36C24219B0012-0001000.docx

DOCX document 21 KB Posted

Attached to
Replace Gym Floor in Bldg. 26 at Montrose VAMC
Solicitation number
36C24219B0012
Issued by

About this file

36C24219B0012 0001 36C24219B0012 0001.docx

View the file

Other files

File Type Posted
36C24219C0119-000.docx DOCX document
36C24219B0012-0001001.pdf PDF
36C24219B0012-0001002.pdf PDF
36C24219B0012-003.pdf PDF
36C24219B0012-001.docx DOCX document
36C24219B0012-004.pdf PDF
36C24219B0012-006.pdf PDF
36C24219B0012-005.pdf PDF
36C24219B0012-002.pdf PDF
36C24219B0012-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-05-2019 620-18-211 Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center 1094 Albany Post Road Montrose

NY

10548-1454 Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Network Acquisition & Logistics(10N3NAL) 1094 Albany Post Road Montrose

NY

10548-1454 To all Offerors/Bidders

36C24219B0012 03-05-2019

X X X

X The purpose of this amendment is to:

A. Incorporate the MFMA Guidelines into the specification.

B. Incorporate Questions and Answers dated March 5, 2019 C. All other terms and conditions remain unchanged.

Christina Katz Questions and Answers – Renovate Gym Floor B. 26 – 36C24219B0012 – March 5, 2019

The current system in the gym appears to be ¾” maple on ¾” 1x6 pine subbase which sits on “sleepers” which is placed and poured into place in a layer of “Cinder fill” or concrete grout which would be on top of the concrete slab.

1) If this is the current existing condition of the current gym floor, has the layer of cinder fill been tested for asbestos? This layer above the concrete slab typically contains asbestos, and requires asbestos abatement. If not, please advise if testing and asbestos abatement should be included in contractor pricing.

Multiple samples of the gymnasium floor underlayment paper and concrete subfloor waterproofing were tested for asbestos none was detected.

2) On drawing title “Gym floor installation detail” drawing 4 detail 1-IF-1, appears to show the new system going directly onto the existing concrete slab. Further- Drawing AD-001 “Gym Floor replacement Site Plan” Calls for “Demo Approx 8800 Sq Ft existing gymnasium sport tile, hardwood flooring & sub-base wood flooring and install new….”

a) If the existing system consists of the above mentioned scenario of the existing floor layers sitting on sleepers on a cinder or grout fill slab above the concrete slab; Is the contractor to include removing all layers down to the concrete slab?

1. All flooring is to be removed to the concrete slab. It is not known if there is existing cinder or grout fill slab above the concrete slab; unforeseen circumstances will be addressed as necessary.

b) If answer to question 2-a- is YES, has the thickness of the sleepers and cinder slab or other sub base been taken into account on the design for the new system? There is a possibility, we believe the design shown /“new” elevation “Gym floor installation detail” drawing 4 detail 1-IF-1 will match the elevation of the existing floor once all floor subbase layers have been removed.

Not Applicable

c) If answer to question 2-a- is YES, please provide thickness of all subbase layers including the sleepers and cinder fill slab. It is needed to provide a fully responsive bid. If answer is No to question 2-a, please provide thickness of all existing layers, and a more descriptive scope of existing layers.

NOT APPLICABLE

1.

3) Based on past experience with similar gym floor conditions, it is possible the pine subbase layer is perfectly usable. If so it would be a substantial cost saving to the VA to leave this layer down, and build up from this layer, while achieving the same quality end product. It is our recommendation to the VA to include an alternate price in the bid; If the pine subbase is usable with up to 10% needing repair, to build up a new system from this pine layer up.

1. The condition of the pine subbase layer may be in usable condition, however, the underlying existing vapor retarder does not meet the performance level of the required 6 mil vapor retarder, and the removal and reinstallation of the pine subbase may lose integrity.

1.

4) The specification calls for the manufacturer Robbins, will other manufacturers and floor systems be acceptable if they meet or exceed specification?

1.

1. Detail 1 on Detail Sheet has leaders that include “ROBBINS…OR SIMILAR”

5) A black membrane is below the floor which coats the concrete below. Has this been tested for asbestos?

Multiple samples of the gymnasium floor underlayment paper and concrete subfloor waterproofing were tested for asbestos none was detected.

6)Humidity is an obvious factor in current floor failure, how will this be mitigated in the new floor application?

Considering its age of the existing gymnasium wooden flooring, 79 years, it is in good condition. The recently installed synthetic gymnasium floor experienced premature failure primarily due to exposure to moisture. This most likely was attributed to leaks in the roof, which has since been replaced.

7) Request clarification. The existing system is about 3 1/2" thick and the one on the drawing is 1 7/8" thick. Can you confirm that this spec is accurate?

On 3/1/2019 at approximately 3:10 pm, measurement of existing floor thickness’ was made:

1. Hardwood Floor System thickness: 1 15/16”

1. Synthetic Floor thickness: 1/2"

Proposed Gym Floor Installation Thickness:

1. 7/16” Maple

1. 2 ea 1/2” or 7/16” = 1” or 7/8”

1. 3/4” Biopad = 2 1/16” or 1 15/16”

See attached document: 000110 Table of Contents R1.

See attached document: Floor-Spec-MFMA.