This document appears to be a set of architectural drawings related to a solicitation for the renovation of the respiratory therapy department at the Stratton VA Medical Center in Albany, New York. The solicitation is for the replacement of the cooling tower atop the chiller plant in Building 54, as the existing roof system has failed and caused problems with recently installed equipment. The solicitation number is 36C24224B0036, and the federal contract opportunity ID is 4a82f58e86e54c6785db7f8c03b7f85d. The procuring agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2. No additional details are provided regarding response dates, award dates, pricing terms, set-asides, or incumbent contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC SIGNATURE BLOCK
DIRECTOR OF MEDICAL CENTER - SIGNATURE BLOCK
BUILDING 1
AREA OF WORK
SITE LOCATION
ENGINEERING LLP
FE PROJECT NO: 21-178
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
PROJECT
NORTH
KEY PLAN
CORE
WING 'C'
WING 'B' WING 'A'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
528A8-21-802
Project Director
JULY 28, 2023 JDFRevisions: Date:
RENOVATE FOR
RESPIRATORY THERAPY
100% CONSTRCUTION
DOCUMENTS
SRB
WING 'D'
A/E:
22021
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenectady Road Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
O₂
ENGINEERING LLP
FE PROJECT NO: 21-178
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
PROJECT
NORTH
KEY PLAN
CORE
WING 'C'
WING 'B' WING 'A'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
528A8-21-802
Project Director
JULY 28, 2023 JDFRevisions: Date:
RENOVATE FOR
RESPIRATORY THERAPY
100% CONSTRCUTION
DOCUMENTS
SRB
WING 'D'
A/E:
22021
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenectady Road Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
SITE SAFETY & PROPOSED STAGING PLAN1
LEGEND:
O₂
7' TEMP. CHAIN LINK FENCING DETAIL3
WITH DOUBLE MAN GATE DETAIL2
TEMPORARY CONSTRUCTION PARTITION
1 2 3 4
A
B
C
D
D236
D228D227
1 2 3 4
A
B
C
D
D236
D228D227
1 2 3 4
A
B
C
D
HIGHEST RISK AREA
ENGINEERING LLP
FE PROJECT NO: 21-178
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
PROJECT
NORTH
KEY PLAN
CORE
WING 'C'
WING 'B' WING 'A'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
528A8-21-802
Project Director
JULY 28, 2023 JDFRevisions: Date:
RENOVATE FOR
RESPIRATORY THERAPY
100% CONSTRCUTION
DOCUMENTS
SRB
WING 'D'
A/E:
22021
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenectady Road Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
UL U465 (1 HOUR RATED)
FIRECODE 'X' GYPSUM BD PANELS
APPLIED VERTICALLY OR HORIZONTALLY.
HORIZONTAL JOINTS NEED NOT BE
STAGGERED. FACE LAYER JOINTS TO BE
FINISHED. FIRE CAULK ALL
PENETRATIONS. ALL PENETRATIONS
MUST BE SEALED. PROVIDE 4' DOORS
WITH 11
2 HOUR RATING AS REQUIRED.
CONSTRUCTION PARTITION WALL DETAIL2
GENERAL PROJECT PHASING NOTE:
CONSTRUCTION PHASING PLAN
54 WEEKS TOTAL
DURATION DESCRIPTION
Weeks 1-9 Submittals & Mobilization
Weeks 10-20 PHASE 1 (Asbestos, testing & abatement)
Weeks 21-31 PHASE 2 (Architectural & MEP Demolition)
Weeks 32-42 PHASE 3 (New construction for MEP)
Weeks 43-53 PHASE 4 (New architectural construction, equipment, & system testing/finalization)
Week 54 Project Closeout:
Including: Closeout Documents, demobilization, etc.
Project Duration: 270 Days
Notes:
1. Certain activities may be combined for expediency.
2. All phasing and work is subject to the owner occupancy schedule.
3. All work needs to be coordinated with the COR in advance.
4. There will be no re-mobilization cost permitted. All work must be completed in allotted time frame.
5. Refer to spec section 01 32 16.15 for more information on Project
Scheduling Requirements.
PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP Class IV
Class III / IV
Class IV Class IV
Description of Required Infection Control Precautions by Class During Construction Project Upon Completion of
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transportation in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C la ss
IV
GENERAL NOTES:
ICRA CONSTRUCTION PLAN1
SAFETY NOTES:
KEYED NOTES:
ICRA CONSTRUCTION PLAN3 ICRA CONSTRUCTION PLAN4
S S
D236
D228D227
D237
R E
F
S S
S S
S
S SS S S S
S SS S S S S S S SS S S S S S
S S
S
S S
S SS S
S S
LIFE SAFETY LEGEND:
EGRESS PATH
EXIT SIGN (E-EXISTING)
EXISTING AREA TO REMAIN
(NOT IN CONTRACT)
INDICATES EXIT ACCESS POINT
FIRE EXTINGUISHER CABINETFEC
NON FIRE RATED SMOKE
LIMITING PARTITION
1 HR FIRE BARRIER (STAIR, SHAFT,
EXIT ACCESS)(45 MINUTE DOOR AND 1
1/2 HR FIRE DAMPER)
2 HR FIRE RATED BARRIER (90 MINUTE
DOOR AND 1 1/2 HR FIRE DAMPER)
NOTE:
GENERAL CONTRACTOR TO VERIFY INTEGRITY OF
RATED PARTITIONS INDICATED AS EXISTING WITHIN THE
PROJECT AREA. PROVIDE SAFING/ AND PATCHING AS
REQUIRED TO ACHIEVE RATING INDICATED.
I (332)
TABLE 18.1.6.1
58'- 10" COMPLIES
18' -2" COMPLIES
8'-0" COMPLIES
8'-0"
2 EXITS
MAXIMUM DEAD
END CORRIDOR
COMMON PATH
OF TRAVEL
FGI GUIDELINES
6'-0" (PUBLIC W/
STRETCHER)
5'-0" (PATIENT AREAS)
3'-8" (STAFF)
8'-0" (SEMI-
RESTRICTED O.R.)
3.7-7.2.2.1/3.1-7.2.2.1
I (332)
.3" / OCCUPANT=4.5"
7.3.3.1
EXISTING (COMPLIES)
36" MIN.
N/A 7.2.2.2.1
7 1/2" MAX.
10" MIN.
6'-8" MIN.
.2" / OCCUPANT=3"
7.3.3.1
-- 8'-0" COMPLIES
SMOKE LIMITING
PARTITIONS
2-HR RATED REAR
STAIR ENCLOSURE
2 HR-4 STORIES & MORE
1 HR-3 STORIES & LESS
7.1.3.2.1
RATINGS -
CORRIDORS
RATINGS -
STAIRS
N/A2 HR-4 STORIES & MORE
1 HR-3 STORIES & LESS
BUT NO LESS THAN
FLOOR RATING
8.6.5
RATINGS -
SHAFTS
EXISTING (COMPLIES)--
1 HR--
ACTUAL / REMARKS
(IF APPLICABLE)
OTHERNFPA 101
PROJECT/BUILDING INFORMATION
AREA OF RENOVATION: 1,880 SQFT
BUILDING IS FULLY SPRINKLERED
PROJECT IS LOCATED AT THE SECOND FLOOR OF HOSPITAL
LIFE SAFETY SCHEDULE
CODE
OCCUPANCY NEW HEALTHCARE
CHAPTER 18
CONSTRUCTION
TYPE
MAX. TRAVEL
DISTANCE
200' 18.2.6.2.1
N/A
30' 18.2.5.10
REMOTENESS OF
EXITS
NOT LESS THAN 1/2
MAX DISTANCE (66'-2")
7.5.1.3
45'-6" COMPLIES
REQUIRED NUMBER
OF EXITS
2 REQ'D
7.4.1.1
MINIMUM
CORRIDOR WIDTH
8'-0" PATIENT AREAS
3'-8" STAFF AREAS
18.2.3.3
REQUIRED EGRESS
WIDTH (PROJECT
CORRIDOR)
REQUIRED STAIR
DIMENSIONS (EXIST)
WIDTH
LANDINGS
RISERS
TREADS
HEAD HEIGHT
REQUIRED EGRESS
WIDTH (STAIRS)
NO RATING REQUIRED
LIMIT THE TRANSFER
OF SMOKE
18.3.6.2
MAXIMUM SMOKE
COMPARTMENT
22,500 GSF
18.3.7.1(3)
MAXIMUM SMOKE
COMPARTMENT
TRAVEL DISTANCE
200' 18.3.7.1(4)
RATING-STORAGE 100 SF OR GREATER
1-HR
50-100 SF
SMOKE LIMITING
PARTITION
OCCUPANT LOAD 1 OCCUPANT/120 SF
TABLE 7.3.1.2
15 OCCUPANTS MAX
FLOOR TO FLOOR HEIGHT: 12'-8"
CLASSIFICATION OF WORK: LEVEL II
EXISTING (COMPLIES)
EXISTING (COMPLIES)
158 SF
CLEAN SUPPLY
D229
120 SF
OFFICE
D230
205 SF
STAFF OPEN OFFICE
D230A
131 SF
OFFICE
D231
115 SF
VENT. PREP
D235
285 SF
CLEAN EQUIP.
D234
121 SF
LOCKER RM
D233
135 SF
BREAK RM
D232
1 2 3 4
A
B
C
D
MAX TRAVEL DISTANCE: 58'-10"
M A X C
O M
M O
N P
A T H
: 18'-2"
MAX DEAD END: 8'-0"
ODD: 66'-2"
REMOTENESS OF EXITS: 45'-6"
STAIR
SW12
FEC
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:2
P
M
1-LS-101
SECOND FLOOR LIFE SAFETY PLAN RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
PROJECT
NORTH
LIFE SAFETY NOTES:
ODD- OVERALL DIAGONAL DISTANCE
ROE- REMOTENESS OF EXITS
SCALE: 1/4" = 1'-0"1-LS-101
1 LIFE SAFETY PLAN- SECOND FLOOR
Revisions: Date:
D228D227
D237 D236
D227
D237
TOILET
MEDS
STORAGE
MECHANICAL
D202
MECHANICAL
C203
ROOF
MECHANICAL
D242
ENDO.
STORAGE
D241
D240
D201
D236
D228D227
D237
D238
D239
S W
D213
D212
D211b D211a
D211
D209 D208
D207 D206
D210
D225
A201
S T E P
MECHANICAL
D241
D240
A201
D236
D227
D237
D238
D239
D213
D212
D209 D208
D207 D206
D210
D225
PACU
TOILET
MEDS
STORAGE
JANITOR
MECHANICAL
D202
MECHANICAL
C203
ROOF
MECHANICAL
D242
MECHANICAL
ENDO.
STORAGE
DEMOLITION LEGEND:
EXISTING DOOR TO REMAIN
PARTITION TO BE REMOVED
DOOR AND FRAME TO BE REMOVED
PLUMBING FIXTURE TO REMAIN
PLUMBING FIXTURE TO BE REMOVED
EXISTING WALL TO REMAIN
AREA NOT HATCHED INDICATES REMOVAL OF ALL ITEMS INCLUDING, BUT NOT LIMITED TO PARTITIONS, VINYL WALL COVERINGS, ALL FINISH FLOOR MATERIALS, WALL BASE AND ASSOCIATED ADHESIVES AND MASTICS, FLOOR ACCESS PANELS, FLOOR DRAINS, BORROWED LITES, DOORS, FRAMES, WALL PROTECTION, CERAMIC TILE, MILLWORK, CASEWORK, LOCKERS, BENCHES, SHELVING, AND STANDARDS, WHITEBOARDS, BULLETIN BOARDS, LIGHT FIXTURES, GYPSUM BOARD CEILINGS AND SOFFITS, SUSPENDED CEILING SYSTEMS, DIFFUSERS, GRILLES, COAT RACKS, PRIVACY CURTAINS AND TRACKS, PLUMBING FIXTURES, TOILET ACCESSORIES, WALL BUMPERS, CHAIR RAILS, TV AND BRACKETS, SHARPS BOXES, ZONE VALVE BOXES, ANESTHESIA COLUMNS, GLOVE BOXES, CLOCKS, HAND SANITIZER DISPENSERS, PNEUMATIC TUBE STATIONS, SURGICAL BOOMS, PRECISION AIR DIFFUSER SYSTEMS. COORDINATE DUCTWORK, ELECTRICAL AND ALL MEDICAL GAS SYSTEM REMOVALS WITH MEP ENGINEER. COORDINATE WITH OWNER FOR THE ITEMS THAT REQUIRE SALVAGING.
COORDINATE STORAGE OF SALVAGED ITEMS WITH OWNER'S REPRESENTATIVE (COR).
EXISTING AREA TO REMAIN
(NOT IN CONTRACT)
XXXX DOOR TO BE REMOVED AND
SALVAGED FOR RELOCATION
AREA OF LIMITED REMOVALS- CEILING TILE ONLY
1 REMOVE ENCLOSURE BACK TO COLUMN.
KEY NOTES:
2 REMOVE DESK IN ENTIRETY. INCLUDING ALL ELECTRICAL
COMPONENTS.
3 REMOVE COUNTER, INCLUDING ALL SUPPORTS, BASE
CABINETS, WALL ANCHORS, SINKS & ACCESSORIES. REFER TO
PLUMBING DRAWING FOR ADDITIONAL PLUMBING FIXTURE
REMOVAL INFORMATION.
4 REMOVE ALL EXTERIOR FURRED OUT WALLS & WINDOW SILLS
BACK TO EXTERIOR BLOCK WALL. TYPICAL THROUGH OUT
PROJECT AREA.
5 REMOVE PLUMBING FIXTURE AND ALL ASSOCIATED TOILET
ACCESSORIES REFER TO PLUMBING DRAWING FOR
ADDITIONAL FIXTURE REMOVAL INFORMATION.
6 REMOVE METAL WINDOW SYSTEM AND ADJACENT WALL
CONSTRUCTION.
7 REMOVE EXISTING FIRE HOSE CABINET AND ASSOCIATED
PLUMBING FIXTURE. REF. PLUMBING DRAWING FOR
ADDITIONAL INFORMATION
8 REMOVE EXISTING CEILING TILE AFTER COMPLETION OF ABOVE
CEILING ELECTRICAL WORK. EXISTING FIXTURES AND DEVICES
TO REMAIN. COORDINATE REMOVALS WORK WITH NEW TILE
INSTALLATION.
DEMOLITION NOTES
1. DRAWINGS SHOW GENERAL SCOPE OF REMOVAL WORK. CONTRACTOR IS REQUIRED TO
VISIT SITE TO CONFIRM EXACT ITEMS AND MATERIALS TO BE REMOVED.
2. CONTRACTOR IS TO PROVIDE ALL WORK AS REQUIRED TO ALLOW FOR INSTALLATION
OF NEW WORK AS SHOWN ON DRAWINGS.
3. PROVIDE NEW OPENINGS IN EXISTING CONSTRUCTION. REMOVE ONLY AS MUCH
EXISTING CONSTRUCTION AS REQUIRED TO PROVIDE NEW OPENING. COORDINATE SIZE
OF OPENING WITH FLOOR PLAN
4. COORDINATE ACTUAL SIZE, LOCATION AND EXTENT OF FLOOR SLAB REMOVAL WITH
MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS. SAW CUT CONCRETE SLAB.
JACKHAMMERS ARE NOT ALLOWED.
5. REMOVE EXISTING FLOORING IN AREAS OF NEW WORK IN THEIR ENTIRETY TO ALLOW
FOR SMOOTH SUBSTRATE FOR NEW FLOORING.
6. SHORE EXISTING CONSTRUCTION AS REQUIRED FOR DEMOLITION AND REMOVALS.
7. REMOVE DEBRIS FROM DEMOLITION AREA AS IT IS PRODUCED. LEGALLY DISPOSE OF
MATERIALS OFF SITE.
8. PROMPTLY REPAIR ADJACENT SURFACES DAMAGED BY THE DEMOLITION.
9. ALL DOORS, EQUIPMENT, FIXTURES, REGISTERS AND OTHER ITEMS REMOVED DURING
DEMOLITION ARE TO REMAIN THE PROPERTY OF THE VA UNLESS OTHERWISE DIRECTED
BY THE VA'S REPRESENTATIVE.
10. REUSE ITEMS REMOVED AS INDICATED ON DRAWINGS OR AS DIRECTED BY VA.
11. REMOVE ALL EXISTING EXPOSED OR CONCEALED CONDUIT, WIRING INSTALLATION,
WIRING DEVICES, ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, AND EQUIPMENT
RENDERED OBSOLETE BY THE DEMOLITION OR ALTERATION. REMOVE PIPING TO THE
NEAREST MAIN.
12. RESTORE ANY EXISTING ELECTRICAL INSTALLATION DISTURBED DURING THE COURSE
OF CONSTRUCTION AND NOT INDICATED FOR REMOVAL.
13. ALL EXTERIOR DOORS AND WINDOWS TO REMAIN, UNLESS OTHERWISE INDICATED.
14. PROVIDE FIRE SAFING AND FIRESTOP SEALANT ALL ABANDONED PIPING AND CONDUIT
REMOVALS AS REQUIRED TO MAINTAIN WALL/ FLOOR RATINGS.
15. COORDINATE ALL REMOVALS SO AS TO PREVENT DEBRIS FROM FALLING INTO CEILING
BELOW.
16. CAREFULLY REMOVE PARTITIONS AROUND COLUMNS AND AT PARTITIONS TO REMAIN.
TO AVOID DAMAGING COLUMNS AND MINIMIZE DAMAGE TO CONSTRUCTION TO REMAIN.
17. PRIOR TO DEMOLITION NOTIFY VA OF ALL FIXTURES, EQUIPMENT, DEVICES, ETC. TO BE
DISCARDED AND SET ASIDE THOSE THE VA WANTS TO SALVAGE.
18. NOTIFY VA OF ALL TELEPHONE AND DATA CABLE(S) AND DEVICES INDICATED TO BE
REMOVED OR DISCONNECTED PRIOR TO TAKING ACTION. VA MAY OPT TO REMOVE.
ELECTRICAL CONTRACTOR TO REMOVE RACEWAY.
19. PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, LAWS,
AND ORDINANCES.
20. EXISTING FACILITY WILL REMAIN IN OPERATION DURING THIS WORK. ENSURE SAFE
PASSAGE OF ALL PERSONS AROUND WORK AREAS. ERECT BARRIERS AS REQUIRED
AND/ OR AS DIRECTED BY VA. MAINTAIN ALL REQUIRED EGRESS ROUTES.
21. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
22. USE SUITABLE METHODS TO LIMIT DUST AND DIRT RISING AND SCATTERING IN THE AIR.
CLEAN ADJACENT SURFACES DIRTIED BY THE REMOVALS.
23. DO NOT INTERRUPT EXISTING UTILITY SERVICE WITHOUT AUTHORIZATION FROM VA,
PROVIDE TEMPORARY SERVICE DURING INTERRUPTIONS.
24. AT ALL EXISTING COLUMN ENCLOSURES WITHIN PROJECT AREA, REMOVE EXISTING
CONSTRUCTION BACK TO STRUCTURAL COLUMN UNLESS NOTED OTHERWISE. REFER
TO PLUMBING AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION ON
ENCLOSURE CONTENT REMOVAL.
25. SURVEY PROJECT AREA FOR ANY OPENINGS THAT ARE UNSEALED AFTER DEMOLITION
WORK IS COMPLETED. SEAL ALL FLOOR OPENINGS FIRE TIGHT AND WATER TIGHT. SEAL
ALL WALL AND CEILING PENETRATIONS FIRE TIGHT AND SMOKE TIGHT.
1 2 3 4
A
B
C
D
1 1
SALVAGE FIRE
EXTINGUISHER FOR
REUSE
REMOVE ALL WALL CONSTRUCTION
BACK TO EXISTING STRUCTURAL
COLUMNS. TYPICAL AT ALL
BUILDING COLUMNS WITHIN
PROJECT AREA.
4 4 4
REMOVE ALL WALL CONSTRUCTION
BACK TO EXISTING STRUCTURAL
COLUMNS. TYPICAL AT ALL
BUILDING COLUMNS WITHIN
PROJECT AREA. REMOVE ALL WALL
CONSTRUCTION BACK TO
EXISTING STRUCTURAL
COLUMNS. TYPICAL AT ALL
BUILDING COLUMNS WITHIN
PROJECT AREA.
AREA OF CEILING
TILE REMOVAL
1-AD-100
ELECTRICAL PANEL
2-DEC REF.
ELECTRICAL DWGS.
ED PATIENT
ROOMS
D119
ONCALL ROOM
D125
FEMALE STAFF
BATHROOM
D124
MALE STAFF
BATHROOM
D123
CONFERENCE /
BREAK ROOM
D122
PATIENT
BATHROOM
D120
1ST FLOOR ED
HATCHED AREA INDICATES AREA OF CEILING
TILE REMOVAL.
APC-3
APC-3
APC-3
APC-3
APC-3
APC-3
D125A
APC-3
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:0
P
M
1-AD-100
SECOND FLOOR DEMOLITION PLAN RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
PROJECT
NORTH
SCALE: 1/4" = 1'-0"1-AD-100
1 SECOND FLOOR DEMOLITION PLAN
Revisions: Date:
NOTE:
AT ALL AREA WITHIN PROJECT SCOPE (APPROX. 1,900 SF): REMOVE
EXISTING 2" TOPPING SLAB DOWN TO STRUCTURAL CONCRETE FLOOR
SLAB. TAKE PROPER PRECAUTIONS TO NOT CUT OR DAMAGE EXISTING
STRUCTURAL FLOOR SLAB. TOPPING SLAB REMOVALS SHALL BE
COORDINATED WITH COR TO INSURE DISRUPTIONS TO ADJACENT AREAS
ARE MINIMIZED.
SCALE: 1/16" = 1'-0"1-AD-100
SECOND FLOOR DEMOLITION REFLECTED CEILING
PLAN
SCALE: 1/8" = 1'-0"1-AD-100
FIRST FLOOR D WING DEMOLITION REFLECTED
CEILING PLAN
CODE
ACCESSORY LEGEND
ITEM
PROVIDED BY
V = VA / C = CONTRACTOR
INSTALLED BY
CCLOTHING HOOKCH C
GRAB BARGB
VHAND SANITIZER DISPENSERHSD
VLIQUID SOAP DISPENSERLSD C
CMIRRORMR C
VPAPER TOWEL DISPENSERPTD C
CSANITARY NAPKIN DISPOSALSND C
C C
C
VTOILET TISSUE DISPENSERTTH C
FEC SIGNAGE
H T
TEL/
DATA
TWIST LOCK
RECEPTACLE
RECEPTACLE
'-6
" 6 '-0
DOOR
ACTUATOR
LIGHTING
SWITCHES
HUMIDISTAT
THERMOSTAT
ALARM
PANEL
FIRE HOSE
CABINET (FHC)
'-0
'-0
'-0
ZONE VALVE BOXES
Z.V. Z.V.
ELECTRIC
PANEL (E.P.)
'-6
" 4 '-0
FEC
'-6
" A T
S T
A F
F /D
U T
Y S
T A
T
IO
N S
'-9
NURSE
CALL
NC
'-0
'-1
0"
CH
PTD
'-2
LSD
'-6
SND
'-3
'-0
HOLDER OUTLET
AND TOP EDGE
OF DISPOSAL
TYPICAL MOUNTING HEIGHTS, EXCLUDES
TOILET ROOMS UNLESS OTHERWISE NOTED.
SOFFIT
3" LIGHT VALANCE,
AS INDICATED
COUNTERTOP AND
BACKSPLASH AS
INDICATED
SINK AND FAUCET -
SEE PLUMBING
DRAWINGS
DOOR SWING
WALL BASE
ADJUSTABLE SHELVES ON BRACKETS
STANDARDS
WIREMOLD/ RECEPTACLE - COORDINATE
WITH ELECTRICAL DRAWINGS
WORK SURFACE
TACK PANEL, AS INDICATED
BACKSPLASH, AS INDICATED
METAL
SUPPORT
BRACKET
WALL CABINET
CABINET
MICROWAVE
OPEN
WALL CABINET
WALL SHELVES
ADJUSTABLE
COUNTER/ SINK BASE CABINET
(1) DRAWER
BASE CABINET/ BASE CABINET
(4) DRAWER
BASE CABINET/
W/ BACKSPLASH
WORKSURFACE
NOTE:
CABINET TYPE LEGEND GRAPHICALLY DENOTES MILLWORK
TYPES FOUND IN INTERIOR ELEVATIONS. SEE MILLWORK DETAIL
DRAWING FOR CORRESPONDING MILLWORK SECTIONS.
DOOR PULLS
V A
R
IE
S
C O
U N
T E
R H
E
IG
H T
SLOPED TOP, AS
INDICATED
MICROWAVE
SINK APRON
REMOVABLE
SINK APRON
FILLER
PROVIDE 4" x 4" RIGID
WALL PROTECTION AT
ADJACENT WALL TO
PROTECT WALL FROM
DOOR HANDLE
MR
PTD
'-4
1'-3"
'-1
0"
MIN.
8"
LEG CLEARANCE
11" MIN.
CLEARANCE
9" TOE
'-3
LAVATORY
'-1
0"
LIQUID SOAP
DISPENSER
LSD
CLEAR
KNEE
SPACE
TYPICAL MOUNTING HEIGHTS AT TOILET
ROOMS UNLESS OTHERWISE NOTED.
1'-6"
3'-6" 1'-0"
'-1
0"
'-9
'-6
39" TO 41"
3'-0" 6"
TOILET - FLOOR MOUNTED
'-5
'-6
7" TO 9"
'-0
NC
GB
GB
TTH
GB
DRAIN PIPE PROTECTION
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE GOVERNMENT CODES INCLUDING BUT
NOT LIMITED TO THE "BUILDING CODE OF NEW YORK STATE", "NEW YORK STATE
ENERGY CONSERVATION CODE", OSHA, ADA, AND NFPA.
2. ALL ENTRANCES SHALL COMPLY WITH THE ARCHITECTURAL BARRIERS ACT (ABA)
ACCESSIBILITY STANDARDS.
3. CONTRACTOR IS TO PERFORM A SITE VISIT TO BECOME FAMILIARIZED WITH EXISTING
CONDITIONS BEFORE SUBMITTING PRICING.
4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND NOTIFY
ARCHITECT OF ANY INACCURACIES.
5. THE CONTRACTOR SHALL HOLD THE VA, ARCHITECT AND ENGINEERS HARMLESS
AGAINST ANY AND ALL CLAIMS ARISING FROM WORK PERFORMED ON THE
CONSTRUCTION SITE.
6. COMMENCE WORK IMMEDIATELY UPON AWARD OF THE CONTRACT. PROCEED
DILIGENTLY AND CONTINUOUSLY TO COMPLETION.
7. PRIOR TO STARTING WORK, SUBMIT FOR VA'S APPROVAL A DETAILED SCHEDULE
INDICATING ALL WORK THAT MIGHT AFFECT VA'S USE OF BUILDING SUCH AS UTILITY
SHUT DOWNS, NOISE GENERATING CONSTRUCTION, ETC.
8. EXISTING FACILITY WILL REMAIN IN OPERATION DURING THIS WORK. ENSURE SAFE
PASSAGE OF ALL PERSONS AROUND WORK AREAS. ERECT BARRIERS AS REQUIRED
AND/OR AS DIRECTED BY VA. MAINTAIN ALL REQUIRED EGRESS ROUTES. DO NOT LIMIT
VA'S USE OF FACILITY WITHOUT VA'S APPROVAL.
9. CONTRACTOR SHALL TAKE PRECAUTIONS TO AVOID ANY DISRUPTION, DAMAGE OR
HAZARD TO VA AND VA'S CLIENTS DURING CONSTRUCTION. MAINTAIN BUILDING
SECURITY AND PROTECTION FOR OCCUPANTS SAFETY.
10. PATCH FIRE PROTECTION DAMAGED DURING CONSTRUCTION TO RESTORE EXISTING
FIRE RATING.
11. DO NOT INTERRUPT EXISTING UTILITY SERVICE WITHOUT VA AUTHORIZATION. PROVIDE
SERVICE DURING INTERRUPTIONS.
12. PERFORM WORK IN A MANNER WHICH MINIMIZES NOISE. SCHEDULE OPERATIONS AS
MAY BE DIRECTED BY VA.
13. PROVIDE VA WITH TIMELINE SCHEDULE FOR INSTALLATION OF VA-PROVIDED,
CONTRACTOR INSTALLED EQUIPMENT.
14. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO COMPLETE
THE WORK.
15. PROVIDE ALL MATERIALS AND PERFORM ALL WORK IN ACCORDANCE WITH RECOGNIZED
GOOD STANDARD PRACTICES.
16. ALL MATERIALS SHALL BE AS SPECIFIED, OR AS EQUAL AS APPROVED BY ARCHITECT.
MATERIALS SPECIFIED INDICATE QUALITY INTENT THAT WILL BE USED AS A BASIS FOR
REVIEW OF SUBSTITUTES.
17. ALL ITEMS WHICH ARE NOT SPECIFICALLY REFERRED TO ON THESE DRAWINGS ARE TO
BE SELECTED BY THE VA FROM THE MANUFACTURER'S STANDARD SAMPLES SHOWING
FULL RANGE OF TEXTURES AND COLORS AVAILABLE.
18. FOLLOW MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS FOR INSTALLATION OF
ALL MATERIALS.
19. SURVEY PROJECT AREA FOR ANY OPENINGS THAT ARE UNSEALED IN FLOORS /
CEILINGS (ABOVE) OR RATED / SMOKE LIMITING PARTITIONS. THIS ALSO INCLUDES ANY
STEAM AND CONDENSATE RISERS. SEAL ALL PENETRATIONS AS REQUIRED BY
PARTITION TYPE OR FLOOR RATING REQUIREMENT.
20. THE WORDS "PROVIDE" OR "SUPPLY" SHALL INCLUDE BOTH FURNISHING AND
INSTALLING THE SPECIFIED OR DETAILED ITEM, IN PLACE AND READY FOR OPERATION
AND USE.
21. CONTRACTOR SHALL STORE MATERIALS IN VA DESIGNATED AREAS. MATERIAL DELIVERY
SHALL BE AS DIRECTED BY VA.
22. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
23. ALL DIMENSIONS SHALL BE FIELD VERIFIED. DO NOT SCALE DRAWINGS. INDICATED
DIMENSIONS ARE TO CENTERLINE OF STEEL, FACE OF EXISTING GYPSUM BOARD
PARTITIONS, FACE OF STUDS AT NEW GYPSUM BOARD PARTITIONS OR FACE OF CMU.
24. MINOR ITEMS OF WORK SUCH AS CUTTING, BLOCKING, TRIM, ETC. SHALL BE
PERFORMED AS REQUIRED TO MAKE THE WORK COMPLETE WHETHER SHOWN ON THE
CONTRACT DOCUMENTS OR NOT.
25. PROVIDE TEMPORARY AND REMOVABLE PROTECTION FOR INSTALLED PRODUCTS.
CONTROL ACTIVITY IN IMMEDIATE WORK AREA TO MINIMIZE DAMAGE.
26. PROVIDE PROTECTIVE COVERINGS AT WALLS, PROJECTIONS, JAMBS, SILLS AND
SOFFITS OF OPENINGS NOT AFFECTED BY CONSTRUCTION.
27. PROTECT FINISHED FLOORS AND OTHER SURFACES WITH DURABLE SHEET MATERIALS
FROM TRAFFIC, DIRT, WEAR, DAMAGE OR MOVEMENT OF HEAVY OBJECTS.
28. PRIOR TO DEMOLITION, NOTIFY VA OF ALL FIXTURES, DEVICES, ETC. TO BE DISCARDED
AND SET ASIDE THOSE THE VA WANTS TO SALVAGE.
29. NOTIFY VA OF ALL TELEPHONE, DATA CABLE(S) AND DEVICES INDICATED TO BE
REMOVED OR DISCONNECTED PRIOR TO TAKING ACTION. VA MAY OPT TO REMOVE.
ELECTRICAL CONTRACTOR TO REMOVE RACEWAY.
30. USE SUITABLE METHODS TO LIMIT DUST/DIRT FROM ADJACENT SURFACES DIRTIED BY
THE REMOVALS.
31. CONTROL ACCUMULATION OF WASTE MATERIALS AND RUBBISH FROM CONSTRUCTION.
LEAVE PROJECT AREA BROOM CLEAN AT THE END OF EACH DAY. REMOVE ALL DEBRIS
FROM THE SITE IN ACCORDANCE WITH STATE AND LOCAL CODES. COORDINATE
REMOVAL WITH VA.
32. PERFORM FINAL CLEANING AT THE END OF THE CONTRACT. CLEAN INTERIOR
SURFACES, EQUIPMENT AND FIXTURES. REPLACE FILTERS AT MECHANICAL EQUIPMENT.
A08
PARTITION TYPE
5/8" TYPE "X" GYPSUM
WALLBOARD, ONE
SIDE
7/8" x 20 GA FURRING HAT
CHANNEL @ 16" O.C.
EXISTING WALL
SCALE: 1" = 1'-0"
1 1/2"
G08
PARTITION TYPE
2 1/2" x 20 GA @ 16" O.C.
STEEL STUD FRAMING
5/8" TYPE "X" GYPSUM
WALLBOARD, ONE SIDE
2 1/2" ACOUSTICAL
BATT INSULATION
SCALE: 1" = 1'-0"
3 1/8"
5/8" TYPE "X" GYPSUM
WALLBOARD, ONE SIDE
3 1/2" ACOUSTICAL
BATT INSULATION
3 5/8" 20 GA @ 16"
O.C. STEEL STUD
FRAMING
J08
PARTITION TYPE
SCALE: 1" = 1'-0"
4 1/4"
5/8" TYPE "X" GYPSUM
WALLBOARD, EACH SIDE
3 5/8" x 20 GA @ 16"
O.C. STEEL STUD
FRAMING
3 1/2" ACOUSTICAL
BATT INSULATION
J18
PARTITION TYPE
SCALE: 1" = 1'-0"
STC 45 UL DESIGN No. U465
(WHERE 1 HR.
RATING NOTED)
4 7/8"
3 5/8" x 20 GA @ 16" O.C.
STEEL STUD FRAMING
5/8" CEMENT BACKER BOARD,
FULL HEIGHT, ONE SIDE
3 1/2" ACOUSTICAL BATT
INSULATION
J30
PARTITION TYPE
SCALE: 1" = 1'-0"
FULL HEIGHT TILE SIDE
(SEE ROOM FINISH
SCHEDULE)
4 1/4"
3 5/8" x 20 GA @ 16" O.C.
STEEL STUD FRAMING
5/8" CEMENT BACKER BOARD,
FULL HEIGHT, ONE SIDE
3 1/2" ACOUSTICAL/FIRE
BATT INSULATION
J33
PARTITION TYPE
SCALE: 1" = 1'-0"
STC 49 UL DESIGN No. U465
(WHERE 1 HR.
RATING NOTED)
5/8" TYPE "X" GYPSUM WALLBOARD,
FULL HEIGHT, ONE SIDE
4 7/8"
(*) INDICATES CEMENT BACKER BOARD PARTIAL
HEIGHT. 5/8" GWB ABOVE REFERENCE ELEVATIONS
FOR EXTENT OF TILE FINISH.
5/8" TYPE "X" GYPSUM
WALLBOARD, EACH SIDE
6" x 20 GA @ 16" O.C.
STEEL STUD FRAMING
5 1/2" ACOUSTICAL/FIRE
BATT INSULATION
L18
PARTITION TYPE
SCALE: 1" = 1'-0"
STC 49 UL DESIGN No. U465
(WHERE 1 HR.
RATING NOTED)
7 1/4"
N01
PARTITION TYPE
EXISTING EXTERIOR WALL
SCALE: 1" = 1'-0"
6"
5/8" TYPE "X" GYP
VAPOR BARRIER
2" Z-FURRING AT 24" OC
VERTICALLY & 2" MINERAL
FIBER INSULATION BOARD
2 1/2" 20 GA @16" O.C. W/ 2 1/2"
MINERAL FIBER INSULATION
+/- 2 1/2"
EXISTING EXTERIOR WALL
5/8" TYPE "X" GYP
VAPOR BARRIER
2" Z-FURRING AT 24" OC VERTICALLY & 2"
MINERAL FIBER INSULATION BOARD
NOTE: THIS PARTITION TYPE IS TYPICAL
AT ALL EXTERIOR WALLS
6" WALL BASE
FLOOR
DECK / STRUCTURE
NEW ACOUSTICAL TILE CEILING
RIGID INSULATION AND VAPOR
BARRIER SHALL EXTEND TO DECK OR
STRUCTURE ABOVE. TYP.
2 1/2" 20 GA @16" O.C. W/ 2 1/2"
MINERAL FIBER INSULATION
INTERIOREXTERIOR
N01
PARTITION TYPE (SECTION VIEW)
SCALE: 1" = 1'-0"
EXISTING CONCRETE DECK
FIRESTOP SEALANT
STEEL TRACK
MECHANICALLY FASTEN
24" O.C. MAX
5/8" TYPE-X
GYPSUM BOARD
3 5/8" STEEL STUD
16" O.C. (SEE PARTITION TYPE FOR
STEEL GAGE)
3 1/2" ACOUSTICAL BATT INSULATION
FLEXIBLE SEALANT1
/4
M
IN
/4
M
A X
.HEAD OF WALL - 1HR
UL DESIGN: HW-D-0079
UL DESIGN: HW-D-0083
PARTITION - 1HR
UL DESIGN: U465
UL DESIGN: V438
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:1
P
M
1-AS-001
GENERAL NOTES, TYPICAL
ELEVATIONS & WALL TYPES
RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
SCALE: 1/2" = 1'-0"1-AS-001
1 TYPICAL MOUNTING HEIGHTS
SCALE: 1/2" = 1'-0"1-AS-001
3 TYPICAL ACCESSORY MOUNTING HEIGHTS
SCALE: 1/2" = 1'-0"1-AS-001
4 TYPICAL CABINET TYPE LEGEND
SCALE: 1/2" = 1'-0"1-AS-001
2 TOILET ROOM FIXTURE LOCATIONS
SCALE: 1 1/2" = 1'-0"1-AS-001
7 1HR RATED ASSEMBLY TO CONCRETE DECK
ALIGN
D228D227
D237
D238
D239
D225
R E
F
FLOOR PLAN LEGEND:
FIRE EXTINGUISHER CABINET
DETAIL/CALLOUT KEY
ROOM TAG
ELEVATION KEY
SECTION KEY
ALIGN KEY
DOOR NUMBER
CORNER GUARD
EXISTING DOOR AND FRAME
NEW DOOR AND FRAME
EXISTING WALL
X
AX.XX
FEC
CG
X
AX.XX
X
AX.XX
NEW PARTITION
FIRE HOSE CABINETFHC
ZONE VALVE BOX. COORDINATE
WITH PLUMBING DRAWINGS.
ZV
MED GAS ALARM PANEL COORDINATE
WITH PLUMBING DRAWINGS.
AP
ELECTRICAL PANEL COORDINATE
WITH ELECTRICAL DRAWINGS.
EP
X WINDOW TAG/ DESIGNATION
WALL MOUNTED GAS OUTLET
(0-OXYGEN, V-VACUUM, MA-MEDICAL AIR)
AX.XX
HATCH INDICATED AREA NOT IN CONTRACT
XXXX
RELOCATED DOOR
XXXX
Room name
XXXX
DIMENSION TO CENTERLINE OF OBJECT
PARTITION TYPE SYMBOLS
--S
PARTITION TYPE
HOURLY FIRE RATING: PARTITION EXTENDS
TO BOTTOM OF STRUCTURE ABOVE.
PARTITION TYPE
PARTITION EXTENDS TO DECK
ABOVE AND SEALED WITH SAFING.
FRAMING EXTENDS TO BOTTOM
OF STRUCTURE ABOVE.
PARTITION TYPE
FINISHES ONE SIDE EXTEND TO 6"
ABOVE HIGHEST ADJACENT CEILING.
FINISHES ONE SIDE EXTEND TO
BOTTOM OF STRUCTURE ABOVE.
PARTITION FRAMING EXTENDS TO
STRUCTURE ABOVE. GYPSUM WALL
BOARD TERMINATES 6" ABOVE HIGHEST
ADJACENT CEILING.
PARTITION TYPE
SUFFIX "S" INDICATES SMOKE BARRIER
PARTITION - SEAL ONE SIDE TO DECK
AND AROUND ALL PENETRATIONS.
INFILL OPENING. MATCH WALL THICKNESS
AND ALIGN WITH EXISTING WALL.
INFILL
PARTIAL HEIGHT WALL TO UNDERSIDE OF
COUNTER UNLESS OTHERWISE NOTED.
PART
1. THE PARTITION TYPE SYMBOLS WILL KEY THE PARTITION TYPES ON PLANS.
2. ANY PENETRATION THROUGH HOURLY RATED PARTITIONS SHALL BE
FIRESTOPPED WITH MATERIALS TO EQUAL THE HOURLY RATING OF THE
PARTITION SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. EXISTING
WALLS WITH NEW PENETRATIONS ARE TO BE SEALED AS REQUIRED TO
MAINTAIN RATING.
3. ALL NEW PARTITIONS TO BE UNLESS OTHERWISE NOTED.
COORDINATE WITH PARTITION TYPE SCHEDULE.
4. ALL CHASES AND DUCT/ PIPE/ COLUMN ENCLOSURES TO BE UNLESS
OTHERWISE NOTED.
5. APPLY 4" HIGH PAINTED STENCILED IDENTIFICATION LETTERING TO ALL FIRE
RATED AND SMOKE PARTITIONS. SEE GYPSUM BOARD SPECIFICATION.
PARTITION TYPE NOTES
J18
CONSTRUCTION NOTES:
1. LOCATE SIDE OF DOOR FRAMES 4" FROM PERPENDICULAR
WALL UNLESS OTHERWISE INDICATED.
2. CONTRACTOR TO COORDINATE LOCATION OF ALL
PARTITIONS ENCLOSING EQUIPMENT WITH APPROVED SHOP
DRAWINGS.
3. PROVIDE 1/2" X 6" FIRE RETARDANT PLYWOOD BLOCKING OR
6" HIGH X 18 GA SHEET BLOCKING IN PARTITIONS AT ALL
LOCATIONS WITH SURFACE APPLIED EQUIPMENT OR
ACCESSORIES SUCH AS HANDRAILS, TOILET ACCESSORIES,
WALL BUMPERS, WALL MOUNTED DOOR STOPS AND FOR
SUPPORT OF WALL CABINETS, SHELVES, EQUIPMENT, ETC.
4. CONFIRM CHASE WALL DIMENSIONS WITH PLUMBING
CONTRACTOR, NOTIFY ARCHITECT OF ANY DISCREPANCIES.
5. CUT AND PATCH EXISTING CONSTRUCTION AS REQUIRED TO
COMPLETE THE WORK.
6. MINOR ITEMS OF WORK SUCH AS CUTTING, BLOCKING, TRIM,
ETC. SHALL BE PERFORMED AS REQUIRED TO MAKE THE
WORK COMPLETE WHETHER SHOWN OR NOTED ON THE
CONTRACT DOCUMENTS OR NOT.
7. RESTORE DAMAGED AND EXPOSED FINISHES OR PATCHED
AREAS IN A MANNER WHICH ELIMINATES EVIDENCE OF
PATCHING AND REFINISHING.
8. PROVIDE FIRE SAFING AT ALL NEW AND EXISTING PIPE /
CONDUIT PENETRATIONS THROUGH FLOOR SLAB AND WALL
PARTITIONS. REFERENCE SHEET 1-AS-101 FOR FIRE
SAFING REQUIREMENTS. CONTRACTOR TO ASSUME (15)
EXISTING FLOOR PENETRATIONS AND (15) EXISTING WALL
PENETRATIONS TO BE SEALED.
158 SF
CLEAN SUPPLY
D229
131 SF
OFFICE
D231
115 SF
VENT. PREP
D235
285 SF
CLEAN EQUIP.
D234
121 SF
LOCKER RM
D233
135 SF
BREAK RM
D232
47 SF
STAFF TOILET
D233A
4'
-7
'-2
'-2
/4
9'-11 1/4" +/-12'-5 3/4"
STAIR
SW12
54'-4 1/2"
'-1
/4
1 2 3 4
A
B
C
D
464 SF
CORRIDOR
D001
1-AS-6017
1-AS-601
1-AS-601
1-AS-601
1HR
J18
J08
J18 J18
J08
J08
J08
J18
G08
J18
J33
J33
J18
J18
J18
J08
D229 D230 D231
D235 D234
D233A
D233 D232
D229
J18
10'-9 1/2" 3 5/8" 13'-11" 3 5/8" 8'-10 3/8" 3 5/8" 8'-7 3/8"
HAND
WASH SINK
D001
D235A
1'-6"
1'-3"
22'-0 1/4"8'-4 1/4"
6"
1-AS-601
4'-2"
CLEAR
3'-6"
J33 J08
J33
D235C
6" 21'-3 1/4" 3 5/8"
CLEAR
9'-0" 3 5/8" 7'-4 1/2" 3 5/8" 4'-11" 3 5/8" 10'-1 3/4"
J08
ALIGN
N01
N01 N01
PART
N01
PART
N01
J18
N01
PART
N01
N01
N01
PART
N01
PART
N01
N01 N01N01
N01
5'-2 1/2"
'-1
R
'-6
2'-2"
NOTE: HOLD COLUMN
FURRING TIGHT TO COLUMN
FIREPROOFING OR
MECHANICAL PIPING TO
MAXIMIZE FLOOR AREA. TYP.
N01
PART
N01
N01 ø 5 '-6
2'-1"
'-1
1"
2'-1"
EP
205 SF
STAFF OPEN OFFICE
D230A
120 SF
OFFICE
D230
1-AS-901
FEC
'-4
STAINLESS STEEL
DROP IN SINK
(ABOVE /
BELOW
WINDOW)
(ABOVE /
BELOW
WINDOW)
(ABOVE /
BELOW
WINDOW)
(ABOVE /
BELOW
WINDOW)
1-AS-901
1-AS-901
1-AS-901
PROVIDE 3 HOUR SPRAY FIRE
PROOFING TYPICAL AT ALL
STRUCTURAL COLUMNS WITHIN
PROJECT AREA.
1HR
J18 J08
J18
'-2
/4
(ABOVE /
BELOW
WINDOW)
(ABOVE /
BELOW
WINDOW)
MIN.
1'-6"
'-2
'-2
APPLY 3 HR SPRAY APPLIED FIRE
PROOFING TO COLUMN BEFORE
BUILDING NEW PARTITIONS
APPLY 3 HR SPRAY APPLIED
FIRE PROOFING TO COLUMN
BEFORE BUILDING NEW
PARTITIONS
16"X16" 2 HOUR FIRE RATED
ACCESS PANEL. PAINT TO
MATCH ADJACENT.
INFILL OPENING
WITH 2 HOUR RATED
GWB ASSEMBLY
APPLY 3 HR SPRAY APPLIED FIRE
PROOFING TO COLUMN BEFORE
BUILDING NEW PARTITIONS
2'-9 3/4"
CLEAR
1'-6"
1'-5"
1-AS-901
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:4
A
M
1-AS-101
SECOND FLOOR PLAN RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
PROJECT
NORTH
SCALE: 1/4" = 1'-0"1-AS-101
2 2ND FLOOR PLAN- RESPIRATORY THERAPY
FLOORING NOTE:
PROVIDE +/- 2" CEMENTITIOUS SELF LEVELING
SUBFLOOR TOPPING ACROSS ENTIRE PROJECT AREA.
INSTALL PRIOR TO SETTING ALL INTERIOR PARTITIONS.
COORDINATE ELEVATIONS TO ACHIEVE SMOOTH
TRANSITIONS AT EXISTING DOOR THRESHOLDS. FLOOR
FLATNESS AND LEVELNESS SHALL NOT EXCEED 1/4"
DEVIATION IN 10' . REFERENCE SPECIFICATION SECTION
090516 FOR SUBFLOOR TOPPING REQUIREMENTS.
SD
D227
D237
D238
D225
D236
D228D227
D237
D238
D225
SD SD
D241
D240
A201
D236
D227
D237
D238
D239
D213
D212
D209 D208
D207 D206
D210
D225
PACU
MEDS
STORAGE
JANITOR
MECHANICAL
D202
MECHANICAL
C203
ROOF
MECHANICAL
D242
MECHANICAL
ENDO.
STORAGE
CORE
D241
D240
A201
D236
D228D227
D237
D238
D239
D213
D212
D209 D208
D207 D206
D210
D225
PACU
MEDS
STORAGE
JANITOR
MECHANICAL
D202
MECHANICAL
C203
ROOF
MECHANICAL
D242
MECHANICAL
ENDO.
STORAGE
D201
S W
D211b D211a
D211
S T E P
CORE
SD SD
WALL / CEILING MOUNTED EXIT SIGN
CEILING GRID START POINT
SUPPLY GRILLE - COORDINATE WITH
MECHANICAL DRAWINGS
NEW ACOUSTICAL TILE CEILING
(ALL CEILING TO BE APC-1 U.N.O.)
GYPSUM BOARD CEILING,
BULKHEAD, SOFFIT AND
FASCIA
RECESSED LIGHT FIXTURE
2'x4' RECESSED LIGHT FIXTURE
2'x2' RECESSED LIGHT FIXTURE
CEILING LEGEND:
EXHAUST/ RETURN GRILLE - COORDINATE
WITH MECHANICAL DRAWINGS
CEILING MOUNTED AREA SMOKE DETECTOR
SPRINKLER HEAD
REPLACE CEILING TILE ONLY.
GRID AND ALL EXISTING
CEILING FIXTURES TO REMAIN.
REFLECTED CEILING PLAN NOTES
1. VERIFY FINAL LOCATION OF ALL CEILING PENETRATIONS WITH VA,
MECHANICAL AND ELECTRICAL CONTRACTORS PRIOR TO INSTALLATION OF
CEILING SYSTEM.
2. SOFFITS ARE TO BE 5/8" GYPSUM WALL BOARD ON 3 5/8" METAL STUDS AT
1'-0" O.C. UNLESS OTHERWISE NOTED.
3. REMOVE EXISTING CEILING SYSTEM, INCLUDING OUTSIDE OF PROJECT
WORK AREA AS REQUIRED FOR INSTALLATION OF DUCTWORK, AND
ELECTRICAL WIRING/ CONDUIT NOT SHOWN ON THESE DRAWINGS.
REINSTALL FOLLOWING COMPLETION OF WORK NOTED. SEE MECHANICAL,
PLUMBING AND ELECTRICAL DRAWINGS.
4. ALL SOFFITS AT WALL CABINETS TO OVERHANG EXPOSED CABINET SIDES 1".
BOTTOM OF ALL SUCH SOFFITS TO BE 7'-0" A.F.F. UNLESS NOTED
OTHERWISE.
5. ALL AREAS NOT DESIGNATED TO RECEIVE A NEW CEILING HAVE AN EXISTING
CEILING OR ARE TO HAVE EXPOSED STRUCTURE.
6. REPLACE ANY EXISTING CEILINGS DAMAGED AS A RESULT OF THE NEW
WORK. MATCH EXISTING CONSTRUCTION.
7. ALL DIMENSIONS ON REFLECTED CEILING PLAN ARE TO FACE OF FINISHED
SURFACE UNLESS NOTED OTHERWISE.
8. LIGHT FIXTURES, SPRINKLER HEADS, ETC. TO BE LOCATED CENTERED ON
CEILING TILE UNLESS OTHERWISE INDICATED.
9. ALL SUSPENDED CEILING SYSTEMS ARE TO BE CENTERED WITHIN THE
OVERALL DIMENSIONS OF THE ROOM UNLESS NOTED OTHERWISE.
10. REFER TO FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.
11. COORDINATE SOFFIT HEIGHT REQUIRED ABOVE PRE-MANUFACTURED
LOCKER UNITS WITH APPROVED MANUFACTURER'S SPECIFICATIONS.
SOFFIT HT
7'-6"
CEILING HT.
8'-6"
GYP. BOARD ON
METAL STUD SOFFIT
WALL CABINET
(BEYOND)
PROVIDE SOLID BLOCKING
FOR WINDOW SHADE
TYPICAL.
ACOUSTICAL CEILING
PANEL EXISTING WINDOW
FRAME
PROVIDE SEALANT
BETWEEN GYP. BOARD AND
WINDOW FRAME
WINDOW SHADE.
SEE SPECIFICATION
1 2 3 4
A
B
C
D
D229
D230D230A D231
D232
D233
D234
D235
D233A
STAIR
SW12
D001
8'-0"
8'-6"
10'-0" 10'-0" 10'-0" 10'-0" 8'-0"
8'-0"
8'-6"
7'-6"
1'-4"
EQ EQ
EQ EQ
EQ EQ
'-1
1'-1"
6'-6"
VERIFY FINAL
SOFFIT HT.
WITH LOCKERS
1'-1"
'-2
APC-2
APC-2
APC-2
8'-6"
8'-6"
ALIGN W/ TOP OF
WINDOW FRAME TYP.
ALIGN W/ TOP OF
WINDOW FRAME TYP.
8'-6"
ALIGN W/ TOP OF
WINDOW FRAME TYP.
ALIGN W/ TOP OF
WINDOW FRAME TYP.
8'-6"+/-
RP-1
(SEE
MECH.)
'-9
(S O
F F
IT
D E
P T
H
PT-3
1-AS-201
1-AS-201
1-AS-201
TYP.
TYP.
1-AS-201
EXTRUDED ALUMINUM
PERIMETER TRIM.
EXISTING
WINDOW
SUSPENDED
GRID SYSTEM
+/-8'-6" A.F.F
VARIES
NOTE: SIZE OF
EXTRUDED ALUMINUM
PERIMETER TRIM MAY
VARY DEPENDING ON
CEILING HEIGHT
GWB RETURN.
PROVIDE J TRIM TYP. BACKER ROD AND
SEALANT TYP.
'-0
VARIES
WINDOW SHADE.
SEE SPECIFICATION
SEE RCP
APC-3
APC-3
APC-3
1-AS-201
HATCHED AREA INDICATES AREA
OF CEILING TILE REPLACEMENT
APPROXIMATELY 1,800 SF
ED PATIENT
ROOMS
D119
ONCALL ROOM
D125
FEMALE STAFF
BATHROOM
D124
MALE STAFF
BATHROOM
D123
CONFERENCE /
BREAK ROOM
D122
PATIENT
BATHROOM
D120
1ST FLOOR ED
HATCHED AREA INDICATES AREA OF CEILING
TILE REPLACEMENT. CEILING TILES TO MATCH
ADJACENT. APPROXIMATELY 1,500SF
REFERENCE PLUMBING DRAWINGS FOR ABOVE
CEILING WORK IN THESE AREAS
NOTE: PATCH AND PAINT ANY DAMAGED
SOFFITS AND WALLS AS A RESULT OF
PLUMBING OR MECHANICAL WORK.
APC-3 APC-3
APC-3
APC-3
APC-3
APC-3
D125A
APC-3
SW12
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:1
P
M
1-AS-201
SECOND FLOOR REFLECTED
CEILING PLAN
RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
PROJECT
NORTH
Revisions: Date:
SCALE: 1 1/2" = 1'-0"1-AS-201
2 DETAIL- BREAK ROOM SOFFIT
SCALE: 1/4" = 1'-0"1-AS-201
1 SECOND FLOOR REFLECTED CEILING PLAN
SCALE: 1 1/2" = 1'-0"1-AS-201
3 DETAIL- TYPICAL WINDOW POCKET
SCALE: 1/16" = 1'-0"1-AS-201
5 SECOND FLOOR REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"1-AS-201
6 FIRST FLOOR D WING REFLECTED CEILING PLAN
D237
D238
D239
D225
R E
F
1 2 3 4
A
B
C
D
CLEAN SUPPLY
D229
OFFICE
D230
STAFF OPEN OFFICE
D230A
OFFICE
D231
VENT. PREP
D235
CLEAN EQUIP.
D234
LOCKER RM
D233
BREAK RM
D232
STAFF TOILET
D233A
STAIR
SW12
CORRIDOR
D001
200 200
202 202
202 202
202 202
202 202
202202202202202202
(16) FULL HT. LOCKERS
202 202 202
107 103 103
CH (5)
CH
CH CH
LSD
PTD
LSD
CLEARø 5 '-6
PTD
FEC
SND
TTH
10'-9"
NOTE:
FIRE EXTINGUISHER CABINET BY CONTRACTOR, FIRE EXTINGUISHER BY VA
LSD
PTD
1-AS-901
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:1
P
M
1-AS-301
SECOND FLOOR FURNITURE &
EQUIPMENT PLAN
RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
PROJECT
NORTH
EQUIPMENT LEGEND
Add to Eqpm Schedule
EQPM
NO. EQUIPMENT NAME PROVIDED BY / INSTALLED BY
100- OFFICE
100 OFFICE CHAIR V / V
101 OFFICE DESK V / V
102 WHITE BOARD V / C
103 COMPUTER & KEYBOARD V / V
104 PRINTER V / V
105 REFRIGERATOR V / V
106 BREAK ROOM TABLE & CHAIRS V / V
107 FURNITURE PARTITION V / V
108 MICROWAVE V / V
109 BULLETIN BOARD 36 x 48 V / C
110 BULLETIN BOARD 24 x 36 V / C
200- CLINICAL
200 METRO SHELF ON CASTERS V / V
202 VENTILATOR V / V
300- LOCKER
300 SINGLE TIER LOCKERS C / C
301 BENCH C / C
SCALE: 1/4" = 1'-0"1-AS-301
1 2ND FLOOR PLAN- FURNITURE & EQUIPMENT
V = VA / C = CONTRACTOR
A
LI
G N
A
LI
G N
A
LI
G N
PT
PT
PL PL PL
PL
SS
FILLER
2'-8" 2'-6"
'-6
MICROWAVE
2'-6" 2'-9" 2 1/2" ± FILLER
REFRIGERATOR
(REF. OPENING ±)
2'-10" (CLEAR)
'-1
0"
'-8
'-6
'-6
'-0
1-AS-901
1-AS-901
1-AS-901
1-AS-901
3'-0"
1-AS-901
'-0
(SOFFIT)
PROVIDE FINISHED END
ADA SINK APRON
PL
PL
PT
PT
D233
FULL HEIGHT LOCKERS
CORNER GUARD
FULL HEIGHT
LOCKERS
(SOFFIT)
6" WALL BASE
PT
PT
FULL HEIGHT LOCKERS
CORNER GUARD
(SOFFIT)
1-AS-901
PT
PT
D233A
CORNER
GUARD
FULL HEIGHT LOCKERS
(SOFFIT) TRANSFER GRILL
(CENTER OVER DOOR)
1-AS-901
9 SIM.
WT-1
PT
2'-0" 10"
'-0
TILE CAP ABOVE
INTEGRAL WALL BASE
2'-6"
EQ.EQ.
(1
T
IL
H
IG
H
T
(1) TILE WIDTH
WT-2
WT-1
LSD
PTD
(ON SIDE WALL)
PLUMBING
LAV SHIELD
WT-1
'-1
0"
D233A
(1 TILE WIDTH)
2'-0"
METAL TILE EDGE,
TYPICAL
'-0
'-6
METAL TILE CAP,
TYPICAL
TILE CAP ABOVE
INTEGRAL WALL BASE
(1
T
IG
H
T
PTD
LSD
WT-1
TILE CAP ABOVE
INTEGRAL WALL BASE
METAL TILE CAP,
TYPICAL
METAL INSIDE CORNER
WALL TRIM, TYPICAL
PT
'-0
(1
T
IG
H
T
(1) TILE WIDTH
2'-0"
'-0
PT
PT
METAL INSIDE CORNER
WALL TRIM, TYPICAL
METAL TILE CAP,
TYPICAL
METAL TILE EDGE
TILE CAP ABOVE
INTEGRAL WALL BASE
WT-1
(1) TILE WIDTH
(1
T
IG
H
T
'-0
SND
TTH
PL-1
SS
WP 2
'-1
0"
PT
2'-6" 2'-6" 1'-3"
'-1
0"
'-8
'-6
S
L O
P E
D T
O
P 2'-6"1" FILLER
2'-7" 2'-6" 2'-6" 1'-3"
'-0
PL-1PL-1
1-AS-901
1-AS-901
1-AS-901
1-AS-901
PTD LSD
1" OVERHANG
PLUMBING
LAV SHIELD
1" OVERHANG2'-0"1'-6"1'-6"
FILLER
1"
'-0
'-0
'-6
PL-1
PL-1
1" FILLER 2'-6" 2'-6"
PL-1
PL-1
'-6
(CLEAR)
3'-10 1/2" ±
TS-1
SOFFIT PANEL
1-AS-901
1-AS-901
1-AS-901
PAINTED
SOFFIT
PT-3
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:2
P
M
1-AS-601
INTERIOR ELEVATIONS RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 JD PB
100% CONSTRUCTION
DOCUMENTS
22021
SCALE: 1/2" = 1'-0"1-AS-601
5 INTERIOR ELEVATION - BREAK ROOM (EAST)
SCALE: 1/2" = 1'-0"1-AS-601
9 INTERIOR ELEVATION - LOCKER ROOM (NORTH)
SCALE: 1/2" = 1'-0"1-AS-601
8 INTERIOR ELEVATION - LOCKER ROOM (EAST)
SCALE: 1/2" = 1'-0"1-AS-601
10 INTERIOR ELEVATION - LOCKER ROOM (WEST)
SCALE: 1/2" = 1'-0"1-AS-601
1 INTERIOR ELEVATION - TOILET ROOM (NORTH)
SCALE: 1/2" = 1'-0"1-AS-601
2 INTERIOR ELEVATION - TOILET ROOM (EAST)
SCALE: 1/2" = 1'-0"1-AS-601
3 INTERIOR ELEVATION - TOILET ROOM (SOUTH)
SCALE: 1/2" = 1'-0"1-AS-601
4 INTERIOR ELEVATION - TOILET ROOM (WEST)
SCALE: 1/2" = 1'-0"1-AS-601
7 INTERIOR ELEVATION - VENT PREP (WEST)
SCALE: 1/2" = 1'-0"1-AS-601
6 INTERIOR ELEVATION - OPEN (SOUTH)
CER: CERAMIC GLAZING -FIRE GLASS (FR-1)
HM: HOLLOW METAL
TEMP: TEMPERED GLASS- (MG-1)
PT: PAINT SYSTEM
CLR: CLEAR
SCWD: SOLID CORE WOOD
ALUM: ALUMINUM
ANOD: ANODIZED
GL: GLASS
INSUL: INSULATED
STAIN: STAIN
LEGEND:
'-9
8" 8"
'-9
5" 8"
F N G
'-0
VARIES
'-0
VARIES
'-0
VARIES
'-7
'-7
H E
IG
H
T
D O
O R
2" 2"
WIDTH
DOOR
SEALANT ALL AROUND,
BOTH SIDES
METAL CLIP
ANCHORS
AT JAMB
HOLLOW
METAL FRAME
METAL STUD/GYPSUM
BOARD
CONSTRUCTION
1/2" 1/2"
U N
L E
S S
O T
H E
R W
IS
E
N O
T E
D
'-0
VARIES, SEE PLAN
/8
ALIGN BOTTOM EDGE OF
TOP DRAWER W/ BOTTOM
EDGE OF SINK APRON
WHERE APPLICABLE
DOOR PULL
BASE CABINET WITH
DRAWER AND
ADJUSTABLE SHELF
3" WALL BASE
/2
1"
BACKSPLASH AS
INDICATED, SEAL ALL
AROUND
COUNTERTOP (SEE ELEVATIONS
FOR MATERIAL). PROVIDE
EASED EDGE TYP. 4
'-1
A T
B R
E A
K R
O O
M
'-0
VARIES, SEE PLAN
"T
Y P
WALL BASE
/2
3"
1"
/8
(3
E Q
U A
L D
R A
W E
R S
BACKSPLASH AS
INDICATED, SEAL ALL
AROUND
COUNTERTOP (SEE ELEVATIONS
FOR MATERIAL). PROVIDE
EASED EDGE TYP.
ALIGN BOTTOM EDGE OF
TOP DRAWER W/ BOTTOM
EDGE OF SINK APRON
WHERE APPLICABLE.
PULL, TYP.
U N
L E
S S
O T
H E
R W
IS
E
N O
T E
D
'-1
0"
VARIES, SEE PLAN
'-3
/2
/2
1"
8"
6"
REMOVABLE PLUMBING SCREEN.
PLAM ON 3/4" TREATED PLYWOOD
FASTEN WITH Z-CLIPS MOUNTED TO
3 x 3 CLEAT EACH END
COUNTER (SEE ELEVATIONS
FOR MATERIAL). PROVIDE
EASED EDGE TYP.
BACKSPLASH AS INDICATED.
SEAL ALL AROUND
WALL CABINET WITH
ADJUSTABLE SHELVES
(NOTE - PROVIDE ONE
SHELF AT 2'-0" HIGH UNIT
AND TWO SHELVES AT 2'-6"
HIGH UNIT)
DOOR PULL
PLASTIC LAMINATE FASCIA
PANEL OR SLOPE TOP, REF.
ELEVATIONS FOR TYPE
V A
R
IE
S
1'-3"
SHIM AS
REQUIRED
U N
L E
S S
O T
H E
R W
IS
E
N O
T E
D
'-0
VARIES, SEE PLAN
COUNTER (SEE ELEVATIONS
FOR MATERIAL)
BACKSPLASH AS INDICATED.
SEAL ALL AROUND
4"
PRE-MANUFACTURED METAL
COUNTER SUPPORT, 4'-0"
MAX. SPACING
6" WALL BASE
GROMMET, COORDINATE WITH
OWNER FOR LOCATIONS
TACKABLE SURFACE UP TO
WALL CABINETS
WALL CABINET (REFERENCE
ELEVATIONS)
PROVIDE CUT OUT FOR
ELECTRIC RECEPTACLE
MICROWAVE, BY OWNER
1'-0"
1'-10"
SHIM AS
REQUIRED
PLASTIC LAMINATE WALL
CABINET (BEYOND)
WALL CABINET WITH
ADJUSTABLE SHELVES
(PROVIDE ONE SHELF)
DOOR PULL
'-6
PAINTED SOFFIT
ABOVE
'-8
'-2
'-4
EXISTING EXTERIOR
WALL TO REMAIN
EXISTING WINDOW TO REMAIN
2" CONTINUOUS INSULATION
ON Z FURRING
SOLID SURFACE WINDOW
SILL ON 1/2" EXTERIOR
GRADE PLYWOOD
5/8" GWB ON METAL
STUD FRAMING
PROVIDE SEALANT AT
WINDOW FRAME
/4
1"
PRESSURE TREATED
BLOCKING AS
REQUIRED
VAPOR BARRIER
VAPOR
BARRIER
3" MINERAL FIBER
INSULATION
CASED OPENING
HOLLOW METAL FRAME
METAL STUD/GYPSUM
BOARD CONSTRUCTION
VARIES
METAL CLIP
ANCHORS AT JAMBS
PROJECT
NORTH
KEY PLAN
CORE
WING
'C'
WING
'B'
WING
'A'
WING
'D'
PROJECT
AREA
HYMAN
HAYES
ASSOCIATES
800 Troy-Schenecady Road, Suite 103
Latham, NY, 12110
(518) 452-3470 www.hymanhayes.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A/E:
20-373
528A8-21-802
C T e m p \R e v it F ile s \2
S tr a tt o n
V A
R e s p ir a to ry T h e ra p y
R je re m y d e la b ru e re
.r v t
/2
/2
:4
:2
P
M
1-AS-901
DOOR SCHEDULE AND MILLWORK
DETAILS
RENOVATE FOR RESPIRATORY
THERAPY
ALBANY, NY
July 20,2023 MH JD
100% CONSTRUCTION
DOCUMENTS
22021
DOOR AND FRAME SCHEDULE
DOOR NO.
DOOR FRAME
HARDWARE
SET LABEL NOTES
SIZE
TYPE MATERIAL FINISH GLASS TYPE MATERIAL FINISH
DETAIL
WIDTH HEIGHT THICK. HEAD JAMB
D001 6'-0" 7'-0" 1 3/4" EXISTIN
G
SCWD - - EXISTING HM PT-4 - (none) EXISTING DOOR AND FRAME. DOOR TO ALLOW FREE EGRESS
(IN BOTH DIRECTIONS) UPON LOSS OF POWER OR FIRE
ALARM
D229 3'-6" 7'-0" 1 3/4" F SCWD STAIN - 1 HM PT-4 3/AS-901 3/AS-901 4 45 MIN. ACCESS CONTROL -PROVIDE PACS CARD READER
D230 3'-0" 7'-0" 1 3/4" F SCWD STAIN - 1 HM PT-4 3/AS-901 3/AS-901 3
D231 3'-0" 7'-0" 1 3/4" F SCWD STAIN - 1 HM PT-4 3/AS-901 3/AS-901 3
D232 3'-0" 7'-0" 1 3/4" G SCWD STAIN TEMP. 1 HM PT-4 3/AS-901 3/AS-901 1
D233 3'-0" 7'-0" 1 3/4" F SCWD STAIN - 1 HM PT-4 3/AS-901 3/AS-901 2
D233A 3'-0" 7'-0" 1 3/4" F SCWD STAIN - 1 HM PT-4 3/AS-901 3/AS-901 2
D234 3'-6" 7'-0" 1 3/4" N SCWD STAIN TEMP. 1 HM PT-4 3/AS-901 3/AS-901 4 ACCESS CONTROL -PROVIDE PACS CARD READER
D235 3'-6" 7'-0" 1 3/4" N SCWD STAIN TEMP. 1 HM PT-4 3/AS-901 3/AS-901 4 ACCESS CONTROL -PROVIDE PACS CARD READER
D235A 3'-6" 7'-0" 1 3/4" G SCWD STAIN TEMP. 1 HM PT-4 3/AS-901 3/AS-901 1
D235C 3'-6" 7'-0" 0" - - - - 1 HM PT-4 4/AS-901 4/AS-901 (none) HOLLOW METAL FRAME ONLY (CASED OPENING )
SCALE: 1/4" = 1'-0"1-AS-901
2 DOOR TYPES
SCALE: 1/4" = 1'-0"1-AS-901
1 FRAME TYPES
SCALE: 1 1/2" = 1'-0"1-AS-901
3 JAMB DETAIL (HEAD SIM.)
SCALE: 1" = 1'-0"1-AS-901
MILLWORK SECTION - DOOR/DRAWER BASE
CABINET
SCALE: 1" = 1'-0"1-AS-901
6 MILLWORK SECTION - DRAWER BASE CABINET
SCALE: 1" = 1'-0"1-AS-901
7 MILLWORK SECTION - COUNTER W/ ADA SINK
SCALE: 1" = 1'-0"1-AS-901
11 MILLWORK SECTION - WALL CABINET
SCALE: 1" = 1'-0"1-AS-901
8 MILLWORK SECTION - WORK COUNTER
SCALE: 1" = 1'-0"1-AS-901
10 MILLWORK SECTION - MICROWAVE CABINET
SCALE: 1 1/2" = 1'-0"1-AS-901
9 SECTION DETAIL AT WINDOW SILL-TYPICAL
SCALE: 1 1/2" = 1'-0"1-AS-901
4 JAMB DETAIL - CASED OPENING
D237
D238
D239
D225
D D
D D
D DD
D D
D D
D D
D D
D D
D D
D D
D DD
D D
D
D DD D D D
D D
D D
D D
D
D
D D DD D D D D D D D D
A
LI
G N
A
LI
G N
A L
IG
N
D DD D D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D DD
D D
D DD
D D
D D
D
D DD
1 2 3 4
A
B
C
D
158 SF
CLEAN SUPPLY
D229
120 SF
OFFICE
D230
205 SF
STAFF OPEN OFFICE
D230A
131 SF
OFFICE
D231
115 SF
VENT. PREP
D235
285 SF
CLEAN EQUIP.
D234
121 SF
LOCKER RM
D233
135 SF
BREAK RM
D232
47 SF
STAFF TOILET
D233A
STAIR
SW12
CORRIDOR
D001
PT-2
WB-1
LVT-1
PT-2
WB-1
LVT-2
PT-2
WB-1
LVT-1
PT-1 / WT-1/2
WSF-1
WSF-1
EPX-1/WP
WB-1
LVT-1
PT-1/WP
WB-1
LVT-1
PT-3
PT-3
PT-2
WB-1
LVT-1
PT-2
WB-1
LVT-2
PT-2
WB-1
LVT-1
PT-2
WB-1
LVT-2
9'-0"
PT-3
PT-1
WB-1
LVT-1
PT-1
WB-1
LVT-2
PT-2
WB-1
LVT-2
PT-2
WB-1
LVT-2
4'-10"
PT-3
PT-3
PT-3
5'-0" ±
PT-2
WB-1
LVT-1
PT-2 PT-2
PT-1
WB-1
LVT-1
PT-2
WB-1
LVT-1
PT-2
WB-1
LVT-2
PT-1
WB-1
LVT-2
CG-2CG-2
CG-1 CG-1
CG-2
PT-3
CG-1 CG-1
CG-1
CG-2
CG-2
CG-1
'-0
CG-2
CG-2 CG-2
CG-2
CG-2
PROVIDE OPAQUE FILM.
BASIS OF DESIGN: 3M FRSARA
SSM-2 SILL TYP.
SSM-2 SILL TYP.
CG-2
PT-2
FINISH NOTES
1. PROVIDE RESILIENT TRANSITION STRIP BETWEEN ALL DISSIMILAR THICKNESS FLOORING
MATERIALS UNLESS OTHERWISE NOTED.
2. SEE REFLECTED CEILING PLAN FOR CEILING LAYOUTS AND HEIGHTS.
3. REPAIR, PATCH, TAPE, SKIM COAT AND SAND ALL EXISTING WALLS AS REQUIRED TO PROVIDE
A LEVEL 4 WALL FINISH SUITABLE FOR PAINTING OR VINYL WALL COVERING.
4. REPLACE EXISTING CEILING PANELS DAMAGED DURING CONSTRUCTION AS REQUIRED.
MATCH EXISTING PANEL TYPE.
5. WITHIN PROJECT SCOPE/SUITE/FLOOR, ALL EXPOSED FACES OF GYPSUM WALLBOARD
SOFFITS TO BE PAINTED COLOR AS INDICATED ON REFLECTED CEILING PLANS, UNLESS
NOTED OTHERWISE ON FINISH SCHEDULES.
6. AT ALL ROOMS IN SCHEDULE WHERE WALLS ARE TO BE PAINTED, PAINT ROOM SIDE OF DOOR
FRAME ONLY TO MATCH ADJACENT WALL, UNLESS NOTED OTHERWISE ALL CORRIDOR SIDES
OF FRAMES ARE TO REMAIN AS IS, UNLESS FRAME IS NEW. IF FRAME IS NEW, CORRIDOR SIDE
OF FRAME IS TO MATCH EXISTING CORRIDOR FRAME PAINT COLOR.
7. ALL ITEMS THAT ARE NOT SPECIFICALLY REFERRED TO ON THESE DRAWINGS ARE TO BE
SELECTED BY THE ARCHITECT FROM THE MANUFACTURER'S STANDARD SAMPLES SHOWING
A FULL RANGE OF COLORS AND TEXTURE AVAILABLE.
8. NEW OR EXISTING FLOOR SURFACES ARE TO BE PREPPED, FINISHED, CORRECTED OR
PATCHED AS REQUIRED TO ACCEPT SPECIFIED FINISHES PER MANUFACTURER'S
RECOMMENDATIONS. FLOOR FILL AND LEVELING INCLUDED.
9. CONTRACTOR IS RESPONSIBLE TO REMOVE ALL COVER PLATES, WALL SCONCES,
HANDRAIL/BUMPERS, ETC AS REQUIRED TO PAINT WALLS. REINSTALL FOLLOWING
COMPLETION OF PAINTING.
10. ANY EXISTING WALL SCHEDULED TO RECEIVE CERAMIC/PORCELAIN TILE MUST HAVE 5/8"
CEMENTITIOUS BACKER BOARD ADHERED TO EXISTING WALL PRIOR TO INSTALLATION.
INSTALL 5/8" CEMENTITIOUS BACKER BOARD FULL HEIGHT OF WALL.
11. IF A WALL IS TO RECEIVE CEMENTITIOUS BACKER BOARD FOR WALL TILE ON A PORTION OF
THE WALL THE REST OF THE WALL MUST RECEIVE GYPSUM WALLBOARD OF THE SAME
THICKNESS TO ENSURE THE PROJECTION OF THE WALL IS FLUSH.
12. IF ROOM IS NOT RECEIVING NEW PAINT, WHERE ITEMS HAVE BEEN REMOVED FROM WALLS,…