36C24219B0051-0001000.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C24219B0051
About this file
36C24219B0051 0001 36C24219B0051 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219C0220-002.docx | DOCX document | |
| 36C24219B0051-0001001.pdf | ||
| 36C24219B0051-001.docx | DOCX document | |
| 36C24219B0051-005.zip | ZIP file | |
| 36C24219B0051-003.pdf | ||
| 36C24219B0051-002.pdf | ||
| 36C24219B0051-006.pdf | ||
| 36C24219B0051-004.pdf | ||
| 36C24219B0051-000.docx | DOCX document | |
| 36C24219B0051-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-19-2019 630-19-3-6306-0074
SL-19-003
36C242 Department of Veterans Affairs Network Contracting Office 2 2094 Albany Post Rd.
Montrose
NY
10548 36C242 Department of Veterans Affairs Network Contracting Office 2 2094 Albany Post Rd.
Montrose
NY
10548 To all Offerors/Bidders
36C24219B0051 07-25-2019
X X X
The purpose of this amendment is to amend Solicitation Number: 36C24219B0051; Project Number: SL-19-003 as follows:
A. Incorporate RFI Questions and Answers B. A 20% Bid Bond is required and must be submitted with the Bid.
C. Revise SOW Section 2.1 General C. Hours of Work and 2.6.B to add relocate exit sign D. See continuation page(s) for amendment description.
NOTE: CONTRACTORS MUST ACKNOWLEDGE ALL SOLICITATION AMENDMENTS.
Acknowledgement can be made on Page 2 of SF1449 or by including a signed SF30 for each amendment.
Emily I. Lindsey Contracting Officer
CONTINUATION PAGE
Mobile MRI Enclosure Removal and Restoration – NYHHS- Manhattan Campus Project # 630-SL-003
The purpose of this amendment is to provide answers to requests for information received by potential bidders and provide revised SOW and Attachment 3 – Partial Ground Floor Plan. The scheduled bid opening remains unchanged and will take place on Wednesday, August 28, 2019 at 2:00 PM at the Contracting Conference Room – B-67, James J. Peters VAMC, 130 West Kingsbridge Road, Bronx, NY 10468.
The following revised SOW and Attachment #3 is attached & will be incorporated into the final contract documents:
S02- SOW – Mobile MRI Enclosure Removal and Restoration- Revised S02 – Attachment 3 – Partial Ground Floor Plan
RFI Responses to Questions 1 – 16
| Q1. | Please advise VA's current contractor's information or unit prices (in form of allowances) for disabling and/or reprograming for "Disconnect and remove all existing circuits to lighting, receptacles, HVAC, doors, alarms, sensors, electrical panels, pull boxes, speakers serving the temporary MRI enclosure" and "Disconnect and remove all existing fire alarm devices including tamper and flow switches". |
| A1. | Unit prices (allowances) not available. |
| Q2. | Please provide a scaled site plan. |
| A2. | No scaled site plan available in addition to one provided in Attachment #1 for the original building site plan. |
| Q3. | Please provide a scaled plan or As-Builts for " all piping supplying utility to entryway, enclosure, and previous mobile MRI unit." and "Temporary MRI panel in enclosure connected to panel NLBA1 in Electrical Closet G616 on Ground Floor". |
| A3. | No scaled as-builts are available. Partial Ground Floor plan showing location of Electrical Closet G616 is provided (See Attachment #3) . Stair 6-1 leaders to the Stairs immediately to the MRI enclosure as observed during the walk-through. |
| Q4. | Please confirm installation of a Temporary Fence be allowed within current MRI Enclosure wall, along planter at the Daycare playground, in order for "Installation of fence and door shall occur immediately after demolition of wall so that Daycare playground is always secured. Provide temporary security as required to prevent any unauthorized access." |
| A4. | Temporary fence can’t be confirmed at this time. |
| Q5. | Please advise VA's current contractor's information or unit prices (in form of allowance) for disabling and/or reprograming in order to "relocate existing alarm on daycare egress door to new door. Replace alarm if required". |
| A5. | Provide pricing to assume replacement of alarm and wiring. |
| Q6. | What is to be done with existing Sliding Door/automatic door.? |
| A6. | Existing sliding door shall be disconnected and removed. |
| Q7. | Can agency provide a sketch/material/color of Fence? |
| A7. | Refer to Attachment #2 for sketch. Refer to Spec Section 323141 for material information. Color shall be black. |
| Q8. | SOW states fence height as 15’ – 0”, is this correct? There is a fence drawing issued via attachment # 2 which shows height of 8’ – 0”. So please clarify which height is correct? |
| A8. | The top of the fence shall be at 15 FT off the finished grade. |
| Q9. | Old drawings show a sidewalk where existing slab is. Are we to remove slab and provide sidewalk? If slab is to remain are, are we making it flush to the concrete. |
| A9. | Slab is to remain. Provide sidewalk over slab as required to provide a distinctive walking path around the perimeter of the ER ambulance driveway. Portion of slab not under sidewalk shall be flush to the surrounding asphalt so ambulances have a smooth path to drive and move stretchers. |
| Q10. | Can agency provide Security camera info (daycare Door)? |
| A10. | Security camera not located on Daycare door but adjacent. Scope of work should not impact camera. |
| Q11. | During walkthrough we saw broken concrete by existing daycare door. Are we to repair this area? |
| A11. | Per Scope of Work, contractor shall provide new curb/sidewalk from original Emergency Department Ambulance entrance and connect to existing curb/sidewalk. This curb/sidewalk shall intersect the daycare entrance and provide a smooth transition. |
| Q12. | Who is responsible for removing Trailer? |
| A12. | The Medical Center will relocate the trailer. |
| Q13. | Wall leading to ramp is to be removed? |
| A13. | Yes, wall leading to the pedestrian ramp is to be removed. The wall is part of temporary enclosure. |
| Q14. | Will agency issue drawings for all the new work which is mentioned in the SOW.? |
| A14. | Drawings will not be provided. Scope of work is similar to design-build. |
Q15. Please confirm whether this project have requirements for Bid bond.
A15. A 20% Bid Bond must be submitted with the bid Q16. Please confirm if any Performance and Payment bonds is required for the project.
A16. Performance and Payment bonds will be required.
MOBILE MRI ENCLOSURE REMOVAL AND RESTORATION
SCOPE OF WORK
PROJECT NUMBER: SL-19-003
1.0 Objective
The objective of Project SL-19-003 is to perform all requirements to remove the existing temporary enclosure and entryway connecting a previously removed temporary mobile MRI unit to the facility building at VA Harbor Healthcare System – New York Campus.
2.0 Scope of Work
2.1 General
A. The contractor shall be responsible for all labor, materials, equipment, disposal, and supervision required to perform the work as indicated the scope of work, specifications and drawings. All work shall be performed at the Veteran’s Affairs Medical Center New York Campus located on 423 East 23rd Street, New York NY 10010.
B. The contractor shall restore to original site conditions the area of work in and adjacent to the Emergency Department ambulance driveway. All utilities and structures previously servicing the temporary MRI unit, enclosure and entryway shall be disconnected and removed back to origin. Coordination of work shall proceed with minimal disruption to the Emergency Department and ambulance driveway.
C. The majority of work is to be performed during normal business hours, however off hour work may be required in order to minimize impact to services provided by the facility and will be at the COR’s discretion and approval. Contractor will be required to work off hours if work impacts Daycare Facility emergency egress. Daycare Facility emergency egress shall be maintained at all times while daycare is open. Normal Daycare Facility hours are Monday through Friday from 7 A.M. to 6:30 P.M. Contractor shall coordinate and schedule all work with the COR to include Daycare Facility, Emergency Department and ambulance driveway. Normal working hours are Monday through Friday, 8:00 A.M. to 4:00 P.M., local time, excluding federal holidays. All deliveries or large movement of equipment, vehicles, barriers, that will impact vehicular access to the facility will be required to be performed outside normal business hours as determined by the COR.
D. The contractor is responsible for all field measurements; the Government will not be held responsible for bidding errors made or the failure to adequately inspect the job site for existing conditions, dimensions and grades or existing utilities. The contractor is responsible for verifying all utilities.
E. The VAMC Project COR shall govern all work done during project duration. Prior to any work commencing in an area the contractor shall notify the COR and shall pre-coordinate work with the COR. Disputes shall be promptly referred to the Contracting Officer, (CO). The contractor will immediately correct any work in which the Project COR deems unacceptable or not in accordance with plans and/or specifications.
2.2 Demolition and Construction
A. Removal of the existing overhang roof and walls of the enclosure including wood frames and block walls. The existing Building 6 facade shall be completely exposed and restored. Reconstruction of the exterior wall of the Building 6 shall be finished in a manner consistent with the remainder of the facade. The wall and façade shall be left structurally sound and completely weatherproof. No weather elements shall penetrate the enclosure including rain, wind, and snow.
B. Removal of walls of ED ambulance entryway connecting to the enclosure.
C. Patch, fill, and paint all ceilings, floors and walls affected by demolition. Provide new blocks, tiles, weatherproofing material, to close all penetrations in a work-man like manner.
D. Remove all VCT and expose concrete below. Clean and prep concrete to be exposed to outside elements. Remove all glue for a clean finish.
2.3 Electrical
A. Disconnect and remove all existing circuits to lighting, receptacles, HVAC, doors, alarms, sensors, electrical panels, pull boxes, speakers serving the temporary MRI enclosure including all associated conduit, wire, back to point of origin unless otherwise noted. Temporary MRI panel in enclosure connected to panel NLBA1 in Electrical Closet G616 on Ground Floor. Contractor shall verify all connections prior to demolition. Update and provide new typed panel directories where circuits/breakers have been removed and or modified.
B. Disconnect and remove all existing fire alarm devices including tamper and flow switches. Remove all associated conduit, wire, back to point of origin.
2.4 Mechanical/Plumbing/Fire Suppression
A. Remove all piping supplying utility to entryway, enclosure, and previous mobile MRI unit.
2.5 Site Work
A. Regrade and lay concrete/asphalt to provide a smooth transition from existing concrete pad previously used for entryway, enclosure, and temporary MRI unit. Existing concrete to remain to the greatest extent possible.
B.
Provide new curb/sidewalk from original Emergency Department Ambulance entrance and connect to existing curb/sidewalk. Refer to Attachment #1 (Drawing 1-L1B, 1L12B, and 1-L14B) for original building site conditions. Original documents available for review in Engineering Office.
C. All sitework shall be laid at the proper pitch to provide adequate drainage.
2.6 Special Considerations and Miscellaneous Requirements
A.Provide and install new anti-ram wrought iron fence and emergency ss pedestrian door with privacy screens on Daycare coping stones/planter to match existing adjacent fence. Excavate coping stones as required to embedded fence. Fence shall have a minimum height of 15FT from the ground to the top of fence and be made of metal and of heavy industrial-grade construction with bar spacing at a maximum of 5 inches on center. Chain link fences and gates shall not be used. Pedestrian gate shall swing in the outward direction, have self-closing gate hinges, and shall be fully accessible to personals with disabilities in width and operation. Provide panic exit bar hardware for door. Installation of fence and door shall occur immediately after demolition of wall so that Daycare playground is always secured. Provide temporary security as required to prevent any unauthorized access. Paint fence including adjacent section for a uniform finish. Color to be determined by facility. Refer to Attachment #2 for VA pedestrian gate detail.
B. Contractor shall relocate existing alarm and exit sign on daycare egress door to new door. Replace alarm if required.
C. Emergency room driveway ramp will remain active throughout the duration of the project to the greatest extent possible. Contractor shall relocate their equipment, materials, immediately in the event an ambulance will need access to the Emergency room entrance.
D. Contractor shall provide all signage as required to redirect ambulances to front entrance when Emergency Room entrance not accessible due to construction activity.
2.7 Submittals
The contractor shall provide submittals for all items outlined in the specification. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re-submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal.
2.8 Training
Contractor will provide user training on operation of all equipment installed to restore original building condition.
2.9 Points of Contract
At the time of award, contractor will provide the names and phone numbers of key personnel who will be the points of contact for Engineering for all issues.
3.0 Period of Performance
The period of performance for this contract is Ninety (90) Calendar Days from NTP.
See attached document: S02 Attachment 3-Partial Ground Floor Plan - Part 3 - Flatten.
File details come from the government source that posted it.