About this file

36C24218U0068 P09 - Revised SOW.docx

View the file

Other files

File Type Posted
36C24218U0068-000.docx DOCX document
36C24218U0068-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

ANNUAL MAINTENANCE OF COOLING SYSTEMS

CANANDAIGUA VA MEDICAL CENTER

The Canandaigua VA Medical Center located at 400 Fort Hill Avenue, Canandaigua, New York has a requirement for the annual maintenance of the cooling systems. The contractor shall provide all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified. Contract includes required maintenance for miscellaneous cooling systems.

Scope of Work (SOW):

Contractor to provide all material, labor, equipment and supervision necessary to perform the Annual and seasonal maintenance of the various cooling systems located at the Canandaigua VAMC and identified in this document (See equipment list). Services performed will meet or exceed manufacturer’s recommendations to assure proper operation of cooling systems. Contractor must have access to any proprietary service manuals and support equipment/tools to appropriately diagnose operation of systems. Period of Performance shall be from October 1, 2018 – September 30, 2019 with a provision of four option years.

All work associated within this Statement of Work shall be completed during normal business hours, unless otherwise noted. Normal business hours are typically 8 am to 5 pm Monday through Friday, exclusive of Federal Holidays.

Federal Holidays observed by the VAMC are:

New Year’s DayLabor Day
Martin Luther King DayColumbus Day
President’s DayVeterans Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1. Equipment List:

Equipment
Manufacturer
Bldg
Model #
Serial #
220T Absorption Chiller (EE47056)
TRANE
7/8
ABSC022ALK01AAAD
L94J09176
50T SCROLL CHILLER (EE125697)
TRANE
1
CGAFC50EABA1000DO
C98M00409M
50T SCROLL CHILLER (EE128536)
TRANE
34
CGAFC50EABA1000DO
C98M00408M
30T RTU (EE67523)
TRANE
2
TCD360AE0C1A6EC5
J98A90169
140T AC CHILLER (EE136711)
TRANE
3
RTAC1404UDONUAFNN
U02M07542
140T AC CHILLER (EE136710)
TRANE
9
RTAC1404UDONUAFNN
U02M07541
15T CONDENSING UNIT AND AHU (EE49074)
TRANE
1
TTA180B300CC
P025N08AH
7 ½ T CONDENSING UNIT AND AHU (EE38460)
McQuay
33
RCS07F090C
7753F431105945
30T CONDENSING UNIT (EE125695)
CARRIER
1
30GUN040-520KA
1300F89350
15T CONDENSING UNIT AND AHU (Pharmacy)
McQuay
2
RCS15F18OC
7925F431106101
VOYAGER AHU 15T (Canteen) ()
TRANE
4
TSH180F3R0A03
140610723D
LIEBERT 17T CONDENSER AND AHU (EE139189) IRM
LIEBERT
37
DCDL205-A
0430C71759
McQUAY 14T COND. UNIT AND AHU
McQuay(ahu)

Carrier (cu)

1
38AKS014-510
3500F28852
McQUAY 8T COND. UNIT AND AHU
McQuay(ahu)

Carrier (cu)

1
38AKS008-501
3600G00001
CARRIER 12T COND. UNIT AND AHU
CARRIER
3
38AUDA12A0K5
3510G10049
ADDISON 4T COND. UNIT AND AHU
ADDISON
3
RCA051A003G
100900401
McQUAY 70T COND. UNIT AND AHU
McQUAY
10
RCS70DYY
FBOU11010105201
DAIKIN 10T COND. UNIT AND AHU
DAIKIN
37
RXYQ120PTJUR
A000056
DAIKIN 8T COND. UNIT AND AHU
DAIKIN
37
RXYQ96PATJ
A000133
DAIKIN 6T COND. UNIT AND AHU
DAIKIN
37
RXYQ72PATJ
A000244
DAIKIN 6T COND. UNIT AND AHU
DAIKIN
37
RXYQ72PATJ
A000225
DAIKIN 12T COND. UNIT AND AHU
DAIKIN
37
RXYQ144PBTJ
A000187
DAIKIN 8T COND. UNIT AND AHU
DAIKIN
37
RXYQ96PATJ
A000123
DAIKIN 10T COND. UNIT AND AHU
DAIKIN
37
RXYQ120PTJUR
A000065
McQUAY 20T COND. UNIT AND AHU
McQUAY
37
RCS20F240C
7931F071002199
DAIKIN 10T COND. UNIT AND AHU
DAIKIN
118
RXYQ120PBTJ
A000188
YORK 3T COND. UNIT AND AHU
YORK
Sewer Plant (80)
DINQ36N07206A
NIL0390360

2. Maintenance Required:

A. Absorption Chiller (SN: L94J09176), Start-Up and Preventative Maintenance including but not limited to (start up and mid-season):

i. Check steam pressure

ii. Evaporator inspection (water pressure in, water pressure out, water temperature in, and water temperature out).

iii. Absorber inspection (water pressure in, water pressure out, water temperature in, and water temperature out).

iv. Condenser inspection (water pressure in, water pressure out, water temperature in, and water temperature out).

v. Solution temperature check (Absorber sump and leaving concentrator).

vi. Purge System (check pulley alignment and v-belt tension, check condition of drive belts, and change oil in purge vacuum pump(s)).

vii. Check pump motor(s) (check operation of lubrication systems, test motor(s) amperages, test motor(s) voltages).

viii. Check solution concentration.

ix. Check refrigerant salt content.

x. Change solution filter and gasket.

xi. Sample and analyze Lithium Bromide once a year, while unit is active.

B. Absorption Chiller (SN: L94J09176), Winter Service including but not limited to:

i. Check the calibration of all safety controls.

ii. Check and tighten control panel terminals.

iii. Check and tighten pump motor terminals.

iv. MEG test motor(s).

v. Clean pump cooling water strainer and replace gasket.

vi. Check refrigerant pump seals for leakage and repair.

vii. Check and tighten all starter terminals.

viii. Check condition of starter contactors.

ix. Change solution filter and gasket.

x. Check refrigerant water salt content.

xi. Inspect condenser and absorber tubes.

xii. Brush clean condenser and absorber tubes.

xiii. Check cooling tower for condition and needed maintenance.

C. Trane Roof Top Unit bldg. 2 (SN: J98A90169) Annual Maintenance (Scheduled with owner for June):

i. Replace filters (annual).

ii. Check supply fan, belts, condensate pan, dampers/vanes, bearings, evaporator coil, condenser coil, condenser fan, oil level contactors and inlet vanes.

iii. Clean condenser coil annually including chemical cleaning (green solution), brushing, and power wash per manufacturer’s recommendation.

iv. Conduct electrical inspection.

v. Conduct refrigerant leak check.

vi. Document all start up information.

vii. Lubricate per manufacturer’s specifications.

viii. Replace air filters (provided by owner).

D. Trane Chillers bldgs. 1,3,9 and 34 (SN: C98M00409M, C98M00408M, U02M07542, U02M07541) Annual Maintenance (Scheduled with owner for June):

i. Clean condenser coil annually including chemical cleaning (green solution), brushing, and power wash per manufacturer’s recommendation.

ii. Perform start up diagnostics per manufacturer’s recommendation. Record operating parameters including temperatures, pressures, and voltage/amp levels as appropriate.

iii. Lubricate per manufacturer’s specifications.

E. Carrier Chiller Unit bldg. 1 (SN: 1300F89350) Annual Maintenance (Scheduled with owner for June):

i. Clean condenser coil annually including chemical cleaning (green solution), brushing, and power wash per manufacturer’s recommendation.

ii. Perform start up diagnostics per manufacturer’s recommendation. Record operating parameters including temperatures, pressures, and voltage/amp levels as appropriate.

iii. Lubricate per manufacturer’s specifications.

F. Condensing Units w/AHU (SN: P025N08AH,7753F431105945, 7925F431106101, 0430C71759, 140610723D, P025ND8AH,3500F28852,3600G00001,3510G10049,100900401, FBOU1101015201, NIL0390360) Annual Maintenance (Scheduled with owner for June):

i. Clean condenser coil annually including chemical cleaning (green solution), brushing, and power wash per manufacturer’s recommendation

ii. Perform start up diagnostics per manufacturer’s recommendation. Record operating parameters including temperatures, pressures, and voltage/amp levels as appropriate.

iii. Lubricate per manufacturer’s specifications.

iv. Check supply fan, belts, condensate pan, damper, bearings, evaporator coil, condenser coil, condenser fan, oil level, contactors, and inlet vanes/VFD as applicable per manufacturer’s recommendation.

v. Replace air filters (provided by owner) G. Condensing Units (SN: A000056, A000133, A000244, A000225, A000187, A000123, A000065, 7931F071002199, A000188,) Annual Maintenance (Scheduled with owner for June):

i. Clean condenser coil annually including chemical cleaning (green solution), brushing, and power wash per manufacturer’s recommendation

ii. Perform start up diagnostics per manufacturer’s recommendation. Record operating parameters including temperatures, pressures, and voltage/amp levels as appropriate.

iii. Lubricate per manufacturer’s specifications.

iv. Check supply fan, belts, condensate pan, damper, bearings, evaporator coil, condenser coil, condenser fan, oil level, contactors, and inlet vanes/VFD as applicable per manufacturer’s recommendation.

v. Replace air filters (provided by owner).

H. Contractor will provide identified condenser coil cleaning for all listed equipment annually.

I. Contractor to provide annual refrigerant usage report regarding systems included on the equipment list.

J. Upon arriving at the installation to perform services, the contractor shall report to the Contracting Officer’s Representative (COR). Upon completion of service, the contractor shall report to the COR providing written reports/evidence of service maintenance performed.

3. Contractor Qualifications:

A. Contractor and/or representatives shall be Environmental Protection Agency (EPA) CFC Certified. North American Technician Excellence (NATE) Certification is also preferred.

B. Industrial HVAC Service Company trained and familiar with service requirements for identified industrial cooling systems.

C. Technicians should be certified/qualified by equipment manufacturers to perform identified preventative maintenance service to devices on the equipment list.

4. Minimum Standards of Workmanship:

All work shall be performed in compliance with all Federal, State, and Local laws. In addition, work will meet equipment manufacturers and generally accepted industry standards of good workmanship. All waste materials shall be disposed of by the Contractor in compliance with Federal, State, and Local laws and regulations.