36C24219B0037-004.pdf

PDF 11 MB Posted

Attached to
RENOVATE ONCOLOGY PHARMACY VAMC BROOKLYN 800 POLY PLACE BROOKLYN, NY
Solicitation number
36C24219B0037
Issued by

About this file

36C24219B0037 630A4_MH-00100-signed.pdf

View the file

Other files

File Type Posted
36C24219B0037-0003003.pdf PDF
36C24219B0037-0003000.docx DOCX document
36C24219B0037-0003001.pdf PDF
36C24219B0037-0003002.pdf PDF
36C24219B0037-0002001.pdf PDF
36C24219B0037-0002000.docx DOCX document
36C24219B0037-0001000.docx DOCX document
36C24219B0037-003.pdf PDF
36C24219B0037-005.pdf PDF
36C24219B0037-009.pdf PDF
36C24219B0037-011.pdf PDF
36C24219B0037-008.pdf PDF
36C24219B0037-001.docx DOCX document
36C24219B0037-002.pdf PDF
36C24219B0037-010.pdf PDF
36C24219B0037-006.pdf PDF
36C24219B0037-007.pdf PDF
36C24219B0037-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL LIST AND ABBREVIATIONS

EXISTING WORK TO REMAIN

DIRECTION OF FLOW

NEW WORK

FLEXIBLE CONNECTION

FIRE & SMOKE DAMPERS W/ACCESS DOOR

RECTANGULAR ELBOW WITH TURNING VANES

IN DUCT AT WALL

FC

FC

RETURN OR EXHAUST DUCT DOWN

RETURN OR EXHAUST DUCT UP

SUPPLY DUCT DOWN

SUPPLY DUCT UP

CEILING DIFFUSER

CEILING REGISTER

MOTORIZED DAMPER

TEMPERATURE SENSOR

CEILING DIFFUSER W/150 CFM SUPPLY AIR CD CD(150)

ACOUSTICAL LINED DUCT

VOLUME DAMPER

VD

VD

VD

STRAINER WITH BLOW-OFF VALVE

UNION

REDUCER

THREE WAY CONTROL VALVE

COMBINATION MEASURING, BALANCING &

SOLENOID VALVE

COCK VALVE

GATE VALVE / SHUT-OFF VALVE

GLOBE VALVE

CHECK VALVE

WATER PRESSURE GAUGE

TWO WAY CONTROL VALVE

THERMOMETER

BUTTERFLY VALVE

PIPE DOWN

PIPE UP

END CAP

SHUT-OFF VALVE

CAV-6

(600)

CAV

EXISTING WORK TO BE DEMOLISHED

SG

RG

SG(300)

RG(300)

SUPPLY AIR GRILLE 300 CFM

RETURN AIR GRILLE 300 CFM

CONSTANT AIR VOLUME BOX W/REHEAT COIL #

6, 600 CFM

HUMIDITY SENSOR

POINT OF CONNECTION NEW TO EXISTING

POINT OF DISCONNECTION FOR REMOVAL

LOW PRESSURE RETURN

MEDIUM PRESSURE RETURN

HIGH PRESSURE STEAMHPS

MPR

LOW PRESSURE STEAM

EXHAUST AIR

ACCESS DOOR

SYMBOL LIST AND ABBREVIATIONS

CUBIC FEET PER MINUTE

ABOVE FINISHED FLOOR

GALLON PER MINITE

ACOUSTICAL LINING

300 CUBIC FEET OF AIR PER MINUTE

CEILING GRILLE

BRITISH THERMAL UNIT

BUILDING AUTOMATION SYSTEM

CEILING DIFFUSER

CEILING REGISTER

HORSE POWER

HEATING COIL

LEAVING WATER TEMPERATURE

LOCKED ROTOR AMPS

LEAVING AIR TEMPERATURE

LRA

LWT

KW

HP

LAT

GPM

HC

EA

DN

CR

KILOWATT

DOWN

CFM

CD

CG

BTU

BAS

AFF

AL

AD

(300)

VFD

W/WMS

WMS

CAV

VARIABLE FREQUENCY DRIVE

WIRE MESH SCREEN

WITH WIRE MESH SCREEN

CONSTANT AIR VOLUME

LVG LEAVING

EEF EFFICIENCY

DWG DRAWING

FC FLEXIBLE CONNECTION

HEATINGHTG

DDC DIRECT DIGITAL CONTROL

FPM FEET PER MINUTE

FT FEET

ELEV ELEVATION

FSD FIRE/SMOKE DAMPER

CHWS

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

OUTSIDE AIR INTAKE

OUTSIDE AIR

NOT TO SCALE

NORMALLY CLOSED

NOT IN THIS CONTRACT

OAI

OA

NTS

NIC

NC

MIN MINIMUM

SA

RA

SUPPLY AIR

RETURN AIR

TYP TYPICAL

MECH MECHANICAL

DET DETAIL

FTR FIN TUBE RADIATION

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MBH THOUSANDS BTU PER HOUR

MD MOTORIZED DAMPER

RHC REHEAT COIL

WPD WATER PRESSURE DROP

ABBREV. SYMBOL DESCRIPTIONS ABBREV. SYMBOL DESCRIPTIONS

FSD/AD, SFD, FSD,

F/SD

1. ALL PIPING AND DUCTWORK SHALL BE SUSPENDED FROM BUILDING STRUCTURE ONLY, EXCEPT AS SPECIFICALLY ALLOWED IN THE SPECIFICATIONS. HVAC CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS NECESSARY TO SUPPORT PIPES AND DUCTS FROM BUILDING STRUCTURE. THE ARCHITECT AND STRUCTURAL ENGINEER SHALL BE THE SOLE DETERMINANT AS TO PERMISSIBILITY OF HANGING NEW WORK FROM BUILDING STRUCTURE AND SLABS.

2. PIPING AND DUCTWORK PROVIDED UNDER THIS CONTRACT SHALL BE COORDINATED UNDER THIS CONTRACT WITH

WORK BEING PROVIDED BY OTHER TRADES.

3. FINAL LOCATION OF ALL CEILING DIFFUSERS, RETURN REGISTERS AND CEILING GRILLES SHALL BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. QUANTITIES OF THESE DEVICES SHALL BE PROVIDED AS SHOWN ON THE HVAC DRAWINGS.

ANY DISCREPANCIES BETWEEN THE HVAC DRAWINGS AND THE ARCHITECTURAL DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT FOR RESOLUTION PRIOR TO BID.

4. WHILE THE DRAWINGS SHALL BE ADHERED TO AS CLOSELY AS POSSIBLE, THE ARCHITECT'S RIGHT IS RESERVED TO VARY THE RUN AND SIZE OF DUCTS DURING THE PROGRESS OF THE WORK IF REQUIRED TO MEET CEILING HEIGHTS, TO MEET STRUCTURAL AND FIELD CONDITIONS. CONTRACTOR SHALL PROVIDE REDRAWING OF SHOP DRAWINGS AS NECESSARY TO ACCOMMODATE THE ARCHITECT'S REQUIREMENTS, AT NO ADDITIONAL COST TO THE OWNER. REFER TO

ARCHITECTURAL REFLECTED CEILING PLANS FOR REQUIRED CEILING HEIGHTS.

5. INSTALL ALL DUCTWORK IN STRICT ADHERENCE TO THE CEILING HEIGHTS INDICATED ON THE ARCHITECT'S DRAWINGS.

CONSULT WITH OTHER CONTRACTORS AND IN CONJUNCTION WITH THE OTHER CONTRACTORS, ESTABLISH THE

NECESSARY SPACE REQUIREMENTS FOR EACH TRADE.

6. THE SHEET METAL DUCTWORK SHALL, WHETHER INDICATED OR NOT, RISE AND/OR DROP AND/OR CHANGE IN SHAPE TO CLEAR ANY AND ALL OTHER DUCTWORK, CONDUITS, LIGHTING FIXTURES, PLUMBING AND HEATING/COOLING MAINS TO MAINTAIN THE DESIRED CEILING HEIGHTS AND TO PROVIDE ADEQUATE MAINTENANCE ROOM AND HEADROOM IN MECHANICAL EQUIPMENT ROOMS. THE DRAWINGS, IN GENERAL, DO NOT SHOW ALL RISES, DROPS AND DUCT

TRANSITIONS REQUIRED. THE DRAWINGS SHOW GENERAL ROUTING REQUIREMENTS ONLY.

7. ALL RECTANGULAR DUCTWORK, UNLESS OTHERWISE NOTED, SHALL BE BUILT FROM GALVANIZED SHEET STEEL AND THOROUGHLY BRACED AND STIFFENED. SEE SPECIFICATIONS FOR DUCTS REQUIRED TO BE FABRICATED OF ALUMINUM AND STAINLESS STEEL. ALL DUCTS WITH ROOMS WITH OPEN TANKS SHALL BE STAINLESS STEEL.

8. PROVIDE A MANUAL VOLUME DAMPER UPSTREAM OF EACH VAV/CAV TERMINAL BOX WHETHER INDICATED OR NOT ON THE DRAWINGS. PROVIDE AN ACCESS DOOR LOCATED BETWEEN VAV/CAV TERMINAL BOX AND VOLUME DAMPER.

PROVIDE ACCESS DOOR IMMEDIATELY DOWNSTREAM OF ANY VAV/CAV BOX REHEAT COIL, WITH BOX BEING PROVIDED

WITH AD UPSTREAM OF REHEAT COIL.

9. ALL VALVES, REHEAT COIL, TERMINAL BOXES (VAV AND CV), DAMPERS AND OTHER EQUIPMENT LOCATED ABOVE THE CEILING, WHICH REQUIRE MAINTENANCE, SHALL BE LOCATED SO AS TO PERMIT MAINTENANCE. IN HIGH FLOOR TO FLOOR AREAS, THIS EQUIPMENT SHALL BE LOCATED AS LOW AS POSSIBLE IN THE CEILING CAVITY FOR EASIER ACCESS. LOCATE SUCH EQUIPMENT ABOVE ACCESSIBLE CEILINGS TO THE EXTENT POSSIBLE TO AVOID ACCESS DOORS IN THE CEILING.

10. PROVIDE ISOLATION VALVES WHERE TYING NEW PIPING INTO THE EXISTING SYSTEM. REFER TO THE VALVES SPECIFICATIONS FOR THE PROPER VALVE TYPE FOR THE SERVICE. REFER TO THE DRAWINGS FOR THE PIPE/VALVE SIZE.

IN ADDITION TO THE ISOLATION VALVES AT THE TIE-IN POINTS, ALSO PROVIDE A BALANCING VALVE ON THE SUPPLY SIDE FOR CHILLED WATER, CHILLED GLYCOL/BRINE, CONDENSER WATER AND HEATING/REHEAT HOT WATER SYSTEM TIE-INS.

11. ALL BIDDERS ARE REQUIRED TO REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF ALL MEP/FP COMPONENTS FOR FULL INTEGRATION INTO ARCHITECTURAL DESIGN. BIDDERS ARE TO IMMEDIATELY CALL TO THE ARCHITECT'S ATTENTION ANY DISCREPANCIES IN QUANTITIES, TYPES AND SCOPE FOR ALL DISCIPLINES/TRADES.

12. SEE ARCHITECTURAL REFLECTED CEILING PLAN (RCP), DRAWINGS AND FLOOR PLANS FOR LOCATION OF ALL CEILING MOUNTED DEVICES. SEE ARCHITECTURAL DRAWINGS FOR LOCATION OF ALL WALL MOUNTED DEVICES.

13. SYMBOLS AND ABBREVIATIONS SHOWN ON THE DRAWINGS ARE FOR MECHANICAL DRAWINGS ONLY. SEE ARCHITECTURAL DRAWING AND OTHER TRADES DRAWINGS FOR THEIR RESPECTIVE SYMBOLS AND ABBREVIATIONS.

14. PRIOR TO PERFORMING ANY CORE DRILLING OR CUTTING OF EXISTING FLOOR OR ROOF SLAB, CONTRACTOR SHALL PERFORM A SCAN OF THE SLAB USING GROUND PENETRATING RADAR (GPR) TO CONFIRM THAT THERE ARE NO EXISTING

CONDUITS OR PIPES IN THE AREA OF CORE DRILL OR CUTTING OF THE SLAB.

15. SEE ARCHITECTURAL DWG AS101 FOR PHASING NOTES.

1. DEMOLITION OF HVAC ITEMS SHALL BE PERFORMED UNDER THE HVAC CONTRACT.

2. LOCATION OF THE EXISTING DUCTWORK & PIPING AS SHOWN ON DRAWINGS IS APPROXIMATE.

3. PROVIDE TEMPORARY SUPPORTS WHERE REQUIRED.

4. DURING DEMOLITION, PROPERLY CAP AND PROTECT ALL DUCTWORK, EQUIPMENT, AND PIPING THAT WILL REMAIN IN OPERATION.

5. WHERE EXISTING INSULATION TO REMAIN IS DAMAGED BY THE REQUIREMENTS OF THE WORK, REPLACE ANY DAMAGED INSULATION TO

MATCH EXISTING.

6. DEMOLISH ALL EQUIPMENT AS INDICATED, FIXTURES AND/OR MISCELLANEOUS ARTICLES IN THEIR ENTIRETY INCLUDING AUXILIARY

EQUIPMENT, PIPING, WIRING, CONDUIT AND DUCTWORK.

7. MATERIALS RESULTING FROM THE DEMOLITION OPERATIONS SHALL NOT BE ALLOWED TO ACCUMULATE ON THE FLOORS AND ROOF SURFACES, EXTERIOR GRADE SURFACES OR OTHER PARTS OF THE PREMISES, AND SHALL BE PROMPTLY REMOVED AND DISPOSED OF

AWAY FROM THE PREMISES.

8. INCLUDE ALL DEMOLITION OF SYSTEMS AND COMPONENTS WHERE SYSTEMS SHALL BE REPLACED BY NEW WORK. REFER TO THE DRAWINGS AND SPECIFICATIONS FOR THE SCOPE OF NEW AND RECONNECTED WORK. THE INTENT OF THIS REQUIREMENT IS TO HAVE THE CONTRACTOR DISCONNECT, DEMOLISH AND REMOVE ALL EXPOSED AND CONCEALED WORK WHERE BEING REPLACED OR

CONNECTED TO THE NEW LAYOUTS.

9. COORDINATE ELECTRICAL POWER DISCONNECTION PRIOR TO DEMOLITION WITH ELECTRICAL CONTRACTOR.

10. PROTECT ALL HVAC WORK AND WORK OF OTHER TRADES WHICH IS TO REMAIN, FROM DAMAGE DURING DEMOLITION.

11. ALL PIPING AND DUCTWORK TO REMAIN SHALL HAVE ENDS TERMINATED IN A NEAT MANNER READY FOR CONNECTION OF NEW WORK.

ALL EXPOSED ENDS OF PIPING AND DUCTWORK SHALL BE CAPPED. SCREWED PIPING SHALL END ON A SCREWED JOINT. FLANGED PIPE SHALL END WITH A FLANGED JOINT. WELDED PIPING SHALL BE MECHANICALLY CUT, CLEANED OF BURRS AND A CAP WELDED TO THE

PIPE. DUCTWORK SHALL BE CAPPED WITH SHEET METAL CONNECTED TO THE DUCT TO REMAIN.

12. REMOVAL OF EQUIPMENT, PIPING AND DUCTWORK SHALL INCLUDE ALL HANGERS & SUPPORT ASSOCIATED WITH THE EQUIPMENT, PIPING AND DUCTWORK TO BE REMOVED.

GENERAL NOTES:

GENERAL DEMOLITION NOTES:

NOTE:

SYMBOLS AND ABBREVIATIONS LISTED IN THE TABLES ABOVE ARE TYPICAL FOR HVAC AIR AND WATER DISTRIBUTION SYSTEMS. NOT ALL OF LISTED SYMBOLS OR ABBREVIATIONS WERE USED IN THIS PROJECT.

EF EXHAUST FAN

LAB EXHAUST FANLE

AIR HANDLERAH

FFU FAN FILTER UNIT

CONDENSATE PUMPCP

SG STEAM GENERATOR

INCHES OF WATER GAUGEIN. W.G.

T

H

DP DIFFERENTIAL PRESSURE SENSOR

LPS

LPR

FFU-1

(400) FAN FILTER UNIT FFU-1, 600 CFM

INDUCTION UNITIU

PUMP CONDENSATEPC

SECONDARY WATER SUPPLYSWS

SECONDARY WATER RETURNSWR

DRAIND

LOW PRESSURE RETURNLPR

STEAM TRAP

TH COMBINED TEMPERATURE AND

HUMIDITY SENSORS

1-MH001

SYMBOLS, ABBREVIATIONS

AND GENERAL NOTES

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

C E

NY 10018

(E) 42x42 DN

(E) 42x42 UP 42x42

42x42 28x20

33x9

33x9

33x9

12x10 12x612x8 12x5

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

33x8

(E) IU (E) IU (E) IU (E) IU (E) IU (E) IU

(E) IU (E) IU

(E) 25x23

SUPPLY

(E) 25x25

SUPPLY

(E) 12x6 CR (150)

(E) 12x6 CR (100)

(E) 12x12 CR (250)

12x4

SWSSWS SWS SWS SWS

SWR SWR SWR SWR SWR SWR

SWS

(E) IU- EXISTING INDUCTION UNIT

(E) 1¼" MPR

(E) 6" SCR

(E) 8" SWR

(E) 6" CHWR

(E) LPR

(E) 6"HPS

(E) 6" CHWS

DISCONNECT AND REMOVE

STEAM FIN TUBE RADIATION AND

CONVECTOR COVER

DISCONNECT AND REMOVE

STEAM FIN TUBE RADIATION AND

CONVECTOR COVER

(E) FD

(E) FD

(E) FD

KEY MAP - BLDG 1 : 8TH FLOOR

8TH FLOOR DEMOLITION HVAC PART PLAN

1-MD101

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

FOR MECH ROOM LAYOUT

SEE DWG. MH--500

NOTE:

1. CONTRACTOR SHALL RELOCATE ALL EXISTING PIPING AND CONDUITS AS

REQUIRED TO INSTALL NEW WORK.

2. LINE OF PHASE 1 TEMPORARY CONSTRUCTION BARRIER SEE DWG. AD101.

3. REFER TO DWG. AS101 AND SPECIFICATIONS FOR PHASING SEQUENCE OF

DEMOLITION AND NEW WORK.

26x12

(E) 42x42 DN

(E) 42x42 UP 42x42

42x42 28x20

33x9

33x9

33x9

12x10 12x612x8 12x5

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

33x8

(E) IU

(E) IND

(E) 25x23

SUPPLY

(E) 25x25

SUPPLY

(E) 12x6 CR (150)

(E) 12x6 CR (100)

(E) 12x12 CR (250)

12x4

SWSSWS SWS SWS SWS

SWR SWR SWR SWR SWR SWR

SWS

(E) 1¼" MPR

(E) 6" SCR

(E) 8" SWR

(E) 6" CHWR

(E) LPR

(E) 6"HPS

(E) 6" CHWS

5 1/8"Ø

CAV-4

(300)

CD

(300)

FFU-3

(800)

16x10CAV-2 (800)16x10

24x1214x1212x8

12x8 7 1/8"Ø

FFU-4

(700)

14x10

CAV-3

(700)

14x10

12x10

CAV-1

(460)

FC

14x12

CAV-10

(160)

14x10

FFU-1

(460)

FFU-2

(460)

VD

8x8

CAV-6

(500)

VD

12x10

14x1212x8 VD

CR

(350)

14x10 14x10

12x8

8x8

8x812x8

12x8

8x8

8x8

CAV-12

(310)

12x8

CAV-7

(100)

CAV-8

(380)

CR

(380)

12x8

12x8 12x8 12x8

CAV-11

(700)

14x12

FC

FC

M

MOTORIZED RELIEF

AIR DAMPER

PLENUM 36x24x1210x8 DN 8x8 BR 6" AFF

RF-1

(1010) 14x12

14x10 DN 12x10 BR 6" AFF

CAV-9

(100)

8x8

CR

(100)

CR

(100)

(680) (620)

12" Ø ID, 14Ø OD STAINLESS STEEL

EXHAUST DUCT FOR CONTINUATION

OF SS DUCT SEE DWG MP-102

16x10 8x8

16x10 DN 14x10 BR 6" AFF

CAV-5

(350)

FFU-5

(500)

16x10 DN 14x10 BR

6" AFF

12x8

12x8

T

DP

DP

DP

DP

TH

TH

TH

DN

(E) FD

(E) FD

(E) FD

OFFICE

ANTE ROOM

STERILE

COMPOUNDING

STORAGE

(191.25 SQ. FT.)

37.3 AC/H

POSITIVE PRESSURE

+0.02" W.G.

(166 SQ. FT.), 57.8 AC/HR

POSITIVE PRESSURE

+.02" W.G.

(198 SQ. FT.), 11.4 AC/HR

NEGATIVE TO CORRIDOR

NEGATIVE PRESSURE

-0.01" W.G.

(54 SQ. FT.), 14.8 AC/HR

NEGATIVE PRESSURE

-0.01" W.G.

EXHAUST AIR

(1000 CFM)

EXHAUST AIR

(100 CFM)

TOTAL SUPPLY 2260 CFM

TOTAL EXHAUST 300 CFM

TOTAL RETURN 1510 CFM

ISO 7

CLEAN ROOM

RETURN AIR

(350 CFM)

SUPPLY AIR

(300 CFM)

TRANFER AIR

(50 CFM)

TRANSFER AIR

(100 CFM)

TRANSFER AIR

(200 CFM)

RETURN AIR

(500 CFM)

SUPPLY AIR

(700 CFM)

TRANSFER AIR

(200 CFM)

RECIRCULATION

AIR (700 CFM)

TRANSFER AIR

(200 CFM)

CHEMO BUFER ROOM

(155 SQ. FT.), 41.3 AC/HR

NEGATIVE PRESSURE

-0.02" W.G.

ISO 7

CLEAN ROOM

SUPPLYAIR

(800 CFM)

SUPPLY AIR

(460 CFM)

RECIRCULATION

AIR (500 CFM)

EXHAUST AIR

(100 CFM)

RETURN AIR

(160 CFM)

ISO 7

CLEAN ROOM

KEY MAP - BLDG 1 : 8TH FLOOR

8TH FLOOR NEW HVAC PART PLAN

1-MH101

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

(2) 14"Ø WELDED

12" ID & 14" OD

316 STAINLESS

STEEL EXHAUST

DUCT DOWN3'-7" HIGH

PARAPET

FENCE

CHEMO EF-1

ON 12" HIGH CURB

NOTE:

SCAFFOLDING AND SIDEWALK

SHED AND BRIDGING ARE

REQUIRED FOR INSTALLATION OF

THE EXTERIOR CONDUITS AND

DUCTWORK.

VFD'S

FENCE

14" EXHAUST DUCT

TO FAN ON ROOF

CHEMO EF-2

ON 12" HIGH CURB

VFD'S.

FOR LOCATION

OF VFD'S, SEE

ELEC. DWG.

1-EP102

14" EXHAUST DUCT

TO FAN ON ROOF

STAINLESS STEEL DUCT SUPPORT EVERY

10 FT. SEE DWG. MH-703 DETAIL 21.

NOTES:

1. LENGTH OF DUCT 322'

FROM FAN TO WINDOW

3'-7" HIGH

PARAPET

(2) 12"Ø ID, 14"Ø OD 316 STAINLESS STEEL

MANUFACTURED EXHAUST DUCT

STAINLESS STEEL DUCT SUPPORT EVERY

10 FT. SEE DWG. MH-703 DETAIL 21.

(2)12"Ø ID, 14"Ø OD 316 STAINLESS STEEL

MANUFACTURED EXHAUST DUCT

BYPASS AIR

PLENUM

12" ROOF

(TYPICAL)

CHEMO EF-2

ROOF

134.00

CHEMO EF-1

14" EXHAUST DUCT

TO FAN ON ROOF

14"Ø FENCE

ROOF HVAC PART PLAN & ELEVATION

FOR LAB EXHAUST

1-MH102J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

C E

NY 10018

KEY MAP - BLDG 1 : 8TH FLOOR

ROOF PART PLAN

SECTION PART PLAN

12"Ø

SWS

SWR

SWS

6" HIGH CONCRETE CURB PAINTED

SAFETY YELLOW, SEE A-5-200 FOR

DETAILS

AHU-1

NEW AIR CONDITIONING UNIT

AHU-1 TO BE INSTALLED

SD

INTEGRAL FACE AND BYPASS

STEAM COIL

CHILLED WATER COIL

HUMIDIFIER SECTION

FAN

FILTERS

(E) 42x42 DN

(E) 42x42 UP 42x42

42x42 28x20

33x9

33x9

33x9

12x10 12x612x8 12x5

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

12"Ø

33x8

(E) IU

(E) IU

(E) 25x25

SUPPLY

(E) 12x6 CR (150)

(E) 12x6 CR (100)

(E) 12x12 CR (250)

12x4

SWSSWS SWS SWS SWS

SWR SWR SWR SWR SWR SWR

SWS

(E) 1¼" MPR

(E) 6" SCR

(E) 8" SWR

(E) 6" CHWR

(E) LPR

(E) 6"HPS

(E) 6" CHWS

3/4"

3/4"

1¼"HWS&R

HWS&R

FROM HX

1" MPR

1" HPS

3/4"

RHC-4

RHC-2

RHC-3

RHC-1

1"HWS&R

1"

1½" CHWS&R

TRAP 1" MPC TO

FLUSH TANK

1½" CHWS&R

1" MPR

1" HPS

FOR MECH ROOM LAYOUT

OF PIPING AND DUCTWORK

SEE DWG. MH--500

FOR HVAC DUCTWORK IN

THIS AREA SEE MH-101

1"MPC

TRAP 1" MPC TO

FLUSH TANK

1½" CHWS&R

3/4"

3/4"

KEY MAP - BLDG 1 : 8TH FLOOR

8TH FLOOR HVAC PIPING PLAN

1-MP103

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

HVAC

SCHEDULES 1

1-MH401

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

HVAC

SCHEDULES 2

1-MH402

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

6" HIGH CONCRETE

CURB PAINTED SAFETY YELLOW,

SEE A-5-200 FOR DETAILSAC-1

NEW AIR CONDITIONING UNIT AC-1 TO BE INSTALLED

1" HPS

1" PC

2"Ø COPPER ATMOSPHERIC

STEAM TO HUMIDIFIER

STEAM EXCHANGE

STEAM GENERATOR SG-1,

WALL MOUNTED 3'-0 " AFF

20x10

20x10 DN TO UNIT W/FC

(2400)

CONDENSATE PUMP CP-1

ON 4" CONCRETE PAD

PAINTED YELLOW

SD

PRV VALVE ASSEMBLY

(10"-0" LONG 9'-0" AFF)

FLASH TANK WESSELS

FTA-6V 4 GALLONS VERTICAL

FLASH TANK OR EQUAL.

1/2" LPC

TO CP-1

1" LPC

1/2" LPS

40" x 52" x 28" D PLENUM

1" PC

1"Ø COOLING COIL CONDENSATE TO

DRAIN

1 1/2" LPS

1" DRAIN

1" CW

44"X12"X48"

PLENUM

8X24 AD

1" LPS

1" LPC

FOR CONTINUATION

SEE DWG. MH-101

CHILLED WATER COIL

1"Ø DRAIN FROM HUMIDIFIER

NEW LOUVER IN WINDOW OPENING BLANKED OFF

WITH INSULATED PANEL EXCEPT BOTTOM 34x24.

SEE ARCHITECTURAL DWG. FOR DETAILS

1" LPC

TO CP-1

1 1/2"

CHWS&R

BMS CONTROL PANEL

ELECTRICAL PANEL

NOTE:

1. CONTRACTOR SHALL RELOCATE ALL EXISTING PIPING AND CONDUITS AS

REQUIRED TO INSTALL NEW WORK.

2. LINE OF PHASE 1 TEMPORARY CONSTRUCTION BARRIER SEE DWG. AD101.

3. REFER TO DWG. AS101 AND SPECIFICATIONS FOR PHASING SEQUENCE OF

DEMOLITION AND NEW WORK.

DRIP

TRAP

1" MPC

TO FLASH

TANK

1/2" LPC

DRIP

TRAP

2" RELIEF VENT TO OUTSIDE

14x12

26x12

BM

S

1" PC

INTEGRAL FACE AND

BYPASS STEAM COIL

1" LPC

1" LPS

HX-1

ET-1

ABOVE

AS-1

1"

P-1 & P-2

1/2" LPC

1"

1 1/2"

HWS&R

1" MPC

FROM TRAP IN

CORRIDOR HPS

TO FLASH TANK

24x12 TO UNIT W/FC

10'-4"

2'

9'-0"

10'-2"

9'-8"

12" w x 48" H x 44" D PLENUM

20x10 DN TO UNIT W/FC

52" x 28" x 40" D PLENUM

4" HIGH CONCRETE CURB

PAINTED SAFETY YELLOW, SEE

ARCHITECTURAL FOR DETAILS

8"x24"ACCESS DOOR

MIXING PLENUM

RA DAMPER

OA DAMPER

FILTERS

INTERNAL FACE & BYPASS STEAM COIL

24x36 OAI LOUVER IN

THE WINDOW OPENING

CHILLED WATER COIL HUMIDIFIER SECTION

FAN

NEW LOUVER IN WINDOW OPENING BLANKED OFF

WITH INSULATED PANEL EXCEPT BOTTOM 24x36

ACCESS

SD

x

OA AIRFLOW SENSOR

ACCESS ACCESS

ACCESS

ACCESS

STEAM EXCHANGE

STEAM GENERATOR GS-1,

WALL MOUNTED 3'-0" AFF

CONDENSATE PUMP CP-1

ON 4" CONCRETE PAD

PAINTED YELLOW

CHILLED WATER COIL

AC-1

(2400)

BM

S

INTEGRAL FACE AND

BYPASS STEAM COIL

HUMIDIFIER SECTION

BMS CONTROL PANEL

ELECTRICAL PANEL

FAN

FILTERS

ACCESS AREAS

FLASH

TANK

8TH FLOOR NEW WORK

HVAC MER PART PLAN AND SECTION

1-MH500

J.O. N.R.

0 1' 2' 4'

SCALE: 1/2" = 1'-0"

0 1' 2' 4'

SCALE: 1/2" = 1'-0"

8TH FLOOR NEW WORK HVAC MER SECTION A-A

0 1' 2' 4'

SCALE: 1/2" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

C E

NY 10018

8TH FLOOR NEW WORK HVAC MER PART PLAN

MER EQUIPMENT ACCESS PART PLAN

STEAM SUPPLY

SHUT-OFF VALVE

CONDENSATE RETURN

GATE VALVE (TYP.)

CHECK VALVE

STEAM TRAP TEST TEE

FLOAT & THERMOSTATIC TRAP

(TWICE COIL CAPACITY)

Y-STRAINER W/BLOW-OFF VALVE

CAP

6" MINIMUM

FULL SIZE COIL TAPPING

UNION OR FLANGE

(AS REQUIRED TYP.)

VACUUM BREAKER

STEAM COIL

CONTROL

VALVE

BYPASS

LINE

GLOBE VALVE

HVAC DETAILS 1

1-MH701

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

HVAC DETAILS 2

1-MH702

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F

N Y

HVAC DETAILS 3

1-MH703

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

SSO-1

WATSON MCDANIEL 1"

(20mm)

HD REGULATOR WITH

SOLENOID PILOT

MPS

45 PSIG

LPS

15 PSI

PS-2

CONTROL ASSOCIATES

ALARM 2-POINT ALARM

PANEL 120VAC

NTS

4) ALL VALVES, REGULATORS & CONTROLS SHALL BE PURCHASED FROM A SINGLE ENTITY

AND THE AUTHORIZED REPRESENTATIVE;

CONTROL ASSOCIATES, INC.

(201) 934-5001 20 COMMERCE DRIVE ALLENDALE, NJ 07401

GENERAL NOTES:

1) REGULATOR BODY MATERIAL TO BE CONSTRUCTED OF DUCTILE IRON.

2) REGULATOR PILOT TO HAVE INTEGRAL STRAINER WITH BLOW DOWN CAPABILITIES.

3) REGULATOR DIAPHRAGM TO BE CONSTRUCTED OF PHOSPHOR BRONZE MATERIAL.

SOV-1

1" (25mm)

PS-1

HIGH/LOW

SOV-3

1-1/2"

BPV-1

3/4"

STEAM PRV SCHEDULE

TAG

INLET - OUTLET

PRESSURE

(PSIG) (KPA)

FLOW RATE

(#/HR) KG/HR

SIZE

(INCHES) (MM)

DESCRIPTION

END

CONNECTIONS

SOV-1

45-45/0 (300)

3/4 (20)

POWELL FORGED STEEL

GATE VALVE

NPT

SSO-1

45-45/0 (300)

3/4 (20)

WATSON MCDANIEL HD

REGULATOR WITH PS

SOLENOID PILOT

NPT

SOV-2

45-45/0 (300)

3/4 (20)

POWELL FORGED STEEL

GATE VALVE

NPT

PRV-1

45-45/0 (300) 300 (136) 3/4 (20)

WATSON MCDANIEL HD

REGULATOR WITH PP

PRESSURE PILOT

NPT

SOV-3

15-15/0 (100)

1 (25)

POWELL FORGED STEEL

GATE VALVE NPT

BPV-1 MANUAL -

3/4 (20)

POWELL FORGED STEEL

GLOBE VALVE NPT

PS-1

2 STAGE PRESSURE

SWITCH WIRED TO ALARM

PANEL

PS-2

MANUAL RESET

PRESSURE SWITCH

OPERATES SSO

PRV-1

WATSON MCDANIEL 3/4" (20mm)

HD REGULATOR WITH

PRESSURE PILOT

1" (25mm) 1" (25mm)

1-1/2" (38mm)

3/4" (20mm)3/4" (20mm)

SOV-2

1" (25mm)

VALVE

STEAM

TRAP

UNION STRAINER

10'-0"

PRESSURE

REGULATING VALVE

BY-PASS VALVE

SAFETY SHUT-OFF

VALVE

D

D

19.540

12" FLANGE ADAPTER

FILTER

47.625" FILTER OR 23.8" FILTER

12" FLEXIBLE DUCT TO HARD DUCT

D

(20mm)

(38mm)

(300 KPA)

(100 KPA)

(305cm)

(496 mm)

(300 mm)

(300 mm)

(1220 mm) OR (605 mm)

HVAC DETAILS 4

1-MH704

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Architectural Design Consultant:

Project Director

5 FEB 2019 MC TBRevisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

TYPICAL TRANSVERSE CABLE BRACING

FOR DUCTWORK

THE VMC GROUP SPEC ISOLATOR TYPE C, D, E

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-120

TYPICAL TRANSVERSE & LONGITUDINAL CABLE BRACING

FOR DUCTWORK

THE VMC GROUP SPEC ISOLATOR TYPE C, D, E

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-122

TYPICAL TRANSVERSE SINGLE ARM BRACE

FOR CLEVIS -HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-210

TYPICAL TRANSVERSE SINGLE ARM BRACE

FOR DUCTWORK

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-212

TYPICAL TRANSVERSE AND LONGITUDINAL CABLE BRACING

FOR INLINE FANS

THE VMC GROUP SPEC ISOLATOR TYPE C, D, E

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-132

TYPICAL TRANSVERSE & LONGITUDINAL

SINGLE ARM BRACE FOR DUCTWORK

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-214

TYPICAL TRANSVERSE SINGLE ARM BRACE

FOR TRAPEZE-HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-216

TYPICAL TRANSVERSE CABLE BRACING

FOR CLEVIS HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-110

TYPICAL CALCULATION SHEET HOUSEKEEPING PAD

REINFORCEMENT

SGMEC-800

TYPICAL ATTACHMENT OF RIGID SEISMIC BRACING TO

PIPE OR CLEVIS USING BEAM CLAMP

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-290

Floor Line

Pad Height

6"

Pad outline

Standard Floor

Reinforcing Rebar

2" min.

3"

"Z" bars tie to standard floor reinforcing rebar

3"

Pad Height

Embedment

Floor Line

Hilti Kwikbolt II concrete expansion anchor or equivalent

Length

22.5"

6"

6"

Width

15"

33.75"

#5 reinforcing rebar spaced at 12" o.c.e.w.*

Length = Per Project Req. Anchor size Embedment

Width = Per Project Req. 5/8" anchor 4"

Pad Height = Per Project Req. 3/4" anchor 4-3/4"

==> 3/4" dia. concrete expansion anchors or #6 rebar "Z" bars

==> 5/8" dia. concrete expansion anchors or #5 rebar "Z" bars

Notes:

1) All housekeeping pad reinforcing should conform to ACI Standards for minimum area and concrete coverage.

2) Minimum concrete strength of 3000 psi.

TYPICAL HOUSEKEEPING PAD TIE-DOWN REQUIREMENTS

6"

Pad outline

*O.C.E.W = ON CENTER EACH WAY

31 32

33 34 35 36 37

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

C E

NY 10018

HVAC DETAILS 5

1-MH705

J.O. N.R.

TYPICAL TRANSVERSE & LONGITUDINAL CABLE BRACING

FOR CLEVIS HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-112

TYPICAL TRANSVERSE CABLE BRACING FOR

TRAPEZE -HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-114

TYPICAL TRANSVERSE& LONGITUDINAL CABLE BRACING

FOR TRAPEZE HUNG PIPING & CONDUIT

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-116

TYPICAL INSTALLATION OF FLOOR-MOUNTED

EQUIPMENT

THE VMC GROUP SPEC ISOLATOR TYPE B

THE VMC GROUP SPEC RESTRAINT TYPE I

DRAWING SGMEC-410

TYPICAL SEISMIC ATTACHMENT OF MECHANICAL EQUIPMENT

TO HOUSEKEEPING PAD OR STRUCTURAL DECK

THE VMC GROUP SPEC RESTRAINT TYPE IV

DRAWING SGMEC-910

TYPICAL ATTACHMENT OF RIGID SEISMIC BRACING TO

STRUCTURE USING BEAM CLAMP

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-292

SEISMIC ROD BRACING CLAMP

THE VMC GROUP SPEC RESTRAIN

TYPE V, VI

DRAWING SGMEC-190

TYPICAL SINGLE ARM BRACE ATTACHMENT

TO CONCRETE STRUCTURE

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-296

38 39 40 41

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

C E

NY 10018

HVAC DETAILS 6

1-MH706

OPTION 1

OPTION 2

OPTION 2

OPTION 1

OPTION 1

OPTION 2

TYPICAL SEISMIC CABLE RESTRAINT ATTACHMENT

OF TYPE SCR TO STRUCTURE

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-194

TYPICAL SINGLE ARM BRACE

ATTACHMENT TO STRUCTURE

THE VMC GROUP SPEC RESTRAINT TYPE VI

DRAWING SGMEC-294

TYPICAL SEISMIC CABLE RESTRAINT ATTACHMENT

TO CONCRETE STRUCTURE

THE VMC GROUP SPEC RESTRAINT TYPE V

DRAWING SGMEC-192

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

C E

NY 10018

HVAC DETAILS 7

1-MH707

SYMBOLS AND ABBREVIATIONS

AI ANALOG INPUT

AO ANALOG OUTPUT

DI DIGITAL INPUT

DO DIGITAL OUTPUT

TEMPERATURE SENSORT

HUMIDITY SENSORH

DIFFERENTIAL PRESSURE SENSORDP

IFBD INTEGRAL FACE AND BYPASS DAMPER

MOTORISED VALVE

M

FREEZE STATFS

SD SMOKE DETECTOR

START / STOPS/S

PRESSURE SENSORP

SG CLEAN STEAM GENERATOR

CURRENT SENSORC/S

HIGH LIMIT HUMIDISTATHLH

RF-1 RETURN FAN

SF-1 SUPPLY FAM

LE-1 LAB EXHAUST FAN

DIFFERENTIAL PRESSURE SENSORDP

AIR FLOW SWITCHAFS

M

MOTORIZED DAMPER

HC-1 HEATING COIL

CC-1 COOLING COIL

PF-1 PRE - FILTER

AF-1 AFTER FILTER

S/S C/S

DIDO

LAB EXHAUST FAN

CHEMO EF-2

CONTROL DIAGRAM

CHEMO EF-2

S/S C/S

DIDO

AC-RF-1

T5 H5

AI AI

M RA

EA

M

RA

OA

M

HC-1PF-1

DP

AF-1

DP

MIFBD

LPS

M P

T2 FS

CC-1

M

CH

W R

CH

W

S

T T

AF

SG-1

M

S/S C/S

DO DI

SF-1

T4 HLH

SA

POWERED AND WIRED TO FA SYSTEM FOR AHU SHUTDOWN

SD

AO AO AO AI AI AO AOAI AI DI AI AIAO DI AO AI DI

CP-1

C/S

DI AI

LOW PRESSURE STEAM CONDENSATE PUMP CP-1

CONTROL DIAGRAM

TH DP FFU

VFD VARIABLE FREQUENCY DRIVE

SCR SILICON CONTROLLED RECTIFIER

P

CHEMO

ROOM

T

AI

SPACE TEMPERATURE SENSOR

(TYPICAL)

AF AIR FLOW SENSOR

CAV CONSTANT AIR VOLUME BOX

AF

T

AIAI HWR

CAV

CAV BOX DIAGRAM

(SUPPLY ONLY)

(SUPPLY ONLY)

LPS

HOT WATER HEATING COIL

(TYPICAL FOR SUPPLY)

T1

AI AI

T3

AI

M

AO

M

AOHWS

T

H

EXISTING OUTSIDE AIR SENSOR

V-1 V-2

V-3

V-4

T T

AC-1

Outside Air

O.A. Damper

Filter AF-1

Mixed Air T1

Return Air Fan RF-1

Heating Coil Steam Valve V1

Steam Pressure

Freezstat

Cooling Coil Chilled Water Valve V2

Chilled Water Temperature Supply Return

Cooling Coil Discharge Temperature T3

Steam Generator Contrl Valve V3

Discharge Air T4

Return Air T5, H5

CAV Boxes (12)

Cav Box Reheat Coil (Supply Only) (4)

Hot Water Supply & Return

Room Space Temperatures (4)

Room Humidity (3)

Filter PF-1

Return Air Damper

Relief Air Damper

Heating Coil Discharge Temperature T2

Fan Filter Units (5)

Differential Pressure Sensors (4)

NOTES:

PROVIDE HARD WIRED POINTS AS SCHEDULED AND SHOWN ON CONTROL DIAGRAMS.

REQUIRED POINTS ARE NOT LIMITED TO THOSE INCLUDED IN THE SUMMARY TABLE.

ADDITIONAL POINTS MAY BE INDICATED IN THE CONTROL DIAGRAM OR SEQUENCE OF OPERATION.

S/S C/S

DIDO

STANDBY

Lab Exhaust Fan & Standby (2)

Condensate Pump

Global Points

AIR HANDLING UNIT AC-1 CONTROL DIAGRAM

Supply duct RH High Limit

DI

AF

AI

COMBINED TEMPERATURE AND HUMIDITY SENSORTH

NOTES:

ALL CONTROL POINTS FOR AC-60, AC-1RF, AND EF-1 SHALL BE CONNECTED

TO FACILITY BMS.

DP

BACNET CONNECTION

TH DP TH

ANTE ROOM

(4)

THESE POINTS PROVIDED BY TERRA MODULAR CLEAN ROOM MANUFACTURER

T

OFFICE

AI

STORAGE

STERILE

COMPOUNDING

ROOM

HX-1

AI

T

T

AS

ET-1

S/S C/S

M

P

DOAO AI DI

LPS HWS

P-1

HWR

HOT WATER HEATER EXCHANGER AND PUMPS

AI AI

Heat Exchanger HX-1

Heat Exchanger Pump P-1 & P-2

P-2

S/S C/S

DO DI

DP

LPC

AI

SEQUENCE OF OPERATION

ALL AUTOMATIC TEMPERATURE CONTROLS SHALL BE PROVIDED THROUGH THE BMS. ALL SETPOINTS SHALL BE FULLY ADJUSTABLE THROUGH THE BMS.

START OPERATION

ON A COMMAND FROM THE BMS, THE OUTSIDE AIR DAMPER OF AC-1 SHALL OPEN TO THE MINIMUM POSITION, THE RETURN AIR DAMPER SHALL OPEN, THE RELIEF AIR DAMPER SHALL REMAIN CLOSED, AIR HANDLER FAN AC-1 SHALL START, AND THE RETURN AIR FAN AC-RF-1 SHALL START. THE OUTSIDE AIRFLOW ENTERING THE AIR HANDLER THROUGH THE OUTSIDE AIR DAMPER SHALL BE MEASURED. THE LAB EXHAUST FAN CHEMO EF-1 AND EF-2 SHALL RUN CONTINUOUSLY. IF THE FIRST LAB EXHAUST DOES NOT START OR STOPS OPERATINGTHE STANDBY LAB EXHAUST FAN SHALL START. THE MAIN AND STANDBY

LAB EXHAUST FAN SHALL ALTERNATE EVERY 168 HOURS (ADJUSTABLE) OF OPERATION.

HEATING OPERATION

WHEN THE OUTSIDE AIR TEMPERATURE IS LESS THAN 32 F (ADJUSTABLE), THE PREHEAT STEAM CONTROL VALVE SHOULD BE OPEN, AND THE

INTEGRAL FACE AND BYPASS DAMPER ON THE STEAM COIL SHALL MODULATE TO MAINTAIN THE DISCHARGE SETPOINT OF 52 F (ADJUSTABLE).

WHEN THE OUTSIDE AIR TEMPERATURE IS ABOVE 32 F (ADJUSTABLE), AND HEATING IS REQUIRED, THE FACE AND BYPASS DAMPER SHALL BE

OPEN TO THE PREHEAT COIL FACE, AND THE STEAM CONTROL VALVE SHALL MODULATE TO MAINTAIN THE DISCHARGE SETPOINT OF 52 F

(ADJUSTABLE). IF THE FREEZESTAT SENSOR TEMPERATURE IS BELOW 32 F (ADJUSTABLE), THE AIR HANDLER SHALL SHUT SHALL DOWN, THE

OUTSIDE AIR DAMPER SHALL CLOSE, AND THE RETURN FAN SHALL SHUT DOWN.

HUMIDIFIER OPERATION

THE HUMIDIFIER OPERATION SHALL BE ENABLED WHENEVER THE OUTSIDE AIR TEMPERATURE IS BELOW 60 F (ADJUSTABLE). THE HUMIDIFIER CLEAN STEAM GENERATOR STEAM CONTROL VALVE SHALL MODULATE STEAM FLOW TO MAINTAIN A MINIMUM RELATIVE HUMIDITY OF 30% (ADJUSTABLE) AND A MAXIMUM RELATIVE HUMIDITY OF 50 %( ADJUSTABLE) IN THE CHEMO BUFFER ROOM, THE STERILE COMPOUNDING ROOM, AND THE ANTE ROOM. IF THE HIGH LEVEL HUMIDITY SENSOR IN THE SUPPLY DUCT IS OVER 90% RELATIVE HUMIDITY, OR THERE IS NO AIRFLOW, THE STEAM GENERATOR CONTROL VALVE

SHALL SHUT DOWN.

COOLING OPERATION

WHEN THE OUTSIDE AIR TEMPERATURE IS GREATER THAN 52 F (ADJUSTABLE), AND CHILLED WATER IA AVAILABLE COOLING SHALL BE PROVIDED BY MODULATING THE COOLING COIL CHILLED WATER CONTROL VALVE TO MAINTAIN A DISCHARGE TEMPERATURE OF 52 F (ADJUSTABLE).

ECONOMIZER CYCLE

WHEN THE OUTSIDE AIR TEMPERATURE IS HIGHER THAN 32 F (ADJUSTABLE) BUT LOWER THAN 52 F (ADJUSTABLE), THE OUTSIDE AIR, RETURN AIR AND RELIEF DAMPERS SHALL MODULATE TO MAINTAIN A DISCHARGE AIR TEMPERATURE OF 52 F (ADJUSTABLE). WHEN THE OUTSIDE AIR TEMPERATURE IS BETWEEN 52 F (ADJUSTABLE) AND 70 F (ADJUSTABLE), THE OUTSIDE AIR DAMPER SHALL BE OPEN, THE RETURN AIR DAMPER SHALL BE CLOSED AND THE RELIEF AIR DAMPER OPEN. WHEN THE OUTSIDE AIR TEMPERATURE IS ABOVE 70 F (ADJUSTABLE), THE OUTSIDE AIR DAMPER SHALL BE CLOSED TO MINIMUM

POSITION.

CAV BOXES WITH REHEAT

THE CAV BOXES SHALL MODULATE TO MAINTAIN A FIXED AIR FLOW RATE. THE HOT WATER REHEAT VALVES SHALL MODULATE TO MAINTAIN THE ROOM TEMPERATURES OF 68 F (ADJUSTABLE) IN THE CHEMO BUFFER ROOM, THE STERILE COMPOUNDING ROOM, AND THE ANTE ROOM. THE HOT WATER REHEAT VALVES SHALL MODULATE TO MAINTAIN A TEMPERATURE OF BETWEEN 70 F (ADJUSTABLE) IN THE WINTER AND 75 F (ADJUSTABLE) IN THE SUMMER IN THE OFFICE. THE BAS SHALL MONITOR THE AIRFLOW OF ALL CAV BOXES AND THE SUPPLY AND RETURN WATER TEMPERATURES TO THE REHEAT COILS AND

ALARM WHEN AIRFLOWS OR WATER TEMPERATURES VARY SIGNIFICANTLY FROM SETPOINT.

FAN FILTER UNITS (FFUS), TEMPERATURE AND HUMIDITY SENSOR AND DIFFERENTIAL PRESSURE SENSORS

THE BAS SHALL MONITOR ALL FFU AIRFLOWS, ROOM TEMPERATURE AND RELATIVE HUMIDITIES, AND DIFFERENTIAL STATIC PRESSURE IN THE CHEMO ROOM, STERILE COMPOUNDING ROOM, AND THE ANTE ROOM AND ALARM WHEN AIRFLOW, TEMPERATURE, RELATIVE HUMIDITY AND STATIC PRESSURE VARY

SIGNIFICANTLY FROM SETPOINT.

SMOKE DETECTOR

THE SMOKE DETECTOR IN THE SUPPLY DUCT SHOULD BE WIRED TO THE FIRE ALARM SYSTEM. THE FIRE ALARM SYSTEM WILL SHUT DOWN THE AIR HANDLER

HOT WATER REHEAT WATER SYSTEM

WHEN THE HOT WATER REHEAT WATER SYSTEM IS ENABLED ,THE HOT WATER PUMP P-1 SHALL RUN CONTINUOUSLY.THE STEAM CONTROL VALVE FOR THE BRAZED PLATE HEAT EXCHANGER HX-1 SHALL MODULATE TO MAINTAIN A SUPPLY WATER TEMPERATURE OF 180 F(ADJUSTABLE). IF PUMP P-1 FAILS, THE STANDBY PUMP P-2 SHALL START AND RUN CONTINUOUSLY. THE MAIN PUMP AND THE STANDBY PUMP SHALL ALTERNATE EVERY 168 HOURS (ADJUSTABLE)

OF OPERATION.

S/S C/S

DIDO

LAB EXHAUST FAN

CHEMO EF-1

CONTROL DIAGRAM

CHEMO EF-1

S/S C/S

DIDO

STANDBY

HVAC CONTROL

DIAGRAM

1-MI800

J.O. N.R.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% CDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Consultant:

Project Director

05 Feb 2019Revisions: Date:

630A4-17-490

800 POLY PLACE, BROOKLYN, NY

RENOVATE ONCOLOGY

PHARMACY

MICHAEL AVRAMIDES ARCHITECT

319 E 50TH STREET, STUDIO E

NEW YORK, NY 10022

T:917.855.8111

ONSULTING NGINEERS

KALLEN & LEMELSON, LLP

P: (212) 643-9898 F: (212) 643-2332

IGHTH VENUE, TH LOOR, EW ORK, 520 E

A 17 F N Y

Sheets and Views
M001
MD-101
MH-101
MH102
MP-103
MH401
MH402
MH500
MH701
MH702
MH703
MH704
MH705
MH706
MH707
MI800