Part II Responses for PreBid Requests for Information - Repair Condensate Steam Lines - 36C24222B0011.pdf

PDF 148 KB Posted

Attached to
Y1NZ--Repair Steam and Condensate Lines 561A4-18-106
Solicitation number
36C24222B0011
Issued by

About this file

This document contains responses to requests for information and details regarding a federal contract opportunity for repair work on condensate and steam lines. The solicitation number is 36C24222B0011 and seeks a contractor to provide all labor, materials, equipment and supervision necessary to complete repairs to steam and condensate lines at the VA New Jersey Healthcare System campus in Lyons, New Jersey. The work includes modifying steam manholes, replacing or modifying sub pumps, repairing damaged lines, removing and rerouting lines that go over a tunnel, replacing expansion sleeves and modifying or replacing condensate pumps. The period of construction is 400 calendar days from notice to proceed. A bid including 20 cubic yards of rock excavation at $450 per cubic yard should be provided, with credits for unused units and modifications for excess of 10 yards. The solicitation confirms all taxes must be included in bids and no tax exemption will be provided.

The related federal contract opportunity is a 100% service-disabled veteran-owned small business set aside seeking bids for project number 561A4-18-106 to repair steam and condensate lines at the same VA campus. The cost estimate is between $1-5 million and bids are due in December 2021 with award timing to be provided. Registration on SAM.gov and verification as a SDVOSB business are required to submit a bid. The Department of Veterans Affairs Veterans Health Administration VISN 2 is the agency listed.

View the file

Other files

File Type Posted
36C24222B0011 0005.docx DOCX document
36C24222B0011 0004.docx DOCX document
Responses for PreBid Requests for Information - Repair Condensate Steam Lines - 36C24222B0011.pdf PDF
PreBid Site Visit Sign-in Sheet - 36C24222B0011.pdf PDF
36C24222B0011 0003_1.docx DOCX document
561A4-18-106 Lyons Condensate Steam-2 of 3 Drawings C-115 C-133 with Detail Drawing C-301 C-306.pdf PDF
561A4-18-106 Lyons Condensate Steam - 3 of 3 Drawings C-401 -C-403 ES-501-ES-506 and E-010 thru E-105.pdf PDF
561A4-18-106 Lyons Condensate Steam - 1 of 3 Drawings G-100-104 ICRA 00-04 C100-C114.pdf PDF
36C24222B0011 0002.docx DOCX document
561A4-18-106 Final Drawing C-123.pdf PDF
561A4-18-106 Final Drawing C-122.pdf PDF
561A4-18-106 Final Drawing C-124.pdf PDF
561A4-18-106 Final Drawing C-121.pdf PDF
561A4-18-106 Final Drawing C-125.pdf PDF
36C24222B0011 0001.docx DOCX document
561A4-18-106 Final Drawing C-115 to C-306.zip ZIP file
561A4-18-106 Final Drawings 2 0f 3 - Condensate and Steam at Lyons.pdf PDF
561A4-18-106 Final Drawings 1 0f 3 - Condensate and Steam at Lyons.pdf PDF
36C24222B0011_1.docx DOCX document
561A4-18-106 Final Drawings 3 0f 3 - Condensate and Steam at Lyons.pdf PDF
561A4-18-106 - Final Specifications.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to Requests for Information for Solicitation No. 36C24222B011 Repair Condensate & Steam Lines Project no. 561A4-18-10

Question 38: RFI response no.11 states that 'excavation is unclassified and no payment will be made for rock excavation'. ----- In reference to this response requesting the agency to issue soil boring reports at all the locations of the new pump stations as this requires massive excavation up to 20' feet below the grade. If soil boring reports are not available, then rock excavation work should be paid by a separate unit price item. This way all the contractors are bidding on the same information. As of now no one knows how much will be the rock excavation, unless all the pump station sites are excavated.

Response 38: Please include 20 cubic yards @ $450.00 Cubic Yard in the bid. A credit will be given for unused units and a modification will be given for excess of 10 yards.

Question 39: Can you please confirm if this project is taxable?

Response 39: The solicitation requires all taxes to be included in the bid. The contractor is responsible for payment of all taxes and the government will not provide a tax exemption certificate or any other information resulting in a tax exemption. If the contractor seeks and receives a tax exemption after award of the contract for any materials or supplies purchased by the contractor to perform any work required under the contract, any such tax savings must be returned to the government.