This solicitation requests proposals for site preparation services to install new medical imaging equipment at a Veterans Affairs medical center. Offerors must provide all labor, materials, equipment, and supervision necessary to design and construct the site work. A two-phase acquisition process will be used, with responses to Phase I due by March 5, 2021 and anticipated award by March 30, 2021. The work must be completed within 180 calendar days of notice to proceed. Offerors should be registered in SAM, VetBiz, and D&B and must review all attachments prior to responding. The services are set aside for SDVOSBs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL INSERTS.pdf | ||
| C10 VA ID PACKAGE UPDATED 01-16-2019.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 79
36C24221R0044
X
02-03-2021
2237: 630-21-2-7908-0001
PO #:
630A4-CSI-427
36C242
Department of Veterans Affairs
Network Contracting Office 2
James J. Peters VA Medical Center
130 West Kingsbridge Road
Bronx NY 10468-3904
Department of Veterans Affairs
Network Contracting Office 2
James J. Peters VA Medical Center
130 West Kingsbridge Road
Bronx NY 10468-3904
VLADIMR STOYANOV VLADIMR.STOYANOV@VA.GOV
SITE PREP FOR CARESTREAM DRX-EXCEL PLUS AND CANON ULTIMAX-I, NEW YORK HARBOR HEALTHCARE SYSTEM, BROOKLYN CAMPUS
This is a TWO-PHASE DESIGN BUILD ACQUISITION - ALL Qualified Offerors may submit for Phase I. After Phase I evaluation, selected Phase II Offerors will be notified for Phase II submission.
Provide turnkey services to include all labor, materials, equipment, and supervision necessary to design and construct the site preparation needed to install a new CARESTREAM DRX-EXCEL PLUS AND CANON ULTIMAX-I in accordance with equipment manufacturer and VA design requirements.
The NAICS code for this procurement is 236220 and the size standard is $39.5 million.
Per FAR 36.204, the magnitude of construction is between $1,000,000 and $2,000,000
This a Total Service-Disabled-Veteran-Owned- Small-Business (SDVOSB) Procurement.
The anticipated award date of the proposed contract is on or before March 30, 2021. Potential contractors must be registered in Beta SAM (www.beta.sam.gov), VetBiz (www.vetbiz.gov) and Dun & Bradstreet (www.dnb.com) at time of offer submission and during the award of this procurement.
The period of performance shall be 180 calendar days from Notice to Proceed.
Phase I Estimated Pre-Solicitation Date: 01/20/2021 4:08 PM
Phase I Estimated Solicitation Date: 02/03/2021 4:00 PM
Phase I Estimated Response Date: 03/05/2021 2:00 PM
Phase II Selection Date on or before: 03/19/2021 2:00 PM
Phase II Interview / RFI / Negotiation Date on or before: 03/26/2021 2:00 PM
Estimated Award Date on or before: 03/30/2021 4:00 PM
Phase I due 03/05/2021 at 2:00pm. Addressed to: VLADIMIR.STOYANOV@VA.GOV AND KHAI.HA@VA.GOV
Contractor to complete the design and construction in 180 calendar days from receipt of Notice of Award.
ALL OFFERORS MUST REVIEW ALL ATTACHEMENTS PRIOR TO PROPOSING
ALL OFFERORS MUST ATTEST TO ALL AND ANSWER ALL QUESTION OF THE SOLICITATION
AWARD IS SUBJECT TO AVAILABILITY OF FUNDS
10 180
X 52.211-10
X
1 2:00PM EST
03-05-2021
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C242
Department of Veterans Affairs
James J. Peters VA Medical Center
Network Contracting Office 2
130 West Kingsbridge Road
Bronx NY 10468-3904
Tungsten Network http://www.tungsten-network.com/us/en
/veterans-affairs
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or
Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.0. SOURCE-SELECTION PROCEDURES AND EVALUATION FACTORS
QUALITY CONTROL PLAN
Content of the CQC Plan
EC-2 STRENGTH to TEAM:
EC-3 SCHEDULE:
EC-4 PAST PERFORMANCE:
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.8 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) 17
2.9 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020)
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.12 PARTNERING
2.13 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) ..22
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (JUL 2020)
GENERAL CONDITIONS
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER
COVERED ENTITIES (JUL 2018)
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2020)
4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
4.9 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
ALTERNATE I (DEC 2007)
4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.12 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN
2020)
4.13 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
4.14 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN
1997)
4.15 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
4.16 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-
OWNED SMALL BUSINESS EVALUATION FACTORS (OCT 2019)
4.17 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (OCT 2019)
4.18 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
4.19 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND
COMPLIANCE (JUL 2018)
4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.22 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.23 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
4.24 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.26 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN
2008)
4.27 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.28 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.29 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
DESIGN BUILD SPECIFICATIONS
4.30 GENDER
4.31 CONTRACTOR'S COST BREAKDOWN
4.32 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES
4.33 OWNERSHIP OF ORIGINAL DOCUMENTS
4.34 RETENTION OF REVIEW DOCUMENTS
4.35 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED
PLANNING INFORMATION
4.36 COORDINATION WITH MEDICAL CENTER
4.37 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR
ATTACHMENTS
ATTACHMENT 1 - RELEASE OF CLAIMS
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT
UNIT
PRICE AMOUNT
GRAND
TOTAL
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
Project Title: 630A4-CSI-427 CARESTREAM DRX-EXCEL PLUS AND CANON
ULTIMAX-I SITE PREPS
Project Number: 630A4-CSI-427
Scope of Work
Provide turn-key services to include all labor, materials, equipment, and supervision necessary to design and construct the site preparation needed for new Canon Medical
Systems Ultimax-i X-Ray in Room 3-518, 3-519, 3-520, and Carestream DRX-Excel
Plus in room 3-508, 3-508A, as well as associated HVAC in 3-517MER, sinks and bathrooms at the Veteran’s Affairs Medical Center, 800 Poly Place, Brooklyn, NY
11209 in accordance with manufacturer equipment drawings & specifications and VA specifications at http://www.cfm.va.gov/til/spec.asp including General Requirements
010000, for a full turn-key project. All contractors must also complete training at https://www.tms.va.gov/plateau/user/login.jsp. Refer to equipment purchase PO number
630-B70044 and Canon’s Project number 180019547XRP1-Cannon and Carestream
PO number 630-B70045 and drawing VA BROOKLYN_R-3-508_20_RFO_F1, 07-13-
2020-Carestream for more information.
Turn-key Installation:
Turn-key installation shall consist of complete support to develop drawings/plans and work statements, site preparation work, non-standard/special rigging, transporting, and installing the above-mentioned system(s), and documentation to achieve fully operational systems.
Extended installation may include, but not be limited to: connecting with existing utilities, furnishing and installing support structures for the equipment, shielding, and other items as may be required to provide for the clinical use of the radiology and imaging system(s) of the facility.
Turn-key services to include asbestos abatement & air monitoring, demolition, installation, structural evaluation, design specs, construction management drawing; the contractor shall also supply the following statement of work, room drawings, and the price breakdown for the extended installation work to be performed.
Completion time: 180 Calendar Days
1.0. SOURCE-SELECTION PROCEDURES AND EVALUATION
FACTORS
This acquisition will be negotiated under negotiated best value with trade-offs procedures outlined in FAR Part.15. All Offerors are instructed to provide information in their proposal
Technical Volume 1 regarding their management plan, team composition, proposed schedule, and past performance experience, specifically on site-prep projects. Additional information shall be provided on proposed subcontractors and the percentage of work to be self-performed. All Offerors are instructed to provide their pricing in a separate Pricing
Volume 2.
The below technical evaluation criteria (EC) EC1- through EC-4 are listed in descending order of importance, and combined are significantly more important than non-technical factor EC-5, Price:
EVALUATION FACTORS
EC-1 MANAGEMENT PLAN:
The Management Plan should emphasize the degree to which the construction team can:
1. Demonstrate that they understand and are familiar with the local Brooklyn VAMC site and its conditions.
2. Effectively and realistically demonstrate its ability to maintain quality assurance and quality control construction practices. Provide a copy of a QA/QC Plan from a previous project of similar size and scope that is in compliance with the Contract Clause titled
"Inspection of Construction:
QC consists of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction design and construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the
Contracting Officer for non-compliance with the quality requirements specified in the contract. In this context, the highest level manager responsible for the overall construction activities at the site, including quality and production, is the project superintendent. The project superintendent must maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
QUALITY CONTROL PLAN
Submit no later than ten days after receipt of Notice to Proceed, the Contractor Quality Control
(CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction." The Government will consider an interim plan for the first seven days of operation.
Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional work.
Content of the CQC Plan
Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, etc.:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three-phase control system for all aspects of the work specified. Include a CQC System Manager who reports to the project superintendent.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including the authority to stop work that is not in compliance with the contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring the test, feature of work to be tested, test frequency, and the person responsible for each test. (Laboratory facilities approved by the Contracting Officer must be used.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests, including documentation.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.
3. Key Personnel Experience/Qualifications – MUST show documentation and demonstrate that the contractor and proposed subcontractors have had previous experience in performing work on similar projects.
4. Demonstrate successful construction safety management and practices on past projects.
Provide a copy of the overall company Construction Safety Policy that is in harmony with the requirements of the Code of Federal Regulations 29, Part 1926.
5. Clearly outline utility shutdown needed to perform work and the proposed timeframes for outages in the proposed construction schedule as required by EC-3 below. Also, state how you will ensure that the main hospital will continue to maintain normal operating activities throughout the site-prep renovation project.
EC-2 STRENGTH to TEAM:
Consideration will be given to the strength brought to the Team by critical:
1. Employees
2. Suppliers
3. Subcontractors
The Selection Committee will also evaluate members of the construction team and the success the Team has had in the past in working together to achieve project objectives. This will include any previous experience the team members have in working together. If you intend to use a teaming agreement with subcontractors, please include a copy of your teaming agreement with your proposal.
The construction team's proposal shall emphasize the Team's expertise in:
1. Construction in a Medical Center/DVA facility while maintaining normal operations of the existing adjacent facility.
2. Site-Prep renovation project.
3. It's capacity to devote time to the Project.
4. The degree to which the contractor has previous project experience with critical team members.
Identify all key members of the construction team in an organizational chart which demonstrates:
1. The specific responsibilities.
2. Specific control of the Project.
Include biographical data of all key project personnel to include the following:
1. Name of individual
2. Company employed by
3. Company position title
4. Years with the company
5. Work experience with projects that were of a similar nature.
EC-3 SCHEDULE:
The proposed schedule will be evaluated as to how well it meets the objectives of the Project:
1. Explain how you would Maintaining Normal Operations of Building 1, Main Hospital
2. Explain your procedures of Planned outages for Building 1, Main Hospital
3. Explain your procedures of Phased closures for the affected area in the
Radiology Department.
4. Discuss the process in scheduling work to be done in Radiology Department.
5. Discuss Testing procedures such as medical gas etc.
Unless other objectives are stated, the shorter the construction duration that is evaluated to be feasible while maintaining safety and quality in conformance with the RFP is preferred and will receive a higher evaluation.
The construction team schedule will:
1. Describe the project schedule (Gantt or CPM type bar chart), identifying major work items, including long-lead items with a start and stop dates that are realistic. The schedule will show the critical path activities highlighted in red.
(i.e., main building utility, medical gas outages, etc.)
2. Describe critical suppliers and subcontractors and if they have reviewed and agree to the schedule.
3. The Government required finish date for this Project is Two Hundred Seventy
(270) days after NTP for base bid. This includes all construction, site work, all contracted modifications, and final punch list and site cleanup and demobilization from the site.
EC-4 PAST PERFORMANCE:
1. The offeror shall demonstrate corporate experience with no less than four projects completed within the last five years similar in size and scope to this
Project.
2. In describing project construction experience, provide the following information:
a. Project title, location, and a brief description including local government agency coordination and contracting method (design-build, design bid construction, CM at risk, RFP, etc.), Project owner, contact name and telephone number and email addresses of owners' contract person;
b. Project Design Architect and Engineers (If Design/Build) and names and telephone number of contact person(s). Note each firm and employee also proposed for this solicitation
c. Project prime contractor and major subcontractors and name and telephone number of contact person(s). Note each firm and managing persons also proposed for this solicitation.
d. Project statistics including start and completion dates (original vs. actual) for construction, cost (with a brief explanation of what is included in the cost), linear footage, significant traffic control or phasing, and any awards received.
e. Referenced projects should preferably have dealt with the situation where adjacent areas were required to be protected, and all services maintained to keep remaining building occupants in operation.
f. The contractor shall respond within 48 hours of attempted contact either by the Contracting Officer or VAMC Engineering staff. Failure to respond within the specified time may result in your technical score being lowered for this area of evaluation.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action
Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the
Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
22.6 % 6.9 %
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance
Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action
Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order
11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for
Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Brooklyn, NY
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"
"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials"
(Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the
Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR
52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury
Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government
Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
VLADIMIR STOYANOV
CONTRACTING OFFICER
Hand-Carried Address:
Department of Veterans Affairs
James J. Peters VA Medical Center - 138 Network Acquisition & Logistics(10N3NAL) 130 West Kingsbridge Rd, B: 100, R: 9B62 Bronx NY 10468-3904 Mailing Address:
Department of Veterans Affairs
James J. Peters VA Medical Center Network Contracting Office 3 (10N3NCO) 130 West Kingsbridge Rd, B: 100, R: 9B62 Bronx NY 10468-3904
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I
(FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
(c) Participants will meet at—
2.8 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC
2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of Clause)
2.9 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020)
(a) Definitions. As used in this clause—
Common item means an item that has multiple applications versus a single or peculiar application.
Counterfeit item means an unlawful or unauthorized reproduction, substitution, or alteration that has been knowingly mismarked, misidentified, or otherwise misrepresented to be an authentic, unmodified item from the original manufacturer, or a source with the express written authority of the original manufacturer or current design activity, including an authorized aftermarket manufacturer. Unlawful or unauthorized substitution includes used items represented as new, or the false identification of grade, serial number, lot number, date code, or performance characteristics.
Critical item means an item, the failure of which is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the item; or is likely to prevent performance of a vital agency mission.
Critical nonconformance means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services;
or is likely to prevent performance of a vital agency mission.
Design activity means an organization, Government or contractor, that has responsibility for the design and configuration of an item, including the preparation or maintenance of design documents. Design activity could be the original organization, or an organization to which design responsibility has been transferred.
Major nonconformance means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.
Suspect counterfeit item means an item for which credible evidence (including but not limited to, visual inspection or testing) provides reasonable doubt that the item is authentic.
(b) The Contractor shall—
(1) Screen Government-Industry Data Exchange Program (GIDEP) reports, available at www.gidep.org, as a part of the Contractor’s inspection system or program for the control of quality, to avoid the use and delivery of counterfeit or suspect counterfeit items or delivery of items that contain a major or critical nonconformance. This requirement does not apply if the
Contractor is a foreign corporation or partnership that does not have an office, place of business, or fiscal paying agent in the United States;
(2) Provide written notification to the Contracting Officer within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that any end item, component, subassembly, part, or material contained in supplies purchased by the Contractor for delivery to, or for, the
Government is counterfeit or suspect counterfeit;
(3) Retain counterfeit or suspect counterfeit items in its possession at the time of discovery until disposition instructions have been provided by the Contracting Officer; and
(4) Except as provided in paragraph (c) of this clause, submit a report to GIDEP at www.gidep.org within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that an item purchased by the Contractor for delivery to, or for, the Government is—
(i) A counterfeit or suspect counterfeit item; or
(ii) A common item that has a major or critical nonconformance.
(c) The Contractor shall not submit a report as required by paragraph (b)(4) of this clause, if—
(1) The Contractor is a foreign corporation or partnership that does not have an office, place of business, or fiscal paying agent in the United States;
(2) The Contractor is aware that the counterfeit, suspect counterfeit, or nonconforming item is the subject of an ongoing criminal investigation, unless the report is approved by the cognizant law enforcement agency; or www.gidep.org file://///DSI-KB2/KBA_Work/KBs/Dev7/GENTRAC/Segments/www.gidep.org
(3) For nonconforming items other than counterfeit or suspect counterfeit items, it can be confirmed that the organization where the defect was generated (e.g., original component manufacturer, original equipment manufacturer, aftermarket manufacturer, or distributor that alters item properties or configuration) has not released the item to more than one customer.
(d) Reports submitted in accordance with paragraph (b)(4) of this clause shall not include—
(1) Trade secrets or confidential commercial or financial information protected under the
Trade Secrets Act (18 U.S.C. 1905); or
(2) Any other information prohibited from disclosure by statute or regulation.
(e) Additional guidance on the use of GIDEP is provided at http://www.gidep.org/about/opmanual/opmanual.htm.
(f) If this is a contract with the Department of Defense, as provided in paragraph (c)(5) of section 818 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112–81), the Contractor or subcontractor that provides a written report or notification under this clause that the end item, component, part, or material contained electronic parts (i.e., an integrated circuit, a discrete electronic component (including, but not limited to, a transistor, capacitor, resistor, or diode), or a circuit assembly) that are counterfeit electronic parts or suspect counterfeit electronic parts shall not be subject to civil liability on the basis of such reporting, provided that the Contractor or any subcontractor made a reasonable effort to determine that the report was factual.
(g) Subcontracts.
(1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert this clause, including this paragraph (g), in subcontracts that are for—
(i) Items subject to higher-level quality standards in accordance with the clause at FAR
52.246–11, Higher-Level Contract Quality Requirement;
(ii) Items that the Contractor determines to be critical items for which use of the clause is appropriate;
(iii) Electronic parts or end items, components, parts, or materials containing electronic parts, whether or not covered in paragraph (g)(1)(i) or (ii) of this clause, if the subcontract exceeds the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, and this contract is by, or for, the Department of Defense (as required by paragraph
(c)(4) of section 818 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L.
112–81)); or
(iv) For the acquisition of services, if the subcontractor will furnish, as part of the service, any items that meet the criteria specified in paragraphs (g)(1)(i) through (g)(1)(iii) of this clause.
(2) The Contractor shall not insert the clause in subcontracts for—
(i) Commercial items; or http://www.gidep.org/about/opmanual/opmanual.htm
(ii) Medical devices that are subject to the Food and Drug Administration reporting requirements at 21 CFR 803.
(3) The Contractor shall not alter the clause other than to identify the appropriate parties.
(End of Clause)
FAR
Number
Title Date
52.204-7 SYSTEM FOR AWARD MANAGEMENT OCT 2018
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE
REPORTING
AUG 2020
52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017
52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE
ACQUISITION ALTERNATE I (OCT 1997)
JAN 2017
52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION OCT 1997
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED
AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC
2009)
Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810
Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:
Deputy Assistant Secretary for Acquisition and Logistics, Risk Management Team, Department of Veterans Affairs 810 Vermont Avenue, N.W.
Washington, DC 20420 Or for solicitations issued by the Office of Construction and Facilities Management:
Director, Office of Construction and Facilities Management 811 Vermont Avenue, N.W.
Washington, DC 20420
2.12 PARTNERING
(a) In order to most effectively accomplish this contract, the Government proposes to form a cohesive partnership with the Contractor and its subcontractors. This partnership would strive to draw on the strengths of each organization in an effort to achieve a quality project, done right the first time, within the budget and on schedule.
(b) This partnership will be totally voluntary. The focus of partnering is to build cooperative relationships with the private sector and avoid or minimize disputes and to nurture a more collaborative ethic characterized by trust, cooperation and teamwork. Partnering is defined as the creation of a relationship between the owner and contractor that promotes mutual and beneficial goals. It is a non-contractual, but formally structured agreement between the parties.
The ultimate goal is the elimination of the "us" versus "them" thinking, and formation of a "we" mentality for the benefit of the project.
(c) Any cost associated with effectuating this partnership will be agreed to by both parties and will be shared equally with no change in contract price.
2.13 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR
2020)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is
236220.
(2) The small business size standard is $39.5 Million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management
(SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal
Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—
Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a
Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I…