About this file

This document provides a modification to a pre-solicitation notice for an architect-engineering contract with services to be performed at the Canandaigua VA Medical Center in Canandaigua, New York. The contract is set aside 100% for small disabled veteran-owned small businesses and involves design services for the replacement of boilers that provide heat to the entire Canandaigua VA Medical Center campus. Responses to questions received are provided regarding available documentation on the existing plant and boilers, as well as adjustments to requirements percentages. The period of performance for design services is 200 days from notice of award. Interested firms should submit current SF-330 forms by April 16, 2020 for evaluation based on specialized experience, professional qualifications, experience in construction period services, past performance, capacity, location, and subcontracting commitments. The estimated construction magnitude is between $5 million to $10 million.

36C24220R0060 36C24220R0060.docx

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--528A5-20-502 DESIGN BOILER REPLACEMENT, newest first.
File Type Posted
36C24220R0060-002.docx DOCX document
36C24220R0060-003.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Modification to a Previous Notice

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Modification to a Previous Notice

C1DA

528A5-20-502 DESIGN BOILER REPLACEMENT

14227 36C24220R0060 N

SDVOSBC

541330 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Rachel Beason Contracting Officer Rachel.Beason@va.gov Canandaigua VA Medical Center 400 Fort Hill Avenue Canandaigua, NY 14424

USA

The purpose of this amendment is to provide responses to the requests of information received. The due date for the receipt of A/E SF 330 submissions remains unchanged from the original pre-solicitation notice.

Q1. What documentation is available regarding the plant and the boilers(drawings, P-3 forms, inspection reports, etc.)?

1A. The full solicitation will be released to the top-rated A/E firm after a full review of the qualifications in accordance with FAR Part 36.6.. The solicitation documents may include additional information such as drawings, etc.; however, the A/E firm awarded the design is required to perform their own investigations/surveys to ensure accuracy of their design.

2Q. Due to the COVID-19 Pandemic and the financial crisis it has caused small businesses, can the VA/Contracting Officer review and adjust the requirement percentages/regulations listed on pages 10 and 11 that will widen the range of qualified SDVOSB's that could bid this project?

2A. No, the requirements set forth in the clause remain unchanged.

3Q. For proper planning of the Phasing Plan when was the last time the yearly boilers, Deaerator (DA) and condensate tank have been inspected?

3A. This information will be up to the awarded firm to verify.

4Q. For proper planning of the Phasing Plan when was the last time the boilers VHA testing conducted?

4A. This information will be up to the awarded firm to verify.

5Q. Will it be required for all CURRENT boiler, DA and condensate tank inspections and VHA testing be current (within a year) through all phasing operations? If so, who's responsibility is this?

5A. If required, This information will be up to the awarded firm to verify.

6Q. Are there any subsequent plans for expansion of the facility that will effect the boiler, DA and condensate size requirements?

6A. This information will be up to the awarded firm to verify.