This document is a government solicitation amendment for contract number 36C24224Q0758, which is for mechanical isolation of the main 4-inch hot and cold water lines at the Stratton VA Medical Center in Albany, NY.
The key details are:
- The purpose is to provide answers to vendor questions about the requirements, including the type of copper piping, the number of line stops needed, the product and conditions in the lines, and any special requirements.
- The services required are to simultaneously isolate four 4-inch copper main hot and cold water lines using line stops or freeze stops, and to provide all labor, materials, supervision, equipment, and travel necessary.
- The NAICS code is 237110 with a $45 million small business size standard. The procurement is 100% set aside for small businesses.
- The period of performance is 7 calendar days after material delivery. The place of performance is the Stratton VAMC boiler plant.
- Responses are due by September 11, 2024 at 10:00 AM EST. The government will evaluate based on price and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224Q0758 0002.pdf | ||
| 36C24224Q0758_1.docx | DOCX document | |
| SCA Wage Determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227
To all Offerors/Bidders
36C24224Q0758
X
X X
The purpose of this amendment is to provide VA answers to vendor questions. Please see the following answers.
All other terms and conditions remain unchanged.
Tony Clemente Contracting Officer
This purpose of this amendment is to provide VA answers to vendors questions.
1) What type of copper are these 4” pipes (Type L, K, TP, etc.)?
The lines are type L copper, measuring 4.12”
2) How many 4” pipes do you need stopped and how many stops on each pipe?
Four 4”pipes 2 stops on each line 8 total.
3) What is the product IN the main pipeline?
Domestic hot and cold water.
4) What is the temperature AND working pressure on the line?
55 deg and 120 deg working pressure is 85 psi.
5) Is there any special safety training or security required to get into the building?
They will have to get badges from the police.
6) Would you like the quote priced on regular time or over time?
This will have to be done on off hours so overtime.
7) Is there any certified payroll or prevailing wage, any OCIP or special insurance requirements?
Yes, prevailing wage rates and liability insurance. See wage determinations that were included in the solicitation.
8) How many hours do you need a set held, just for your work.
1 hour for each water line for a total of 4 hours.
9) What work are you doing once the line is stopped?
Adding 4 inch propress ball valves.
10)If you are requesting multiple line stops, how many would you like done per mobilization?
Do they need to be done simultaneously or a set at a time? Are they in the same room/area, how many feet apart, etc.? They need to be done one at a time. They run parallel to each other they are a foot apart plenty of space for the stop machine.