This document contains questions and responses regarding a request for information (RFI) for demolition and abatement services at the Buffalo VA Medical Center. The RFI involves abating asbestos floor tile and mastic under specification 02 82 13.19, as well as any traditionally encountered asbestos under specification 02 82 11. Responses clarify the application of project schedule and safety requirement specifications, provide amended pre-bid documents including a site visit sign-in sheet and room layout plans, and note specification reference errors in the statement of work. No direct information is included regarding products or services, pricing terms, or award details.

View the file

Other files

File Type Posted
3rd Floor.pdf PDF
36C24223B0036 0002.docx DOCX document
9th Floor.pdf PDF
Basement.pdf PDF
6th Floor.pdf PDF
1st Floor.pdf PDF
36C24223B0036 0001.docx DOCX document
PRE-BID SITE VISIT Bldg. 1 Abatement Demo Sign-in.pdf PDF
P07 WAGE DETERMINATION.pdf PDF
SPECIFICATIONS.pdf PDF
36C24223B0036_1.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION AND ABATEMENT BDLG 1

VARIOUS ROOMS

BUFFALO VAMC

REQUEST FOR INFORMATION (RFI)

Q. There seems to be a duplication of Spec Section 01 32 16.15 Project Schedules. Unless they read different and both apply, can one of them be deleted?

R. There is only one.

Q. Spec Section 02 82 11 Traditional Asbestos Abatement is 74 pages long, Spec Section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement has pages numbered 02 82 11 at the bottom and is 60 pages long. Which of these apply to this project?

R. Both shall apply; the abatement listed in the SOW shall be abated under 02 82 13.19 FLOOR AND MASTIC ABATEMENT, if there is any traditional asbestos found during the demolition shall be abated under 02 82 11 TRADITIONAL ASBESTOS ABATEMENT.

Q. Please send a copy of the sign-in sheet from the pre-bid site visit of 8/24/2023.

R. Pre bid site visit sign in sheet has been posted with Amendment to solicitation P0001.

Q. Please issue current floor plans that show the room numbers for this project in relation to the rooms in each floor and wing.

R. See attached PDF’s rooms are numbered in red.

Q. Page 12 of the SOW ¶1.6 cites 528-21-135 Article 1.5. where can this be found?

R. Anything in the SOW that references 528-21-135 is a typo. Each spec that is referenced should correspond with those listed in section 2.2:

01 00 00GENERAL REQUIREMENTS
01 32 16.15PROJECT SCHEDULES (SMALL PROJECTS)
01 35 26SAFETY REQUIREMENTS
01 74 19CONSTRUCTION WASTE MANAGEMENT
02 41 00DEMOLITION
02 82 11TRADITIONAL ASBESTOS ABATEMENT
02 82 13.19FLOOR AND MASTIC ABATEMENT

Q. Page 14 of the SOW ¶3 cites 528-21-135. Where can this be found?

R. See question above.