This document is a solicitation (Solicitation Number 36C24224R0037) for construction services to expand the MRI facilities at the Syracuse VA Medical Center. The project involves the construction of a new approximately 5,800 square foot addition on the ground floor and 5,000 square feet in the basement to house 2 new MRI units, as well as related renovation work within the existing building.
The procurement is set aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and has an estimated project value between $10-20 million. Proposals are due by July 18, 2024 at 10:30 AM EDT. The period of performance is 550 calendar days from the notice to proceed. Offerors must be registered in SAM and verified/certified as an SDVOSB prior to award. The solicitation provides details on the scope of work, submission requirements, evaluation factors, and applicable contract clauses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224R0037 0003.docx | DOCX document | |
| Prebid RFI Expand MRI (2).docx | DOCX document | |
| 36C24224R0037 0002.docx | DOCX document | |
| Prebid RFI Expand MRI.docx | DOCX document | |
| Revised Electrical Drawings - Solicitation Amendment 1.pdf | ||
| 36C24224R0037 0001.docx | DOCX document | |
| 528-709 Expand for New MRI - Geotech Report.pdf | ||
| Past Performace Questionaire- 2 May 2024.pdf | ||
| 528-709 Expand for New MRI - Bid Drawings NEW-JUNE 2024.pdf | ||
| 528-709 Expand for New MRI - Bid Specifications NEW.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24224R0037 X 05-30-2024 528-709 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Syracuse
NY
13210 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Syracuse
NY
13210
FISHER, SANDRA
315-466-8362 Contractor to provide all labor, tools, materials, equipment, and supervision to expand for MRI at the Syracuse VA Medical Center located at 800 Irving Ave Syracuse NY 13210
Project number: 528-709 Set-aside: 100% SDVOSB - This is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement.
Project Magnitude: between $10,000,000 and $20,000,000.
NAICS: 236220 Commercial and Institutional Building Construction NAICS small business size standard: $45M Completion Time is 550 calendar days from the issuance of the Notice to Proceed.
All prospective bidders must be registered in SAM (www.sam.gov) under NAICS 236220, and verified/visible/certified in SBA and VetCert (https://veterans.certify.sba.gov) at the time of offersubmission and before award of this procurement.
Failure to be both verified by SBA and VetCert prior to contract award will result in the offerors proposal being deemed non-compliant. All offerors are urged to contact VetCet and submit documents to obtain verification of the SDVOSB status if they have not already done so. In accordance with FAR 52.204-7, prospective contractors shall be registered in the SAM database prior to award of a federal contract. All offerors must submit their VETS-4212 report.
All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror's insurance company and be furnished on the insurance carrier's letterhead.
Offerors are required to complete the Buy American Certification and the Limitations on Subcontracting Certification.
The Architect-Engineer that designed this project cannot be awarded the construction contract.
Site visit: 13 June 2024, at 1100 EST. at Syracuse VAMC Rm NG44 , AM& M Conference Rm CO RFIS due: 25 June 2024 at 1030 to Sandra.fisher3@va.gov All requests for information (RFI) and proposals must be emailed to sandra.fisher3@va.gov by dates specified in the instructions
X X 52.211-10 X 10:30
EDT
07-18-2024 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs Network Contracting Office 02 1304 Buckley Road Suite 101 Syracuse
NY
13212 Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/
Statement of Work Project Name: Expand for New MRI Project No: 528-709 Project Address: 800 Irving Ave Syracuse, NY 13210
Overview:
The Syracuse VA Medical Center located at 800 Irving Ave Syracuse, NY 13210 has a need to expand the facility’s MRI services and as such a new MRI expansion shall be constructed adjoining to the main building and atop an adjacent former parking lot and includes renovation within Building 1.
Scope of Work:
The Contractor shall refer to all contract documents including drawings, specifications and Statement of Work for a complete detailed description of work and all requirements to be performed. Furthermore, it is the contractor’s responsibility to provide all required supervision, labor, materials and equipment necessary to complete the work required per all contract documents. Contractor is required to follow all infection control requirements, interim life safety measures, safety/security procedures and all other VA requirements.
Project includes general construction of a building addition of a new MRI expansion of approximately 5,800sf on the Ground Floor level and 5,000sf on the Basement level that will house 2 new MRIs. Expansion will include, but is not limited to the following: new structure, walls, finishes, electrical, lighting, ceilings, flooring, mechanical equipment, HVAC ductwork and piping, plumbing, fire protection, fire alarm and windows as well as required medical gas, nurse call, and all necessary appurtenances and healthcare and administrative support required for an active MRI suite.
CLIN 0001
General construction for new MRI expansion to include renovation of Basement and Ground floors of Building 1 located at Syracuse VA Medical Center which includes, but is not limited to, demolition and disposal of existing modular administrative trailers, general construction, site work, demolition, renovation, carpentry, mechanical, electrical, plumbing, fire protection, security, and all other items required by the drawings and specifications.
Work Hours:
Normal business hours (Monday through Friday, 8am – 4pm) as well as after normal business hours and weekends will be required to minimize impact to patient care and facility operations. Demolition and construction that is disruptive to facility operations and patient care shall be coordinated with the facility in advance to ensure no disruption to patient care services. Activities that create noise and vibration is to be performed 2 hours on (maximum) and 2 hours off (minimum) unless otherwise determined with the COR to minimize disruption to adjacent Audiology Clinic and other patient care services including, but not limited to Sleep Lab, ICU and Imaging. Site demolition and groundwork creating noise and vibration including, but not limited to excavation, site and footing demolition and structural foundation installations shall be performed on weekends. All domestic water, electrical, steam, chilled and heating hot water shutdowns, as required, shall be coordinated one week in advance with the COR and scheduled for completion after normal business hours.
Period of Performance:
The duration of this project is 120 days for submittals, 430 days for construction for a total period of performance of 550 days. The Contractor is to submit a detailed construction schedule to the CO and COR for review and approval two weeks upon receipt of Notice to Proceed. In addition, the contractor is to provide contact information for all individuals who will be working on-site 7 days before starting the work.
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INFORMATION REGARDING PROPOSAL MATERIAL, OFFER GUARANTEE AND BONDS | 6 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 9 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 16 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 17 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 17 |
| 2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023) | 18 |
| 2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 19 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 20 |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 20 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 21 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 21 |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 21 |
| REPRESENTATIONS AND CERTIFICATIONS | 23 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024) | 23 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 27 |
| 3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 29 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 31 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 32 |
| GENERAL CONDITIONS | 35 |
| 4.1 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023) | 35 |
| 4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 39 |
| 4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 40 |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (FEB 2024) | 40 |
| 4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 43 |
| 4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 44 |
| 4.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023) | 45 |
| 4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS | 52 |
| 4.9 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) | 52 |
| 4.10 52.244-2 SUBCONTRACTS (JUN 2020) | 52 |
| 4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 55 |
| 4.12 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 56 |
| 4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 56 |
| 4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 58 |
| 4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 59 |
| 4.16 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) | 60 |
| 4.17 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 61 |
| 4.18 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 61 |
| 4.19 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 62 |
| 4.20 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 63 |
| 4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 63 |
| 4.22 MANDATORY WRITTEN DISCLOSURES | 65 |
| 4.23 IT CONTRACT SECURITY | 65 |
| 4.24 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022) | 75 |
| 4.25 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022) | 78 |
INFORMATION REGARDING PROPOSAL MATERIAL, OFFER GUARANTEE AND BONDS
GENERAL PROPOSAL INFORMATION
1. Proposal materials consisting of Request for Proposal, drawings, specifications and contract forms will be available on http://www.sam.gov in electronic format only. All interested parties (subs & primes) should register at http://www.sam.gov as an “Interested Vendor” so that others will know of your interest in participating in this procurement. An Offerors mailing list WILL NOT BE prepared by the Contracting Officer. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. By registering to “Receive Notification”, you will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers.
1. If an offer exceeds $150,000 a bid bond must be submitted. Am offeror guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of offers, will require rejection of the offer in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.
1. If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.
1. If the offer is between $30,000 - $150,000 The offeror to whom award is made will be required to furnish a Payment Bond, Standard Form 25A or alternative payment protection which conforms to the requirements set forth in FAR Clause 52.228-13, Alternative Payment Protections, as noted in the General Conditions of this Specification. Copies of the Standard Form of Payment Bond may be obtained upon application to the Issuing Office.
1. VAAR Clause 852.219-77 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-77 will be considered ineligible for evaluation and award.
1. Service-Disabled Veteran-Owned Small Business Verification: This action is a 100% set aside for verified Service-Disabled Veteran Owned Small Businesses (SDVOSB) in VetCert. The award of this solicitation shall not be delayed due to loss of SDVOSB verification. Proposals submitted by non-verified SDVOSB will be excluded from award consideration.
1. Joint Ventures must be verified SDVOSBs and registered in SAM at the time of solicitation response and at award.
1. VETS-4212: Title 38, USC Section 4212(d), and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS-4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.
1. Proposals that contain a Teaming Agreement must provide the following information at time of proposal submittal:
· Legal name of company that will be teaming with the offeror firm
· Legal address of the company that will be teaming with the offer firm
· Duns & Bradstreet number of the company that will be teaming with the offeror firm
· Copy of the System Award Management (SAM) document of the company that will be teaming with the offeror firm.
· Offeror firm must submit a narrative identifying exactly how the Teaming Agreement will be written defining each party’s role in the preparation process and clearly defines separate roles for the proposed prime contractor and for the proposed subcontractor and how the proposed offeror intends to totally control contract performance. The teaming subcontractor must not have a role in contract management, particularly, a role where the teaming subcontractor employees are the key personnel. The narrative needs to contain the listing of team members, responsibilities of the team members, duration, and responsibilities of the team lead contractor. All bonds must be in the offeror’s name. Failure to provide complete narrative describe above at time of the proposal will be considered unacceptable and their proposal will be rejected.
Prior to award, should the selected offeror indicate their proposal contains a Teaming Agreement, the offeror has ten (10) calendar days to provide a duly executed Teaming Agreement acceptable to the Contracting Officer once the offeror is notified in writing. Failure to provide a duly executed Teaming Agreement within the ten (10) calendar day timeframe, the offeror will be considered unacceptable, and their proposal will be rejected.
PROJECT PROPOSAL ITEMS
See procedures for submittal of offers and proposal evaluation criteria.
ADDITIONAL SUBMISSION DOCUMENTS
The following documents are to be included with the proposal submission:
1. One (1) signed SF 1442 page 2, Offer page, with blocks 14-20c completed, AND the completed SF 1442 continuation page with amendments acknowledged.
· Include response to FAR 52.204-8(2) (i) or (ii) Annual Representations and Certifications
· Response to FAR 52.209-13(b)(1) or (2) Violation of Arms Controls Treaties or Agreements
1. Acknowledgment of all amendments must be accomplished either via entering data in block nineteen (19) of the SF1442 or completing blocks fifteen (15) a, b, and c of the amendment and attaching it to the SF 1442 Offer page.
1. One (1) original completed/signed SF24 Bid Bond and Power of Attorney as required.
1. One (1) signed VA Notice of Limitations on Subcontracting - Certificate of compliance for services and, Construction.
1. One (1) signed Buy American Certificate
1. Safety or Environmental Violations and Experience Modification Rate:
1. All Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.
1. All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information will be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead.
1. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead may obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR will obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
1. Offerors are responsible for ensuring and verifying their offer and all required proposal documents are received at sandra.fisher3@va.gov by the date and time specified in block thirteen (13)a of the SF 1442 solicitation (subject to amendment).
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA
1. Overview
The intent of this solicitation is to select one contractor to provide professional construction services in accordance with the Statement of Work (SOW), drawings, and specifications to Expand for New MRI, 36C24224R0037.
The Government intends to use the “Best Value” tradeoff process source selection approach in accordance with FAR 15.101-1. Award will be made to the responsive responsible offeror whose offer in conformance with this solicitation, results in the best value to the Government, price plus other factors considered. The Contracting Officer will award a firm fixed price contract to the responsive responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
2. Submittal of offers
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals, so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's experience, technical approach, and management capabilities to successfully complete the project. Proposals shall follow in the order of sequence set forth in the Request for Proposal (RFP). Information provided out of sequence may not be evaluated and may result in the offeror's disqualification from award. Requirements stated in this RFP are minimums. Innovative, creative or cost-saving proposals that meet or exceed the requirements should be clearly noted and justified in the proposal.
2.2 Offerors shall comply with the detailed instructions for the format and content of the proposal. Proposals that do not comply with the detailed instructions for the format and content of the proposal may be considered unacceptable and may render the Offeror ineligible for award.
2.3 All proposal materials shall be submitted in separate .pdf documents with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below.
Volume I: Sections 1 – 3 Volume I: Sections 1-3 shall be submitted in .pdf. Proposals should be typed using 11- point Times New Roman font. Packages that are handwritten will not be evaluated. Failure to place the required submission information under the appropriate tab (factor or sub factor) and format may result in a lower rating if the evaluators cannot readily find the appropriate information.
Volume I: Sections are to be prepared as follows:
| Section 1 | Technical Capability |
| Section 2 | Past Performance |
| Section 3 | Schedule |
Volume II:
Section 4 Price Information
Volume II: Section 4 shall be submitted as a .pdf and shall be submitted as a separate document, included with the proposal package. It shall include the following: Standard Form 1442, Proposal Pricing Page, and any additional submissions such as Representations and Certifications, Limitation on Subcontracting Certification, and Bonding.
2.4 All proposals shall be submitted in .pdf version to Sandra Fisher at:
Sandra.Fisher3@va.gov
3. Proposal Evaluation Process
3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Department of Veterans Affairs will evaluate the proposals. The identities of the SSEB personnel are confidential, and any attempt by the offerors to contact these individuals is prohibited. The evaluation will be based on the content of the proposal and any subsequent discussions, if necessary, as well as information obtained from other sources, e.g. past performance information.
3.2 The proposal evaluation consists of four parts: Technical Capability, Past Performance, Schedule, and Price Evaluation.
3.2.1 Schedule, Management approach Evaluation and technical: Proposals will be evaluated against the Evaluation Factors and Criteria as identified in paragraphs below.
3.2.2 Price Evaluation: After the SSEB completes the Technical evaluation the Contracting Officer will evaluate Volume II price proposals.
4. Evaluation
4.1 Proposals will be evaluated in accordance with the Evaluation Factors identified below. Technical Capability, Past Performance are equally important. Schedule is less important than Factor one (1) and two (2) but more important than four (4), and when all three of these evaluation factors are combined, they are more important than Price.
4.2. As demonstrated in their proposals, offerors will be evaluated in terms of the offeror’s ability to meet or exceed the project’s requirements as identified in the SOW, and those proposals demonstrating an ability to exceed specified requirements may be rated higher in those areas than proposals demonstrating only the ability to meet requirements. Offerors are reminded to include their best technical and price terms in their initial offer and not assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.
The Government intends to make award to a responsible offeror submitting a conforming proposal without discussions, if deemed to be in the best interest of the Government.
5. Evaluation Factors
5.1 Evaluation Factor 1 - Volume I - Technical Capability: Offerors shall submit a clear and concise narrative not to exceed 25 pages (front and back side use of a single page will count as 2 pages). This page limit excludes the Organizational Chart (with brief relevant details of individuals' experiences/qualifications), Tentative Schedule, Quality Control Plan synopsis. Company advertising literature shall not be included. The narrative shall address the three (3) sub-factors detailed herein. The sub-factors, listed under Evaluation Factor 1, are of equal importance. An overall rating will be assigned at the Factor Level only based on all reviewers' ratings. The Government will evaluate the offeror's answers for information and completeness.
Sub-factor 1: Schedule The offeror’s ability to adhere to a construction schedule for project completion as specified in the solicitation shall be detailed in Sub-factor 1.
Using the information submitted in response to the solicitation, the Government will evaluate the offeror’s scheduling methodology to determine if the offeror understands scheduling processes that ensure timely completion and control of the project. To be evaluated as acceptable, the offeror must provide a sample schedule that demonstrates an understanding of and ability to meet the requirements, including phasing. If the offeror plans to use a fast-track approach to permit early mobilization and construction, this approach shall be described. Based on the information provided in response to the RFP, the Government will evaluate the schedule and make an acceptability determination as to the offeror’s ability to meet the contract completion time.
Sub-factor 2: Management Approach Using the information submitted in response to the solicitation, the Government will evaluate the offeror’s ability to successfully manage the project.
1. Offerors shall identify key personnel proposed for the project and their documented experience on successful completion of other similar projects.
2. Offerors shall discuss the sequence of work to be performed in a realistic fashion; i.e. coordination with subcontractors.
Sub-factor 3: Experience.
The offeror shall discuss their technical expertise and experience with the following:
1. excavation,
2. shoring,
3. pile foundations,
4. backfill/grading,
5. drainage structures and piping,
6. concrete and steel structures,
7. magnetic and radio frequency (RF) shielding
8. carpentry,
9. mechanical systems,
10. mechanical controls,
11. electrical systems,
12. plumbing,
13. medical gases, and
14. fire protection
In addition : The offeror shall discuss their technical expertise and experience with successfully performing construction work in a fully active hospital environment. Expertise in quality control, successful implementation of a construction phasing schedule, experience in coordinating multiple discipline subcontractors working day, evening and overnight shifts concurrently, all while maintaining without interruption hospital department operations.
The information provided should be for the offeror, not for proposed subcontractors.
5.2 Evaluation Factor 2 - Volume I - Contractor's Past Performance
Submission Requirements: Contractor Past Performance - Project Recency and Relevancy Using the information submitted in response to the solicitation, the Government will evaluate the offeror’s technical expertise to determine acceptability. The past performance section shall not exceed four (4) pages and shall be rated based on recent and relevant project submittals. To be evaluated favorably the offeror must provide details of three (3) previous similar contracts within the past five (5) years including:
1) Project description, at a minimum, the description should include scope, size and dollar value of the project and can include photographs, to determine recent and relevant past performance.
2) Show the participation of key personnel (identified previously with resume) in the listed projects. The offeror can also include the subcontractors by company name. Including subcontractors may be beneficial to show the experience of the company in addition to the key personnel.
3) Include customer's point of contact (name, title, phone number, and email).
In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their proposals, e.g., the relevance of an offeror's Past Performance information and adverse Past Performance information to which the offeror has not previously had an opportunity to respond, or to resolve minor clerical errors.
Evaluation Criteria Contractor Past Performance - Project Recency and Relevancy The SSEB will evaluate the Project Recency and Relevancy based on the information provided by the contractor.
Evaluation Criteria Contractor Past Performance - Confidence The SSEB will evaluate the degree of successful completion of the recent and relevant past performance identified in the proposal in response to Volume I, Section 2, Past Performance, for the prime contractor past performance along with the designated team of subcontractors. Documentation of satisfactory performance of projects similar in size, scope, and dollar value will be considered to have met the minimum requirements of the RFP. Projects that are not determined similar in size, scope and dollar value may not be considered. Past performance will be evaluated in accordance with FAR 15.305(a)(2). Evaluations may include past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement. Offerors without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance and shall receive a neutral rating for Past Performance. Offerors may provide information on problems encountered on the identified contracts and the corrective action taken, if desired. This shall be rated based on the confidence portrayed for each of the projects submitted.
A neutral rating is given when no current and/or relevant performance record is identifiable upon which to base a meaningful performance risk prediction. Government Personnel were unable to identify any relevant Past Performance information for the offeror or key team members/subcontractors or their key personnel. This is neither a negative or positive assessment and represents an unknown risk.
This information shall be submitted for this procurement using Exhibit C, Past Performance Questionnaire, transmitted via Exhibit B, Sample Transmittal Letter and past Performance Evaluation Questionnaire.
5.3 Evaluation Factor 3 - Volume I - Contractor's Schedule
Submission Requirements: Contractor Schedule The SSEB will evaluate the degree of presentation and understanding of the offeror’s proposed Schedule.
The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the tentative Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work including all phasing. All schedule items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process including, but not limited to:
Construction Period: Mobilization, temporary re-routed Medical Center vehicular and pedestrian routes, demolition, site utilities, excavation, shoring, pile foundation, drainage structures and piping, concrete, backfill, grading, structural steel, magnetic and radio frequency (RF) shielding, carpentry, mechanical/mechanical controls systems, electrical systems, plumbing, medical gases, fire protection, finishes, provisions for overtime or shift work, final inspection, punch list and demobilization.
General Project Delivery Schedule and Narrative: Show relationships between construction activities for method and sequencing of the tasks noted above (at a minimum).
The Offeror shall specify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each sequence of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.
Short Schedules - The Offeror must provide for completion within the time frame (number of days after receipt of the Notice to Proceed). The maximum anticipated days of completion for this project is indicated on the Standard Form 1442 Construction, Offer and Award (Construction, Alteration or Repair). This duration shall establish the contract completion date. Short schedules will not be accepted. Critical path activity durations shall total the number of days indicated on Standard Form 1442.
5.4 Evaluation Factor 4 - Volume II - Price Information
The offeror shall complete and submit Standard Form 1442. The offeror shall submit a price based on the line items. Note: If discussions or negotiations occur, the Government may require additional cost information.
Discounts: Prompt payment discounts will not be considered in the evaluation of offers.
6. Discussions
Government intends to make award to a responsible Offeror submitting a conforming proposal without discussions if deemed to be in the best interest of the Government.
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price, Requirements contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 3.8 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
(End of Provision)
2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023)
(a) Definitions. "Bahraini, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Hand-Carried Address:
Department of Veterans Affairs Syracuse Network Contracting Activity sandra.fisher3@va.gov
Mailing Address:
Department of Veterans Affairs Syracuse Network Contracting Activity sandra.fisher3@va.gov
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— 13 June 24 at 1100
(c) Participants will meet at— Bldg 2 NG 44 AM&M conference room (End of Provision)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.252-6 |
| AUTHORIZED DEVIATIONS IN CLAUSES |
| NOV 2020 |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.215-1 |
| INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION |
| NOV 2021 |
| 52.215-16 |
| FACILITIES CAPITAL COST OF MONEY |
| JUN 2003 |
| 52.236-28 |
| PREPARATION OF PROPOSALS—CONSTRUCTION |
| OCT 1997 |
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:
| Deputy Assistant Secretary for Acquisition and Logistics, |
| Risk Management Team, Department of Veterans Affairs |
| 810 Vermont Avenue, N.W. |
| Washington, DC 20420 |
Or for solicitations issued by the Office of Construction and Facilities Management:
| Director, Office of Construction and Facilities Management |
| 811 Vermont Avenue, N.W. |
| Washington, DC 20420 |
| FAR Number |
| Title |
| Date |
| 852.233-70 |
| PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION |
| OCT 2018 |
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $45 Million.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source…