This pre-solicitation notice announces an upcoming solicitation for heating hot water and miscellaneous mechanical repair work at the Syracuse VA Medical Center in New York. The work includes extending hot water piping to the kitchen and other repairs, with an estimated cost between $250,000 and $500,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and have a NAICS code of 236220 with a small business size standard of $36.5 million. Interested contractors should monitor the Federal Business Opportunities website for the posting expected around January 7, 2020. The single scheduled site visit will be detailed in the solicitation. Bids must include a 20% bid bond and performance and payment bonds will be required from the successful contractor.
36C24220B0012 Drawings REV1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220B0012-0001000.docx | DOCX document | |
| 36C24220B0012-002.pdf | ||
| 36C24220B0012-004.pdf | ||
| 36C24220B0012-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o n e e i g h t h i c e f o t
B
A
C
D
E
F t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
COVER SHEET
MA KW
GI-001
PLAN NORTH
KEY PLAN
SCALE: NONE
DRAWING INDEX
SHEET NO.
1. GI-001 COVER SHEET
2. MG-001 MECHANICAL ABBREVIATIONS, SYMBOLS & NOTES
3. MD-101 REMOVE DUCTWORK & INFILL SHAFT 5
4. MD-102 MECHANICAL PIPING DEMOLITION PLANS
5. MP-101 SUB-BASEMENT, BASEMENT & GROUND FLOOR PIPING PLANS
6. MP-102 FIRST & SECOND FLOOR PIPING PLANS
7. MP-103 ADD PRV 5TH FLOOR SCI
8. MP-104 ADD HX-501 TO 10TH FLOOR
9. MP-105 ADD SIESMIC BRACING FOR NATURAL GAS LINES
10. MP-401 RISER DIAGRAMS
11. MP-501 DETAILS
12. MP-601 SCHEDULES
DEPARTMENT OF VETERANS AFFAIRS
800 IRVING AVE
SYRACUSE, NY 13210
PROJECT # 528A7-20-782
EXTEND HEATING HOT WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
STATEMENT OF WORK
1. EXTEND HOT WATER PIPING FROM EXISTING BOILER HOT WATER LOOP IN
BASEMENT TO THE KITCHEN. INCLUDE ALL ASSOCIATED PIPING,
INSULATION AND SUPPORTS REQUIRED FOR A FULLY FUNCTIONING
SYSTEM AS IDENTIFIED ON THE PLANS.
2. REMOVE EXHAUST DUCTWORK AND LOUVERS ASSOCIATED AS SHOWN IN
SHAFT 5 FROM BASEMENT TO FIFTH FLOOR. INFILL ALL ASSOCIATED
FLOORS WITH MATCHING GRADING AND CONCRETE FLOOR.
3. INSTALL PRESSURE REDUCING VALVE (PRV) AND PIPE WORK LOCATED ON
FIFTH FLOOR OF THE SCI- WING.
4. ADD SEISMIC BRACING FOR EXISTING NATURAL GAS PIPING.
5. ADD PLATE AND FRAME HX-501 TO HWS-501 ON 10TH FLOOR.
GENERAL NOTES
1. THE BUILDING SHALL BE OCCUPIED FOR THE DURATION OF THE
CONSTRUCTION PERIOD.
2. ALL SPACES, STAIRWAYS, CORRIDORS AND ELEVATORS SHALL BE
TEMPORARILY PROTECTED WHEN USED FOR THE TRANSPORTATION OF
MATERIALS INTO OR OUT OF THE WORK AREAS. PROVIDE PLASTIC
SHEATHING, PROTECTIVE FLOOR COVERINGS, SIGNAGE AND BARRIERS AS
REQUIRED TO PROTECT THE EXISTING BUILDING ELEMENTS AS WELL AS
THE PATIENTS, VISITORS AND HOSPITAL STAFF.
3. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT AND OBTAIN
APPROVAL FOR A PLAN THAT INDICATES ROUTING OF EQUIPMENT
THROUGH THE BUILDING AND DETAILS PROTECTIVE MEASURES TO BE
TAKEN.
4. ALL DISRUPTION TO THE EXISTING SERVICES SHALL BE COORDINATED
WITH HOSPITAL STAFF AND THE CONTRACTING OFFICER REPRESENTATIVE
(COR) AT LEAST TEN DAYS IN ADVANCE.
5. PRE-ASSEMBLY AND EQUIPMENT STAGING SHOULD BE PLANNED TO
MINIMIZE DOWN-TIME OF SYSTEMS IN ALL CASES. MAXIMUM DOWN-TIME
SHALL BE AS INDICATED HEREIN AND/OR AS DIRECTED BY THE
CONTRACTING OFFICER.
6. ACCESS FOR THE PIPE ROUTING IS LIMITED BY EXISTING
STRUCTURE/EQUIPMENT CONTRACTORS ARE STRONGLY ENCOURAGED
TO BECOME FAMILIAR WITH THE SPECIFIC WORK AREAS PRIOR TO BIDDING
IN ORDER TO ACCOUNT FOR RIGGING, STAGING AND SITE-ACCESS
RESTRICTIONS.
7. COORDINATE ALL STORAGE, STAGING AND SITE ACCESS WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) PRIOR TO
CONSTRUCTION.
8. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES
IN ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
SHAFT 5
BASEMENT, GROUND,
FIRST, AND SECOND
FLOORS
FIFTH FLOOR
GENERAL PIPING SYMBOLS
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CO CLEAN OUT
CP CONDENSATE PUMP
CR CEILING REGISTER
CRAC COMPUTER ROOM AIR CONDITIONING
UNIT
CU CONDENSING UNIT
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DOM DOMESTIC
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DSS DUCTLESS SPLIT-SYSTEM (EVAPORATOR)
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
(ER) EXISTING TO REMAIN
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
(E) EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GF/CI GOVT. FURNISHED/CONTRACTOR INSTALL
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRR GLYCOL-WATER RUN AROUND RETURN
GRS GLYCOL-WATER RUN AROUND SUPPLY
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J (INTENTIONALLY LEFT BLANK)
kPa KILOPASCAL kW KILOWATT
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MIN MINIMUM
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
NA NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAUGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAUGE
PSV PRESSURE SAFETY VALVE
(R) RELOCATE/RELOCATED
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RCP RADIANT CEILING PANEL
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATOR DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SVS STEAM VENT SILENCER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC UNDER CUT
UL UNDERWRITERS LABORATORY
V VALVE
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCACU WATER-COOLED COMP RM A/C
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOW METER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAUGE
WHA WATER HAMMER ARRESTOR
AV
MV
GENERAL NOTES AND CONDITIONS
1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE AVAILABLE
BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED AND FIELD SURVEY
INFORMATION COMPILED BY THE VA ENGINEERING DESIGN TEAM FOR THE PURPOSE OF
ENGINEERING DESIGN. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS
POSSIBLE. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS
EXISTING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,
SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE
ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.
1.1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PLANS AND
SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT PLANS AND SPECIFICATIONS
FROM OTHER DISCIPLINES, TO BECOME FAMILIAR WITH THE FULL PROJECT SCOPE
AND COORDINATED RESPONSIBILITIES.
1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR RELATED
WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, OR IN
THE SPECIFICATIONS, CONSULT THE COR FOR NECESSARY CLARIFICATIONS, AND
CONFORM TO THOSE CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH
THE ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK
PROCEED IN UNCERTAINTY.
1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED
CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION BY
CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD CONDITIONS
ENCOUNTERED DURING CONSTRUCTION WITHOUT COMPROMISING THE INTENT OF
THE ORIGINAL DESIGN. COORDINATE ANY MODIFICATIONS WITH THE COR PRIOR
TO STARTING WORK IN AREAS AFFECTED.
1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
AT SITE PRIOR TO STARTING WORK.
1.5. DO NOT SCALE DRAWINGS.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND
REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING
OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE
EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND THE OWNER'S
EMPLOYEES WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE
CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE
WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE
COORDINATED WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY
BE REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVISION AND MAINTENANCE OF WARNING SIGNS, LIGHT SIGNAL DEVICES,
GUARD LIGHTS, BARRICADES, GUARD RAILS, FENCES AND OTHER DEVICES,
APPROPRIATELY LOCATED ON AND AROUND THE JOB SITE WHICH GIVE PROPER
AND UNDERSTANDABLE WARNING TO PERSONS WITH REGARD TO HAZARDOUS
CONDITIONS, EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION
WITH THE WORK.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES FOR
ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE ADDITIONAL
MECHANICAL/PLUMBING WORK, AND ITEMS THAT ARE NOT INDICATED ON THE
DRAWINGS.
4. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF
FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING JURISDICTION. IN
PARTICULAR, THE WORK WILL BE IN ACCORDANCE WITH THE CURRENT ADOPTED
EDITION OF THE NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE
AND ALL OF ITS APPLICABLE SUBCODES AND AMENDMENTS.
5. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND
WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING CODES (ABOVE),
INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE MANUFACTURERS
RECOMMENDATIONS AND REQUIREMENTS.
6. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING ALL
LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT
REASONABLY IMPLIED. THIS SHALL INCLUDE CUTTING, PATCHING AND RESTORATION OF
EXISTING SURFACES DAMAGED DURING THE CONSTRUCTION. CONTRACTOR SHALL
ALSO PROVIDE ALL EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.
SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL GIVEN
WRITTEN APPROVAL BY THE OWNER.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR NONCOMPLIANCE
WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL NOT BE ALLOWED CHANGE
ORDERS FOR PROBLEMS ARISING FROM NEGLECT OF PROVISIONS INCLUDED IN THESE
CONDITIONS.
8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON SUBSTANTIAL
COMPLETION PERFORM FINAL CLEANUP. REMOVE CONSTRUCTION RUBBISH,
SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD
STRUCTURES, AND OTHER MATERIALS OR EQUIPMENT THAT WAS REQUIRED IN
CONNECTION WITH THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.
9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES AND
CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE
CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY
COMPLETION OF THE WORK. COMMENCEMENT OF WORK BY A TRADE ON A SURFACE OR
CONSTRUCTION SHALL IMPLY ACCEPTANCE OF SUCH SURFACE OR CONSTRUCTION. DO
NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
10. THE CONTRACTOR SHALL SECURE ALL PERMITS AND APPLICATIONS AND PAY ANY AND
ALL FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND
CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
DELIVER ALL PERMITS, CERTIFICATES AND APPROVALS TO THE OWNER AGENT PRIOR
TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST FILE NECESSARY
DRAWINGS, PREPARE DOCUMENTS AND MAKE APPLICATIONS FOR EACH REQUIRED
PERMIT AND INSPECTION, PRIOR TO COMMENCING WORK TO AVOID DELAYS DURING
CONSTRUCTION.
11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA SHEETS ON
ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR APPROVAL BY OWNER.
THESE DRAWINGS OR SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E.,
MANUFACTURER, CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS
AND ALL OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE CLARITY
AND INSTALLATION.
12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS WHICH
SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND CONNECTIONS OF ALL
EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL PROVIDE COPIES OF ALL
MAINTENANCE INFORMATION AND INSTRUCTIONS RECEIVED WITH EQUIPMENT AND
SYSTEMS. ALL "AS-BUILT" DRAWINGS AND MISCELLANEOUS INFORMATION SHALL BE
GIVEN TO THE OWNER AND ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR
SHALL GUARANTEE ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE
YEAR PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER.
13. AS DIRECTED BY THE OWNER, ALL EXISTING EQUIPMENT AND MATERIAL IN USABLE
CONDITION THAT IS REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER, OR
HANDLED AS INSTRUCTED BY THE OWNER, BE DISPOSED OF BY THE CONTRACTOR. ALL
MATERIALS DEEMED FOR REMOVAL SHALL BE RECYCLED WHENEVER POSSIBLE, IN
ACCORDANCE WITH THE REQUIREMENTS SET FORTH WITHIN SPECIFICATION SECTION 01
74 19 (CONSTRUCTION WASTE MANAGEMENT).
14. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS, RIGGING,
HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE INSTALLATION OF THEIR
WORK.
15. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND ERECT ALL
REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS MUST BE ALTERED
TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR SHALL RESTORE
STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND REPLACEMENT OF ALL CEILING
AS REQUIRED TO COMPLETE THE WORK.
HVAC NOTES AND CONDITIONS
1. ALL HVAC EQUIPMENT SHALL MEET THE REQUIREMENTS SET FORTH IN THE
ANSI/ASHRAE/IESNA STANDARD 90.1 ENTITLED "ENERGY STANDARDS FOR BUILDINGS
EXCEPT LOW-RISE RESIDENTIAL BUILDINGS".
2. ALL METALLIC DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH SMACNA STANDARD "HVAC DUCT CONSTRUCTION STANDARDS-METAL AND
FLEXIBLE" AND NFPA STANDARD 90A TITLED "INSTALLATION OF AIR CONDITIONING AND
VENTILATION SYSTEMS". ALL DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH SMACNA 2 IN WG PRESSURE CLASS, SEAL CLASS A, UNLESS
OTHERWISE NOTED.
3. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS. CONTRACTOR SHALL INCREASE THE DUCT SIZE ACCORDINGLY TO
COMPENSATE FOR ACOUSTICAL DUCT LINING THICKNESS (UNLESS OTHERWISE NOTED).
CONTRACTOR MAY ADJUST DUCT SIZES ACCORDINGLY TO SUIT FIELD CONDITIONS AS
LONG AS THE DUCT FREE AREA AND STATIC PRESSURE DROP ARE EQUAL TO THE
PROJECT DOCUMENTS.
4. CONTRACTOR SHALL PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION,
ADJUSTMENT AND MAINTENANCE OF ALL FANS, VALVES, COILS AND MECHANICAL
EQUIPMENT.
5. ADEQUATELY SIZED ACCESS PANELS SHOULD BE PROVIDED ON BOTH SIDES OF THE
SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS,
COILS AND OTHER DEVICES LOCATED IN THE DUCTWORK WHICH REQUIRE INSPECTION
AND/OR MAINTENANCE.
6. CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCT WORK SYSTEMS
(SUPPLY, RETURN, VENTILATION AIR AND EXHAUST) CONNECTED TO ALL AIR HANDLING
UNITS, FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT
(UNLESS NOTED OTHERWISE).
7. ALL AIR HANDLING SYSTEMS SHALL BE DESIGNED AND INSTALLED WITH BALANCE
DAMPERS LOCATED IN THE MAIN SUPPLY, EXHAUST AND OUTSIDE AIR DUCTS FOR
PROPER BALANCING OF EACH SYSTEM, AND FOR EACH SUPPLY, RETURN, OR EXHAUST
GRILLE, UNLESS OTHERWISE NOTED.
8. DUCTWORK WILL INCLUDE ALL DUCTS, FITTINGS, TURNING VANES, DAMPERS, SUPPORTS,
AND ALL ACCESSORIES, SUBASSEMBLIES, AND PARTS INCORPORATED THEREIN OR
REQUIRED FOR THE INSTALLATION AND COMPLETION OF SYSTEMS. ALL SUPPLY,
RETURN, AND EXHAUST DUCT BRANCHES SHALL BE DESIGNED AND INSTALLED WITH
BALANCE DAMPERS.
9. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED TO 2" WG LEAKAGE
CLASS AND SEAL CLASS SHALL BE CLASS A IN ACCORDANCE WITH THE STANDARDS
DESCRIBED IN SMACNA "DUCT CONNECTION STANDARDS METAL AND FLEXIBLE" AND
"SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL".
10. SMOOTH TURN RADIUS DUCTWORK OR TURNING VANES AND 45 DEGREE ENTRY OR
CONICAL DUCT BRANCH CONNECTIONS SHALL BE USED THROUGHOUT.
11. ALL DAMPER SHAFTING, RODS AND LINKAGE WILL HAVE CORROSION RESISTANT FINISH.
ALL VOLUME DAMPERS WILL MOVE FREELY THROUGH FULL TRAVEL WITHOUT BINDINGS
AFTER INSTALLATION OF INSULATION.
12. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVING DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST.
13. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
14. INSTALL NEW THERMOSTATS FOR ALL NEW AND EXISTING ZONES UNLESS OTHERWISE
INDICATED.
15. CONTRACTOR SHALL PROPERLY SUPPORT & BRACE ALL DUCTWORK IN ACCORDANCE
WITH SMACNA STANDARDS FROM BUILDING STRUCTURE ONLY. DUCTWORK SUPPORT
MATERIALS, UNLESS OTHERWISE INDICATED, SUPPORTS, FASTENERS, ANCHORS,
STRAPS, TRIM AND ANGLES WILL GENERALLY BE THE SAME MATERIAL AS THE
DUCTWORK, HOT DIPPED GALVANIZED.
16. DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION WILL CONFORM TO
SMACNA STANDARDS AND THE MANUFACTURERS' INSTALLATION REQUIREMENTS WHERE
NOT OTHERWISE SPECIFIED, INDICATED OR REQUIRED.
17. ALL INTERIOR AND EXTERIOR WALL, CEILING AND ROOF OPENINGS AND DUCT AND PIPE
THROUGH WALL PENETRATIONS, FRAMING, SLEEVES, WEATHERPROOFING AND FIRE
SEALING SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED
OTHERWISE.
18. CONTRACTOR SHALL PROVIDE AND INSTALL ALL FIRE DAMPERS IN ACCORDANCE WITH UL
555 AND MANUFACTURER'S REQUIREMENTS WHERE DUCTS PENETRATE FIRE RATED
WALLS OR FLOORS. ALL FIRE DAMPERS SHALL BE UL LISTED AND LABELED CONSISTENT
WITH THE WALLS OR FLOORS THAT ARE PENETRATED. PROVIDE ACCESS DOORS SIZED
AND LOCATED TO FACILITATE TESTING AND RESETTING OF ALL FIRE DAMPERS.
19. INSULATE PER SPECIFICATION SECTION 23 07 11.
20. THE NEW DUCT SYSTEM IS TO BE CLEANED THOROUGHLY OF ALL DEBRIS BEFORE
INSTALLING INLET/OUTLET DEVICES.
21. CONTRACTOR SHALL TEST ADJUST & BALANCE THE COMPLETED SYSTEM. ALL
BALANCING WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF AN AABC OR
NEBB-QUALIFIED SUPERVISOR WHO SHALL CERTIFY THE RESULTS.
22. TEST, ADJUST AND BALANCE WORK WILL DEMONSTRATE THAT ALL SYSTEMS OPERATE AS
THEY WERE INTENDED TO. UPON COMPLETION OF THE WORK A WRITTEN TEST AND
BALANCE REPORT WILL BE SUBMITTED TO THE OWNER. FORMS AND PROCEDURES
UTILIZED FOR THIS WORK WILL BE AS PROPOSED BY THE AABC OR OTHER NATIONALLY
RECOGNIZED ORGANIZATION ACCEPTABLE TO THE OWNER.
23. ALL DUCTWORK,PIPING AND EQUIPMENT SHOWN ON NEW WORK PLANS AND DETAILS
SHALL BE CONSIDERED AS NEW UNLESS IDENTIFIED AS EXISTING TO REMAIN.
24. ALL DUCTWORK WITHOUT EXCEPTION, AND ALL PIPING 0" AND LARGER SHALL BE SHOWN
IN DOUBLE LINE
PIPING NOTES
1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES,
VALVES, ETC. SHALL BE DESIGNED, FABRICATED AND INSTALLED PER
APPROPRIATE SECTIONS OF THE LATEST ANSI AND ASTM CODES AND STANDARDS
AND THE MATERIAL SPECIFICATIONS FOUND IN THE PROJECT DOCUMENTS.
2. CONTRACTOR TO INSTALL HIGH POINT VENTS AT ALL SYSTEM HIGH POINTS AND
LOW POINT DRAINS AT SYSTEM LOW POINTS. VENTS AND DRAINS ARE REQUIRED
TO FACILITATE SYSTEM DRAINING AND VENTING DURING TESTING AND START-UP.
3. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE
PROPERLY FLUXED AND MADE WITH APPROVED SOLDER. SOLDER JOINTS FOR
POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN
0.2 PERCENT LEAD.
4. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC
UNIONS MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (ie
CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING
REMOVAL AND REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT
GALVANIC CORROSION.
5. CONTRACTOR SHALL PROPERLY BRACE, ANCHOR, AND SUPPORT ALL PIPING,
VALVES ETC. UNLESS SHOWN OTHERWISE, ALL PIPE HANGERS AND SUPPORTS
SHALL BE DESIGNED, MANUFACTURED AND INSTALLED PER MSS SP-58, MSS SP-69
AND MSS SP-89.
6. ALL ABOVEGROUND PIPING SHALL BE INSULATED AND JACKETED AS NOTED IN THE
SPECIFICATIONS.
7. ALL PIPES THAT PASS THROUGH EXTERIOR WALLS SHALL BE SLEEVED AND MADE
WEATHER TIGHT.
8. ALL PIPING AND VALVES MUST BE PROPERLY IDENTIFIED AND LABELED PER ANSI
13.1, ENTITLED "SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS". ALL
VALVES MUST BE IDENTIFIED AND TAGGED WITH WEATHERPROOF TAGS.
9. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS,
FLOORS AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40
CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL
BE GALVANIZED COATED. ALL SLEEVES SHALL BE INSTALLED FLUSH ON BOTH
SIDES OF WALL PENETRATION.
NON-RATED WALL: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF
INSULATED AND NON-INSULATED PIPES AND TUBING.
RATED WALL: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOOR SHALL
USE THE APPROPRIATE CODE APPROVED, TESTED AND INSTALLATION METHOD
OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).
EXTENSION WALLS & FOUNDATION WALLS: PIPES WHICH PASS THROUGH
EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED AND MADE
WEATHER TIGHT.
10. INSULATE COLD AND HOT WATER PIPING WITH FIRE RETARDANT VAPOR BARRIER
JACKET. PIPE INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.
SEE SPECIFICATIONS.
2 1
1/2
MECHANICAL ABBREVIATIONS DUCTWORK SYMBOLS
1-SF-1
SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY. THE PRESENCE OF A SYMBOL DOES NOT
IMPLY ITS USE ON THIS PROJECT. REFER TO THE DRAWINGS FOR SPECIFIC SYMBOLS USED.
(NOTE: NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)
DRAWING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN);
" PER FOOT
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAUGE
FLOW ELEMENT
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
MAKE-UP WATER
DRAIN LINE
VENT LINE
CHILLED GLYCOL-WATER RETURN
GLYCOL-WATER RUN AROUND SUPPLY
TUBE CLEANER WATER SUPPLY
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
COLD WATER (CITY WATER)
GLYCOL-WATER RUN AROUND RETURN
SOFTENED WATER
HOT WATER
REVERSE OSMOSIS
EXISTING PIPE OR EQUIPMENT TO BE REMOVED
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH
" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE &
HOSE CONNECTION)
WYE STRAINER WITH VALVUED DRAIN AND
QUICK COUPLE HOSE CONNECTION
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
PRESSURE REDUCING VALVE (PRV)
CONTROL VALVE (CV) - FLOAT-OPERATED
PLUG VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT (PIPE OR DUCT)
INCLINED RISE, IN DIRECTION OR AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION (PIPE OR DUCT)
FLEXIBLE CONNECTION, EQUIPMENT VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARED RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSION: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO REMOVE
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC
PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE
CLASS "(IN. OF WATER) WHICH WILL ACCOMMODATE
MAXIMUM OPERATING PRESSURE IN THE DUCT
SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT
UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL
APPEARS. A "N" SUPERSCRIPT INDICATED NEGATIVE
PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
STANDARD BRANCH SUPPLY OR RETURN,
NO SPLITTER (45° TAP)
SMOKE DAMPER
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE WALL
AREA OF WORK
SMOKE DETECTOR - DUCT MOUNTED
KEY NOTE SYMBOL
MULTIPLE KEY NOTES APPLYING TO THE SAME
ITEM
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION NUMBER
DRAWING NUMBER
WHERE DRAWN
AHU THAT SERVES THE EQUIPMENT
EQUIPMENT ABBREVIATION (SUPPLY FAN)
EQUIPMENT NUMBER
PIPING SYMBOLS
VALVE SYMBOLS
AUTOMATIC BALANCING CONTROL VALVE
FE
M-103
M-103
TYPICAL DRAWING
BLOCK OR DETAIL TITLE
FLOOR PLAN
SCALE: NONE
FC
10x8
VD
SUPPLY
RETURN
45°
45°
R
D
UP
UP
UP DN
DN
DN
HWHS
HWHR
GHS GHS
GHR
CWS CWS
CWR
GCS GCS
GCR
D D
V V
GR GR
GRR
FLOW SWITCH HIGH
FLOW SWITCH LOW
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTER
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
VARIABLE SPEED MOTOR CONTROLLER
HVAC CONTROL PANEL
LOCAL TEMPERATURE CONTROL PANEL
OCCUPANCY SENSOR
CARBON MONOXIDE TRANSMITTER
CARBON DIOXIDE TRANSMITTER
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR VALVE
HPS HPS
HPR
MPS MPS
MPR
LPS LPS
LPR
TC TC
CF CF
OFL
A A
CW CW
SW SW
HW HW
RO RO
CONTROLS SYMBOLS
T
M
TT
MT
PT
SPS
FT
PDT
PDS
HS
TSL
TSH
LC
LT
PSH
PSL
AT
CO2
AT
CO
AT
OC
LTCP
HVAC
VSMC
FSH
FSL
M
MD
MOTORIZED DAMPER
FIRE DAMPER
FIRE/SMOKE DAMPER
SD
FIRE AND SMOKE DETECTOR
FSD
10"Ø
SA
DUCT TERMINAL OUTLET INFO TAG
TERMINAL TYPE
2x2 OR 2x4 RADIANT HEATING CEILING PANEL
PIPE CAP OR PLUG
HEATING VALVE BOX ASSEMBLY
SD
NECK
SIZE
CFM
FD
SD
FSD
DIFFERENTIAL STATIC
PRESSURE MONITOR
TEMPERATURE SENSOR
OS
OCCUPANCY SENSOR (CLEAN ROOM)
TS
ΔP
1 1
1 2 o n e e i g h o t
B
A
C
D
E
F t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
MECHANICAL
ABBREVIATIONS, SYMBOLS & NOTES
MA KW
#1
MG-001
CL02A
SHAFT 5
REMOVE 60"X30"
DUCT AND FIRE DAMPER
AG47
SHAFT 5
"-20 GA. FLOOR
DECK + 4
CONCRETE FLOOR
A509A
SHAFT 5
AG47
SHAFT 5
W X
W8X10
W8X10
W8X10
W X
W X
W8X24
W X
"-20 GA. FLOOR
DECK + 4
CONCRETE FLOOR
W8X24
5'-4
" 5'-4
AG47
SHAFT 5
N105
SHAFT 5
A209A
SHAFT 5
N305
SHAFT 5
C400A
A411A
SHAFT 5
N105
SHAFT 5
W X
∠4X3X
8" (TYP)
1ST - 5TH FLOOR
A209A
SHAFT 5
C400A
A411A
SHAFT 5
N305
SHAFT 5
A509A
SHAFT 5
o n e e i g h o t
B
A
C
D
E
F t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
REMOVE DUCTWORK & INFILL
SHAFT 5
MA KW
MD-101
NORTH
BASEMENT (DEMO)
SCALE: 1/4" = 1'-0"
GROUND (DEMO)
SCALE: 1/4" = 1'-0"
FIFTH FLOOR (DEMO)
SCALE: 1/4" = 1'-0"
1-1/2" 20 GA.EXISTING
METAL FLOOR DECK
NEW COMPOSITE METAL DECK TO MATCH EXISTING
NEW 4" CONCRETE FLOOR
3X3X
" SUPPORT ANGLE WELDED EACH SIDE
INFILL CONCRETE SLAB
SCALE: 1/4" = 1'-0"
8A
GROUND EXISTING (STRUCTURAL)
SCALE: 1/4" = 1'-0"
KEY PLANS
SHAFT 5
GROUND INFILL (NEW)
SCALE: 1/4" = 1'-0"
INFILL FLOOR
SEE DETAIL 8A/MD-101
FIRST FLOOR (DEMO)
SCALE: 1/4" = 1'-0"
SECOND FLOOR (DEMO)
SCALE: 1/4" = 1'-0"
THIRD FLOOR (DEMO)
SCALE: 1/4" = 1'-0"
FOURTH FLOOR (DEMO)
SCALE: 1/4" = 1'-0"
FIRST FLOOR (NEW)
SCALE: 1/4" = 1'-0"
SECOND FLOOR (NEW)
SCALE: 1/4" = 1'-0"
INFILL WITH
1-1/4X 3/16" THICK BAR GRATING
(TYP) 1ST - 5TH FLOOR
THIRD FLOOR (NEW)
SCALE: 1/4" = 1'-0"
FOURTH FLOOR (NEW)
SCALE: 1/4" = 1'-0"
KEYED NOTES:
DEMOLISH ALL DUCTWORK SHOWN
INFILL USING 1-1/4"X
16" THICK BAR GRATING. USING 4X3X
8" ANGLE
TYP.
INFILL WITH 2" RIGID INSULATION SANDWICHED BETWEEN 20GA.
SHEET METALS
2 2 2
FIFTH FLOOR (NEW)
SCALE: 1/4" = 1'-0"
KEY PLAN
03-05-13 o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
MECHANICAL PIPING
DEMOLITION PLANS
MA KW
MD-102
NORTH
KEYED NOTES:
REMOVE WALL AS SHOWN TO ACCESS FOR PIPING.
REMOVE PIPING & CAP AS SHOWN ON 3/MD-102.
DEMOLISH HX-903. CAP STEAM LINES, AS SHOWN.
ELECTRICAL AND CONTROLS DEMOLITION BY OWNER.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER SPECIFICATION
130541.
3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,
C170, C261A, C263.
FIRST FLOOR DEMOLTION
SCALE: 1/4" = 1'-0"
GROUND FLOOR DEMOLITION
SCALE: 1/4" = 1'-0"
BASEMENT DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SECOND FLOOR DEMOLITION
SCALE: 1/4" = 1'-0"
LOCATION HWHR/HWHS
3 1
WALL TYPES
SCALE: N.T.S
CMU
W/2" BATT INSULATION
2 LAYER
" GWB - TYPE 'X'
8" METAL STUDS - 20 GA
AT 16" O.C.
1 LAYER
" GWB LAMINATE
TO EXISTING PLASTER OR
MASONRY
EXISTING PLASTER &
LATH WALL OR MASONRY
2 HR FIRE-RATED
UL TEST: U-618
MATCH EXISTING
PLASTER OR MASONRY
2 HR FIRE-RATED UL
TEST: U-618
12/4/2019
ADD KEYED NOTE 4
HPS HPS HPS HPS HPS
G H
R G
H R
H U
A
L P
R
L P
S
L P
S
HPS
CSG-21A
H P
S
(E)5"CHW S&R
(E)4"HPS RISER
CW
H P
S
L P
R
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
C113
MECHANICAL ROOM
C170
OFFICE
C171
LOCKER
C171A
TOILET
DEMOLISH
HWH-903
H P
S H
P S
H P
S
HPSHPS
L P
R L
P R
H R
A
B
EF-21A
C
A
C W
S
CWS CWS
C W
S
CWR CWR
C W
R
H W
H R
H W
H S
GHR
G H
S G
H S
3" GHR
1" LPR
3" LPS
HGH
CW
RELOCATE
VALVE & CAP
2" HWHR
&HWHS
CUT & CAP
CL61
CL08A
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
H W
H S
H W
H S
H W
H S
HWHR HWHR HWHR HWHR HWHR HWHR HWHR
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
CG19C
CG25
CONNECTIONS &
PIPES ABOVE CEILING
C202F
INGREDIENT STORAGE
C263
FACULTY CIO
C261A
NUTRITION SEC
C261
DIETARY
SF
C202G
COOLER
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
4"CMU
TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979
KEY PLAN
03-05-13 o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
SUB-BASEMENT, BASEMENT, &
GROUND PIPING PLANS
MA KW
MP-101
BASEMENT
SCALE: 1/8" = 1'-0"
NORTH
NORTH
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER SPECIFICATION
130541.
3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,
C170, C261A, C263.
NORTH
SUB-BASEMENT PIPING PLAN
SCALE: 1/16" = 1'-0"
GROUND FLOOR
SCALE: 1/4" = 1'-0"
NORTH
KEYED NOTES:
CORE DRILL CONCRETE FLOOR FOR VERTICAL PIPE PENETRATIONS. PROVIDE
FIRE-RATED SEAL PER DETAIL 9/MP-501.
INSTALL 4" HWHS & HWHR PIPE VERTICAL THROUGH 2ND FLOOR.
INFILL WALLS TO MATCH EXISTING. REMOVE AND REINSTALL SECTION OF
CEILING GRID, AS NEEDED.
1 2 3
WALL TYPES
SCALE: N.T.S
LOCATION HWHR/HWHS
CMU
W/2" BATT INSULATION
1 LAYER
" GWB - TYPE 'X'
" METAL STUDS - 20 GA
AT 16" O.C.
1 LAYER
" GWB LAMINATE
TO EXISTING PLASTER OR
MASONRY
EXISTING PLASTER &
LATH WALL OR MASONRY
2 HR FIRE-RATED
UL TEST: U-618
MATCH EXISTING PLASTER
OR MASONRY
2 HR FIRE-RATED UL TEST:
U-618
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
HWHR HWHR
HWHS HWHS HWHS
HWHR HWHR HWHR
HWHS HWHS HWHS HWHS
HWHR HWHR HWHR
M13 N13
M15
M14
N15
N14
M16 N16
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
4" HWHS & HWHR
6"
6"
6"
6"
4" VALVE AND
CAPPED FOR
FUTURE USE
6"
4"
CL61
CL08A
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
4" HWHS & HWHR
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H R
H W
H R
H W
H R
H W
H R
HWHR HWHR HWHR HWHR HWHR HWHR HWHR HWHR HWHR
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
2" HWHS &HWHR
CG19C
CG25
4" HWHS & HWHR
HWHS HWHS
1" HWHS
2" HWHS &HWHR
" HWHR&HWHS
UP TO 21A-HW
e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
FIRST & SECOND FLOOR PIPING
PLAN
MA KW
MP-102
KEYED NOTES:
CORE DRILL CONCRETE FLOOR FOR VERTICAL PIPE PENETRATIONS. PROVIDE
FIRE-RATED SEAL PER DETAIL 9/MP-501.
INSTALL 4" HWHS & HWHR PIPE VERTICAL THROUGH 2ND FLOOR.
INFILL WALLS TO MATCH EXISTING. REMOVE AND REINSTALL SECTION OF
CEILING GRID, AS NEEDED. WALL COVE TO MATCH EXISTING.
ADD VALVE & CAP FOR FUTURE.
ADD HX AND ASSOCIATED PIPING AND APERTURES. SEE DETAIL ON 7/MP-501.
CAP STEAM LINE.
GENERAL DRAWING NOTES:
1. MAINTAIN CLEAR SERVICE ACCESS TO EXISTING EQUIPMENT WHEN LOCATING
NEW PIPING AND HEAT EXCHANGERS.
2. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
3. FOLLOWING WORK TO BE COMPLETED DURING 2ND SHIFT IN ROOMS CG19C,
C170, C261A, C263.
FIRST FLOOR PIPING PLAN
SCALE: 1/4" = 1'-0"
KEY PLANS
NORTH
NORTH
SECOND FLOOR PIPING PLAN
SCALE: 1/4" = 1'-0"
NORTH
LOCATION HWHR/HWHS
WALL TYPES
SCALE: N.T.S
CMU
W/2" BATT INSULATION
1 LAYER
" GWB - TYPE 'X'
" METAL STUDS - 20 GA
AT 16" O.C.
1 LAYER
" GWB LAMINATE
TO EXISTING PLASTER OR
MASONRY
EXISTING PLASTER &
LATH WALL OR MASONRY
2 HR FIRE-RATED
UL TEST: U-618
MATCH EXISTING PLASTER
OR MASONRY
2 HR FIRE-RATED UL TEST:
U-618
HPS HPS HPS HPS HPS
G H
R G
H R
H U
A
L P
R
L P
S
L P
S
HPS
CSG-21A
H P
S
(E)5"CHW S&R
(E)4"HPS RISER
CW
H P
S
L P
R
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
C113
MECHANICAL ROOM
C170
OFFICE
C171
LOCKER
C171A
TOILET
ADD 4" HWHS
& HWHR
H P
S H
P S
H P
S
HPSHPS
L P
R L P
R
H R
A
B
EF-21A
C A
C W
S
CWS CWS
C W
S
CWR CWR
C W
R
H W
H R
H W
H S
GHR
H W
H R
GHR
G H
R
G H
R
GHR
G H
S G
H S
3" GHR
1" LPR
3" LPS
HGH
CW
2" HWHR
&HWHS
HX-21A
SEE DETAIL
7/MP-501
2" GHR
" HWHS &
HWHR
CUT & CAP
C202F
INGREDIENT STORAGE
C263
FACULTY CIO
C261A
NUTRITION SEC
C261
DIETARY
SF
C265
CONFERENCE
C202G
COOLER
C202E
SALAD PREP
C202A
OFFICE
C265B
STAFF AREA
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
VALVE & CAP
FOR FUTURE
USE
ADD 4" HWHS
& HWHR
ABOVE
CEILING
4"CMU
CORE THROUGH MASONARY
WALL
TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 TemtrolR2 A x B 42 x 30
0.09 / 979 e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r q u a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
ADD PRV 5TH FLOOR SCI
MA KW
MP-103
PIPING DEMOLITION, ROOM S510
SCALE: 1/2" = 1'-0"
KEY PLANS
SCI- 5TH FLOOR
NORTH
NORTH
KEYED NOTES:
REMOVE EXISTING PIPES AS SHOWN AND CAP.
INSTALL NEW PIPES AS SHOWN AND CAP ABANDON TEE.
INSTALL NEW PRV GOVERNMENT FURNISHED. SEE DETAIL 8/MP-501.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER
SPECIFICATION 130541.
PIPING PLAN, ROOM S510
SCALE: 1/2" = 1'-0"
NORTH
H W
H R
H W
H R
HWHR HWHR HWHR HWHR HWHR
H W
H S
H W
H S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S
MPS MPS
H P
S
HPS HPS
G H
R G
H R
G H
R G
H R
G H
R G
H R
GHR
G H
S
GHS GHS
G H
S
G H
S
GHS
G H
S G
H S
G H
S G
H S
G H
S G
H S
G H
S G
H S
G H
S
M P
R M
P R
M P
R
HPR HPR HPR
HWHS HWHS HWHS HWHS
H W
H S
G H
S G
H S
M P
S
LPS LPS LPS LPS LPS LPS LPS
LPS LPS LPS
6" LPS
(15)
6" MPS (30)
HX-101
HX-102
ET-5-04
M
P
S
C
W
C
W
C
W
MPS
C
W
C
W
C
W
C
W
C
W
C W
C W
CW CW CW CW CW CW
2" VENT
H P
R
F T
M
P
S
M
P
S
M
P
S
MPS MPS
MPS MPS
MPR MPR MPR
M
C P
4"
H W
H R
H W
H R
HWHR HWHR HWHR HWHR HWHR
H W
H S
H W
H S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
S
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M
P
S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S M
P S
M P
S
MPS MPS
H P
S
HPS HPS
G H
R G
H R
G H
R G
H R
G H
R G
H R
GHR
G H
S
GHS GHS
G H
S
G H
S
GHS
G H
S G
H S
G H
S G
H S
G H
S G
H S
G H
S G
H S
G H
S
M P
R M
P R
M P
R
HPR HPR HPR
HWHS HWHS HWHS HWHS
H W
H S
G H
S G
H S
M P
S
LPS LPS LPS LPS LPS LPS LPS
LPS LPS LPS
6" LPS
(15)
6" MPS (30)
HX-101
HX-102
ET-5-04
M
C
W
C
W
C
W
MPS
C
W
C
W
C
W
C
W
C
W
C W
C W
CW CW CW CW CW CW
2" VENT
H P
R
F T
M
P
S
M
P
S
M
P
S
MPS MPS
MPS MPS
MPR MPR MPR
M
SEE DETAIL
8/MP-501
C P
4"
L e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
ADD HX-501 TO 10TH FLOOR
MA KW
MP-104
DEMOLITION, RM A1000
SCALE: 1/4" = 1'-0"
KEY PLANS
10TH FLOOR
NORTH
NORTH
KEYNOTES:
REMOVE EXISTING 6" CONCRETE PAD.
REMOVE & RELOCATE SPRINKLER HEAD.
INSTALL HX-501 ON NEW HOUSEKEEPING PAD.
NEW NORMALLY CLOSED BUTTERFLY VALVE.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER
SPECIFICATION 130541.
PIPING PLAN, ROOM A1000
SCALE: 1/4" = 1'-0"
NORTH
ELEVATION PIPING PLAN, HX-501, RM A1000
SCALE: 1/2" = 1'-0"
ALL PIPING 4" DIAMETER, UNLESS NOTED OTHERWISE. SEE DETAIL
7/MP-501.
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H S
H W
H S
H W
H S
H W
H S
HWH-502
HWH-501
H W
H S
H W
H S
HWHS HWHS HWHS
HWHR HWHR HWHR
CWS CWS CWS CWS CWS CWS
CWR CWR CWR CWR CWR
H W
H R
C W
S C
W S
C W
R C
W R
H W
H S
H W
H S
H W
H R
H W
H R
C W
R
C W
S C
W S
FD
H W
H S
FD
HWHS
HWHS
HWHS HWHS
H W
H R
H W
H R
P U
M P
S
A
F F
H W
H S
HWHR
H W
H S
HWHS
HWHR
H W
H S
HWHS
4"
DEMO 1" HWHS/
HWHR PIPES AND
UNIT HEATER ABOVE
4"
2"
4" HWHS
4" HWHR
4"
P
P
CUT & CAP
DEMOLISH 6"
CONCRETE PAD
P P
CUT & CAP
2"
2"
4"
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H S
H W
H S
H W
H S
H W
H S
HWH-502
HWH-501
H W
H S
H W
H S
HWHS HWHS HWHS
HWHR HWHR HWHR
CWS CWS CWS CWS CWS CWS
CWR CWR CWR CWR CWR
H W
H R
C W
S C
W S
C W
R C
W R
H W
H S
H W
H S
H W
H R
H W
H R
C W
R
C W
S C
W S
FD
H W
H S
FD
HWHS
HWHS
HWHS HWHS
H W
H R
H W
H R
P U
M P
S
A
F F
H W
H S
HWHR
H W
H S
HWHS
HWHR
H W
H S
HWHS
4"
4"
2"
4" HWHS
4" HWHR
4"
P
P
P P
H W
H R
H W
H S
2"
2"
4"
MP-104
H W
H R
HWHR
H W
H S
HWHS HWHS HWHS
HWHS HWHS HWHS
H W
H S
HWHS
FROM LOOP
TO LOOP
BOILER HW
4" HWHS
4"
HWHR
HX-501
P47
HWH-501
B H
W H
S
B(HWHR)
B(HWHS)
F1 F2
F3
F4
HWHS
HWHR
P
4" CONCRETE PAD
SEE DETAIL 1/MP-501
4"
4"
4" e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
ADD SIESMIC BRACING FOR
NATURAL GAS LINES
MA KW
MP-105
SUB-BASEMENT N. GAS MAIN PIPING
1/16" = 1'-0"
GROUND FLOOR LEVEL N. GAS MAIN PIPING
1/16" = 1'-0"
BASEMENT LEVEL N. GAS MAIN PIPING
1/16" = 1'-0"
DRAWING LEGEND
NATURAL GAS
ISOLATION (SHUTOFF) VALVE
PRESSURE REDUCING VALVE
PRESSURE REGULATING VALVE
GAS COCK
GAS METER
CONCENTRIC REDUCER
FLANGE
FLOW DIRECTION
PIPE UP / PIPE RISER
PIPE ELBOW DOWN
PIPE BOTTOM CONNECTION
NG
M
NATURAL GAS RISER DIAGRAM
N.T.S
KEY PLANS
NORTH
SHAFT 3
SHAFT 8
SUB-BASEMENT
NOTES:
1. CONTRACTOR TO VERIFY NATURAL GAS PIPE SIZE, LOCATION, AND SUBMIT
DRAWING TO A LICENSED P.E.
2. HORIZONTAL PIPING SHOWN WITH " X " ON DETAIL 1 & 2 TO BE SEISMICALLY
BRACED. EXACT LOCATION AND TYPE OF BRACING TO BE DETERMINED BY
THE P.E. PER SPECIFICATION 130541.
KEYNOTES:
CLOUDED VERTICAL PIPING TO BE SEISMICALLY BRACED PER
SPECIFICATION 130541.
SHAFT 2
SHAFT 5
SHAFT 3
CL55
E6 G6 H6 I6
I8
J9 K9
K6
K10
K11
J6 L6
L9
L10
L11
L12
M6 N6 O6 Q6
R6 S6 T6 U6
M8 N8 O8
Q8 R8
S7 T7
I10 J10 M10 N10
I11 J11 M11 N11
I12 J12 K12 M12 N12
H13 I13 J13
K13 L13 M13 N13
I15
I14
J15
J14
K15
K14
L15
L14
M15
M14
N15
N14
I16
J16
K16
L16 M16 N16 P16 Q16 R16 S16
I17
J17
L17 M17 N17 P17 R17 S17 Q17
J18 K18 L18
J19 K19
8" UP TO 5TH
FLOOR CEILING
& TO CHP ON
SCI ROOF
8"
6"
6"
8"
6" UP TO 11TH FLOOR
HOT WATER BOILERS
6" UP TO BSMT CL16
8" UP TO BSMT CL16
NG
NG
NG
N G
N G
" UP (PREVIOUSLY FED
8TH FLOOR INCINERATOR
THAT HAS BEEN REMOVED)
1" UP TO
CANTEEN
N G
N G
3"
1"
3" UP TO GROUND
FLOOR CG26
CANTEEN
3"
NG
1" UP
NG
2"
2" UP TO MAIN
KITCHEN
1" UP TO BASEMENT
LEVEL CL55
NG
" UP
1"
1"
2"
1"
ABANDONED
1"
CL19
CL20
CL18
CL40
CL44
CL42
CL45
CL14
CL16
CL46A CL46
CL61
CL15
4" UP TO CG26A, 6" DN
TO SUB-BASEMENT
8" UP TO CG26A
8" DN TO
SUB-BASEMENT
NG
3" UP & DN
CANTEEN
CG38
CG39
CG35
CG36
CG32
CG33
CG30
C G
CG27
CG23
CG25
CG26
CG75
CG76
CG26A
DG25
DG22DG22A
DG24
4" DN TO BSMT CL16
8" DN TO BSMT CL16
4" FROM METER
8" FROM METER
N G
N G
NG
3" DN TO SUB-BASEMENT
3"
9th FLOOR
SHAFT TWO
8th FLOOR
7th FLOOR
6th FLOOR
5th FLOOR
SHAFT FIVE
11th FLOOR
(MACHINE ROOM)
SHAFT THREE
SHAFT FOUR
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
BASEMENT
B-1 B-2 B-3 B-4
DUMBWAITER
MECHANICAL
SHAFT EIGHT
ELEV 259.17'
ELEV 259.17'
ELEV 222.36'
ELEV 244.82'
ELEV 210.44'
ELEV 199.44'
ELEV 187.52'
ELEV 174.92'
ELEV 163.92
ELEV 141.92'
ELEV 130.00'
ELEV 118.08'
ELEV 112.58' TO
ELEV 104.58
ELEV 152.92'
1st FLOOR
2nd FLOOR
3rd FLOOR
4th FLOOR
GAS
METER
ASSEMBLY
N G
NG
N G
N G
NG
CL55
D-WING
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
9th FLOOR
8th FLOOR
7th FLOOR
6th FLOOR
5th FLOOR
BASEMENT
GROUND
FLOOR
10th FLOOR
(PENTHOUSE)
11th FLOOR
(MACHINE ROOM)
10th FLOOR
(PENTHOUSE)
ROOF
SHAFT SIX
2.5 FLOOR
SCI ROOF
SCI BUILDING BUILDING 1
5th FLOOR
(PENTHOUSE)
1st FLOOR
GROUND
FLOOR
SCI BASEMENT
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
SUB-
BASEMENT
SHAFT ONE
SHAFT 3 ROOF
5th FLOOR
HOT
WATER
BOILERS
ROOF
6"
6"
6"
4"
SUB-BASEMENT
BASEMENT
SUB-BASEMENT
NG
2" FROM UTILITY
GRADE
N G
8"
N G
3"
8"
NG
N G
EARTHQUAKE
VALVE
BYPASS
METER
PRV
ROOF
3"
NG
6"
N G
NG
8"
N G
8"
NG
3"
3"
CG76
NG
NG
6"
6"
6"
M
12"
4"
8"
2" PREVIOUSLY FOR INCINERATOR THAT HAS BEEN REMOVED
N G
1" TO ????
N G
N G
1"
CANTEEN
OVEN CANTEEN CANTEEN CANTEEN?
2"
1"
NG
GROUND
FLOOR
1"
NG
NG
N G
1"
1"
1"
1"
GROUND
FLOOR
N G
1"
2"
4"
MAIN
KITCHEN
N G
2"
8" NGAS TO CHP
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER
SPECIFICATION 130541.
o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e o t o n e i n c e f o o t t h r a r t e r s i n o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
10/24/2019
528A7-20-782EXTEND HEATING HOT
WATER TO KITCHEN & MISC.
MECHANICAL REPAIRS
RISER DIAGRAM
MA KW
MP-401
RISER DIAGRAM STEAM (DEMOLITION)
SCALE: N.T.S
RISER DIAGRAM HWH (NEW CONSTRUCTION)
SCALE: N.T.S
KITCHEN
HWH-903
CP-07
COND.
PUMP
FLASH TANK
AC-21 / EF-21
PHARMACY
C113
PRV-903
(709PPH)
AC-36 /
EF-36
KITCHEN
ROOF
AC-34 /
EF-34
KITCHEN
ROOF
AC-16 /
EF-16
KITCHEN
ROOF
PRV-716
(341PPH)
PRV-734
(750PPH)
PRV-736
(1706PPH)
AC-29 / EF-29
CL55
PRV-829
(140PPH)
C P
D
HPS
HPS
MPR
M P
R
2"
2"
2"
6"
4"
4"
4"
4"
3"
2"
1"
FT-07
BASEMENT
GROUND FLOOR
1st FLOOR
2nd FLOOR
3rd FLOOR
ELEV 104.58' TO
ELEV 112.58'
ELEV 118.08'
ELEV 130.00'
ELEV 141.92'
ELEV 152.92'
ELEV 163.92
SUB-BASEMENT
CUT & CAP
CUT & CAP
HWHR
HWHS
BASEMENT
GROUND FLOOR
1st FLOOR
2nd FLOOR
3rd FLOOR
ELEV 118.08'
ELEV 130.00'
ELEV 141.92'
ELEV 152.92'
ELEV 163.92
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
GHR
GHR GHR
H W
H S
H W
H S
H W
H R
AC-21 / EF-21
PHARMACY
C113
G H
R
GHS
GHS GHS
ELEV 104.58' TO
ELEV 112.58'
SUB-BASEMENT
HWHR HWHR
HWHS
4"
4"
4"
HWHS HWHS HWHS HWHS HWHS HWHS
HWHR HWHR HWHR HWHR HWHR HWHR
6"
BOILER
LOOP
HX-21A
6"
4" VALVE AND
CAPPED FOR
FUTURE USE
4" VALVE AND
CAPPED FOR
FUTURE USE
2" e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .