528A7-20-782 EXTEND HEATING HOT WATER TO KITCHEN AND MISC REPAIRS
Solicitation number
36C24220B0012
Issued by

About this file

This pre-solicitation notice announces an upcoming solicitation for heating hot water and miscellaneous mechanical repair work at the Syracuse VA Medical Center in New York. The work includes extending hot water piping to the kitchen and other repairs, with an estimated cost between $250,000 and $500,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and have a NAICS code of 236220 with a small business size standard of $36.5 million. Interested contractors should monitor the Federal Business Opportunities website for the posting expected around January 7, 2020. The single scheduled site visit will be detailed in the solicitation. Bids must include a 20% bid bond and performance and payment bonds will be required from the successful contractor.

36C24220B0012 Drawings REV1.pdf

View the file

Other files

File Type Posted
36C24220B0012-0001000.docx DOCX document
36C24220B0012-002.pdf PDF
36C24220B0012-004.pdf PDF
36C24220B0012-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o n e e i g h t h i c e f o t

B

A

C

D

E

F t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

COVER SHEET

MA KW

GI-001

PLAN NORTH

KEY PLAN

SCALE: NONE

DRAWING INDEX

SHEET NO.

1. GI-001 COVER SHEET

2. MG-001 MECHANICAL ABBREVIATIONS, SYMBOLS & NOTES

3. MD-101 REMOVE DUCTWORK & INFILL SHAFT 5

4. MD-102 MECHANICAL PIPING DEMOLITION PLANS

5. MP-101 SUB-BASEMENT, BASEMENT & GROUND FLOOR PIPING PLANS

6. MP-102 FIRST & SECOND FLOOR PIPING PLANS

7. MP-103 ADD PRV 5TH FLOOR SCI

8. MP-104 ADD HX-501 TO 10TH FLOOR

9. MP-105 ADD SIESMIC BRACING FOR NATURAL GAS LINES

10. MP-401 RISER DIAGRAMS

11. MP-501 DETAILS

12. MP-601 SCHEDULES

DEPARTMENT OF VETERANS AFFAIRS

800 IRVING AVE

SYRACUSE, NY 13210

PROJECT # 528A7-20-782

EXTEND HEATING HOT WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

STATEMENT OF WORK

1. EXTEND HOT WATER PIPING FROM EXISTING BOILER HOT WATER LOOP IN

BASEMENT TO THE KITCHEN. INCLUDE ALL ASSOCIATED PIPING,

INSULATION AND SUPPORTS REQUIRED FOR A FULLY FUNCTIONING

SYSTEM AS IDENTIFIED ON THE PLANS.

2. REMOVE EXHAUST DUCTWORK AND LOUVERS ASSOCIATED AS SHOWN IN

SHAFT 5 FROM BASEMENT TO FIFTH FLOOR. INFILL ALL ASSOCIATED

FLOORS WITH MATCHING GRADING AND CONCRETE FLOOR.

3. INSTALL PRESSURE REDUCING VALVE (PRV) AND PIPE WORK LOCATED ON

FIFTH FLOOR OF THE SCI- WING.

4. ADD SEISMIC BRACING FOR EXISTING NATURAL GAS PIPING.

5. ADD PLATE AND FRAME HX-501 TO HWS-501 ON 10TH FLOOR.

GENERAL NOTES

1. THE BUILDING SHALL BE OCCUPIED FOR THE DURATION OF THE

CONSTRUCTION PERIOD.

2. ALL SPACES, STAIRWAYS, CORRIDORS AND ELEVATORS SHALL BE

TEMPORARILY PROTECTED WHEN USED FOR THE TRANSPORTATION OF

MATERIALS INTO OR OUT OF THE WORK AREAS. PROVIDE PLASTIC

SHEATHING, PROTECTIVE FLOOR COVERINGS, SIGNAGE AND BARRIERS AS

REQUIRED TO PROTECT THE EXISTING BUILDING ELEMENTS AS WELL AS

THE PATIENTS, VISITORS AND HOSPITAL STAFF.

3. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT AND OBTAIN

APPROVAL FOR A PLAN THAT INDICATES ROUTING OF EQUIPMENT

THROUGH THE BUILDING AND DETAILS PROTECTIVE MEASURES TO BE

TAKEN.

4. ALL DISRUPTION TO THE EXISTING SERVICES SHALL BE COORDINATED

WITH HOSPITAL STAFF AND THE CONTRACTING OFFICER REPRESENTATIVE

(COR) AT LEAST TEN DAYS IN ADVANCE.

5. PRE-ASSEMBLY AND EQUIPMENT STAGING SHOULD BE PLANNED TO

MINIMIZE DOWN-TIME OF SYSTEMS IN ALL CASES. MAXIMUM DOWN-TIME

SHALL BE AS INDICATED HEREIN AND/OR AS DIRECTED BY THE

CONTRACTING OFFICER.

6. ACCESS FOR THE PIPE ROUTING IS LIMITED BY EXISTING

STRUCTURE/EQUIPMENT CONTRACTORS ARE STRONGLY ENCOURAGED

TO BECOME FAMILIAR WITH THE SPECIFIC WORK AREAS PRIOR TO BIDDING

IN ORDER TO ACCOUNT FOR RIGGING, STAGING AND SITE-ACCESS

RESTRICTIONS.

7. COORDINATE ALL STORAGE, STAGING AND SITE ACCESS WITH THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR) PRIOR TO

CONSTRUCTION.

8. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES

IN ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

SHAFT 5

BASEMENT, GROUND,

FIRST, AND SECOND

FLOORS

FIFTH FLOOR

GENERAL PIPING SYMBOLS

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

AD ACCESS DOOR

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CO CLEAN OUT

CP CONDENSATE PUMP

CR CEILING REGISTER

CRAC COMPUTER ROOM AIR CONDITIONING

UNIT

CU CONDENSING UNIT

CW COLD WATER (POTABLE)

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DOM DOMESTIC

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DSS DUCTLESS SPLIT-SYSTEM (EVAPORATOR)

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

EJ EXPANSION JOINT

ENT ENTERING

ER EXHAUST REGISTER

(ER) EXISTING TO REMAIN

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

(E) EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FLOOR REGISTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GF/CI GOVT. FURNISHED/CONTRACTOR INSTALL

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRR GLYCOL-WATER RUN AROUND RETURN

GRS GLYCOL-WATER RUN AROUND SUPPLY

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J (INTENTIONALLY LEFT BLANK)

kPa KILOPASCAL kW KILOWATT

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MIN MINIMUM

MM MILLIMETER

MOD MOTOR OPERATED DAMPER

MOV MOTOR OPERATED VALVE

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

(N) NEW

NA NOT APPLICABLE

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PG PRESSURE GAUGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAUGE

PSV PRESSURE SAFETY VALVE

(R) RELOCATE/RELOCATED

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RCP RADIANT CEILING PANEL

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATOR DEVICE

SAT SUPPLY AIR TEMPERATURE

SCFM STANDARD CUBIC FEET PER MINUTE

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

ST STEAM TRAP

SVS STEAM VENT SILENCER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP TYPICAL

UC UNDER CUT

UL UNDERWRITERS LABORATORY

V VALVE

VAV VARIABLE AIR VOLUME

VB VACUUM BREAKER

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

W WATTS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCACU WATER-COOLED COMP RM A/C

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOW METER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAUGE

WHA WATER HAMMER ARRESTOR

AV

MV

GENERAL NOTES AND CONDITIONS

1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE AVAILABLE

BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED AND FIELD SURVEY

INFORMATION COMPILED BY THE VA ENGINEERING DESIGN TEAM FOR THE PURPOSE OF

ENGINEERING DESIGN. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS

POSSIBLE. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS

EXISTING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,

SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE

ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.

1.1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PLANS AND

SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT PLANS AND SPECIFICATIONS

FROM OTHER DISCIPLINES, TO BECOME FAMILIAR WITH THE FULL PROJECT SCOPE

AND COORDINATED RESPONSIBILITIES.

1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR RELATED

WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, OR IN

THE SPECIFICATIONS, CONSULT THE COR FOR NECESSARY CLARIFICATIONS, AND

CONFORM TO THOSE CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH

THE ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK

PROCEED IN UNCERTAINTY.

1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED

CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION BY

CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD CONDITIONS

ENCOUNTERED DURING CONSTRUCTION WITHOUT COMPROMISING THE INTENT OF

THE ORIGINAL DESIGN. COORDINATE ANY MODIFICATIONS WITH THE COR PRIOR

TO STARTING WORK IN AREAS AFFECTED.

1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS

AT SITE PRIOR TO STARTING WORK.

1.5. DO NOT SCALE DRAWINGS.

2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND

REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING

OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE

EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND THE OWNER'S

EMPLOYEES WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE

CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE

WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE

COORDINATED WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY

BE REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.

2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE RESPONSIBLE

FOR PROVISION AND MAINTENANCE OF WARNING SIGNS, LIGHT SIGNAL DEVICES,

GUARD LIGHTS, BARRICADES, GUARD RAILS, FENCES AND OTHER DEVICES,

APPROPRIATELY LOCATED ON AND AROUND THE JOB SITE WHICH GIVE PROPER

AND UNDERSTANDABLE WARNING TO PERSONS WITH REGARD TO HAZARDOUS

CONDITIONS, EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION

WITH THE WORK.

3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES FOR

ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE ADDITIONAL

MECHANICAL/PLUMBING WORK, AND ITEMS THAT ARE NOT INDICATED ON THE

DRAWINGS.

4. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF

FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING JURISDICTION. IN

PARTICULAR, THE WORK WILL BE IN ACCORDANCE WITH THE CURRENT ADOPTED

EDITION OF THE NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE

AND ALL OF ITS APPLICABLE SUBCODES AND AMENDMENTS.

5. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND

WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING CODES (ABOVE),

INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE MANUFACTURERS

RECOMMENDATIONS AND REQUIREMENTS.

6. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING ALL

LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT

REASONABLY IMPLIED. THIS SHALL INCLUDE CUTTING, PATCHING AND RESTORATION OF

EXISTING SURFACES DAMAGED DURING THE CONSTRUCTION. CONTRACTOR SHALL

ALSO PROVIDE ALL EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.

SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL GIVEN

WRITTEN APPROVAL BY THE OWNER.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR NONCOMPLIANCE

WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL NOT BE ALLOWED CHANGE

ORDERS FOR PROBLEMS ARISING FROM NEGLECT OF PROVISIONS INCLUDED IN THESE

CONDITIONS.

8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON SUBSTANTIAL

COMPLETION PERFORM FINAL CLEANUP. REMOVE CONSTRUCTION RUBBISH,

SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD

STRUCTURES, AND OTHER MATERIALS OR EQUIPMENT THAT WAS REQUIRED IN

CONNECTION WITH THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.

9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES AND

CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE

CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY

COMPLETION OF THE WORK. COMMENCEMENT OF WORK BY A TRADE ON A SURFACE OR

CONSTRUCTION SHALL IMPLY ACCEPTANCE OF SUCH SURFACE OR CONSTRUCTION. DO

NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN

CORRECTED.

10. THE CONTRACTOR SHALL SECURE ALL PERMITS AND APPLICATIONS AND PAY ANY AND

ALL FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND

CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.

DELIVER ALL PERMITS, CERTIFICATES AND APPROVALS TO THE OWNER AGENT PRIOR

TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST FILE NECESSARY

DRAWINGS, PREPARE DOCUMENTS AND MAKE APPLICATIONS FOR EACH REQUIRED

PERMIT AND INSPECTION, PRIOR TO COMMENCING WORK TO AVOID DELAYS DURING

CONSTRUCTION.

11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA SHEETS ON

ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR APPROVAL BY OWNER.

THESE DRAWINGS OR SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E.,

MANUFACTURER, CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS

AND ALL OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE CLARITY

AND INSTALLATION.

12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS WHICH

SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND CONNECTIONS OF ALL

EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL PROVIDE COPIES OF ALL

MAINTENANCE INFORMATION AND INSTRUCTIONS RECEIVED WITH EQUIPMENT AND

SYSTEMS. ALL "AS-BUILT" DRAWINGS AND MISCELLANEOUS INFORMATION SHALL BE

GIVEN TO THE OWNER AND ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR

SHALL GUARANTEE ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE

YEAR PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING

DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL

COST TO THE OWNER.

13. AS DIRECTED BY THE OWNER, ALL EXISTING EQUIPMENT AND MATERIAL IN USABLE

CONDITION THAT IS REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER, OR

HANDLED AS INSTRUCTED BY THE OWNER, BE DISPOSED OF BY THE CONTRACTOR. ALL

MATERIALS DEEMED FOR REMOVAL SHALL BE RECYCLED WHENEVER POSSIBLE, IN

ACCORDANCE WITH THE REQUIREMENTS SET FORTH WITHIN SPECIFICATION SECTION 01

74 19 (CONSTRUCTION WASTE MANAGEMENT).

14. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS, RIGGING,

HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE INSTALLATION OF THEIR

WORK.

15. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND ERECT ALL

REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS MUST BE ALTERED

TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR SHALL RESTORE

STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND REPLACEMENT OF ALL CEILING

AS REQUIRED TO COMPLETE THE WORK.

HVAC NOTES AND CONDITIONS

1. ALL HVAC EQUIPMENT SHALL MEET THE REQUIREMENTS SET FORTH IN THE

ANSI/ASHRAE/IESNA STANDARD 90.1 ENTITLED "ENERGY STANDARDS FOR BUILDINGS

EXCEPT LOW-RISE RESIDENTIAL BUILDINGS".

2. ALL METALLIC DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE

WITH SMACNA STANDARD "HVAC DUCT CONSTRUCTION STANDARDS-METAL AND

FLEXIBLE" AND NFPA STANDARD 90A TITLED "INSTALLATION OF AIR CONDITIONING AND

VENTILATION SYSTEMS". ALL DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN

ACCORDANCE WITH SMACNA 2 IN WG PRESSURE CLASS, SEAL CLASS A, UNLESS

OTHERWISE NOTED.

3. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR

DIMENSIONS. CONTRACTOR SHALL INCREASE THE DUCT SIZE ACCORDINGLY TO

COMPENSATE FOR ACOUSTICAL DUCT LINING THICKNESS (UNLESS OTHERWISE NOTED).

CONTRACTOR MAY ADJUST DUCT SIZES ACCORDINGLY TO SUIT FIELD CONDITIONS AS

LONG AS THE DUCT FREE AREA AND STATIC PRESSURE DROP ARE EQUAL TO THE

PROJECT DOCUMENTS.

4. CONTRACTOR SHALL PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION,

ADJUSTMENT AND MAINTENANCE OF ALL FANS, VALVES, COILS AND MECHANICAL

EQUIPMENT.

5. ADEQUATELY SIZED ACCESS PANELS SHOULD BE PROVIDED ON BOTH SIDES OF THE

SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS,

COILS AND OTHER DEVICES LOCATED IN THE DUCTWORK WHICH REQUIRE INSPECTION

AND/OR MAINTENANCE.

6. CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCT WORK SYSTEMS

(SUPPLY, RETURN, VENTILATION AIR AND EXHAUST) CONNECTED TO ALL AIR HANDLING

UNITS, FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE

CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT

(UNLESS NOTED OTHERWISE).

7. ALL AIR HANDLING SYSTEMS SHALL BE DESIGNED AND INSTALLED WITH BALANCE

DAMPERS LOCATED IN THE MAIN SUPPLY, EXHAUST AND OUTSIDE AIR DUCTS FOR

PROPER BALANCING OF EACH SYSTEM, AND FOR EACH SUPPLY, RETURN, OR EXHAUST

GRILLE, UNLESS OTHERWISE NOTED.

8. DUCTWORK WILL INCLUDE ALL DUCTS, FITTINGS, TURNING VANES, DAMPERS, SUPPORTS,

AND ALL ACCESSORIES, SUBASSEMBLIES, AND PARTS INCORPORATED THEREIN OR

REQUIRED FOR THE INSTALLATION AND COMPLETION OF SYSTEMS. ALL SUPPLY,

RETURN, AND EXHAUST DUCT BRANCHES SHALL BE DESIGNED AND INSTALLED WITH

BALANCE DAMPERS.

9. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED TO 2" WG LEAKAGE

CLASS AND SEAL CLASS SHALL BE CLASS A IN ACCORDANCE WITH THE STANDARDS

DESCRIBED IN SMACNA "DUCT CONNECTION STANDARDS METAL AND FLEXIBLE" AND

"SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL".

10. SMOOTH TURN RADIUS DUCTWORK OR TURNING VANES AND 45 DEGREE ENTRY OR

CONICAL DUCT BRANCH CONNECTIONS SHALL BE USED THROUGHOUT.

11. ALL DAMPER SHAFTING, RODS AND LINKAGE WILL HAVE CORROSION RESISTANT FINISH.

ALL VOLUME DAMPERS WILL MOVE FREELY THROUGH FULL TRAVEL WITHOUT BINDINGS

AFTER INSTALLATION OF INSULATION.

12. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN

DUCTS, INCLUDING DIVING DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE

PROVIDED AT NO ADDITIONAL COST.

13. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL

REFLECTED CEILING PLANS, LIGHTING AND OTHER CEILING ITEMS AND MAKE MINOR DUCT

MODIFICATIONS TO SUIT.

14. INSTALL NEW THERMOSTATS FOR ALL NEW AND EXISTING ZONES UNLESS OTHERWISE

INDICATED.

15. CONTRACTOR SHALL PROPERLY SUPPORT & BRACE ALL DUCTWORK IN ACCORDANCE

WITH SMACNA STANDARDS FROM BUILDING STRUCTURE ONLY. DUCTWORK SUPPORT

MATERIALS, UNLESS OTHERWISE INDICATED, SUPPORTS, FASTENERS, ANCHORS,

STRAPS, TRIM AND ANGLES WILL GENERALLY BE THE SAME MATERIAL AS THE

DUCTWORK, HOT DIPPED GALVANIZED.

16. DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION WILL CONFORM TO

SMACNA STANDARDS AND THE MANUFACTURERS' INSTALLATION REQUIREMENTS WHERE

NOT OTHERWISE SPECIFIED, INDICATED OR REQUIRED.

17. ALL INTERIOR AND EXTERIOR WALL, CEILING AND ROOF OPENINGS AND DUCT AND PIPE

THROUGH WALL PENETRATIONS, FRAMING, SLEEVES, WEATHERPROOFING AND FIRE

SEALING SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED

OTHERWISE.

18. CONTRACTOR SHALL PROVIDE AND INSTALL ALL FIRE DAMPERS IN ACCORDANCE WITH UL

555 AND MANUFACTURER'S REQUIREMENTS WHERE DUCTS PENETRATE FIRE RATED

WALLS OR FLOORS. ALL FIRE DAMPERS SHALL BE UL LISTED AND LABELED CONSISTENT

WITH THE WALLS OR FLOORS THAT ARE PENETRATED. PROVIDE ACCESS DOORS SIZED

AND LOCATED TO FACILITATE TESTING AND RESETTING OF ALL FIRE DAMPERS.

19. INSULATE PER SPECIFICATION SECTION 23 07 11.

20. THE NEW DUCT SYSTEM IS TO BE CLEANED THOROUGHLY OF ALL DEBRIS BEFORE

INSTALLING INLET/OUTLET DEVICES.

21. CONTRACTOR SHALL TEST ADJUST & BALANCE THE COMPLETED SYSTEM. ALL

BALANCING WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF AN AABC OR

NEBB-QUALIFIED SUPERVISOR WHO SHALL CERTIFY THE RESULTS.

22. TEST, ADJUST AND BALANCE WORK WILL DEMONSTRATE THAT ALL SYSTEMS OPERATE AS

THEY WERE INTENDED TO. UPON COMPLETION OF THE WORK A WRITTEN TEST AND

BALANCE REPORT WILL BE SUBMITTED TO THE OWNER. FORMS AND PROCEDURES

UTILIZED FOR THIS WORK WILL BE AS PROPOSED BY THE AABC OR OTHER NATIONALLY

RECOGNIZED ORGANIZATION ACCEPTABLE TO THE OWNER.

23. ALL DUCTWORK,PIPING AND EQUIPMENT SHOWN ON NEW WORK PLANS AND DETAILS

SHALL BE CONSIDERED AS NEW UNLESS IDENTIFIED AS EXISTING TO REMAIN.

24. ALL DUCTWORK WITHOUT EXCEPTION, AND ALL PIPING 0" AND LARGER SHALL BE SHOWN

IN DOUBLE LINE

PIPING NOTES

1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES,

VALVES, ETC. SHALL BE DESIGNED, FABRICATED AND INSTALLED PER

APPROPRIATE SECTIONS OF THE LATEST ANSI AND ASTM CODES AND STANDARDS

AND THE MATERIAL SPECIFICATIONS FOUND IN THE PROJECT DOCUMENTS.

2. CONTRACTOR TO INSTALL HIGH POINT VENTS AT ALL SYSTEM HIGH POINTS AND

LOW POINT DRAINS AT SYSTEM LOW POINTS. VENTS AND DRAINS ARE REQUIRED

TO FACILITATE SYSTEM DRAINING AND VENTING DURING TESTING AND START-UP.

3. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE

PROPERLY FLUXED AND MADE WITH APPROVED SOLDER. SOLDER JOINTS FOR

POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN

0.2 PERCENT LEAD.

4. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC

UNIONS MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (ie

CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING

REMOVAL AND REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT

GALVANIC CORROSION.

5. CONTRACTOR SHALL PROPERLY BRACE, ANCHOR, AND SUPPORT ALL PIPING,

VALVES ETC. UNLESS SHOWN OTHERWISE, ALL PIPE HANGERS AND SUPPORTS

SHALL BE DESIGNED, MANUFACTURED AND INSTALLED PER MSS SP-58, MSS SP-69

AND MSS SP-89.

6. ALL ABOVEGROUND PIPING SHALL BE INSULATED AND JACKETED AS NOTED IN THE

SPECIFICATIONS.

7. ALL PIPES THAT PASS THROUGH EXTERIOR WALLS SHALL BE SLEEVED AND MADE

WEATHER TIGHT.

8. ALL PIPING AND VALVES MUST BE PROPERLY IDENTIFIED AND LABELED PER ANSI

13.1, ENTITLED "SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS". ALL

VALVES MUST BE IDENTIFIED AND TAGGED WITH WEATHERPROOF TAGS.

9. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS,

FLOORS AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40

CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL

BE GALVANIZED COATED. ALL SLEEVES SHALL BE INSTALLED FLUSH ON BOTH

SIDES OF WALL PENETRATION.

NON-RATED WALL: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF

INSULATED AND NON-INSULATED PIPES AND TUBING.

RATED WALL: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOOR SHALL

USE THE APPROPRIATE CODE APPROVED, TESTED AND INSTALLATION METHOD

OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).

EXTENSION WALLS & FOUNDATION WALLS: PIPES WHICH PASS THROUGH

EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED AND MADE

WEATHER TIGHT.

10. INSULATE COLD AND HOT WATER PIPING WITH FIRE RETARDANT VAPOR BARRIER

JACKET. PIPE INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.

SEE SPECIFICATIONS.

2 1

1/2

MECHANICAL ABBREVIATIONS DUCTWORK SYMBOLS

1-SF-1

SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY. THE PRESENCE OF A SYMBOL DOES NOT

IMPLY ITS USE ON THIS PROJECT. REFER TO THE DRAWINGS FOR SPECIFIC SYMBOLS USED.

(NOTE: NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)

DRAWING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN);

" PER FOOT

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

INVERTED BUCKET TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

THERMOSTATIC TRAP SET INCLUDING PIPING

ACCESSORIES SEE DETAIL

THERMOMETER

PRESSURE GAUGE

FLOW ELEMENT

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

QUICK-COUPLE HOSE CONNECTOR

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HIGH PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

CONDENSATE PUMP DISCHARGE

HOT WATER HEATING SUPPLY

HOT WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

GLYCOL-WATER HEATING RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

MAKE-UP WATER

DRAIN LINE

VENT LINE

CHILLED GLYCOL-WATER RETURN

GLYCOL-WATER RUN AROUND SUPPLY

TUBE CLEANER WATER SUPPLY

CHEMICAL FEED

OVERFLOW

COMPRESSED AIR

COLD WATER (CITY WATER)

GLYCOL-WATER RUN AROUND RETURN

SOFTENED WATER

HOT WATER

REVERSE OSMOSIS

EXISTING PIPE OR EQUIPMENT TO BE REMOVED

GATE VALVE - THREADED / FLANGED

GLOBE VALVE - THREADED / FLANGED

GATE VALVE WITH

" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE &

HOSE CONNECTION)

WYE STRAINER WITH VALVUED DRAIN AND

QUICK COUPLE HOSE CONNECTION

FLEXIBLE CONNECTION

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

PRESSURE SAFETY VALVE

PRESSURE REDUCING VALVE (PRV)

CONTROL VALVE (CV) - FLOAT-OPERATED

PLUG VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

CIRCUIT SETTER VALVE

WATER BALANCE DEVICE

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

SQUARE 1-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN REGISTER OR TOP GRILLE

(WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT (PIPE OR DUCT)

INCLINED RISE, IN DIRECTION OR AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION (PIPE OR DUCT)

FLEXIBLE CONNECTION, EQUIPMENT VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARED RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSION: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO REMOVE

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC

PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE

CLASS "(IN. OF WATER) WHICH WILL ACCOMMODATE

MAXIMUM OPERATING PRESSURE IN THE DUCT

SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT

UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL

APPEARS. A "N" SUPERSCRIPT INDICATED NEGATIVE

PRESSURE.

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

STANDARD BRANCH SUPPLY OR RETURN,

NO SPLITTER (45° TAP)

SMOKE DAMPER

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE WALL

AREA OF WORK

SMOKE DETECTOR - DUCT MOUNTED

KEY NOTE SYMBOL

MULTIPLE KEY NOTES APPLYING TO THE SAME

ITEM

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

SECTION NUMBER

DRAWING NUMBER

WHERE DRAWN

AHU THAT SERVES THE EQUIPMENT

EQUIPMENT ABBREVIATION (SUPPLY FAN)

EQUIPMENT NUMBER

PIPING SYMBOLS

VALVE SYMBOLS

AUTOMATIC BALANCING CONTROL VALVE

FE

M-103

M-103

TYPICAL DRAWING

BLOCK OR DETAIL TITLE

FLOOR PLAN

SCALE: NONE

FC

10x8

VD

SUPPLY

RETURN

45°

45°

R

D

UP

UP

UP DN

DN

DN

HWHS

HWHR

GHS GHS

GHR

CWS CWS

CWR

GCS GCS

GCR

D D

V V

GR GR

GRR

FLOW SWITCH HIGH

FLOW SWITCH LOW

ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT

ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT

TEMPERATURE TRANSMITTER

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRANSMITTER

STATIC PRESSURE SENSOR

FLOW TRANSMITTER

SMOKE DETECTOR

PRESSURE DIFFERENTIAL TRANSMITTER

PRESSURE DIFFERENTIAL SWITCH

HAND SWITCH (HAND-OFF-AUTO SWITCH)

TEMPERATURE SWITCH, LOW (FREEZESTAT)

TEMPERATURE SWITCH, HIGH (FREEZESTAT)

LEVEL CONTROLLER

LEVEL TRANSMITTER

VARIABLE SPEED MOTOR CONTROLLER

HVAC CONTROL PANEL

LOCAL TEMPERATURE CONTROL PANEL

OCCUPANCY SENSOR

CARBON MONOXIDE TRANSMITTER

CARBON DIOXIDE TRANSMITTER

PRESSURE SWITCH LOW

PRESSURE SWITCH HIGH

TEMPERATURE SENSING ELEMENT FOR TRANSMITTING

TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM

LENGTH IN DUCT WHEN SPACE PERMITS.)

MOTOR STARTER

ELECTRIC OPERATED CONTROL DAMPER / OR VALVE

HPS HPS

HPR

MPS MPS

MPR

LPS LPS

LPR

TC TC

CF CF

OFL

A A

CW CW

SW SW

HW HW

RO RO

CONTROLS SYMBOLS

T

M

TT

MT

PT

SPS

FT

PDT

PDS

HS

TSL

TSH

LC

LT

PSH

PSL

AT

CO2

AT

CO

AT

OC

LTCP

HVAC

VSMC

FSH

FSL

M

MD

MOTORIZED DAMPER

FIRE DAMPER

FIRE/SMOKE DAMPER

SD

FIRE AND SMOKE DETECTOR

FSD

10"Ø

SA

DUCT TERMINAL OUTLET INFO TAG

TERMINAL TYPE

2x2 OR 2x4 RADIANT HEATING CEILING PANEL

PIPE CAP OR PLUG

HEATING VALVE BOX ASSEMBLY

SD

NECK

SIZE

CFM

FD

SD

FSD

DIFFERENTIAL STATIC

PRESSURE MONITOR

TEMPERATURE SENSOR

OS

OCCUPANCY SENSOR (CLEAN ROOM)

TS

ΔP

1 1

1 2 o n e e i g h o t

B

A

C

D

E

F t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

MECHANICAL

ABBREVIATIONS, SYMBOLS & NOTES

MA KW

#1

MG-001

CL02A

SHAFT 5

REMOVE 60"X30"

DUCT AND FIRE DAMPER

AG47

SHAFT 5

"-20 GA. FLOOR

DECK + 4

CONCRETE FLOOR

A509A

SHAFT 5

AG47

SHAFT 5

W X

W8X10

W8X10

W8X10

W X

W X

W8X24

W X

"-20 GA. FLOOR

DECK + 4

CONCRETE FLOOR

W8X24

5'-4

" 5'-4

AG47

SHAFT 5

N105

SHAFT 5

A209A

SHAFT 5

N305

SHAFT 5

C400A

A411A

SHAFT 5

N105

SHAFT 5

W X

∠4X3X

8" (TYP)

1ST - 5TH FLOOR

A209A

SHAFT 5

C400A

A411A

SHAFT 5

N305

SHAFT 5

A509A

SHAFT 5

o n e e i g h o t

B

A

C

D

E

F t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

REMOVE DUCTWORK & INFILL

SHAFT 5

MA KW

MD-101

NORTH

BASEMENT (DEMO)

SCALE: 1/4" = 1'-0"

GROUND (DEMO)

SCALE: 1/4" = 1'-0"

FIFTH FLOOR (DEMO)

SCALE: 1/4" = 1'-0"

1-1/2" 20 GA.EXISTING

METAL FLOOR DECK

NEW COMPOSITE METAL DECK TO MATCH EXISTING

NEW 4" CONCRETE FLOOR

3X3X

" SUPPORT ANGLE WELDED EACH SIDE

INFILL CONCRETE SLAB

SCALE: 1/4" = 1'-0"

8A

GROUND EXISTING (STRUCTURAL)

SCALE: 1/4" = 1'-0"

KEY PLANS

SHAFT 5

GROUND INFILL (NEW)

SCALE: 1/4" = 1'-0"

INFILL FLOOR

SEE DETAIL 8A/MD-101

FIRST FLOOR (DEMO)

SCALE: 1/4" = 1'-0"

SECOND FLOOR (DEMO)

SCALE: 1/4" = 1'-0"

THIRD FLOOR (DEMO)

SCALE: 1/4" = 1'-0"

FOURTH FLOOR (DEMO)

SCALE: 1/4" = 1'-0"

FIRST FLOOR (NEW)

SCALE: 1/4" = 1'-0"

SECOND FLOOR (NEW)

SCALE: 1/4" = 1'-0"

INFILL WITH

1-1/4X 3/16" THICK BAR GRATING

(TYP) 1ST - 5TH FLOOR

THIRD FLOOR (NEW)

SCALE: 1/4" = 1'-0"

FOURTH FLOOR (NEW)

SCALE: 1/4" = 1'-0"

KEYED NOTES:

DEMOLISH ALL DUCTWORK SHOWN

INFILL USING 1-1/4"X

16" THICK BAR GRATING. USING 4X3X

8" ANGLE

TYP.

INFILL WITH 2" RIGID INSULATION SANDWICHED BETWEEN 20GA.

SHEET METALS

2 2 2

FIFTH FLOOR (NEW)

SCALE: 1/4" = 1'-0"

KEY PLAN

03-05-13 o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

MECHANICAL PIPING

DEMOLITION PLANS

MA KW

MD-102

NORTH

KEYED NOTES:

REMOVE WALL AS SHOWN TO ACCESS FOR PIPING.

REMOVE PIPING & CAP AS SHOWN ON 3/MD-102.

DEMOLISH HX-903. CAP STEAM LINES, AS SHOWN.

ELECTRICAL AND CONTROLS DEMOLITION BY OWNER.

GENERAL DRAWING NOTES:

1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER SPECIFICATION

130541.

3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,

C170, C261A, C263.

FIRST FLOOR DEMOLTION

SCALE: 1/4" = 1'-0"

GROUND FLOOR DEMOLITION

SCALE: 1/4" = 1'-0"

BASEMENT DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SECOND FLOOR DEMOLITION

SCALE: 1/4" = 1'-0"

LOCATION HWHR/HWHS

3 1

WALL TYPES

SCALE: N.T.S

CMU

W/2" BATT INSULATION

2 LAYER

" GWB - TYPE 'X'

8" METAL STUDS - 20 GA

AT 16" O.C.

1 LAYER

" GWB LAMINATE

TO EXISTING PLASTER OR

MASONRY

EXISTING PLASTER &

LATH WALL OR MASONRY

2 HR FIRE-RATED

UL TEST: U-618

MATCH EXISTING

PLASTER OR MASONRY

2 HR FIRE-RATED UL

TEST: U-618

12/4/2019

ADD KEYED NOTE 4

HPS HPS HPS HPS HPS

G H

R G

H R

H U

A

L P

R

L P

S

L P

S

HPS

CSG-21A

H P

S

(E)5"CHW S&R

(E)4"HPS RISER

CW

H P

S

L P

R

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

C113

MECHANICAL ROOM

C170

OFFICE

C171

LOCKER

C171A

TOILET

DEMOLISH

HWH-903

H P

S H

P S

H P

S

HPSHPS

L P

R L

P R

H R

A

B

EF-21A

C

A

C W

S

CWS CWS

C W

S

CWR CWR

C W

R

H W

H R

H W

H S

GHR

G H

S G

H S

3" GHR

1" LPR

3" LPS

HGH

CW

RELOCATE

VALVE & CAP

2" HWHR

&HWHS

CUT & CAP

CL61

CL08A

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

H W

H S

H W

H S

H W

H S

HWHR HWHR HWHR HWHR HWHR HWHR HWHR

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

CG19C

CG25

CONNECTIONS &

PIPES ABOVE CEILING

C202F

INGREDIENT STORAGE

C263

FACULTY CIO

C261A

NUTRITION SEC

C261

DIETARY

SF

C202G

COOLER

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

4"CMU

TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979

KEY PLAN

03-05-13 o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

SUB-BASEMENT, BASEMENT, &

GROUND PIPING PLANS

MA KW

MP-101

BASEMENT

SCALE: 1/8" = 1'-0"

NORTH

NORTH

GENERAL DRAWING NOTES:

1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER SPECIFICATION

130541.

3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,

C170, C261A, C263.

NORTH

SUB-BASEMENT PIPING PLAN

SCALE: 1/16" = 1'-0"

GROUND FLOOR

SCALE: 1/4" = 1'-0"

NORTH

KEYED NOTES:

CORE DRILL CONCRETE FLOOR FOR VERTICAL PIPE PENETRATIONS. PROVIDE

FIRE-RATED SEAL PER DETAIL 9/MP-501.

INSTALL 4" HWHS & HWHR PIPE VERTICAL THROUGH 2ND FLOOR.

INFILL WALLS TO MATCH EXISTING. REMOVE AND REINSTALL SECTION OF

CEILING GRID, AS NEEDED.

1 2 3

WALL TYPES

SCALE: N.T.S

LOCATION HWHR/HWHS

CMU

W/2" BATT INSULATION

1 LAYER

" GWB - TYPE 'X'

" METAL STUDS - 20 GA

AT 16" O.C.

1 LAYER

" GWB LAMINATE

TO EXISTING PLASTER OR

MASONRY

EXISTING PLASTER &

LATH WALL OR MASONRY

2 HR FIRE-RATED

UL TEST: U-618

MATCH EXISTING PLASTER

OR MASONRY

2 HR FIRE-RATED UL TEST:

U-618

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

HWHR HWHR

HWHS HWHS HWHS

HWHR HWHR HWHR

HWHS HWHS HWHS HWHS

HWHR HWHR HWHR

M13 N13

M15

M14

N15

N14

M16 N16

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

4" HWHS & HWHR

6"

6"

6"

6"

4" VALVE AND

CAPPED FOR

FUTURE USE

6"

4"

CL61

CL08A

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

4" HWHS & HWHR

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H R

H W

H R

H W

H R

H W

H R

HWHR HWHR HWHR HWHR HWHR HWHR HWHR HWHR HWHR

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

2" HWHS &HWHR

CG19C

CG25

4" HWHS & HWHR

HWHS HWHS

1" HWHS

2" HWHS &HWHR

" HWHR&HWHS

UP TO 21A-HW

e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

FIRST & SECOND FLOOR PIPING

PLAN

MA KW

MP-102

KEYED NOTES:

CORE DRILL CONCRETE FLOOR FOR VERTICAL PIPE PENETRATIONS. PROVIDE

FIRE-RATED SEAL PER DETAIL 9/MP-501.

INSTALL 4" HWHS & HWHR PIPE VERTICAL THROUGH 2ND FLOOR.

INFILL WALLS TO MATCH EXISTING. REMOVE AND REINSTALL SECTION OF

CEILING GRID, AS NEEDED. WALL COVE TO MATCH EXISTING.

ADD VALVE & CAP FOR FUTURE.

ADD HX AND ASSOCIATED PIPING AND APERTURES. SEE DETAIL ON 7/MP-501.

CAP STEAM LINE.

GENERAL DRAWING NOTES:

1. MAINTAIN CLEAR SERVICE ACCESS TO EXISTING EQUIPMENT WHEN LOCATING

NEW PIPING AND HEAT EXCHANGERS.

2. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,

C170, C261A, C263.

FIRST FLOOR PIPING PLAN

SCALE: 1/4" = 1'-0"

KEY PLANS

NORTH

NORTH

SECOND FLOOR PIPING PLAN

SCALE: 1/4" = 1'-0"

NORTH

LOCATION HWHR/HWHS

WALL TYPES

SCALE: N.T.S

CMU

W/2" BATT INSULATION

1 LAYER

" GWB - TYPE 'X'

" METAL STUDS - 20 GA

AT 16" O.C.

1 LAYER

" GWB LAMINATE

TO EXISTING PLASTER OR

MASONRY

EXISTING PLASTER &

LATH WALL OR MASONRY

2 HR FIRE-RATED

UL TEST: U-618

MATCH EXISTING PLASTER

OR MASONRY

2 HR FIRE-RATED UL TEST:

U-618

HPS HPS HPS HPS HPS

G H

R G

H R

H U

A

L P

R

L P

S

L P

S

HPS

CSG-21A

H P

S

(E)5"CHW S&R

(E)4"HPS RISER

CW

H P

S

L P

R

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

C113

MECHANICAL ROOM

C170

OFFICE

C171

LOCKER

C171A

TOILET

ADD 4" HWHS

& HWHR

H P

S H

P S

H P

S

HPSHPS

L P

R L P

R

H R

A

B

EF-21A

C A

C W

S

CWS CWS

C W

S

CWR CWR

C W

R

H W

H R

H W

H S

GHR

H W

H R

GHR

G H

R

G H

R

GHR

G H

S G

H S

3" GHR

1" LPR

3" LPS

HGH

CW

2" HWHR

&HWHS

HX-21A

SEE DETAIL

7/MP-501

2" GHR

" HWHS &

HWHR

CUT & CAP

C202F

INGREDIENT STORAGE

C263

FACULTY CIO

C261A

NUTRITION SEC

C261

DIETARY

SF

C265

CONFERENCE

C202G

COOLER

C202E

SALAD PREP

C202A

OFFICE

C265B

STAFF AREA

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

VALVE & CAP

FOR FUTURE

USE

ADD 4" HWHS

& HWHR

ABOVE

CEILING

4"CMU

CORE THROUGH MASONARY

WALL

TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 TemtrolR2 A x B 42 x 30

0.09 / 979 e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

ADD PRV 5TH FLOOR SCI

MA KW

MP-103

PIPING DEMOLITION, ROOM S510

SCALE: 1/2" = 1'-0"

KEY PLANS

SCI- 5TH FLOOR

NORTH

NORTH

KEYED NOTES:

REMOVE EXISTING PIPES AS SHOWN AND CAP.

INSTALL NEW PIPES AS SHOWN AND CAP ABANDON TEE.

INSTALL NEW PRV GOVERNMENT FURNISHED. SEE DETAIL 8/MP-501.

GENERAL DRAWING NOTES:

1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER

SPECIFICATION 130541.

PIPING PLAN, ROOM S510

SCALE: 1/2" = 1'-0"

NORTH

H W

H R

H W

H R

HWHR HWHR HWHR HWHR HWHR

H W

H S

H W

H S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S

MPS MPS

H P

S

HPS HPS

G H

R G

H R

G H

R G

H R

G H

R G

H R

GHR

G H

S

GHS GHS

G H

S

G H

S

GHS

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S

M P

R M

P R

M P

R

HPR HPR HPR

HWHS HWHS HWHS HWHS

H W

H S

G H

S G

H S

M P

S

LPS LPS LPS LPS LPS LPS LPS

LPS LPS LPS

6" LPS

(15)

6" MPS (30)

HX-101

HX-102

ET-5-04

M

P

S

C

W

C

W

C

W

MPS

C

W

C

W

C

W

C

W

C

W

C W

C W

CW CW CW CW CW CW

2" VENT

H P

R

F T

M

P

S

M

P

S

M

P

S

MPS MPS

MPS MPS

MPR MPR MPR

M

C P

4"

H W

H R

H W

H R

HWHR HWHR HWHR HWHR HWHR

H W

H S

H W

H S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

S

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

C

W

R

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M

P

S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S M

P S

M P

S

MPS MPS

H P

S

HPS HPS

G H

R G

H R

G H

R G

H R

G H

R G

H R

GHR

G H

S

GHS GHS

G H

S

G H

S

GHS

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S G

H S

G H

S

M P

R M

P R

M P

R

HPR HPR HPR

HWHS HWHS HWHS HWHS

H W

H S

G H

S G

H S

M P

S

LPS LPS LPS LPS LPS LPS LPS

LPS LPS LPS

6" LPS

(15)

6" MPS (30)

HX-101

HX-102

ET-5-04

M

C

W

C

W

C

W

MPS

C

W

C

W

C

W

C

W

C

W

C W

C W

CW CW CW CW CW CW

2" VENT

H P

R

F T

M

P

S

M

P

S

M

P

S

MPS MPS

MPS MPS

MPR MPR MPR

M

SEE DETAIL

8/MP-501

C P

4"

L e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

ADD HX-501 TO 10TH FLOOR

MA KW

MP-104

DEMOLITION, RM A1000

SCALE: 1/4" = 1'-0"

KEY PLANS

10TH FLOOR

NORTH

NORTH

KEYNOTES:

REMOVE EXISTING 6" CONCRETE PAD.

REMOVE & RELOCATE SPRINKLER HEAD.

INSTALL HX-501 ON NEW HOUSEKEEPING PAD.

NEW NORMALLY CLOSED BUTTERFLY VALVE.

GENERAL DRAWING NOTES:

1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER

SPECIFICATION 130541.

PIPING PLAN, ROOM A1000

SCALE: 1/4" = 1'-0"

NORTH

ELEVATION PIPING PLAN, HX-501, RM A1000

SCALE: 1/2" = 1'-0"

ALL PIPING 4" DIAMETER, UNLESS NOTED OTHERWISE. SEE DETAIL

7/MP-501.

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H S

H W

H S

H W

H S

H W

H S

HWH-502

HWH-501

H W

H S

H W

H S

HWHS HWHS HWHS

HWHR HWHR HWHR

CWS CWS CWS CWS CWS CWS

CWR CWR CWR CWR CWR

H W

H R

C W

S C

W S

C W

R C

W R

H W

H S

H W

H S

H W

H R

H W

H R

C W

R

C W

S C

W S

FD

H W

H S

FD

HWHS

HWHS

HWHS HWHS

H W

H R

H W

H R

P U

M P

S

A

F F

H W

H S

HWHR

H W

H S

HWHS

HWHR

H W

H S

HWHS

4"

DEMO 1" HWHS/

HWHR PIPES AND

UNIT HEATER ABOVE

4"

2"

4" HWHS

4" HWHR

4"

P

P

CUT & CAP

DEMOLISH 6"

CONCRETE PAD

P P

CUT & CAP

2"

2"

4"

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H S

H W

H S

H W

H S

H W

H S

HWH-502

HWH-501

H W

H S

H W

H S

HWHS HWHS HWHS

HWHR HWHR HWHR

CWS CWS CWS CWS CWS CWS

CWR CWR CWR CWR CWR

H W

H R

C W

S C

W S

C W

R C

W R

H W

H S

H W

H S

H W

H R

H W

H R

C W

R

C W

S C

W S

FD

H W

H S

FD

HWHS

HWHS

HWHS HWHS

H W

H R

H W

H R

P U

M P

S

A

F F

H W

H S

HWHR

H W

H S

HWHS

HWHR

H W

H S

HWHS

4"

4"

2"

4" HWHS

4" HWHR

4"

P

P

P P

H W

H R

H W

H S

2"

2"

4"

MP-104

H W

H R

HWHR

H W

H S

HWHS HWHS HWHS

HWHS HWHS HWHS

H W

H S

HWHS

FROM LOOP

TO LOOP

BOILER HW

4" HWHS

4"

HWHR

HX-501

P47

HWH-501

B H

W H

S

B(HWHR)

B(HWHS)

F1 F2

F3

F4

HWHS

HWHR

P

4" CONCRETE PAD

SEE DETAIL 1/MP-501

4"

4"

4" e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

ADD SIESMIC BRACING FOR

NATURAL GAS LINES

MA KW

MP-105

SUB-BASEMENT N. GAS MAIN PIPING

1/16" = 1'-0"

GROUND FLOOR LEVEL N. GAS MAIN PIPING

1/16" = 1'-0"

BASEMENT LEVEL N. GAS MAIN PIPING

1/16" = 1'-0"

DRAWING LEGEND

NATURAL GAS

ISOLATION (SHUTOFF) VALVE

PRESSURE REDUCING VALVE

PRESSURE REGULATING VALVE

GAS COCK

GAS METER

CONCENTRIC REDUCER

FLANGE

FLOW DIRECTION

PIPE UP / PIPE RISER

PIPE ELBOW DOWN

PIPE BOTTOM CONNECTION

NG

M

NATURAL GAS RISER DIAGRAM

N.T.S

KEY PLANS

NORTH

SHAFT 3

SHAFT 8

SUB-BASEMENT

NOTES:

1. CONTRACTOR TO VERIFY NATURAL GAS PIPE SIZE, LOCATION, AND SUBMIT

DRAWING TO A LICENSED P.E.

2. HORIZONTAL PIPING SHOWN WITH " X " ON DETAIL 1 & 2 TO BE SEISMICALLY

BRACED. EXACT LOCATION AND TYPE OF BRACING TO BE DETERMINED BY

THE P.E. PER SPECIFICATION 130541.

KEYNOTES:

CLOUDED VERTICAL PIPING TO BE SEISMICALLY BRACED PER

SPECIFICATION 130541.

SHAFT 2

SHAFT 5

SHAFT 3

CL55

E6 G6 H6 I6

I8

J9 K9

K6

K10

K11

J6 L6

L9

L10

L11

L12

M6 N6 O6 Q6

R6 S6 T6 U6

M8 N8 O8

Q8 R8

S7 T7

I10 J10 M10 N10

I11 J11 M11 N11

I12 J12 K12 M12 N12

H13 I13 J13

K13 L13 M13 N13

I15

I14

J15

J14

K15

K14

L15

L14

M15

M14

N15

N14

I16

J16

K16

L16 M16 N16 P16 Q16 R16 S16

I17

J17

L17 M17 N17 P17 R17 S17 Q17

J18 K18 L18

J19 K19

8" UP TO 5TH

FLOOR CEILING

& TO CHP ON

SCI ROOF

8"

6"

6"

8"

6" UP TO 11TH FLOOR

HOT WATER BOILERS

6" UP TO BSMT CL16

8" UP TO BSMT CL16

NG

NG

NG

N G

N G

" UP (PREVIOUSLY FED

8TH FLOOR INCINERATOR

THAT HAS BEEN REMOVED)

1" UP TO

CANTEEN

N G

N G

3"

1"

3" UP TO GROUND

FLOOR CG26

CANTEEN

3"

NG

1" UP

NG

2"

2" UP TO MAIN

KITCHEN

1" UP TO BASEMENT

LEVEL CL55

NG

" UP

1"

1"

2"

1"

ABANDONED

1"

CL19

CL20

CL18

CL40

CL44

CL42

CL45

CL14

CL16

CL46A CL46

CL61

CL15

4" UP TO CG26A, 6" DN

TO SUB-BASEMENT

8" UP TO CG26A

8" DN TO

SUB-BASEMENT

NG

3" UP & DN

CANTEEN

CG38

CG39

CG35

CG36

CG32

CG33

CG30

C G

CG27

CG23

CG25

CG26

CG75

CG76

CG26A

DG25

DG22DG22A

DG24

4" DN TO BSMT CL16

8" DN TO BSMT CL16

4" FROM METER

8" FROM METER

N G

N G

NG

3" DN TO SUB-BASEMENT

3"

9th FLOOR

SHAFT TWO

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

SHAFT FIVE

11th FLOOR

(MACHINE ROOM)

SHAFT THREE

SHAFT FOUR

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

BASEMENT

B-1 B-2 B-3 B-4

DUMBWAITER

MECHANICAL

SHAFT EIGHT

ELEV 259.17'

ELEV 259.17'

ELEV 222.36'

ELEV 244.82'

ELEV 210.44'

ELEV 199.44'

ELEV 187.52'

ELEV 174.92'

ELEV 163.92

ELEV 141.92'

ELEV 130.00'

ELEV 118.08'

ELEV 112.58' TO

ELEV 104.58

ELEV 152.92'

1st FLOOR

2nd FLOOR

3rd FLOOR

4th FLOOR

GAS

METER

ASSEMBLY

N G

NG

N G

N G

NG

CL55

D-WING

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

9th FLOOR

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

BASEMENT

GROUND

FLOOR

10th FLOOR

(PENTHOUSE)

11th FLOOR

(MACHINE ROOM)

10th FLOOR

(PENTHOUSE)

ROOF

SHAFT SIX

2.5 FLOOR

SCI ROOF

SCI BUILDING BUILDING 1

5th FLOOR

(PENTHOUSE)

1st FLOOR

GROUND

FLOOR

SCI BASEMENT

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

SUB-

BASEMENT

SHAFT ONE

SHAFT 3 ROOF

5th FLOOR

HOT

WATER

BOILERS

ROOF

6"

6"

6"

4"

SUB-BASEMENT

BASEMENT

SUB-BASEMENT

NG

2" FROM UTILITY

GRADE

N G

8"

N G

3"

8"

NG

N G

EARTHQUAKE

VALVE

BYPASS

METER

PRV

ROOF

3"

NG

6"

N G

NG

8"

N G

8"

NG

3"

3"

CG76

NG

NG

6"

6"

6"

M

12"

4"

8"

2" PREVIOUSLY FOR INCINERATOR THAT HAS BEEN REMOVED

N G

1" TO ????

N G

N G

1"

CANTEEN

OVEN CANTEEN CANTEEN CANTEEN?

2"

1"

NG

GROUND

FLOOR

1"

NG

NG

N G

1"

1"

1"

1"

GROUND

FLOOR

N G

1"

2"

4"

MAIN

KITCHEN

N G

2"

8" NGAS TO CHP

GENERAL DRAWING NOTES:

1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN

ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.

2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER

SPECIFICATION 130541.

o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

DRAWING TITLE

APPROVED PROJECT DIRECTOR

PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISIONS DATE

SYRACUSE VA

MEDICAL CENTER

ENGINEERING

DEPARTMENT

ISSUED DATE

800 IRVING AVE. SYRACUSE, NY 13210

DWG.

10/24/2019

528A7-20-782EXTEND HEATING HOT

WATER TO KITCHEN & MISC.

MECHANICAL REPAIRS

RISER DIAGRAM

MA KW

MP-401

RISER DIAGRAM STEAM (DEMOLITION)

SCALE: N.T.S

RISER DIAGRAM HWH (NEW CONSTRUCTION)

SCALE: N.T.S

KITCHEN

HWH-903

CP-07

COND.

PUMP

FLASH TANK

AC-21 / EF-21

PHARMACY

C113

PRV-903

(709PPH)

AC-36 /

EF-36

KITCHEN

ROOF

AC-34 /

EF-34

KITCHEN

ROOF

AC-16 /

EF-16

KITCHEN

ROOF

PRV-716

(341PPH)

PRV-734

(750PPH)

PRV-736

(1706PPH)

AC-29 / EF-29

CL55

PRV-829

(140PPH)

C P

D

HPS

HPS

MPR

M P

R

2"

2"

2"

6"

4"

4"

4"

4"

3"

2"

1"

FT-07

BASEMENT

GROUND FLOOR

1st FLOOR

2nd FLOOR

3rd FLOOR

ELEV 104.58' TO

ELEV 112.58'

ELEV 118.08'

ELEV 130.00'

ELEV 141.92'

ELEV 152.92'

ELEV 163.92

SUB-BASEMENT

CUT & CAP

CUT & CAP

HWHR

HWHS

BASEMENT

GROUND FLOOR

1st FLOOR

2nd FLOOR

3rd FLOOR

ELEV 118.08'

ELEV 130.00'

ELEV 141.92'

ELEV 152.92'

ELEV 163.92

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

GHR

GHR GHR

H W

H S

H W

H S

H W

H R

AC-21 / EF-21

PHARMACY

C113

G H

R

GHS

GHS GHS

ELEV 104.58' TO

ELEV 112.58'

SUB-BASEMENT

HWHR HWHR

HWHS

4"

4"

4"

HWHS HWHS HWHS HWHS HWHS HWHS

HWHR HWHR HWHR HWHR HWHR HWHR

6"

BOILER

LOOP

HX-21A

6"

4" VALVE AND

CAPPED FOR

FUTURE USE

4" VALVE AND

CAPPED FOR

FUTURE USE

2" e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .