36C24224Q0571_1.docx

DOCX document 288 KB Posted

Attached to
H999--Syracuse VAMC Bio-Safety Hood and Room Testing
Solicitation number
36C24224Q0571
Issued by

About this file

This document is a solicitation (Request for Quote) for annual and semi-annual bio-safety hood and room testing services at the Syracuse VA Medical Center.

The key details are:

  • The Department of Veterans Affairs is seeking a contractor to perform testing and certification of bio-safety cabinets, fume hoods, laminar flow benches, and HEPA filters at the Syracuse VAMC.
  • The testing must be conducted in accordance with manufacturer specifications and industry standards, including USP 797 and USP 800 for pharmacy-specific equipment.
  • The contract is set-aside for certified Service-Disabled Veteran-Owned Small Businesses.
  • Offers are due by June 10, 2024 at 2:00 PM EDT.
  • The contract will be awarded for a 1-year base period with two 1-year option periods.
  • Site visits for interested offerors are scheduled for May 21, 2024.
  • Pricing is required for the services outlined in the detailed Statement of Work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24224Q0571

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

528-24-2-7893-0393 36C24224Q0571 05-16-2024 Stephanie.Decker2@va.gov 716-862-7461 06-10-2024 14:00

EDT

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 X X 541380 $19 Million N/A X Department of Veterans Affairs Syracuse VAMC 800 Irving Ave Syracuse NY 13210 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

See CONTINUATION Page Annual and Semi-Annual Bio-Safetey Room and Hood Testing at the Syracuse VA Medical Center, 800 Irving Ave, Syracuse, NY 13210 Please see SOW for specific details.

Interested offerors may attend a site visit planned for 5/21/2024 at 10:00am by sending an email to donald.devito@va.gov. Vendors must email prior to COB 5/20/2024 to be able to attend.

Questions will be not be accepted after 5/28/2024.

See Section E.5 for submission requirements and evaluation factors. Offers are to be submitted via email to stephanie.decker2@va.gov.

See CONTINUATION Page 528-3640162-7893-854100-2543 0100C1C92 X X X Michelle Harsch michelle.harsch@va.gov Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 STATEMENT OF WORK5
B.3 PRICE/COST SCHEDULE18
SECTION C - CONTRACT CLAUSES98
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)98
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)103
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)104
C.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)104
C.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)107
C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)109
C.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)110
C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)110
C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)111
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS120
D.1 WAGE DETERMINATION120
SECTION E - SOLICITATION PROVISIONS129
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)129
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)133
E.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)136
E.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)137
E.5 52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES137
E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)139

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C242 Michelle Harsch Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[ ]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[x] monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

http://www.tungsten-network.com/us/en/veterans-affairs ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

36C24224Q0571

Page 1 of Page 1 of

B.2 STATEMENT OF WORK

Biological Safety Cabinet, Fume Hood, Flow Bench, and HEPA certification and testing, Syracuse VAMC The Syracuse, New York VAMC has a requirement for reoccurring testing and certification of facility Pharmacy-specific and non-Pharmacy specific safety cabinets, fume hoods, laminar flow benches, room environments, and HEPA filters. Permanent HEPA filtration units requiring testing are detailed within this Statement of Work. Testing and certification dates contained within this Statement of Work are best documented; Contractor shall be responsible to confirm and/or adjust certification/testing requirements to ensure no lapse in requirements and thus no undesirable effect on the mission of the Syracuse VAMC.

I. All non-Pharmacy Biological Safety Cabinets, Atmos Tech in Line HEPA Filtered exhaust fan (Attachment A), and laboratory fume hoods (Attachment B) shall be tested in accordance with the manufacturer’s specifications, the latest version of NSF/ANSI 49 standards, and in accordance with the latest edition of GP17-A2 Clinical Laboratory Safety Guidelines.

II. All non-Pharmacy Laminar Flow Benches and Dump Station (Attachment A) shall be tested in accordance with the manufacturer’s specifications, the latest version of NSF/ANSI 49 standards, and in accordance with the latest edition of GP17-A2 Clinical Laboratory Safety Guidelines.

III. All Pharmacy-specific equipment will obtain CETA (Controlled Environment Testing Association) certification every six calendar months from the date of last certification/testing of bio-safety cabinets, Compounding Aseptic Isolator (Attachment C), laminar flow hoods (Attachment D), ceiling mounted HEPA filters (Attachment E), and room spaces/environments (Attachment F) in accordance with VHA Directive 1108.12, VHA Guidance on Compounding Sterile Preparations Recommendations –USP 797 and USP 800. Pharmacy-specific spaces and equipment are broken down as follows:

1. Pharmacy Contingency space off set by (3) months from Main mixing rooms (currently room D407 and subject to relocation): one (1) bio-safety cabinet, one (1) Laminar Flow Work bench, four (4) ceiling mount HEPA filters shall be certified and tested in staggered frequency against primary Pharmacy spaces and equipment to ensure available redundancy in the event of primary space or equipment process interruptions. Contingency space shall be certified semi-annually for non-viable particle counts.

2. Pharmacy Primary Spaces (B133, B134, B135, B135A, B135B): two (2) bio-safety cabinets, two

(2) Laminar Flow Workbenches, and twelve (12) ceiling mount HEPA filters. Quantity five (5) areas shall be certified semi-annually in February and August for non-viable particle counts; contractor shall increase viable count testing to monthly upon implementation of USP 800 guidelines and notification from the contract COR. Certification periodicities shall be confirmed by contractor, post award, and adjusted as necessary to meet the needs of the Syracuse VA Hospital through consolidation of equipment/area due dates. Certification and testing shall conform to USP and OSHA standards.

(a) General Requirements:

(1) The Contractor shall comply with Federal, State, and Local Laws, plus any Federal Regulations as applicable to the performance of this contract; to include USP 797 and USP 800.

(2) The individual performing the testing shall be CETA certified to perform this work, in accordance with USP 797 and USP 800. The contractor shall provide a copy of the individual’s CETA credentials prior to start of work.

(3) Volumetric air sampling for viable airborne particles must be completed in all classified areas (ISO 5 PEC, ISO 7 & 8 rooms) and must be done using an impaction device during dynamic operating conditions at least every 6 months.

(4) Surface sampling of all four (4) classified areas and three (3) pass-through chambers connected to classified areas for microbial contamination must be conducted at least every six months based on USP 797 standards. Sampling must be performed at the end of compounding activity but before the area has been cleaned & disinfected.

(5) Dynamic airflow smoke pattern test: Smoke pattern tests must be performed for each PEC during dynamic operating conditions per USP 797 and USP 800.

(b) Scope:

(1) The contractor shall:

· Perform semi-annual certification of Pharmacy-specific equipment contained within Attachment C and Attachment D.

· Perform semi-annual certification of engineering controls consisting of:

· Non-viable particle count testing in a “Dynamic” operating condition

· ISO Class 8 Garb Room B133

· ISO Class 7 Sterile Preparation Ante Room B135

· ISO Class 7 Non-Hazardous Compounding B135A

· ISO Class 7 Hazardous Compounding B135B

· Unclassified Space – Hazardous Drug Storage Room B134

· ISO Class 7/8 - Contingency Space

· Measure and document HEPA air volumes and velocities.

· Measure and document space pressurization in relationship to adjacent room(s):

1. B133 Garb Room

2. B134 Hazardous Drug Storage Room

3. B135 Sterile Preparation Ante Room

4. B135A Non-Hazardous Compounding

5. B135B Hazardous Compounding

6. Contingency Space

· Perform room calculations to determine air changes per hour in each room.

· Measure and document average air temperature and relative humidity in each room.

· Perform semi-annual ceiling HEPA filter leak / challenge testing (See Attachment E)

(1) Perform semi-annually Viable Environmental Sampling for microorganisms (Bacterial/Fungal counts with ID’s as needed). All environmental testing to be performed by accredited laboratory. Each location listed will consist of quantity: one (1) air bacterial, oneair fungal, one (1) surface bacterial, and one (1) surface fungal sampling. See Attachment F.

· Provide written report of all testing and all results, no later than 14 days following completion of all work.

Certification and Testing documentation layout – Pharmacy results only: Contractor shall provide a written report of all testing and certification results, no later than fourteen (14) days following completion of all work. Contractor shall include Summary tables listing all rooms or areas tested and the acceptable limits, actual readings and indication of testing results (e.g. pass/fail) for the designated testing criteria for compliance. Designated testing criteria should include room differential pressure, room air change rates, HEPA Filter leak challenge test, non-viable air particulate, room temperature, and relative humidity. Contractor shall use Attachment G as an example of testing and certification results layout.

Hours of Work: Work required in the performance of this contract shall be performed during the hospital's regular administrative working hours, 8:00 a.m. - 4:30 p.m. excluding weekends and Federal holidays. The Contractor shall notify the Contracting Officers Representative (COR) a minimum of five (5) working days prior to visiting the hospital for inspection purposes. This notification is required to ensure that potential hazards of the hoods being inspected will be communicated to the COR prior to beginning inspection. The user will be responsible for communicating the potential hazards to the COR. Pharmacy-specific certification scheduling will be approved in advance by Pharmacy Chief.

Emergency Requirements: In order to provide the most efficient service to our veterans, our Pharmacy service may require emergency/short notice certification in the event of any unforeseen facility failure (mechanical, electrical, etc.) or unplanned disruption that causes Pharmacy service to be interrupted. Contractor shall be available to provide on-site CETA certification within 96-hour notice, if required.

Representatives of Contracting Officer: The Contracting Officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally supervise the work to be performed under this contract. Such designation will be in writing and will define the scope and limitations of the designee's authority. A copy of the designation shall be furnished the Contractor.

Safety Requirements: In the performance of this contract, the Contractor shall take such safety precautions as the Contracting Officer, or his designee may determine to be reasonably necessary to protect the lives and health of human and animal occupants of the buildings. The Contracting Officer or his designee will notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the Contractor in default in accordance with the Default clause of this contract.

Damage to Government Property From Causes Other Than Contractor's Negligence: Nothing in this contract shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for indemnification for any loss, destruction of, or damages to property in the custody and care of the Contractor, where such loss, destruction of, or damage is to Government property. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for any loss, destruction of, or damage to Government property and upon request of the Contracting Officer, shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.

Contractor's Responsibilities: The Contractor shall obtain all necessary licenses and/or permits required to perform this work. He/she shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. He/she shall be responsible for any injury to himself/herself, his/her employee or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employee's fault or negligence. Before commencing work under this contract, the Contracting Officer may require the Contractor to furnish a certification from his insurance company indicating the coverage as specified

Research Biosafety Cabinets, Fume hoods, and Laminar (horizontal) Flow cabinets

Location
Fan ID
MFG658
Model
S/N
Testing Frequncy
DG01
Dump Station
Allentown
3210000
201205142J
Semi-annual
DG03
Recirculating
Nuaire
NU-425-400
57049
Semi-annual
DG04
Recirculating
Nuaire
NU-425-400
57047
Semi-annual
DG06
Recirculating
Nuaire
NU-540-500
215775090722
Semi-annual
DG08
Recirculating
Baker
SG-400
SL-43403V
Semi-annual
DG08
In-Line HEPA
Atmos Tech
SA-183

Semi-annual

D117
Recirculating
Nuaire
NU-477-400
169117062915
Annual
D205a
D-Wing/49
Nuaire
NU-425-600
57893ABM
Semi-annual
D213c
Recirculating
Nuaire
NU-540-500
220320051123
Annual
D217
Recirculating
Nuaire
NU-540-600
217801011123
Annual
D215
Recirculating
Nuaire
NU-425-500
157316061313
Annual
D305
D-Wing/53
Nuaire
NU-540-500
220318051123
Semi-annual

ATTACHMENT A:

Laboratory Fume Hood

Location
Fan ID
MFG658
Model
S/N
Testing Frequncy
D117
D-wing/42
Duralab
D117-01
Annual
D205
D-wing/49
Duralab
D205-01
Annual
D213
D-wing/48
Duralab
D213-01
Annual
D217
D-wing/46
Duralab
D217-01
Annual
D217A
D-wing/47
Duralab
D217A-01
Annual
D222
D-wing/45
Duralab
D222-01
Annual

Laminar/Horizontal Flow Hoods

Location
Fan ID
MFG658
Model
S/N
Testing Frequncy
D213b
Recirculating
Labconco
3610000
080181456P
Annual
D217a
Recirculating
Nuaire
NU-240-630
219722041223
Annual

Attachment B:

Laminar Flow Benches Labs and Morgue

Location
Fan Type
MFG
Model
Freq
A342
Horizontal

Hamilton

4FT
Annual
C322
Horizontal
1375
Annual

C322

Horizontal The Baker Co.

Annual

C325A
Horizontal
The Baker Co.
Sterile Guard
Annual
C343
Horizontal
Thermo Scientific

Annual

C349
Horizontal
Fisher Hamilton
54L933
Annual
C375
Horizontal
Thermo Scientific
1321
Annual
C389
Horizontal
Labconco
Premier Protector
Annual

BL-18

Morgue

Horizontal

MorTech

Attachment C:

Sterile Compounding Area/IV Cleanroom suite 2 - locations Main Sterile Compounding Area/IV cleanroom suite

Primary Engineering Controls (PEC):

Type
Class
Model #
Serial #
EE #
Location
BSC-1, Class II B2
ISO 5
NU-430-400
172639021116
248263
B135B
BSC-2, Class II B2
ISO 5
NU-560-400
194119092319
288945
B135B
LFB-1
ISO 5
NU-201-600
151283061212
211056
B135A
LFB-2
ISO 5
NU-201-600
151282061212
211054
B135A
Secondary Engineering Controls (SEC):
ISO level
Garb room
ISO 8

B133

Anteroom
ISO 7

B135

Non-Haz/IV Prep buffer room
ISO 7

B135A

Haz/chemo buffer room
ISO 7

B135B

Hazardous Storage room
Unclassified

B134

Main Sterile Compounding Area/IV cleanroom suite

The following drawing depicts the Pharmacy Primary and Secondary Engineering Controls layout. The drawing is not to scale.

Attachment D:

Contingency space:

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite

Primary Engineering Controls (PEC):

Type
Class
Model #
Serial #
EE #
Location
BSC, Class II A2 with VFC exhaust canopy
ISO 5
NU-543-400
xxxx
xxxx
C105C
LFB
ISO 5
NU-240-430
xxxx
xxxx
C105D
Secondary Engineering Controls (SEC):
ISO level
Garb room
ISO 8

C105A

Anteroom
ISO 7

C105B

Non-Haz/IV Prep buffer room
ISO 7

C105D

Haz/chemo buffer room
ISO 7

C105C

Contingency Sterile Compounding Area/IV clean room suite

The following drawing depicts the Pharmacy Primary and Secondary Engineering Controls layout. The drawing is not to scale.

ATTACHMENT E:

Pharmacy-specific HEPA Filters – tested Semi Annually

HEPA location
HEPA size (feet)
Garb Room B133
2 x 2
Garb Room B133
2 x 4
Ante Room B135
2 x 4
Ante Room B135
2 x 4
IV Room B135A
2 x 4
IV Room B135A
2 x 4
IV Room B135A
2 x 4

Hazardous Compounding B135B 2 x 4

Hazardous Compounding B135B 2 x 4

Hazardous Compounding B135B 2 x 4

Hazardous Compounding B135B 2 x 2

Chemo Storage B134
2 x 4
Contingency C105A
2 x 2
Contingency C105B
2 x 4
Contingency C105C
2 x 2
Contingency C105C
2 x 4
Contingency C105D
2 x 4
Area
Testing Frequency
Garb Room B133
Semi-annually
Ante Room B135
Semi-annually
IV Room B135A
Semi-annually
Hazardous Compounding B135B
Semi-annually
Laminar Flow Benches B135A (2)
Semi-annually
Biologic Safety Cabinets B135B (2)
Semi-annually
Pharmacy Compounding Pass-Through Windows (3)
Semi-annually

Contingency C105A Semi-annually

Contingency C105B Semi-annually

Contingency C105C Semi-annually

Contingency C105D Semi Annually

ATTACHMENT F:

Viable air & surface Environmental Sampling Areas – to be tested Semi-Annually

ATTACHMENT G:

**Example Document of Certification testing Results**

Location/Facility:Vendor:
Date:Certifier:

PRESSURE

Higher Pressure
Lower Pressure
Accept Min Pressure
Actual Diff Pressure
Design Pressure
Actual Pressure
Results
Garb Room
Main Pharmacy
NA
0.029
POS
POS
PASS
Anteroom
Garb Room
0.02
0.023
POS
POS
PASS
IV prep room (non-HD)
Anteroom
0.02
0.030
POS
POS
PASS
Haz Compound
Anteroom
0.01 – 0.03
0.022
NEG
NEG
PASS
Haz storage
Garb Room
0.01
0.024
NEG
NEG
PASS
ROOM
ROOM AREA (FT)
ROOM VOLUME (FT3)
AIR VOLUME

(cfm)

CLASS
MIN ACCEPTED ACR
AC/HR
TEST RESULT
GARB ROOM B133
100.0
750.0
212
8
12
17
PASS
ANTE ROOM B135
158.0
1,158
587
7
30
30
PASS

HAZ

COMPOUND B135B

109.0
818.0
1,285
7
30
94
PASS
CHEMO STORAGE B134
150.0
675
140
UN
12
12
PASS
IV ROOM B135A
178.0
1,335
1,050
7
15
47
PASS
IV ROOM W/PECS
178.0
1,335
1,050
7
30
154
PASS

AIR EXCHANGES IN ROOM

UN == unclassified

LOCATION
ROOM TEMP (°C)
USP guidelines
HUMIDITY (%Rh)
USP ?? Guidelines
GARB ROOM B133
21.0
20°C
44
Less than 60%
ANTEROOM B135
22.0
20°C
44
Less than 60%
IV PREP ROOM B135A
22.0
20°C
44
Less than 60%
HAZ COMPOUND B135B
22.0
20°C
44
Less than 60%
HAZARDOUS STORAGE B134
NA
Not measured
NA
Less than 60%

TEMPERATURE – relative HUMIDITY **Current temperature above 20°C to maintain %Rh less than 60%. Engineering to replace valve to better regulate ?? to be replaced with most current/updated standards of USP

DYNAMIC SMOKE TEST

LAMINAR EQUIPMENT
ISO CLASS
TEST RESULT
VIDEO EVIDENCE
BSC-1
5
PASS
YES
BSC-2
5
PASS
YES
LFB-1
5
PASS
YES
LFB-2
5
PASS
YES

Staff performing smoke test – Marci

PARTICLES

LOCATION
CLASS
ACCEPT MAX AVERAGE

COUNT

ACTUAL MAX AVERAGE

COUNT

RESULTS
Model #
Serial #
EE#
Report ID
BSC-1
5
3,520
0
PASS
NU-430- 400
159451100913
225052
687616
BSC-2
5
3,520
0
PASS
NU-560- 400
194119092319
288945
687617
LFB- 1 (right)
5
3,520
0
PASS
NU-201- 630
151282061212
211056
687614
LFB-2 (left)
5
3,520
0
PASS
NU-201-
151283061212
211054
687615
HAZ COMPOUND
7
352,000
3940
PASS
NA
NA
NA
NA
ANTEROOM
7
352,000
3660
PASS
NA
NA
NA
NA
IV PREP (NON- HD)
7
352,000
2560
PASS
NA
NA
NA
NA
GARB ROOM
8
3,520,000
312,240
PASS
NA
NA
NA
NA
HAZ STORAGE
UN
NA
NA
NA
NA
NA
NA
NA

HEPA LEAK TEST – Room filters

HEPA ID
Source
Actual Leakage
Design Leakage %
Pass/Fail
HAZ - TAF1
Supply
0.00
<0.01
PASS
HAZ - TAF2
Supply
0.00
<0.01
PASS
HAZ - TAF3
Supply
0.00
<0.01
PASS
HAZ - TAF4
Supply
0.00
<0.01
PASS
ANTE – AF1
Supply
0.00
<0.01
PASS
ANTE – TAF2
Supply
0.00
<0.01
PASS
NONHAZ – TAF1
Supply
0.00
<0.01
PASS
NONHAZ – TAF2
Supply
0.00
<0.01
PASS
NONHAZ – TAF3
Supply
0.00
<0.01
PASS
GARB – TAF1
Supply
0.00
<0.01
PASS
GARB – TAF2
Supply
0.00
<0.01
PASS
CHEMO STORE – TAF1
Supply
0.00
<0.01
PASS

HEPA LEAK TEST - equipment

Source
Model #
Serial #
EE#
Report ID
Design Leakage

Actual Leakage Pass/Fail

BSC-1
Exhaust
NU-430-400
159451100913
225052
687616
<0.01
0.00
PASS

Supply

<0.01
0.00
PASS
BSC-2
Exhaust
NU-560-400
194119092319
288945
687617
<0.01
0.00
PASS

Supply

<0.01
0.00
PASS
LAFW 1 (right)
Supply
NU-201-630
151282061212
211056
687614
<0.01
0.00
PASS
LAFW 2 (left)
Supply
NU-201-630
151283061212
211054
687615
<0.01
0.00
PASS

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Annual Bio-Safety Testing Contract Period: Base POP Begin: 07-01-2024 POP End: 06-30-2025 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: H999 - Other Quality Control, Testing, and Inspection - Miscellaneous

0001AA

1.00
JB
__________________
__________________

(Location: D117) Recirculating Fan, Nuaire, Model: NU-477-400, SN: 169117062915

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AB

1.00
JB
__________________
__________________

(Location: D213C) Recirculating Fan, Nuaire, Model: NU-540-500, SN: 220320051123

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AC

1.00
JB
__________________
__________________

(Location: D217) Recirculating Fan, Nuaire, Model: NU-540-600, SN: 217801011123

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AD

1.00
JB
__________________
__________________

(Location: D215) Recirculating Fan, Nuaire, Model: NU-425-500, SN: 157316061313

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AE

1.00
JB
__________________
__________________

(Location: D117) D-wing/42 Duralab Laboratory Fume Hood SN: D117-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AF

1.00
JB
__________________
__________________

(Location: D205) D-wing/49 Duralab Laboratory Fume Hood SN: D205-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AG

1.00
JB
__________________
__________________

(Location: D213) D-wing/48 Duralab Laboratory Fume Hood SN: D213-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AH

1.00
JB
__________________
__________________

(Location: D217) D-wing/46 Duralab Laboratory Fume Hood SN: D217-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AI

1.00
JB
__________________
__________________

(Location: D217A) D-wing/47 Duralab Laboratory Fume Hood SN: D217A-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AJ

1.00
JB
__________________
__________________

(Location: D222) D-wing/45 Duralab Laboratory Fume Hood SN: D222-01

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AK

1.00
JB
__________________
__________________

(Location: D213b) Laminar/Horizontal Flow Hoods, Labonco, Model: 3610000, SN: 080181456P

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AL

1.00
JB
__________________
__________________

(Location: D217a) Laminar/Horizontal Flow Hoods, Nuaire, Model: NU-240-630, SN: 219722041223

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AM

1.00
JB
__________________
__________________

(Location: A32) Laminar Flow Benches Labs and Morgue - Horizontal, Hamilton, 4ft

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AN

1.00
JB
__________________
__________________

(Location: C322) Laminar Flow Benches Labs and Morgue, Horizontal, 1375

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AO

1.00
JB
__________________
__________________

(Location: C322) Laminar Flow Benches Labs and Morgue, Horizontal, The Baker Company, 1375

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AP

1.00
JB
__________________
__________________

(Location: C325A) Laminar Flow Benches Labs and Morgue, Horizontal, The Baker Company, Sterile Guard

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AQ

1.00
JB
__________________
__________________

(Location: C343) Laminar Flow Benches Labs and Morgue, Horizontal, Thermo Scientific

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AR

1.00
JB
__________________
__________________

(Location: C349) Laminar Flow Benches Labs and Morgue, Horizontal, Fisher Hamilton, 54L933

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AS

1.00
JB
__________________
__________________

(Location: C375) Laminar Flow Benches Labs and Morgue, Horizontal, Thermo Scientific, 1321

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AT

1.00
JB
__________________
__________________

(Location: C389) Laminar Flow Benches Labs and Morgue, Horizontal, Labconco, Premier Protector

POP Begin: 07-01-2024 POP End: 06-30-2025

0001AU

1.00
JB
__________________
__________________

(Location: B11-18 Morgue) Laminar Flow Benches Labs and Morgue, Horizontal, MorTech

POP Begin: 07-01-2024 POP End: 06-30-2025

2.00
JB
__________________
__________________

Semi-Annual Bio-Saftey Testing

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AA

2.00
JB
__________________
__________________

(Location: DG01) Dump Station, Allentown, Model: 3210000, SN: 201205142J

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AB

2.00
JB
__________________
__________________

(Location: DG03) Recirculating, Nuaire, Model: NU-425-400, SN: 57049

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AC

2.00
JB
__________________
__________________

(Location: DG04) Recirculating, Nuaire, Model: NU-425-400, SN: 57047

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AD

2.00
JB
__________________
__________________

(Location: DG06) Recirculating, Nuaire, Model: NU-540-500, SN: 215775090722

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AE

2.00
JB
__________________
__________________

(Location: DG08) Recirculating, Baker, Model: SG-400, SN: SL-43403V

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AF

2.00
JB
__________________
__________________

(Location: DG08) In Line Hepa, Atmos Tech, Model: SN-183

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AG

2.00
JB
__________________
__________________

(Location: D305) D-wing/53, Nuaire, Model: NU-425-600, SN: 57893ABM

POP Begin: 07-01-2024 POP End: 06-30-2025

0002AH

2.00
JB
__________________
__________________

(Location: D205a) D-wing/49, Nuaire, Model:NU-540-500, SN: 220318051123

POP Begin: 07-01-2024 POP End: 06-30-2025

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite - Semi-Annual

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AA

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: BSC-1, Class II B2, ISO 5, Model: NU-430-400, SN: 172639021116, EE# 248263, Location: B135B

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AB

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: BSC-2, Class II B2, ISO 5, Model: NU-560-400, SN: 194119092319, EE# 288945, Location: B135B

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AC

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: LFB-1, ISO 5, Model: NU-201-600, SN: 151283061212, EE# 211056, Location: B135A

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AD

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: LFB-2, ISO 5, Model: NU-201-600, SN: 151282061212, EE# 211054, Location: B135A

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AE

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Garb Room, ISO8, Location: B133

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AF

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Ante Room, ISO7, Location: B135

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AG

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Non-Haz/IV Prep buffer room, ISO7, Location: B135A

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AH

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Haz/chemo buffer room, ISO7, Location: B135B

POP Begin: 07-01-2024 POP End: 06-30-2025

0003AI

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Hazardous Storage room, unclassified, Location: B134

POP Begin: 07-01-2024 POP End: 06-30-2025

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite - Semi-Annual Contract Period:

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AA

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, BSC, Class II A2 with VFC exhaust canopy, ISO5, Model: NU-543-400, Location: C105C

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AB

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, LFB, ISO 5, Model: NU-240-430, Location: C105D

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AC

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Garb Room, ISO8, Location: C105A

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AD

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Anteroom Room, ISO7, Location: C105B

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AE

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Non-Haz/IV Prep buffer room , ISO7, Location: C105D

POP Begin: 07-01-2024 POP End: 06-30-2025

0004AF

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Haz/chemo buffer room , ISO7, Location: C105C

POP Begin: 07-01-2024 POP End: 06-30-2025

2.00
JB
__________________
__________________

Pharmacy-specific HEPA Filters – tested Semi Annually

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AA

2.00
JB
__________________
__________________

Location: Garb Room B133 Size: 2x2

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AB

2.00
JB
__________________
__________________

Location: Garb Room B133 Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AC

2.00
JB
__________________
__________________

Location: Ante Room B135 Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AD

2.00
JB
__________________
__________________

Location: Ante Room B135 Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AE

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AF

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AG

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AH

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AI

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AJ

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AK

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x2

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AL

2.00
JB
__________________
__________________

Location: Chemo Storage B134 Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AM

2.00
JB
__________________
__________________

Location: Contingency C105A Size: 2x2

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AN

2.00
JB
__________________
__________________

Location: Contingency C105B Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AO

2.00
JB
__________________
__________________

Location: Contingency C105C Size: 2x2

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AP

2.00
JB
__________________
__________________

Location: Contingency C105C Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

0005AQ

2.00
JB
__________________
__________________

Location: Contingency C105D Size: 2x4

POP Begin: 07-01-2024 POP End: 06-30-2025

2.00
JB
__________________
__________________

Viable Air and Surface Environmental Sampling Areas - tested Semi-Annually

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AA

2.00
JB
__________________
__________________

Garb Room B133

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AB

2.00
JB
__________________
__________________

Ante Room B135

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AC

2.00
JB
__________________
__________________

IV Room B135A

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AD

2.00
JB
__________________
__________________

Hazardous Compounding B135B

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AE

2.00
JB
__________________
__________________

Laminar Flow Benches B135A (2)

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AF

2.00
JB
__________________
__________________

Biologic Safety Cabinets B135 B (2)

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AG

2.00
JB
__________________
__________________

Pharmacy Coupounding Pass-Through Windows (3)

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AH

2.00
JB
__________________
__________________

Contingency C105A

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AI

2.00
JB
__________________
__________________

Contingency C105B

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AJ

2.00
JB
__________________
__________________

Contingency C105C

POP Begin: 07-01-2024 POP End: 06-30-2025

0006AK

2.00
JB
__________________
__________________

Contingency C105D

POP Begin: 07-01-2024 POP End: 06-30-2025

1.00
JB
__________________
__________________

Annual Bio-Safety Testing Contract Period: Option 1 POP Begin: 07-01-2025 POP End: 06-30-2026

1001AA

1.00
JB
__________________
__________________

(Location: D117) Recirculating Fan, Nuaire, Model: NU-477-400, SN: 169117062915

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AB

1.00
JB
__________________
__________________

(Location: D213C) Recirculating Fan, Nuaire, Model: NU-540-500, SN: 220320051123

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AC

1.00
JB
__________________
__________________

(Location: D217) Recirculating Fan, Nuaire, Model: NU-540-600, SN: 217801011123

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AD

1.00
JB
__________________
__________________

(Location: D215) Recirculating Fan, Nuaire, Model: NU-425-500, SN: 157316061313

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AE

1.00
JB
__________________
__________________

(Location: D117) D-wing/42 Duralab Laboratory Fume Hood SN: D117-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AF

1.00
JB
__________________
__________________

(Location: D205) D-wing/49 Duralab Laboratory Fume Hood SN: D205-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AG

1.00
JB
__________________
__________________

(Location: D213) D-wing/48 Duralab Laboratory Fume Hood SN: D213-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AH

1.00
JB
__________________
__________________

(Location: D217) D-wing/46 Duralab Laboratory Fume Hood SN: D217-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AI

1.00
JB
__________________
__________________

(Location: D217A) D-wing/47 Duralab Laboratory Fume Hood SN: D217A-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AJ

1.00
JB
__________________
__________________

(Location: D222) D-wing/45 Duralab Laboratory Fume Hood SN: D222-01

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AK

1.00
JB
__________________
__________________

(Location: D213b) Laminar/Horizontal Flow Hoods, Labonco, Model: 3610000, SN: 080181456P

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AL

1.00
JB
__________________
__________________

(Location: D217a) Laminar/Horizontal Flow Hoods, Nuaire, Model: NU-240-630, SN: 219722041223

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AM

1.00
JB
__________________
__________________

(Location: A32) Laminar Flow Benches Labs and Morgue - Horizontal, Hamilton, 4ft

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AN

1.00
JB
__________________
__________________

(Location: C322) Laminar Flow Benches Labs and Morgue, Horizontal, 1375

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AO

1.00
JB
__________________
__________________

(Location: C322) Laminar Flow Benches Labs and Morgue, Horizontal, The Baker Company, 1375

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AP

1.00
JB
__________________
__________________

(Location: C325A) Laminar Flow Benches Labs and Morgue, Horizontal, The Baker Company, Sterile Guard

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AQ

1.00
JB
__________________
__________________

(Location: C343) Laminar Flow Benches Labs and Morgue, Horizontal, Thermo Scientific

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AR

1.00
JB
__________________
__________________

(Location: C349) Laminar Flow Benches Labs and Morgue, Horizontal, Fisher Hamilton, 54L933

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AS

1.00
JB
__________________
__________________

(Location: C375) Laminar Flow Benches Labs and Morgue, Horizontal, Thermo Scientific, 1321

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AT

1.00
JB
__________________
__________________

(Location: C389) Laminar Flow Benches Labs and Morgue, Horizontal, Labconco, Premier Protector

POP Begin: 07-01-2025 POP End: 06-30-2026

1001AU

1.00
JB
__________________
__________________

(Location: B11-18 Morgue) Laminar Flow Benches Labs and Morgue, Horizontal, MorTech

POP Begin: 07-01-2025 POP End: 06-30-2026

2.00
JB
__________________
__________________

Semi-Annual Bio-Saftey Testing

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AA

2.00
JB
__________________
__________________

(Location: DG01) Dump Station, Allentown, Model: 3210000, SN: 201205142J

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AB

2.00
JB
__________________
__________________

(Location: DG03) Recirculating, Nuaire, Model: NU-425-400, SN: 57049

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AC

2.00
JB
__________________
__________________

(Location: DG04) Recirculating, Nuaire, Model: NU-425-400, SN: 57047

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AD

2.00
JB
__________________
__________________

(Location: DG06) Recirculating, Nuaire, Model: NU-540-500, SN: 215775090722

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AE

2.00
JB
__________________
__________________

(Location: DG08) Recirculating, Baker, Model: SG-400, SN: SL-43403V

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AF

2.00
JB
__________________
__________________

(Location: DG08) In Line Hepa, Atmos Tech, Model: SN-183

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AG

2.00
JB
__________________
__________________

(Location: D305) D-wing/53, Nuaire, Model: NU-425-600, SN: 57893ABM

POP Begin: 07-01-2025 POP End: 06-30-2026

1002AH

2.00
JB
__________________
__________________

(Location: D205a) D-wing/49, Nuaire, Model:NU-540-500, SN: 220318051123

POP Begin: 07-01-2025 POP End: 06-30-2026

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite - Semi-Annual

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AA

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: BSC-1, Class II B2, ISO 5, Model: NU-430-400, SN: 172639021116, EE# 248263, Location: B135B

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AB

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: BSC-2, Class II B2, ISO 5, Model: NU-560-400, SN: 194119092319, EE# 288945, Location: B135B

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AC

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: LFB-1, ISO 5, Model: NU-201-600, SN: 151283061212, EE# 211056, Location: B135A

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AD

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, Type: LFB-2, ISO 5, Model: NU-201-600, SN: 151282061212, EE# 211054, Location: B135A

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AE

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Garb Room, ISO8, Location: B133

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AF

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Ante Room, ISO7, Location: B135

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AG

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Non-Haz/IV Prep buffer room, ISO7, Location: B135A

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AH

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Haz/chemo buffer room, ISO7, Location: B135B

POP Begin: 07-01-2025 POP End: 06-30-2026

1003AI

2.00
JB
__________________
__________________

Main Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Hazardous Storage room, unclassified, Location: B134

POP Begin: 07-01-2025 POP End: 06-30-2026

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite - Semi-Annual

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AA

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, BSC, Class II A2 with VFC exhaust canopy, ISO5, Model: NU-543-400, Location: C105C

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AB

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Primary Engineering Controls, LFB, ISO 5, Model: NU-240-430, Location: C105D

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AC

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Garb Room, ISO8, Location: C105A

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AD

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Anteroom Room, ISO7, Location: C105B

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AE

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Non-Haz/IV Prep buffer room , ISO7, Location: C105D

POP Begin: 07-01-2025 POP End: 06-30-2026

1004AF

2.00
JB
__________________
__________________

Contingency/Alternate Sterile Compounding Area/IV cleanroom suite, Secondary Engineering Controls, Haz/chemo buffer room , ISO7, Location: C105C

POP Begin: 07-01-2025 POP End: 06-30-2026

2.00
JB
__________________
__________________

Pharmacy-specific HEPA Filters – tested Semi Annually

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AA

2.00
JB
__________________
__________________

Location: Garb Room B133 Size: 2x2

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AB

2.00
JB
__________________
__________________

Location: Garb Room B133 Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AC

2.00
JB
__________________
__________________

Location: Ante Room B135 Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AD

2.00
JB
__________________
__________________

Location: Ante Room B135 Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AE

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AF

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AG

2.00
JB
__________________
__________________

Location: IV Room B135A Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AH

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AI

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AJ

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AK

2.00
JB
__________________
__________________

Location: Hazardous Compounding B135B Size: 2x2

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AL

2.00
JB
__________________
__________________

Location: Chemo Storage B134 Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AM

2.00
JB
__________________
__________________

Location: Contingency C105A Size: 2x2

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AN

2.00
JB
__________________
__________________

Location: Contingency C105B Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AO

2.00
JB
__________________
__________________

Location: Contingency C105C Size: 2x2

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AP

2.00
JB
__________________
__________________

Location: Contingency C105C Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

1005AQ

2.00
JB
__________________
__________________

Location: Contingency C105D Size: 2x4

POP Begin: 07-01-2025 POP End: 06-30-2026

2.00
JB
__________________
__________________

Viable Air and Surface Environmental Sampling Areas - tested Semi-Annually

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AA

2.00
JB
__________________
__________________

Garb Room B133

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AB

2.00
JB
__________________
__________________

Ante Room B135

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AC

2.00
JB
__________________
__________________

IV Room B135A

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AD

2.00
JB
__________________
__________________

Hazardous Compounding B135B

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AE

2.00
JB
__________________
__________________

Laminar Flow Benches B135A (2)

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AF

2.00
JB
__________________
__________________

Biologic Safety Cabinets B135 B (2)

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AG

2.00
JB
__________________
__________________

Pharmacy Coupounding Pass-Through Windows (3)

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AH

2.00
JB
__________________
__________________

Contingency C105A

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AI

2.00
JB
__________________
__________________

Contingency C105B

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AJ

2.00
JB
__________________
__________________

Contingency C105C

POP Begin: 07-01-2025 POP End: 06-30-2026

1006AK

2.00
JB
__________________
__________________

Contingency C105D

POP Begin: 07-01-2025 POP End: 06-30-2026

1.00
JB
__________________
__________________

Annual Bio-Safety Testing Contract Period: Option 2 POP Begin: 07-01-2026 POP End: 06-30-2027

2001AA

1.00
JB
__________________
__________________

(Location: D117) Recirculating Fan, Nuaire, Model: NU-477-400, SN: 169117062915

POP Begin: 07-01-2026 POP End: 06-30-2027

2001AB

1.00
JB
__________________
__________________

(Location: D213C) Recirculating Fan, Nuaire, Model: NU-540-500, SN: 220320051123

POP Begin: 07-01-2026 POP End: 06-30-2027

2001AC

1.00
JB
__________________
__________________

(Location: D217) Recirculating Fan, Nuaire, Model: NU-540-600, SN: 217801011123

POP Begin: 07-01-2026 POP End: 06-30-2027

2001AD

1.00
JB
__________________
__________________

(Location: D215) Recirculating Fan, Nuaire,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .