This document outlines an upcoming federal contract opportunity for renovations to the 8th floor Community Living Center at the Syracuse VA Medical Center. The project encompasses approximately 21,000 square feet and will be completed over four phases to allow continued patient care. Scope of work includes demolition, new interior finishes, abatement of asbestos and hazardous materials, installation of walls, electrical, lighting, ceilings, floors, mechanical equipment, ductwork, plumbing, HVAC and controls. Period of performance is 515 calendar days with submittals due in 90 days, abatement in 60 days and construction in 365 days. The NAICS code is 236220 and this opportunity is 100% set aside for Service-Disabled Veteran Owned Small Businesses. Firms must be registered in SAM, self-perform 15% of work, and provide an EMR rating. Payment and performance bonds are required along with a 20% bid bond due with bids. The estimated value is between $2-5 million.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project No. 528A7-18-739 Syracuse VA Medical Center AE Works Project No. 19002 8TH Floor CLC Renovation

Not for Construction 12-01-18

GENERAL REQUIREMENTS

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, interior alterations, necessary removal of existing structures and construction and certain other items.

ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project.

ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project.

Deduct Alternate 1: Scope of Work to be mechanical only in patient rooms A819, A823, A826, A835, A837, A841, A842, A846, A847, C804, C816, C827, C831, C837, C839.

Deduct Alternate 2: All doors associated with Demoltion Keynote D1 to remain as is. Frame, Slab, Hardware, and Accessories are to remain.

Deduct Alternate 3: All new patient lifts and kitchen equipment to be removed from scope of work. Provided and installed by VA.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

BASE BID to INCLUDE All associated work including Items I, II, III above. There are NO Deduct Alternates.