purging, the contractor shall supply the bin for the time necessary and then remove. Keys to all consoles and totes placed at the VA sites shall be provided only to the COR representative.

Consoles shall meet the following specifications:

· Approximate size - 35"- 40" in height, 15"- 19" in width, and 15"- 19" in depth.

· Must be securely locked with a deadbolt mechanism.

· Must have a frontal opening approximately 2"X15" for depositing materials

· Must contain an inner bag that will hold approximately 100 pounds of material when full and secured inside (Inner bags are not used at the Bath facility)

· Must be aesthetically pleasing to the eye, preferably gray or similar light color in nature, and be able to accept labeling for acceptable material.

Totters shall meet the following specifications:

· Totters shall accommodate 65-95 gallons or 200-300 pounds of material when full.

· Totters shall be easily mobile (have wheels)

· Totters shall be plastic in nature

· Totters shall be locked with lock and Keys to be provided by Contractor to the COR.

· Totters shall have a slot on top of unit approximately 2" X 17"

· Totters shall be able to accept labeling for type of material acceptable.

Requirements at Each Facility Facility Contractor Badge: Contractor personnel shall get a vendor badge from the Police Office at each medical center location. Badges must be returned to the Police Office at the end of the contract, the expiration date of the badge, or termination of Contractor employment.

Service Check List: A listing of all bins at the facility shall be provided to the technician(s) each service date. The technician must check off each bin serviced and turn in this checklist to the COR representative or designee at the end of each service date. These listings of bins are subject to change as bins are increased and/or decreased. The technician is to check off each room serviced; if a bin is not available to service, do not check off as serviced.

Checklists are to be turned into COR representatives at each site. Batavia checklist must be dropped off to COR in Buffalo.

Sign in/out Sheet Locations In WNY (Buffalo and Batavia) – Sign in/out sheets in Buffalo are in the EMS office Room 63; and in Batavia in Building 3, Room 104, there are clip boards to sign in/out.

At Appletree Business Park – Ring doorbell and check in with Administrative Officer in Room 14.

For the Bath facility, sign-in/out sheets and bin verification sheets are in building 41, EMS. Contractor shall check in at all CBOCs and HBPCs reception.

At Stratton VA Albany, the sign in/out sheets are located in room SB-1, EMS Suite, on a bookshelf in a binder marked “Sign In.”

In Syracuse, the sign in/out sheet is in the basement main building in the Supervisors office Rm# CL-52.

For Canandaigua VAMC and Rochester Outpatient Clinic, badges are to be secured from the PIV office building 4 room 121 and worn whenever on either station.

BIN/TOTE/Container requirements per location:

Albany Stratton VA – 64 Gallon: 35

Bath VAMC – 95 Gallon: 5 64 Gallon: 12 32 Gallon: 60 Console w/door: 20 Desktop Units: 6

Buffalo and Batavia VAMCs – 64 Gallon: 35 Console w/door: 236

Canandaigua VAMC/Rochester OP Clinic – 95 Gallon or similar: 20 32 Gallon or similar: 89

Syracuse VAMC – 95 Gallon: 2 64 Gallon: 4 32 Gallon: 4

Bin Locations At Stratton VA Albany, the bins to be serviced shall be located on the EMS loading dock for emptying and shredding.

For Bath VAMC, bins are not to be removed from the campus, they are located throughout the facility and emptied by technician into larger bins checking off service via the checklist provided for its campus locations.

For Buffalo and Batavia VAMCs, bins are not to be removed from the campus, they located throughout the facility and are emptied into larger bins checking off service via the checklist provided for its campus locations.

In Syracuse, the contractor shall remove all paper documents from containers secured in room SL52. The Contractor will pick up full containers located in Room SL52 and shred the paper media contained within the 95-gallon containers on site. The sensitive document bins in Syracuse are the property of the Syracuse VAMC. There are 25 facility-owned 95-gallon lockable containers that are not to leave the Syracuse VAMC property. The bins are not to be removed; all documents are to be destroyed on site.

At Canandaigua, the pickup location is Warehouse Building 11 Loading Dock and at the Rochester Outpatient Clinic it is the shipping dock. Contractor shall provide 17 secured 65-gallon bins for Canandaigua and 3 secured 65-gallon bins for ROPC to be stored at each site.

The “Bins Removed” form below shall be documented at time of service with how many totes are leaving the facility at each site. Leave this completed form with the COR representative or designee at end of service.

Work Hours: The Contractor shall provide a work schedule with a preferred day and time of service to the COR representative prior to the contract commencement date for approval. Days of service are Monday through Friday. Any change in dates must be verified with the COR representative 24 to 48 hours before change may take place. If the regular scheduled pickup date is a Federal holiday, pickup shall be the following day.

Canandaigua hours are 7:00 AM to 3:00 PM and Rochester Outpatient Clinic hours are 7:00 AM to 4:00 PM.

Syracuse hours are 7:00 AM to 3:30 PM.

Bath hours are 7:00 AM to 2:30 PM

Buffalo and Batavia hours are 7:00 AM to 2:30PM

Stratton VA Albany hours are 7:00 AM to 2:30 PM

Invoices: Invoices shall be billed per pound based on service check list at each medical center location. Pricing shall be based on pounds removed and shredded at each site. Charges shall be invoiced separately for each medical center location.

Documentation: The Contractor shall maintain an excel spreadsheet or other acceptable spreadsheet of pounds removed from each VAMC site and associated off-site locations providing a copy monthly to all respective COR representatives. The original, signed in ink, Final Certificate of Destruction must be given to the VA Medical Center COR representative after each service date. The Final Certificate of Destruction shall contain the following: date received, pounds removed that service date, method of disposal, certify during the witnessed shredding the date/time.

3. Quality Assurance Surveillance Plan The Contractor is responsible for management and quality control actions to meet the terms of the contract. The role of the Government in quality assurance is to ensure contract standards are achieved. The Contractor and the COR shall develop specific monitors covering work performance and management under this contract. A copy of these monitors shall be maintained by both parties. Monitors shall be completed no later than six (6) weeks after date of award. The Government will monitor the Contractor’s performance under this contract utilizing customer complaints, performance requirements, and random quality assurance inspections.

Quarterly Meetings with COR:

It is the COR’s responsibility to develop a monthly schedule for activities based on the surveillance plan’s requirements. This schedule will cover the times during which work is being performed or re-performed under the terms of this contract. The surveillance schedule will be monthly. The monthly schedule will be completed by the last workday of the preceding month and a copy will be submitted electronically to the Contracting Officer for information. The COR will routinely inspect containers on site and document the inspection. Unannounced inspections will be completed periodically with the VA Privacy Officer and COR to ensure information within the containers are safeguarded at all times.

4. Security Requirements

Final Destruction: Final Destruction is the process through which temporary paper records are pulped, macerated, shredded or otherwise destroyed to a degree that definitively ensures that they are not readable or reconstructable to any degree. Final destruction performed at or away from a VA facility must be performed, where practicable, by a bonded and insured recycler or paper mill, and any intermediary processes must protect the records until final destruction is completed. Final destruction will be witnessed by the contractor employee.

The contractor employee may act as witness, and the written attestation and Final Certificate of Destruction shall be submitted to the VA COR(s).

Final Certificates of Destruction must be maintained in accordance with applicable VA Records Control Schedules and should only be accepted from data destruction or recycle vendors after final destruction has actually taken place.

Records Management Clause for Contracts requiring the creation, use, storage, or disposition of Federal Records:

Use of Contractor's site and services may require management of Federal records. If the contractor holds Federal records, the contractor must manage Federal records in accordance with all applicable records management laws and regulations, including but not limited to the Federal Records Act (44 U.S.C. chapters 21, 29, 31& 33), and regulations of the National Archives and Records Administration (NARA) at 36 CFR Chapter XII Subchapter B). Managing the records includes, but is not limited to secure storage, retrievability, and proper disposition of all federal records including transfer of permanently valuable records to NARA in a format and manner acceptable to NARA at the time of transfer. The agency also remains responsible under the laws and regulations cited above for ensuring that applicable records management laws and regulations are complied with through the life and termination of the contract.

5. Contractor Personnel Security Requirements All contractor employees will require a background investigation and must receive a favorable adjudication from the VA Office of Security and Law Enforcement prior to commencement performing contract services. This requirement is also applicable to all subcontractor personnel.

Position Sensitivity – The position sensitivity has been designated as Low Risk for Document Destruction services.

Background Investigation – The level of background investigation commensurate with the required level of access is National Agency Check with Written Inquiries (NACI/Tier 1).

Contractor Responsibilities

1. The contractor shall bear the expense of obtaining background investigations. If the Office of Personnel Management (OPM) conducts the investigation, the contractor shall reimburse VA within 30 days. If timely payment is not made within 30 days from date of bill for collection, then VA shall deduct the cost incurred from the contractors 1st month(s) invoice(s) for services rendered.

1. Training: All contractors and sub-contractor’s employees are required to complete VA’s Security Awareness and Privacy Training course annually on-line; TMS Course #10176. Contractor and subcontractors employees will provide a course completion certificate to the COR representative.

1. The contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain a U.S. citizenship and are able to read, write, speak and understand the English language.

1. The contractor, when notified of an unfavorable determination by the Government, shall withdraw the employee from consideration from working under the contract.

1. Failure to comply with the contractor personnel security requirements may result in termination of the contract for default.

Government Responsibilities

a. The contracting officer will forward the names, social security numbers, and dates of birth of the contractor’s employees to the VA Law Enforcement Training Center/SIC.

b. The VA Law Enforcement Training Center/SIC will provide the necessary investigative forms to the contractor or to the contractor's employees, coordinate the background investigations, and notify the contracting officer and contractor of the results of the investigations.

c. The VA facility will pay for requested investigations in advance. A bill for collection will be sent to the contractor to reimburse the VA facility. The contractor will reimburse the VA facility within 30 days. If timely payment is not made within 30 days from date of bill for collection, then VA shall deduct the cost incurred from the contractors 1st month(s) invoice(s) for services rendered.

d. The current fees associated with NACI/Tier 1 background investigations are approximately $297.00 each for low level investigation.

image1.emf

Bins Removed

VA WNY HEALTHCARE SYSTEM

List below the number of bins removed for each service date

At each site

Turn in this sheet to the COR or designee at end of service

Service date:__________________________

Facilities:

_______Bins – Main Hospital, Bailey Ave (Buffalo)

_______Bins –VAMC, Richmond Ave, Batavia

_______Bins – Apple Tree, Cheektowaga

_______Bins – CBOC, Niagara Falls

_______Bins – HBPC Jamestown

_______Bins – Day Treatment, Buffalo

_______Bins – Homeless Program, Buffalo

_______Bins – HBPC, Springville

_______Bins – CBOC, Olean

________Bins – VAMC 400 Fort Hill Ave

(Canandaigua)

File details come from the government source that posted it. Updated .