36C24219B0044-007.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24219B0044
About this file
36C24219B0044 S02 DRAWINGS.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219B0044-008.pdf | ||
| 36C24219B0044-006.pdf | ||
| 36C24219B0044-010.pdf | ||
| 36C24219B0044-009.pdf | ||
| 36C24219B0044-011.pdf | ||
| 36C24219B0044-005.docx | DOCX document | |
| 36C24219B0044-004.pdf | ||
| 36C24219B0044-003.pdf | ||
| 36C24219B0044-002.pdf | ||
| 36C24219B0044-001.pdf | ||
| 36C24219B0044-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATE LAUNDRY TEXTILE PRODUCTION ROOMS
630A4-19-102SA
COVER SHEET
N
DEPARTMENT OF VETERANS AFFAIRS
NEW YORK HARBOR HEALTHCARE SYSTEM
QUEENS, NEW YORK
LOCATION MAP AREA OF WORK
EE
ES
S OF
M
R C
D
T
T T
IIN
U A
AA
V
RAP
M
N
T
T OF
E E
D
RS
I
FA
A
NT
SR
F
AEE
DRAWING LIST
PROJECT #630A4-19-102SA
RENOVATE LAUNDRY TEXTILE PRODUCTION ROOMS
ISSUED FOR BID DOCUMENT
N
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 1 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
GI-001
AutoCAD SHX Text Project No.
AutoCAD SHX Text Approved Division Chief:
AutoCAD SHX Text
GI-001
AutoCAD SHX Text
GC-101
AutoCAD SHX Text
GC-102
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
SHEET# OUT OF TOTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AD-101
AutoCAD SHX Text
DEMOLITION PLANS
AutoCAD SHX Text
AutoCAD SHX Text
AE-101
AutoCAD SHX Text
ARCHITECTURAL PLANS
AutoCAD SHX Text
AutoCAD SHX Text
GI-002
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
GENERAL NOTES
GENERAL NOTES PART 1
1. ALL WORK AND MATERIALS FURNISHED SHALL COMPLY WITH THE NATIONAL FIRE PROTECTION ASSOCIATION REQUIREMENTS, AND ALL FEDERAL AUTHORITIES HAVING JURISDICTION OVER THE WORK. THE BUILDING PERMIT SHALL BE SECURED BY THE GENERAL CONTRACTOR, AND HE SHALL OBTAIN ALL OTHER PERMITS AND APPROVALS AS REQUIRED BY LAW FOR THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL OBTAIN THE CERTIFICATE OF OCCUPANCY.
2. CONTRACTOR SHALL PROVIDE CONTROLLED INSPECTIONS AS REQUIRED FOR APPROVAL. ALL CONTROLLED INSPECTIONS ARE TO BE PERFORMED BY LICENSED PROFESSIONALS AND THE
COST OF THESE SERVICES IS TO BE PAID BY THE CONTRACTOR.
3. THE SUBMISSION OF A PROPOSAL BY THE CONTRACTOR WILL BE CONSTRUCTED AS EVIDENCE THAT A CAREFUL AND THOROUGH EXAMINATION OF THE REMISES HAS BEEN MADE AND LATER CLAIMS FOR LABOR, MATERIALS OR EQUIPMENT REQUIRED OR FOR DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED. IT SHALL ALSO CONSTITUTE A REPRESENTATION THAT THE CONTRACTOR HAS CHECKED AND VERIFIED ALL QUANTITIES, WORK AND MATERIALS INVOLVED AND THAT HE
SHALL TAKE RESPONSIBILITY FOR ANY DEFICIENCIES THEREIN.
4. BEFORE ORDERING ANY MATERIAL OR DOING ANY WORK, EACH TRADE SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING AND SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF SAME.
NO EXTRA CHARGE OR COMPENSATION WILL BE ALLOWED ON ACCOUNT OF DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND THE MEASUREMENTS INDICATED ON THE DRAWINGS; ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE VA FOR CONSIDERATION AND CLARIFICATION BEFORE PROCEEDING
WITH THE WORK.
5. ALL OF THE VA's DRAWING AND CONSTRUCTION NOTES ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL; ANY WORK SHOWN OR REFERRED TO ON ONE DRAWING SHALL BE PROVIDED AS THOUGH SHOWN ON ALL DRAWINGS. WHENEVER AN ITEM IS SPECIFIED AND/OR SHOWN ON THE DRAWINGS BY DETAIL OR REFERENCE IT SHALL BE CONSIDERED TYPICAL FOR OTHER ITEMS WHICH ARE OBVIOUSLY INTENDED TO BE THE SAME, EVEN THOUGH NOT SO DESIGNATED OR SPECIFICALLY NAMED BUT
DO SERVE THE SAME FUNCTION.
6. THE WORK TO BE PERFORMED CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES, FEES, MATERIALS, AND SERVICES IN ACCORDANCE WITH THESE NOTES AND DRAWINGS AND PERFORMING ALL OPERATIONS NECESSARY TO CONSTRUCTION AND INSTALL COMPLETE AND IN SATISFACTORY CONDITION THE VARIOUS MATERIALS AND EQUIPMENT AT THE LOCATIONS SHOWN. IT IS INTENDED THAT THE DRAWINGS INCLUDE EVERYTHING REQUISITE AND NECESSARY TO FINISH THE ENTIRE WORK PROPERLY, NOTWITHSTANDING THE FACT THAT EVERY ITEM NECESSARILY INVOLVED MAY NOT BE SPECIFICALLY MENTIONED OR SHOWN. ANY ITEM WHICH MAY BE REASONABLY CONSTRUED AD INCIDENTAL TO THE PROPER AND SATISFACTORY COMPLETION OF THE WORK IN ACCORDANCE WITH THE INTENT OF THESE NOTES AND DRAWINGS IS HEREBY INCLUDED.
7. THE CONTRACTOR SHALL ABIDE BY AND COMPLY WITH THE TRUE INTENT AND MEANING OF THE DRAWINGS AND NOTES TAKEN AS A WHOLE AND SHALL NOT AVAIL HIMSELF OF ANY OBVIOUS ERRORS OR OMISSIONS, SHOULD ANY EXIST. SHOULD ANY ERROR OR DISCREPANCY APPEAR OR ANY DOUBT ARISE AS TO THE TRUE MEANING OR THE DRAWINGS OR NOTES, THE CONTRACTOR SHALL BRING SUCH ITEMS TO THE ATTENTION OF THE VA BEFORE SUBMISSION OF PROPOSAL FOR EXPLANATION OR CORRECTION OF SAME. AFTER THE SUBMISSION OF
PROPOSAL, THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL SUCH ITEMS.
8. THE CHARACTER AND SCOPE OF THE WORK ARE ILLUSTRATED BY THE DRAWINGS AND NOTES. TO INTERPRET AND EXPLAIN THE DRAWINGS OTHER INFORMATION DEEMED NECESSARY BY THE VA WILL BE FURNISHED TO THE CONTRACTOR WHEN AND AS REQUIRED BY THE WORK, AND IT IS UNDERSTOOD THAT SAID ADDITIONAL INFORMATION OR DRAWINGS ARE TO BE OF
EQUAL FORCE WITH THESE DRAWINGS.
9. DETAILS OR CONDITIONS INDICATED FOR A PORTION OF THE WORK BUT NOT CARRIED OUT FULLY FOR OTHER PORTIONS SHALL APPLY THROUGHOUT TO ALL SIMILAR PORTIONS EXCEPT AS OTHERWISE SPECIFICALLY NOTED. IN EVERY CASE A MORE EXPENSIVE ITEM OR METHOD SHALL BE ASSUMED OVER A LESS EXPENSIVE ONE AND DIMENSIONS SHALL BE FIGURED RATHER
THAN DETERMINED BY RULE OR SCALE.
10.THE PROJECT HAS BEEN DESIGNED AND DETAILED FOR THE SPECIFIC MATERIALS AND EQUIPMENT SPECIFIED. NO SUBSTITUTIONS SHALL BE MAKE WITHOUT THE EXPRESS WRITTEN CONSENT OF THE VA. IF THE SPECIFIED MATERIAL IS NOT AVAILABLE. THE CONTRACTOR SHALL PROPOSE AN ALTERNATE MATERIAL AND SHALL PROVIDE DRAWINGS, SAMPLES, SPECIFICATIONS, MANUFACTURER'S LITERATURE, PERFORMANCE DATA, ETC., IN ORDER THAT THE VA CAN EVALUATE THE PROPOSED SUBSTITUTION. IF THE SUBSTITUTION AFFECTS A CORRELATED FUNCTION, ADJACENT CONSTRUCTION, OR THE WORK OF ANY OTHER CONTRACTOR OR TRADE, THE NECESSARY CHANGES AND MODIFICATIONS TO THE AFFECTED WORK SHALL BE ACCOMPLISHED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. NO REQUESTS FOR SUBSTITUTES WILL BE ENTERTAINED BY THE VA DUE TO CONTRACTOR'S
FAILURE TO ORDER MATERIALS IN A TIMELY MANNER.
11.THE CONTRACTOR SHALL SUBMIT IN WRITING ALL PROPOSALS FOR ADDITIONAL WORK TO THE VA FOR REVIEW AND APPROVAL. NO ADDITIONAL WORK IS TO PROCEED UNTIL A SIGNED
AUTHORIZATION TO PROCEED IS RETURNED TO CONTRACTOR.
12.THE STANDARD SPECIFICATIONS OF THE MANUFACTURERS APPROVED FOR USE IN THE PROJECT ARE HEREBY MADE A PART OF THESE NOTES WITH THE SAME FORCE AND EFFECT AS THOUGH HEREIN WRITTEN OUT IN FULL, EXCEPT THAT WHEREVER THE DRAWINGS REQUIRE HEAVIER MEMBERS, BETTER QUALITY MATERIALS OR ARE OTHERWISE MORE STRINGENT, THOSE
MORE STRINGENT REQUIREMENTS SHALL GOVERN.
13.THE CONTRACTOR SHALL NOTIFY THE VA IMMEDIATELY IF HE CANNOT FOR ANY REASON COMPLY WITH ALL THE REQUIREMENTS OF THESE NOTES AND DRAWINGS.
14.THE CONTRACTOR SHALL COORDINATE AND SUPERVISE THE WORK OF ALL CONTRACTORS AND SUB-CONTRACTORS. HE SHALL BE RESPONSIBLE FOR GIVING ALL TRADES SUCH
INFORMATION, PLANS OR DETAILS AS MAY BE REQUIRED FOR THE PROPER INSTALLATION OF THEIR WORK. ALL MATERIALS SHALL BE ORDERED SUFFICIENTLY AHEAD OF TIME SO THAT WORK CAN PROCEED ON SCHEDULE. NO SUBSTITUTIONS WILL BE ACCEPTED BECAUSE OF FAILURE TO DO SO.
15.THE OWNER RESERVES THE RIGHT TO LET THE OTHER CONTRACTS IN CONNECTION WITH THE WORK OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF WORK WITH OTHER CONTRACTORS. THE CONTRACTOR SHALL AFFORD OTHER CONTRACTORS REASONABLE OPPORTUNITY FOR THE INTRODUCTION AND STORAGE OF THEIR MATERIALS
AND EQUIPMENT AND THE EXECUTION OF THEIR WORK.
16.ALL MATERIALS REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT SHALL BE NEW AND OF THE BEST QUALITY OF KINDS SPECIFIED, ALL SUBJECT TO THE APPROVAL OF THE VA. THE USE OF OLD OR SECOND-HAND MATERIALS IS STRICTLY FORBIDDEN. THE CONTRACTOR SHALL, IF REQUIRED, FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF MATERIALS AND WORKMANSHIP. MATERIALS SHALL BE USED IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. UPON REQUEST, THE MANUFACTURER'S REPRESENTATIVE SHALL GO TO THE SITE AND INSTRUCT THE MECHANICS IN THE USE OF THE MATERIALS OR SHALL SUPERVISE THEIR USE.
17.ANY MATERIALS DELIVERED OR WORK PERFORMED, CONTRARY TO THE DRAWINGS AND SPECIFICATIONS AND APPROVED SHOP DRAWINGS, SHALL BE REMOVED BY THE CONTRACTOR AT HIS OWN EXPENSE, AND THE SAME SHALL BE REPLACED WITH OTHER MATERIALS OR WORK SATISFACTORY TO THE VA. THE CONTRACTOR SHALL ALSO ASSUME THE COST OF REPLACING
THE WORK WHICH MAY BE DISTURBED.
18.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING WITH BUILDING MANAGEMENT FOR THE USE OF THE ELEVATOR OR OTHER HOISTING FACILITIES FOR HANDLING THE DELIVERY OF MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL SUB TRADES OF CONDITIONS REGARDING ELEVATOR CAB SIZE, DOOR OPENINGS, ETC.. ANY AND ALL FEES INVOLVED FOR THE USE OF THE HOISTING FACILITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY AND ACCURATELY LAYING OUT THE WORK AND FOR THE LINES AND MEASUREMENTS HEREIN. HE SHALL ESTABLISH NECESSARY REFERENCE LINES AND PERMANENT BENCH MARKS FROM WHICH BUILDING LINES AND ELEVATIONS SHALL BE TAKEN. HEIGHTS OF ALL WORK CALLED FOR "A.F.F." INCLUDING BUT NOT LIMITED TO SOFFITS, CEILINGS, DOORS, AND HOLLOW METAL SHALL BE TRUE AND LEVEL WITHIN A MAXIMUM TOLERANCE OF 1/8" OVERALL THROUGHOUT THE ENTIRE PROJECT.
20. THE CONTRACTOR SHALL KEEP THE VA INFORMED OF THE PROGRESS OF HIS WORK. NO WORK SHALL BE CLOSED OR COVERED UNTIL IT HAS BEEN DULY INSPECTED AND APPROVED.
SHOULD UNINSPECTED WORK BE COVERED THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, UNCOVER ALL SUCH WORK SO THAT IT CAN BE PROPERLY INSPECTED AND AFTER SUCH
INSPECTION, HE SHALL PROPERLY REPAIR AND REPLACE ALL WORK INTERRED WITH.
21. ALL WORK SHALL BE SUBJECT TO FINAL INSPECTION AND ACCEPTANCE BY THE VA.
22. PROTECT OWNER'S PROPERTY, EQUIPMENT, AND EMPLOYEES FROM INJURY OR DAMAGE AT THE PROJECT SITE.
23. ALL WORK ARE TO BE COORDINATED SO THAT NO CONFLICTS OCCUR. ANY CONFLICTS WHICH RESULT IN A RELOCATION OF A FINISHED SURFACE MUST BE BROUGHT TO THE ATTENTION
OF THE VA PRIOR TO INSTALLATION.
24. THE CONTRACTOR SHALL SUBMIT CERTIFICATES OF INSURANCE IN ACCORDANCE WITH BUILDING REQUIREMENTS AND SHALL INCLUDE A HOLD HARMLESS CLAUSE FOR THE OWNER, BUILDING MANAGEMENT, TENANT, AND VA.
25. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY COVERING ALL WORK PERFORMED AND EQUIPMENT INSTALLED.
26. THE CONTRACTOR SHALL SUBMIT ALL FABRICATION SHOP DRAWINGS, SAMPLES, AND FIXTURE CUTS FOR THE VA'S REVIEW AS REQUIRED AND/OR INDICATED ON THE DRAWINGS. THE VA'S
REVIEW SHALL NOT BE CONSTRUCTED AS AN INDICATION THAT THE SUBMITTAL IS CORRECT OR SUITABLE NOR THAT WORK REPRESENTED BY SUBMITTAL COMPLIES WITH THE DRAWINGS, EXCEPT AS TO MATTERS OF FINISH, COLOR, AND OTHER AESTHETIC MATTERS. ACTION NOTED ABOVE DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY TO COORDINATE ALL TRADES AND TO CHECK QUANTITIES AND DIMENSIONS AGAINST CONDITIONS IN THE FIELD. CONTRACTORS SHALL ASSUME RESPONSIBILITY FOR ALL ERRORS ON THEIR DRAWINGS.
27. THE CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS COMPLETE WITH MANUFACTURER'S EQUIPMENT CUTS, FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. SUBMITTAL SHALL BE IN THE FORM OF (A) REPRODUCIBLE SEPIA TRANSPARENCY (POSITIVE SIDE UP), AND (B) 3 BLACK AND WHITE PRINTS OF EACH DRAWING. SAMPLES SHALL BE SUBMITTED IN TRIPLICATE. THE CONTRACTOR WILL NOT COMMENCE FABRICATION BEFORE RECEIVING THE APPROVAL OF THE VA.
28. ITEMS TO BE SUBMITTED FOR REVIEW ARE NOTED IN THE VAURAL AND ENGINEERING SPECIFICATIONS.
29. THE PREMISES AND THE JOB SITE SHALL BE MAINTAINED IN A REASONABLY NEAT AND ORDERLY CONDITION AND KEPT FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH
DURING THE ENTIRE CONSTRUCTION PERIOD. REMOVE CRATES, CARTONS AND OTHER FLAMMABLE WASTE MATERIALS OR TRASH FROM THE WORK AREAS AT THE END OF EACH WORKING
DAY.
30. ELECTRICAL CLOSETS, PIPE AND DUCT SHAFTS CHASES, FURRED SPACES AND SIMILAR SPACES SHALL BE CLEANED AND LEFT FREE FROM RUBBISH LOOSE PLASTER, MORTAR DRIPPINGS, EXTRANEOUS CONSTRUCTION MATERIALS, DIRT AND DUST.
31. CARE SHALL BE TAKEN BY WORKMEN NOT TO MARK, SOIL, OR OTHERWISE DEFACE FINISHED SURFACES. IN THE EVENT THAT FINISHED SURFACES BECOME DEFACED, CLEAN AND
RESTORE SUCH SURFACES TO THEIR ORIGINAL CONDITION.
32. CLEAN UP IMMEDIATELY UPON COMPLETION OF EACH TRADE'S WORK.
33. CLEAN AREAS OF THE BUILDING IN WHICH PAINTING AND FINISHING WORK IS TO BE PERFORMED JUST PRIOR TO THE START OF THIS WORK, AND MAINTAIN THESE AREAS IN SATISFACTORY
CONDITION FOR PAINTING AND FINISHING.
34. THIS CLEANING INCLUDES THE REMOVAL OF TRASH AND RUBBISH FROM THESE AREAS, BROOM CLEANING OF FLOORS, THE REMOVAL OF ANY PLASTER MORTAR, DUST AND OTHER
EXTRANEOUS MATERIALS FROM FINISH SURFACES, INCLUDING BUT NOT LIMITED TO MISCELLANEOUS METAL, WOODWORK, PLASTER, GLASS, GYPSUM DRYWALL, MASONRY, CONCRETE, MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING DUCTWORK, CONDUIT, AND SURFACES VISIBLE AFTER PERMANENT FIXTURES, INDUCTION UNIT COVERS, GRILLES, REGISTERS, AND
OTHER SUCH FIXTURES OR DEVICES ARE IN PLACE.
35. IN ADDITION TO THE CLEANING SPECIFIED ABOVE AND THE MORE SPECIFIC CLEANING WHICH MAY BE REQUIRED IN VARIOUS SECTIONS OF THE SPECIFICATIONS THE PREMISES SHALL BE PREPARED FOR OCCUPANCY BY: (i) A THOROUGH CLEANING THROUGHOUT INCLUDING WASHING OR CLEANING BY OTHER APPROVED METHODS OF ALL FLOORS AND SURFACES ON WHICH DIRT OR DUST HAS COLLECTED AND BY WASHING GLASS, REMOVING ALL PAINT, FOREIGN MATERIAL, AND STAINS THEREON. (ii) PROVIDING AND MAINTAINING ADEQUATE RUNNER STRIPS OF NON-STAINING REINFORCED KRAFT BUILDING PAPER ON FINISHED FLOORS AS REQUIRED FOR PROTECTION. (iii) LEAVING ALL FIXTURES AND EQUIPMENT IN AN UNDAMAGED, BRIGHT, CLEAN POLISHED CONDITION. (iv) CLEAN AND POLISH ALL HARDWARE AND ALL OTHER METAL WORK. (v) DO ALL OTHER CLEANING AS REQUIRED TO TURN THE PREMISES OVER TO THE OWNER IN A
SPOTLESS AND ORDERLY CONDITION.
36. ALL EXITS AND MEANS OF EGRESS ROUTES SHALL BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL TIMES.
37. PRIOR TO SUBMITTING THE BID. EACH CONTRACTOR AND SUBCONTRACTOR SHALL THOROUGHLY EXAMINE EXISTING CONDITIONS AT THE PROJECT SITE TO ASSURE THAT THE SCOPE OF
WORK IS IN ACCORDANCE WITH THE CONTRACT DOCUMENT. CONDITION FOUND WHICH WILL ADVERSELY AFFECT THE WORK SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE/VA.
38. THE CONSTRUCTION MANAGER SHALL BE RESPONSIBLE FOR THE SAFETY AND PROTECTION/SECURITY OF THE PROPERTY AND THE SURROUNDING AREAS, INCLUDING SIDEWALKS, ROADS
AND ADJACENT STRUCTURES. ALL OPERATIONS SHALL BE CONDUCTED SO AS TO PREVENT DAMAGE TO EXISTING STRUCTURES, ADJACENT SPACES AND OTHER FACILITIES TO REMAIN.
ELEMENTS TO BE RETAINED SHALL BE SAFEGUARD AND PROTECTED FROM DAMAGE OF ANY KIND.
39. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE V.A. GUIDELINES, NFPA 101 LIFE SAFETY AND ELECTRIC CODES, O.S.H.A. SAFETY REGULATIONS.
40. THE CONTRACTOR SHALL ASSURE FREE AND SAFE PASSAGE FOR PEDESTRIAN AROUND THE SITE AREA. IN CONFORMANCE WITH GOVERNING AGENCIES AND THE OWNER. THE
CONTRACTOR SHALL OBTAIN ALL PERMITS AND PAY ALL RELATED FEES REQUIRED, ALL SITE CONSTRUCTION SIGNAGE AND ASSOCIATED TRAFFIC MEASURES.
41. PRIOR TO THE COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS, APPROVALS, ETC. FROM ALL RESPECTIVE DEPARTMENTS, AGENCIES, COMMISSIONS ETC. HAVING JURISDICTION AND SHALL SUBMIT ONE (1) COPY OF SUCH TO BOTH THE OWNER AND THE VA.
42. THE CONTRACTOR SHALL EMPLOY MEANS AND METHODS THAT MINIMIZE VIBRATION, NOISE, DUST, POLLUTANTS AND OTHER DISTURBANCES TO OPERATIONS OF EXISTING ADJACENT
TENANCIES.
43. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONSTRUCTION, CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ANY DEMOLITION OPERATIONS. NO WORK IS TO TAKE PLACE
WHICH ALTERS THE BUILDING STRUCTURE OR STRUCTURAL FIREPROOFING SYSTEMS. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE OWNER PRIOR TO THE START OF THE WORK. COMMENCEMENT OF THE WORK SHALL IMPLY ACCEPTANCE OF ALL EXISTING CONDITIONS.
44. THE OWNER, UNDER SEPARATE CONTRACT, SHALL ABATE THE CONSTRUCTION SITE OF ALL ASBESTOS CONTAINING MATERIALS. IF THE CONTRACTOR DISCOVERS ASBESTOS OR ANY OTHER HAZARDOUS MATERIALS THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND SHALL IMMEDIATELY STOP DISTURBING THE HAZARDOUS MATERIAL. THE OWNER SHALL NOTIFY THE CONTRACTOR WHEN IT IS PERMISSIBLE TO RESUME WORK IN THE AREA BASED ON REVIEW AND APPROVALS BY THE OWNER'S APPROPRIATE CONSULTANT. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE CODES, LAWS, REGULATIONS AND COMMON TRADE PRACTICE.
45. THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR SPACES AND ASSEMBLIES ADJACENT TO THE AREA OF OPERATION UNDER THIS CONTRACT. ANY DAMAGE OR DISTURBANCE RESULTING FROM WORK DONE UNDER THIS CONTRACT SHALL BE PROMPTLY RESTORED, REPLACED, OR REPAIRED AT NO EXTRA COST OF THE OWNER.
46. ALL DEBRIS AND ADDITIONAL MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF PROPERLY.
47. SEAL ALL OPENINGS UNCOVERED DURING THE DEMOLITION OF FURRED WALLS. RELOCATION OF DUCT SHAFTS OR PIPE CHASES, OR REMOVAL OF PARTITIONS OR FIXTURES.
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 2 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
GI-002
AutoCAD SHX Text Project No.
Approved Division Chief:
AREA OF WORK
Scope of Work
1. Contractor is to remove existing paint on the ceiling, duct work and duct work components, piping, and conduits.
2. Contractor is to remove existing paint on the walls.
3. Contractor is to clean and prepare metal deck ceiling, duct work and duct work components, piping, conduits, and walls for painting.
4. Contractor is to prime all areas with two coatings, and two coatings of the final paint or as approved by the COR as per manufacturer recommendations.
5. Contractor is to remove existing flooring and prepare floor for epoxy.
6. Contractor is to install commercial grade, high durability, non-slip epoxy flooring. Epoxy mortar system must have a cove base, primer, mortar base, seal coat, top coat.
7. Contractor to apply epoxy line marking system in yellow for safety, around the equipment, equipment components, columns, drains, and exits.
8. Flooring must be ADA compliant.
9. Contractor cannot do acid etching, and must provide another method acceptable to the VA.
10. Contractor is required to have a dedicated safety officer.
11. Contractor must have OSHA training, and specialized OSHA training regarding scaffolding, lifts, and fall protection.
12. Contractor is responsible for protecting existing VA Laundry equipment and all associated components. Any damages are the responsibility of the contractor to repair or replace with new.
13. Contractor is responsible for protecting existing VA Laundry equipment and ALL laundry equipment components from any physical damage, paint, dust, and anything that can affect the operation of the equipment and rails.
14. Contractor MUST cover equipment, rails, and all equipment components.
15. Contractor is responsible for maintaining VA laundry equipment warranty.
16. Contractor must have VA Laundry equipment vendor Purchinex, LLC to inspect the site whenever work is being performed to maintain the equipment warranty.
17. Contractor responsible for phasing the work to reduce the impact on the Laundry.
18. Contractor must properly vent the area while working.
19. Contractor shall follow all Infection Control measures and Interim Life Safety measures during construction. All work performed will be in an operational healthcare facility.
20. All work shall be done in compliance with the Contract Drawings and Specifications.
21. All work shall be done in accordance with NFPA, Life Safety, and VA Standards and Regulations, and OSHA regulations.
22. Contractor shall account for any additional expenses for afterhours/weekend work due to area being occupied.
23. Contractor shall give at least one year warranty on all work, material and labor.
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 3 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
GC-101
AutoCAD SHX Text Project No.
AutoCAD SHX Text Approved Division Chief:
AutoCAD SHX Text
BUILDING 173 FIRST FLOOR PLAN
AutoCAD SHX Text
SCALE 1/8" = 1'-0"
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
8' HIGH WALLS
AutoCAD SHX Text
PIPE RAILING
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UWOMEN'S
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text %%U116
AutoCAD SHX Text
%%ULOCKERS
AutoCAD SHX Text %%U115
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UJANITOR
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UWOMEN'S TOILET
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UELECT.
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text %%U127
AutoCAD SHX Text
%%UOFFICE/LOUNGE
AutoCAD SHX Text
%%ULINEN
AutoCAD SHX Text
%%USUPPLIES
AutoCAD SHX Text %%U203
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULOUNGE
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text %%U107
AutoCAD SHX Text
%%UMAINTENANCE SHOP
AutoCAD SHX Text
%%ULUNCH ROOM
AutoCAD SHX Text %%U103
AutoCAD SHX Text
%%UMECHANICAL ROOM
AutoCAD SHX Text
%%ULAUNDRY PROCESSING
AutoCAD SHX Text
%%UEQUIPMENT
AutoCAD SHX Text %%U128
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULAUNDRY
AutoCAD SHX Text
LAUNDRY PLANT
AREA OF WORK
PHASING PLAN
NOTES
1. COORDINATE ALL PHASING WITH VA
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 4 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
GC-102
AutoCAD SHX Text Project No.
AutoCAD SHX Text Approved Division Chief:
AutoCAD SHX Text
BUILDING 173 FIRST FLOOR PLAN
AutoCAD SHX Text
SCALE 1/8" = 1'-0"
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
8' HIGH WALLS
AutoCAD SHX Text
PIPE RAILING
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UWOMEN'S
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text %%U116
AutoCAD SHX Text
%%ULOCKERS
AutoCAD SHX Text %%U115
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UJANITOR
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UWOMEN'S TOILET
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UELECT.
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text %%U127
AutoCAD SHX Text
%%UOFFICE/LOUNGE
AutoCAD SHX Text
%%ULINEN
AutoCAD SHX Text
%%USUPPLIES
AutoCAD SHX Text %%U203
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULOUNGE
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text %%U107
AutoCAD SHX Text
%%UMAINTENANCE SHOP
AutoCAD SHX Text
%%ULUNCH ROOM
AutoCAD SHX Text %%U103
AutoCAD SHX Text
%%UMECHANICAL ROOM
AutoCAD SHX Text
%%ULAUNDRY PROCESSING
AutoCAD SHX Text
%%UEQUIPMENT
AutoCAD SHX Text %%U128
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULAUNDRY
AutoCAD SHX Text
LAUNDRY PLANT
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
PHASE 3
DEMOLITION PLANS
GENERAL NOTES PART2
1. THE CONTRACTOR SHALL VERYIFY ALL EXISTING CONDITIONS AND
DIMENSIONS PRIOR TO
COMMENCEMENTOF ANY DEMOLITION OPERATIONS. NO WORK IS TO TAKE PLACE
WHICH ALTERS THE
BUILDING STRUCTURE OR STRUCTURAL FIREPROOFING SYSTEMS. THE CONTRACTOR
SHALL REPORT ANY
DISCREPANCIES TO THE OWNER PRIOR TO THE START OF THE WORK. COMMENCEMENT
OF THE WORK
SHALL IMPLY ACCEPTANCE OF ALL EXISTING CONDITIONS.
2. IF ANY ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE DISCOVERED, THE
CONTRACTOR SHALL
IMMEDIATELY STOP DISTURBING THE HAZARDOUS MATERIAL AND NOTIFY THE
RESIDENT ENGINEER. THE
RESIDENT ENGINEER SHALL NOTIFY THE CONTRACTOR WHEN IT IS PERMISSIBLE TO
RESUME WORK IN
THE AREA BASED ON REVIEW AND APPROVALS BY VA'S APPROPRIATE CONSULTANT.
THE CONTRACTOR
SHALL ADHERE TO ALL APPLICABLE CODES, LAWS REGULATIONS AND COMMON TRADE
PRACTICE.
3. THE CONTRACTOR SHALL EMPLOY MEANS AND METHODS THAT MINIMIZE
VIBRATION NOISE, DUST,
POLLUTANTS AND OTHER DISTURBANCES TO OPERATIONS OF EXISTING ADJACENT
TENDANCIES.
4. THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR SPACES AND
ASSEMBLIES ADJACENT
TO THE AREA OF OPERATION UNDER THIS CONTRACT.
ANY DAMAGE OR DISTURBANCE RESULTING FROM WORK DONE UNDER THIS CONTRACT
SHALL BE
PROMPTLY RESTORED, REPLACED, OR REPAIRED AT NO EXTRA COST TO THE OWNER.
5. ALL DEBRIS AND ADDITIONAL MATERIAL SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF
PROPERLY.
6. ALL EXITS SHALL BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL
TIMES.
7. SEAL ALL OPENINGS UNCOVERED DURING DEMOLITIOIN OF FURRED WALLS,
RELOCATION OF DUCT
SHAFTS OR PIPE CHASES, OR REMOVAL OF PARTITIONS OR FIXTURES.
8. EXISTING STEEL COLUMN AND FIREPROOF ENCLOSURE SHALL REMAIN.
CONTRACTOR SHALL REPAIR,
PATCH & SEAL EXISTING STRUCTURAL ASSEMBLY AS REQUIRED TO MAINTAIN EXISTING
RATING, TYPICAL
U.O.N.
9. THE CONTRACTOR SHALL EMPLOY MEANS AND METHODS THAT MINIMIZE
VIBRATION NOISE, DUST,
POLLUTANTS AND OTHER DISTURBANCES TO OPERATIONS OF EXISTING ADJACENT
TENDANCIES.
10. THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR SPACES AND
ASSEMBLIES ADJACENT
TO THE AREA OF OPERATION UNDER THIS CONTRACT.
ANY DAMAGE OR DISTURBANCE RESULTING FROM WORK DONE UNDER THIS CONTRACT
SHALL BE
PROMPTLY RESTORED, REPLACED, OR REPAIRED AT NO EXTRA COST TO THE OWNER.
11. ALL DEBRIS AND ADDITIONAL MATERIAL SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF
PROPERLY.
12. ALL EXITS SHALL BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL
TIMES.
13. THE SCOPE OF WORK SHALL INCLUDE ALL REMOVALS AS REQUIRED BY THE
DRAWINGS AS WELL AS
ALL REMOVALS NOT SPECIFICALLY INDICATED ON DRAWINGS BUT NECESSARY FOR THE
COMPLETION OF
THE WORK
Demolition Notes
D1- Remove existing VCT flooring
D2- Remove existing paint from ceiling
D3- Remove existing paint from duct work
D4- Remove existing paint from conduit and pipes (excluding the sprinklers)
D5- Remove existing paint from walls and columns
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 3 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
AD-101
AutoCAD SHX Text Project No.
AutoCAD SHX Text Approved Division Chief:
AutoCAD SHX Text
BUILDING 173 FIRST FLOOR PLAN
AutoCAD SHX Text
SCALE 1/8" = 1'-0"
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
8' HIGH WALLS
AutoCAD SHX Text
PIPE RAILING
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UWOMEN'S
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text %%U116
AutoCAD SHX Text
%%ULOCKERS
AutoCAD SHX Text %%U115
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UJANITOR
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UWOMEN'S TOILET
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UELECT.
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text %%U127
AutoCAD SHX Text
%%UOFFICE/LOUNGE
AutoCAD SHX Text
%%ULINEN
AutoCAD SHX Text
%%USUPPLIES
AutoCAD SHX Text %%U203
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULOUNGE
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text %%U107
AutoCAD SHX Text
%%UMAINTENANCE SHOP
AutoCAD SHX Text
%%ULUNCH ROOM
AutoCAD SHX Text %%U103
AutoCAD SHX Text
%%UMECHANICAL ROOM
AutoCAD SHX Text
%%ULAUNDRY PROCESSING
AutoCAD SHX Text
%%UEQUIPMENT
AutoCAD SHX Text %%U128
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULAUNDRY
AutoCAD SHX Text
LAUNDRY PLANT
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D1
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D1
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
D5
ARCHITECTURAL FLOOR PLANS
Construction Notes
C1- Reinforce existing construction barrier with gypsum board and make smoke/dust tight, and provide temporary door hardware
C2- Protect and cover all equipment and equipment components
C3- Clean and prepare ceiling for painting
C4- Clean and prepare ductwork and registers
C5- Clean and prepare conduits and pipes (including sprinklers)
C6- Clean and prepare walls and columns
C7- Prepare and prime with 2 coats the ceiling, ductwork, conduits, pipes, columns and walls
C8- Paint ceiling, ductwork, conduits, pipes, columns and walls with 2 coats of paint (color to be chosen by VA)
C9- Clean and prepare the floor for non-slip epoxy
C10- Apply non-slip epoxy for the floor
C11- Apply line marking system in yellow for all equipment, equipment components, columns, drains and exits
AutoCAD SHX Text
AutoCAD SHX Text Healthcare System
AutoCAD SHX Text New York Harbor
AutoCAD SHX Text Queens, New York 11425
AutoCAD SHX Text 179-00 Linden Blvd
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
QUEENS, NEW YORK
AutoCAD SHX Text Drawn By
AutoCAD SHX Text Location
AutoCAD SHX Text Designed By
AutoCAD SHX Text Checked By
AutoCAD SHX Text Scale:
AutoCAD SHX Text Sht. 6 Of
AutoCAD SHX Text Date
AutoCAD SHX Text
AW
AutoCAD SHX Text 6/3/19
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AW
AutoCAD SHX Text
AE-101
AutoCAD SHX Text Project No.
AutoCAD SHX Text Approved Division Chief:
AutoCAD SHX Text
BUILDING 173 FIRST FLOOR PLAN
AutoCAD SHX Text
SCALE 1/8" = 1'-0"
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
LINE OF SECOND FLOOR ABOVE
AutoCAD SHX Text
8' HIGH WALLS
AutoCAD SHX Text
PIPE RAILING
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UWOMEN'S
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text %%U116
AutoCAD SHX Text
%%ULOCKERS
AutoCAD SHX Text %%U115
AutoCAD SHX Text
%%UTOILET
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UJANITOR
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UWOMEN'S TOILET
AutoCAD SHX Text
%%UMEN'S TOILET
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
%%UELECT.
AutoCAD SHX Text
%%UCL.
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text %%U127
AutoCAD SHX Text
%%UOFFICE/LOUNGE
AutoCAD SHX Text
%%ULINEN
AutoCAD SHX Text
%%USUPPLIES
AutoCAD SHX Text %%U203
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULOUNGE
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text %%U107
AutoCAD SHX Text
%%UMAINTENANCE SHOP
AutoCAD SHX Text
%%ULUNCH ROOM
AutoCAD SHX Text %%U103
AutoCAD SHX Text
%%UMECHANICAL ROOM
AutoCAD SHX Text
%%ULAUNDRY PROCESSING
AutoCAD SHX Text
%%UEQUIPMENT
AutoCAD SHX Text %%U128
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
%%ULOADING DOCK
AutoCAD SHX Text
%%ULAUNDRY
AutoCAD SHX Text
LAUNDRY PLANT
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C1
AutoCAD SHX Text C2
AutoCAD SHX Text C3
AutoCAD SHX Text C4
AutoCAD SHX Text C5
AutoCAD SHX Text C6
AutoCAD SHX Text C7
AutoCAD SHX Text C8
AutoCAD SHX Text C9
AutoCAD SHX Text C10
C11
| GI-001 COVER SHEET |
| Sheets and Views |
| Model |
| GI-002 GENERAL NOTES |
| Sheets and Views |
| Model |
| GC-101 AREA OF WORK |
| Sheets and Views |
| Model |
| GC-102 PHASING PLAN |
| Sheets and Views |
| Model |
| AD-101 DEMOLITION PLANS |
| Sheets and Views |
| Model |
| AE-101 ARCHITECTURAL PLANS |
| Sheets and Views |
| Model |
File details come from the government source that posted it.