36C24221B0073 0004.docx
DOCX document 26 KB Posted
- Attached to
- Z1DA--528A6-21-606 SECURITY UPGRADES Federal contract opportunity
- Solicitation number
- 36C24221B0073
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221B0073 0005.docx | DOCX document | |
| 36C24221B0073 0003.docx | DOCX document | |
| 36C24221B0073 0002.docx | DOCX document | |
| S06 528A6-21-606 SOW Revised.docx | DOCX document | |
| S06 528A6-21-606 Revised Drawings.pdf | ||
| 36C24221B0073 0001.docx | DOCX document | |
| 36C24221B0073_1.docx | DOCX document | |
| S02 528A6-21-606 Drawings.pdf | ||
| S02 21-606 Specifications.pdf | ||
| S02 Certification of Vaccination.pdf | ||
| S02 05779335 082621 003 CAO Memorandum - Attestation Guidance for Health and Safety Precautions for COVID-19 - Aug 25 2021 (1).pdf | ||
| S02 Wage Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11/29/2021 528-22-1-6192-0005 528A6-21-606 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders
36C24221B0073
X X X
528-3620162-6192-854200 Non-Recurring Ma-3223 Buildings and Facilities-23NRNR002 See Continuation Page for Q&As.
Tanya Baldwin Contracting Officer
CONTINUATION PAGE
Q&As:
1. The end of sale for the Cisco Catalyst switches end of sale date is OCT 31st we reached out to ask for the direct replacement of that model and wondering if that will work? Yes as long as it is a direct replacement.
1. I reached out last week to get confirmation on all the doors needing Mag locks etc but there is nothing in the drawings stating that This is just for cameras and their associated hardware/software.
1. Page 2 requests Axis Camera model M3046V which is discontinued. Can we substitute the replacement which is model # M3066V? Yes as long as it is a direct replacement.
1. Page 1 cites that "Upon completion of installation, all programming will be required to 100% integrate the cameras into the current Lenel/Prism system" The Prism software is obsolete and is no longer supported nor purchasable through Lenel. Please advise how the VA intends to proceed with adding these cameras into the current VMS. This can be updated to Lenel/Milestone as we are in the process of upgrading our current system thru amendment of our current security maintenance contract.
1. Page 2, Section 6 cites "Upon completion of this project, it is expected that all cameras and any electronic access control shall be 100% operational upon completion of the contract. It is also required that all installed devices must be fully integrated with the current Lenel/Onguard system". Can you confirm that this project is for Video Surveillance only and not access control? This can be updated to Lenel/Milestone.
1. Please confirm that the new cameras are going to be replacing existing camera locations. Yes some will be in the same locations, some will be in relocated positions and there are also new cameras as part of this project.
1. Please confirm all analog coaxial cables home run location. If the cameras are being replaced then they are analog and will need the camera and cabling replaced. The cabling for the new digital cameras is noted in the drawings based on the location in each building.
1. Please confirm VA IT staff will be taking switches we are providing and connecting to their network and also provide IP addresses for new cameras? Will IT Staff provide appropriate connectivity between buildings? Our security system is a stand alone system that IT does not have access to and all IP’s are assigned by our system maintenance contractor that manages our system (M3T) Connectivity between the current switches in the respective buildings can be accomplished by pairing to the current security switch as this project exceeds the capacity of our current switches.
1. Please confirm that this RFI is only for video surveillance upgrade and no Access Control or Intrusion? It is just cameras and their associated hardware/software.
1. For the question “We would like to install the structured cabling prior to removing the analog cabling and devices on a floor-by-floor basis, keeping disruption to security to a minimum”. Is there sufficient room in the current cable routing and chase locations to accommodate the cat6 cabling needed for the new installation? The majority of the current analog cameras are out of service and do not need to stay online during the project. Doing this will save time and will minimize the time the contractor only needs to go into the ceiling space. There is cable tray with ample space for new cabling to be run.
1. In the event of non-availability and compliance, will you accept equipment substitutions? Yes bust they be submitted for approval before they can move forward.
1. In the SOW under section 4 Scope states: “This Contract will cover equipment, materials, installation, software, licenses, onsite training for dispatchers and Police Services and any other items needed to complete the installation”. Since you will continue using the OnGuard system your personnel are currently using, what training will be needed? We are in process of upgrading Lenel/Milestone. This is a turnkey contract and must be treated as such. Training will ensure dispatch staff are trained on the cameras that will be upgrade/added is this contract.
1. The SOW states “this installation must provide any and all required software and IP addresses to operate the (76) cameras on our current Lenel/On Guard system”. Do you have a predetermined subnet that we should assign ip addresses from? Our security system is a standalone system that IT does not have access to and all IP’s are assigned by our system maintenance contractor that manages our system (M3T)
1. In the SOW under section Contractor Requirements, it states “You are requesting that the Contractor, all technicians, or sub-contractors possess certifications by Lenel to install, service, maintain, and support the Bath VAMC Lenel/Guard Security System”. I will have a Lenel Tech for the Onguard system, a Cisco tech for the switches and myself for the Axis cameras as well as installers for the structured Cat6 cabling. Since this is an install without service, will my team suffice for your needs? “We are not requesting” We are requiring that all technicians, or sub-contractors possess certifications by Lenel to install, program, and support the Bath VAMC Lenel/Milestone Security System during this project.