RFI.docx

DOCX document 14 KB Posted

Attached to
Y1DZ--620-23-101 LVT Flooring
Solicitation number
36C24223B0011
Issued by

View the file

Other files

File Type Posted
36C24223B0011 0005.docx DOCX document
Wage Determination.pdf PDF
36C24223B0011 0004.docx DOCX document
36C24223B0011 0003.docx DOCX document
Building 12.pdf PDF
620 012 Asbestos Survey.pdf PDF
36C24223B0011 0002.docx DOCX document
36C24223B0011 0001.docx DOCX document
P01 - MR-012-02.pdf PDF
36C24223B0011_1.docx DOCX document
52-225-2-Buy-American-Certificate.pdf PDF
P01 - MR-012-01.pdf PDF
S02 - Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What is the weight capacity of the elevator as no freight elevator is available? 4000lbs

2. Is there an identified laydown area for the GC’s dumpster? No assigned area provided.

3. Is there a identified area for the GC’s QC/Supper/SSHO to work from?

TBD – there are several areas around Building 12 that can be utilized and we can work with EMS to assign.

4. Is there an identified area where the GC can store material?

No storage onsite – daily materials can be stored in the elevator lobby on the floor currently under construction (and excess left overnight) – ensuring no hazards or fire code violations.

5. Has the flooring been tested for asbestos?

Yes – the results were previously provided for review. Several layers of flooring are existing. The top layer (broadloom carpet) only will be demolished, and skim coat/install over existing VCT tiles below.

6. Has the substrate been tested to ensure there are no issues?

Yes – the results were previously provided for review. Several layers of flooring are existing. The top layer (broadloom carpet) only will be demolished, and skim coat/install over existing VCT tiles below.