About this file

36C24219B0017 Drawings File 2 of 2 a 561A4-17-101 a Generator Upgrade and Transfer Switches Replacements.pdf

View the file

Other files

File Type Posted
36C24219C0122-000.docx DOCX document
36C24219B0017-0002001.pdf PDF
36C24219B0017-0002000.docx DOCX document
36C24219B0017-0001000.docx DOCX document
36C24219B0017-002.pdf PDF
36C24219B0017-003.pdf PDF
36C24219B0017-001.docx DOCX document
36C24219B0017-005.pdf PDF
36C24219B0017-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-115

A

F i l e

P a t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 53 BASEMENT ROOM W6 DEMO

AND NEW WORK PLANS BID (ALTERNATE 1)

D.L.E B.V.N

T T

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-116

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 54 BASEMENT ROOM 7 & 9

DEMO AND NEW WORK PLANS 54

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-117

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 57 BASEMENT ROOM 7A DEMO

AND NEW WORK PLANS

D.L.E. C.E.T.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-118

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 57 BASEMENT ROOM 7A DEMO

AND NEW WORK PLANS (BID ALTERNATE 1)

BUILDING 135 FIRST FLOOR

DEMO AND NEW WORK PLANS 135

D.L.E B.V.N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-119

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 135 FIRST FLOOR DEMO AND

NEW WORK PLANS (BID ALTERNATE 1) 135

D.L.E B.V.N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-120

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

BUILDING 141 MCC ROOM

DEMO AND NEW WORK PLANS 141

D.L.E B.V.N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-121

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

BUILDING 141 GENERATOR

REPLACEMENT PLANS 141

D.L.E B.V.N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-122

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-123

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

D.L.E B.V.N

BUILDING 143 FIRST FLOOR

DEMO PLANS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-124

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 143 FIRST FLOOR

NEW WORK PLANS 143

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-125

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 143 FIRST FLOOR NEW

WORK PLANS (BID ALTERNATE 1) 143

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-126

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

DEMO AND TEMPORARY

ONE-LINE DIAGRAMS

D.L.E C.E.T

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-127

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

DEMO AND TEMPORARY

ONE-LINE DIAGRAMS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-301

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

DETAIL SHEET 1

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EP-302

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

DETAIL SHEET 2

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EK-101

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 57 ELECTRICAL ROOM

EXPANSION

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EK-102

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 135 NEW ELECTRICAL ROOM

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

EK-103

A

F i t h

P

M

CONSTRUCTION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERATOR TRANSFER

SWITCHES UPGRADE

LYONS CAMPUS, 151 KNOLLCRAFT RD

561A4-17-101

Project Director

07/24/2018Revisions: Date:

CONSTRUCTION

DOCUMENTS

BUILDING 135 NEW SOILED LINEN ROOM

561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE 1 of XX GI-01 - COVER SHEET-GI-01
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE 2 of XX CS-100 - CAMPUS SITE PLAN-CS-100
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE 3 of XX EP-001 - SYMBOLS AND ABBREVIATIONS-EP-001
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-101 - 1 - DEMO & NEW WORK-EP-101
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-102 - 2 - DEMO & NEW WORK-EP-102
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-103 - 4 - DEMO & NEW WORK-EP-103
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-104 - 7 - TAP BOX-EP-104
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-105 - 7 - DEMO & NEW WORK-EP-105
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-106 - 7 - BID DEDUCT 1-EP-106
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-107 - 8 - DEMO & NEW WORK-EP-107
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-108 - 9 - DEMO & NEW WORK-EP-108
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-109 - 10 - DEMO & NEW WORK-EP-109
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-110 - 10 - BID DEDUCT 1-EP-110
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-111 - 13 - DEMO & NEW WORK-EP-111
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-112 - 14 - DEMO & NEW WORK-EP-112
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-113 - 14 - BID DEDUCT 1-EP-113
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-114 - 53 - DEMO & NEW WORK-EP-114
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-115 - 53 - BID DEDUCT 1-EP-115
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-116 - 54 - DEMO & NEW WORK-EP-116
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-117 - 57 - DEMO & NEW WORK-EP-117
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-118 - 57 - BID DEDUCT 1-EP-118
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-119 - 135 - FIRST FLOOR ALL-EP-119
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-120 - 135 - FIRST FLOOR ALL-EP-120
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-121 - 141 - BUILDING-EP-121
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-122 - 141 - GEN-EP-122
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-123 - 143 - FIRST NORTH-EP-123
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-124 - 143 - FIRST NORTH-EP-124
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-125 - 143 - BID DEDUCT 1-EP-125
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-126 - temporary 1-EP-126
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-127 - temporary 2-EP-127
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-301 - DETAILS-EP-301
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE E-302 - DETAILS-EP-302
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE EK-101 - 57 ELECTRICAL ROOM EXPANSION-EK-101
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE EK-102 - 135 NEW ELECTRICAL ROOM-EK-102
561A4-17-101 GENERATOR TRANSFER SWITCHES UPGRADE EK-103 - 135 NEW SOILED LINEN ROOM-EK-103

File details come from the government source that posted it.