36C24224Q0402 0001.pdf

PDF 188 KB Posted

Attached to
J041--Solicitation | WNY BUF/BAT Chiller & Boiler Water Treatment
Solicitation number
36C24224Q0402
Issued by

About this file

This solicitation seeks proposals for water treatment systems and support services for boiler water, chilled water, and cooling towers at two Department of Veterans Affairs medical centers. The services include installation, testing, commissioning, monitoring, chemicals, and maintenance of water treatment systems from April 1, 2024 through March 31, 2025, with four optional one-year extensions. Responses are due on March 22, 2024 and should be submitted to the contracting officer. Vendors should carefully review the scope of work, price schedule, instructions to offerors, and evaluation criteria sections. The scope of work provides details on the new cooling tower system and requirements for tower cleanings and remote monitoring. Edits clarify monitoring and document requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4 None

None

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

To all Offerors/Bidders

36C24224Q0402

03-15-2024

X

X 1

See attached document.

The solicitation quote submission deadline has been moved to 03/22/2024 at 10:00am EST.

Daniel Zielinski Contracting Officer

This amendment answers the following vendor questions after the site visit on 03/13/2024 and makes changes to the SOW. A revised SOW is provided in the attachments. All additional questions shall be submitted by 03/20/2024 at 10:00am EST.

The solicitation quote submission deadline has been moved to 03/22/2024 at 10:00 am EST.

Vendor Questions

1. Question: It sounded like the new tower system and the tower system that is to remain operational in Bldg 20 will both be operational year-round. Is that correct? Or is one or both of these systems being drained for the winter? (In Buffalo, that is).

Answer: Building 20, cooling tower 3 utilizes a remote sump for a walk-in cooler that will remain filled all winter, the tower pumps only come on at 50 degrees and above. We hope to keep at least one tower full for the building 1 system for usage on the occasional “warm winter day” when cooling is necessary for our critical areas.

2. Question: I see in part 2g of section B.2.6 that it states that a third-party needs to document makeup water quality, system water chemistry, and corrosion byproducts.

Does that mean that we need to send samples out to a third-party lab every month, or is your water treatment provider considered the third party?

Answer: A water sample must be taken from the cooling tower system at least one time each month that the unit is operational and sent to an environmental-accredited laboratory for HPC testing. (ES-2019-001, pg 15).

3. Question: I.e Boiler Chemical. Can replacement porta bins be brought directly into boiler room and pumped into the bins in the containment or does the boiler chemical have to be pumped in from outside?

Answer: The boiler chemicals can be brought in from the loading dock, down the elevator and into the boiler plant main floor. The sulfite is on the mezzanine level and is currently pumped in from outside the boiler plant by the grounds offloading dike thru a permanent hose that is mounted inside the man door.

4. Question: For the Buffalo plant, can we get steam production by season?....and which boilers are in use by season?

Answer: Boilers 1,2,3 are predominantly used during the cold months, and boiler 4 is our summer boiler but does run during cold weather to supplement sometimes. All four boilers are kept in hot standby yearlong and are fired regularly to keep warm when not the main running boiler. See attached SOW for steam produced per month.

5. Question: Do you track the water usage (makeup) for the tower systems? We’d like to know how much is typically used in a year for both Buffalo and Batavia.

Answer: The are currently not being tracked by the VA.

6. Question: What is the total volume of water in the tower systems? Especially the new tower system in Buffalo.

Answer: Approximately 44,000 gallons.

7. Question: Could we get some clarification on your expectations for tower cleanings?

Answer: Semi-annual preventive maintenance (PM) as part of the start-up/shutdown process, including Cleaning of the sump and fill: the system must be disinfected, cleaned and re-disinfected immediately prior to initial startup following commissioning or any shutdown period of greater than one month or at intervals not exceeding 6 months (ES- 2019-001, pg 14).

8. Question: Will we be given an opportunity to present our findings / recommendations in person?

Answer: Written proposal only.

9. Question: One question I have is regarding the current chemical containment bins on site. Are all chemical containment bins part of this bid? Do any on site at either location need to be replaced as part of the bid?

Answer: All equipment including containment be the contractor’s responsibility to furnish, install, and maintain.

10. Question: Do dip slides need to be sent to an environmentally accredited lab?

Answer: Heterotrophic Plate Count (HPC): A water sample must be taken from the cooling tower system at least one time each month that the unit is operational and sent to an environmental-accredited laboratory for HPC testing. (ES-2019-001, pg 15)

11. Question: It also looks like the spec is calling from remote wireless data monitoring for the towers (that is reasonable), but it also says that remote monitoring should be set up for the chilled water side of each tower system. I've never seen that done and am not sure what we would even monitor in a closed loop system. Can you provide any insight as to what you're looking for?

Answer: This was a typo. See SOW edits below.

SOW EDITS

1. B.3.7.14.a shall now read the following:

a. Remote monitoring is to be set up on the condenser.

2. B.3.7.14.h has been added to read the following:

a. Monitoring system shall be able to effectively communicate with our building management system.

3. B.3.12.2 Guiding Documents, shall now read:

1. The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of applicable documents, whether they are listed here or not.

a. VHA Master Construction Specifications:

i. 23 08 00 Commissioning of HVAC Systems

ii. 23 21 13 Hydronic Piping

iii. 23 21 23 Hydronic Pumps

iv. 23 25 00 HVAC Water Treatment

2. VHA DIRECTIVE 1061(1)

3. VHA Engineering Standard ES-2019-001

a. The above directives, guides, handbooks, and drawings form a part of this document to the extent specified herein. Unless otherwise specified, the latest revisions available shall be used. Copies of related Department of Veterans Affairs directives, guides, and handbooks are available from the Office of Construction and Facilities Management website:

i. http://www.cfm.va.gov/til/index.asp

4. ASHRAE 188-2018

5. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

6. Should a conflict exist between VA requirements and nationally recognized codes and standards, the conflict must be brought to the attention of the VA. The resolution of conflict must be made by the VA Authority Having Jurisdiction (AHJ).

http://www.cfm.va.gov/til/index.asp

File details come from the government source that posted it. Updated .