36C24218Q0523-00002000.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C24218Q0523
About this file
36C24218Q0523 00002 36C24218Q0523 00002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218Q0523-00001000.docx | DOCX document | |
| 36C24218Q0523-000.docx | DOCX document | |
| 36C24218Q0523-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 05-29-2018
NONE
Department of Veterans Affairs Samuel S . Stratton VA Medical Center 113 Holland Avenue (2-90NCA) Albany
NY
12208-3410 Department of Veterans Affairs Samuel S . Stratton VA Medical Center Network Contracting Activity 113 Holland Avenue (2-90NCA) Albany
NY
12208-3410 To all Offerors/Bidders
36C24218Q0523 05-29-2018
X X The purpose of this solicitation amendment is to respond to RFI's submitted regarding the SOW for work to be performed. The questions and responses are provided on page 2 of this document.
In order to allow for individuals to account for these changes, the close date of the solicitation has been extended to Wednesday June 6, 2018 at 4pm EST.
New RFI's will not be accepted after Thursday May 31, 2018 at 12pm Noon.
ANTHONY MURRAY
CONTRACTING OFFICER
Contractors who are interested in the solicitation posed the following questions.
RFI 1:
WE are interested in bidding this. Can you please tell me how to acquire plans and specs?
RFI 1 Response: We do not have plans of specs for this currently available.
RFI 2: (with responses) A.2 states “Solid Products”…..A.5 mentions liquid products for boilers. I believe there is currently a mix for the boiler especially the amine is liquid. Please clarify solid vs liquid products. Solid for everyday use. Liquid and powder chemicals to layup boiler wet and to treat quickly condensate and boilers.
A.5 states….. liquid Amine as needed to help protect the condensate return lines and maintain return pH 7.5 - 8.0…. We were told during a walkthrough that the amine is used only to treat the steam lines in the boiler plant and does not feed to the steam lines to the building. For purposes of this bid are we treating just the steam lines in the boiler plant as is currently done or expanding the treatment now to the building? Currently Amine is to treat the chiller plant steam to the heat exchangers.
Who owns the current dry product feeders? MIS of America
Who owns the existing cooling tower blowdown/chemical feed controllers? MIS of America
RFI 3:
Scope of Work Section A there is a conflict of information.
Under item 2. – it states all tower and boiler chemicals shall be solid products.
Then under Item 5. – it discusses the need for boiler de-scaler, liquid amine, liquid alkalinity booster, and liquid phosphate.
Please clarify which type of chemicals will be required.
RFI 3 Response: The need for de-scaler, liquid amine, liquid alkalinity booster, and liquid phosphate is to layup a boiler when not in use and to bring a boiler quickly back into the proper chemical range if the said boiler fall out of chemistry parameters.
Also… bromine tablets are needed for tower water treatment for quick disinfection and/or for use in the brominators.