36C24218B0554-003.pdf
PDF 774 KB Posted
- Solicitation number
- 36C24218B0554
About this file
36C24218B0554 S02-DRAWINGS.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218C0165-000.docx | DOCX document | |
| 36C24218B0554-001.docx | DOCX document | |
| 36C24218B0554-004.pdf | ||
| 36C24218B0554-002.pdf | ||
| 36C24218B0554-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o n e e i g h t h i n c h e f o o t
C
D t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
COVER SHEET EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
GI-001
PLAN NORTH
KEY PLAN
SCALE: NONE
SHEET LIST
GI-001 COVER SHEET
MP-101 SUB-BASEMENT & BASEMENT PIPING PLANS TO D-WING & SHAFT #2
MP-102 DG-24 BOILER PIPING PLAN, D-WING
MP-103 PIPING PLANS-BASEMENT TO FIRST FLOOR, TO SHAFT #2
MP-401 BOILER PIPING SCHEMATIC
MP-402 BOILER CONTROLS - N.I.C. REFERENCE ONLY
MP-501 SCHEDULES & DETAILS
DEPARTMENT OF VETERANS AFFAIRS
800 IRVING AVE
SYRACUSE, NY 13210
PROJECT # 528A7-20-779
EXTEND HEATING HOT WATER TO D-WING & SHAFT #2
STATEMENT OF WORK
1. EXTEND HOT WATER PIPING FROM EXISTING BOILER HOT WATER LOOP IN
BASEMENT TO THE EMERGENCY DEPARTMENT VAV REHEAT LOOP AND
THE PHARMACY VAV REHEAT LOOP. INCLUDE ALL ASSOCIATED PIPING,
INSULATION AND SUPPORTS REQUIRED FOR A FULLY FUNCTIONING
SYSTEM AS IDENTIFIED ON THE PLANS.
2. EXTEND HOT WATER PIPING FROM SUB-BASEMENT TO INDICATED
EQUIPMENT LOCATED IN THE BASEMENT AND D-WING.
3. DRAIN AND FLUSH THE GLYCOL MIXTURE FROM THE EMERGENCY
DEPARTMENT VAV HEATING LOOP. REFILL WITH WATER.
GENERAL NOTES
1. THE BUILDING SHALL BE OCCUPIED FOR THE DURATION OF THE
CONSTRUCTION PERIOD.
2. ALL SPACES, STAIRWAYS, CORRIDORS AND ELEVATORS SHALL BE
TEMPORARILY PROTECTED WHEN USED FOR THE TRANSPORTATION OF
MATERIALS INTO OR OUT OF THE WORK AREAS. PROVIDE PLASTIC
SHEATHING, PROTECTIVE FLOOR COVERINGS, SIGNAGE AND BARRIERS AS
REQUIRED TO PROTECT THE EXISTING BUILDING ELEMENTS AS WELL AS
THE PATIENTS, VISITORS AND HOSPITAL STAFF.
3. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT AND OBTAIN
APPROVAL FOR A PLAN THAT INDICATES ROUTING OF EQUIPMENT
THROUGH THE BUILDING AND DETAILS PROTECTIVE MEASURES TO BE
TAKEN.
4. ALL DISRUPTION TO THE EXISTING SERVICES SHALL BE COORDINATED
WITH HOSPITAL STAFF AND THE CONTRACTING OFFICER REPRESENTATIVE
(COR) AT LEAST TEN DAYS IN ADVANCE.
5. PRE-ASSEMBLY AND EQUIPMENT STAGING SHOULD BE PLANNED TO
MINIMIZE DOWN-TIME OF SYSTEMS IN ALL CASES. MAXIMUM DOWN-TIME
SHALL BE AS INDICATED HEREIN AND/OR AS DIRECTED BY THE
CONTRACTING OFFICER.
6. ACCESS FOR THE PIPE ROUTING IS LIMITED BY EXISTING
STRUCTURE/EQUIPMENT CONTRACTORS ARE STRONGLY ENCOURAGED
TO BECOME FAMILIAR WITH THE SPECIFIC WORK AREAS PRIOR TO BIDDING
IN ORDER TO ACCOUNT FOR RIGGING, STAGING AND SITE-ACCESS
RESTRICTIONS.
7. COORDINATE ALL STORAGE, STAGING AND SITE ACCESS WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) PRIOR TO
CONSTRUCTION.
8. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES
IN ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
SHAFT #4
SHAFT #3
SHAFT #2
SHAFT #1
SHAFT 3
6" HWS AND HWR UP DUMBWAITER /
MECHANICAL SHAFT #8 TO 10TH FLOOR
MECHANICAL ROOM, EXISTING
6" HWS AND HWR UP
SHAFT #3 TO 5TH FLOOR
MECHANICAL ROOM
6"
6"
6" HWS AND HWR UP TO
BASEMENT CL16; SEE
BASEMENT PIPING PLAN
2/MP-101
L14
K14
J14
L13
M13
N13
K13
J13
M14
N14
L12
M12
N12
K12
J12
I14 I13 I12
N G
EXIST. 8" N. GAS
(REF)
M11
N11
K11
J11
I11
L11
CONNECTIONS IN LINE
WITH & BETWEEN
COLUMNS N12 & N13
H W
S
H W
R
HWS
HWR
H W
S H W
R
H W
S H W
R
H W
S
H W
R
HWR
HWS
N13 N12
RUN PIPING UNDER
EXIST. ELEC. TRAPEZE
HWS
HWR
H W
S
H W
R
SHAFT 2
INSTALL NEW VALVES ON
EXISTING PIPES FEEDING
SHAFT 3 RISERS
PIPE ANCHOR
(TYP)
M10
N10
K10
J10
I10
L10
M09
N09
K09
J09
I09
L09
M08
N08
K08
J08
I08
L08
PIPE ANCHOR
(TYP)
40" ABOVE FLOOR & OVER
CONDENSATE TANK
6'-8"
4" UP, SEE PIPING
PLAN 1/MP-103
4"
PROVIDE EXPANSION
LOOP ON ANY STRAIGHT
RUNS THAT EXCEED 50 FT.
CORE DRILL
CORE DRILL
4"
FUTURE
SHAFT #8
SHAFT #2
SHAFT #1
SHAFT #3
SHAFT #4
SHAFT #5
CL16
BASEMENT
CL20
BASEMENT
CL18
BASEMENT
CL14
BASEMENT
CL02
BUILDING ELECTRICAL
CL22
BASEMENT
6" HWS AND HWR DN TO
SUB-BASEMENT; SEE
SUB-BASEMENT PIPING
PLAN 1/MP-101
4" HWS & HWR
UP TO DG-24
(SEE MP-102)
6"
H W
S H W
R
N G
EXIST. 8" N. GAS
(REF)
H W
S H W
R
10'-0"
5"
3"
CORE DRILL1
HX-DG24 SEE DETAILS
7/MP-501 & 8/MP-501
FUTURE TO D-417
NORTH
KEY PLAN
BASEMENT
SUB-BASEMENT
(PARTIALLY EXCAVATED PIPE SPACE)
S U
B B
A S
E M
E N
T
F
U L
L
H
E I G
H T
M
E C
H
R
O O
M
C
L
03-05-13 o n e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
SUB-BASEMENT & BASEMENT
PIPING PLANS TO D-WING & SHAFT #2
EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-101
SUB-BASEMENT PIPING PLAN
SCALE: 1/16" = 1'-0"
BASEMENT CL16 PIPING PLAN
SCALE: 1/8" = 1'-0"
SUB-BASEMENT
(PARTIALLY EXCAVATED PIPE SPACE)
SUB-BASEMENT
(PARTIALLY EXCAVATED PIPE SPACE)
NORTH
NORTH
KEYED NOTES:
CORE DRILL CONCRETE WALL OR FLOOR FOR HORIZONTAL OR VERTICAL PIPE
PENETRATIONS. PROVIDE FIRE-RATED SEAL PER DETAIL 9/MP-501.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER SPECIFICATION
130541.
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text L01
AutoCAD SHX Text
CORR
AutoCAD SHX Text L70
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
CL55
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
EAST
AutoCAD SHX Text
EF64A
DG-24
DDC ROOM PANEL
DDC
DDC FIELD
PANEL
75# HPS DN
30#HPS
MOTOR CONTROL CENTER
W
C
O I L
C-25
C-26HCP-26
HCP-25
2"
ATC VALVE
COND
EXIST. PRV
STATION 75#-30#
3"
2"
HWS
HWR
HWS
HWR
" EXISTING
COND DN
6" CHWR UP & DN
6" CHWS UP & DN
COND
AC-25
AC-26
" COND AT
4" AFF±
H W
R
" COND
DN THRU
FLR
H W
S
3" HWR
(63" AFF)
3" HWS+R
DN THRU
FLR
H
P S
HX-602(E)
4" SEWER
PIPE
HWS
HWR
3" HWS AND
HWR DN TO
SUB-BASEMENT
F M
FM
SHAFT #3
DG-24
SHAFT #2
SHAFT #1
SHAFT #3SHAFT #4
o n e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
DG-24 BOILER PIPING PLAN, D-WING EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-102
GROUND FLOOR
KEYED NOTES:
CORE DRILL CONCRETE WALL OR FLOOR FOR HORIZONTAL OR VERTICAL PIPE
PENETRATIONS. PROVIDE FIRE-RATED SEAL PER DETAIL 9/MP-501.
NOT USED.
REFER TO MP-402 AND MP-501 HOT WATER HEATING COIL CONTROL
SCHEMATIC AND HEAT EXCHANGER DETAIL. PROVIDE ALL REQUIRED FITTINGS,
VALVES, INSULATION, HEAT EXCHANGER AND APPURTENANCES TO CONNECT
HWS & HWR TO EXISTING HEATING LOOP. REMOVE EXISTING PIPING AS
SHOWN AND REQUIRED FOR NEW PIPE ROUTING AND DEVICE INSTALLATION.
INSTALL NEW ISOLATION VALVE AS SHOWN.
REMOVE EXISTING ABB MINI MAG FLOW METER AND MOVE TO NEW LOCATION
AS SHOWN. PROVIDE SPOOL PIECE AND RE-INSULATE WHERE FLOW METER
WAS REMOVED. RE-INSTALL THE FLOW METER PER ABB INSTALLATION
INSTRUCTIONS, INCLUDING A MINIMUM 3° PIPE PITCH BY ADJUSTING EXISTING
PIPING AS NECESSARY. POWER AND CONTROLS BY OWNER.
GENERAL DRAWING NOTES:
1. MAINTAIN CLEAR SERVICE ACCESS TO EXISTING EQUIPMENT WHEN LOCATING
NEW PIPING AND HEAT EXCHANGERS.
2. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
DG-24 FLOOR PLAN LAYOUT
SCALE: 1/4" = 1'-0"
KEY PLANS
NORTH
NORTH
HX-1
AHU-1
5"
PRV-1
FAN
F-2
HWR
HWS
CUH-5
UH
LPC
2"
" HWS
& HWR UP
HX-2
GH
GHR
FAN
F-9
2"
3"
3"
2"
LPS
1"
2-
3"
DUPLEX
CONDENSATE
PUMP
3"
LPS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
H W
R
H W
S
DROP PIPING TO
JUST BELOW
FLOOR GRATING
PIPING TO PENETRATE
MASONRY WALL APPROX.
12" ABOVE GROUND
FLOOR GRATING
L P
S
2-1/2" RUN JUST BELOW
FLOOR GRATING @
GROUND FLOOR
3" HWS & HWR UP,
CONT'D ON GROUND
FLOOR SHAFT #2 PLAN
2/MP-103; 4" DOWN
CONT'D ON
SUB-BASEMENT PLAN
1/MP-101; OFFSET AS
REQUIRED TO CLEAR
DUCT
H W
R
H W
S
PIPING RUN @
GROUND FLOOR
SEE PIPING
PLAN 2/MP-104
BL16
B03
MECHANICAL
SHAFT #2
HWR
HWS
C H
R
C H
S
H P
S
C A
C P
D
H P
S
C H
S
C H
R
UH
3"
1-1/2"
1-1/2"
3/4"
E T
A S
NC
2-
2-
CA
CPD
CHS
CHR
HPS
GLY
3/4"
" CONTROL
VALVE (GF/CI)
SHAFT #8
SHAFT #2
SHAFT #1
SHAFT #3
SHAFT #4
SHAFT #1
SHAFT #5
SHAFT #2
PIPING TO PENETRATE
MASONRY WALL APPROX.
12" ABOVE GROUND
FLOOR GRATING
3" HWS & HWR
DN TO BASEMENT
HWS
CHS
H W
S
C H
S
" DN
TO BSMT
2"
2"
CA
2-
" HWS &
HWR UP;
CONNECT
TO EXIST.
" HWS AT
1st FLOOR
HWR
HWS
" HWS & HWR
FUTURE 55 GPM
CONNECTIONS TO
AC-21A & AC-48
NEW 1"
MODULATING
CONTROL
VALVE (GF/CI)
CIRCUIT
SETTER
UH
HPS
CHS
CHS
HWS
HWR
CHR
CHR
H P
S
1"
2"
1"
2"
3/4"
" HWS &
HWR DN TO
GROUND
FLOOR
CONN. TO
PHARMACY
VAV HWR
SHAFT #2
H W
S H
W R o n e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
PIPING PLANS-BASEMENT TO
FIRST FLOOR, TO SHAFT #2
EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-103
BASEMENT FLOOR PLAN SHAFT #2
SCALE: 1/4" = 1'-0"
KEY PLANS
BASEMENT-1st FLOOR
GROUND FLOOR SHAFT #2
SCALE: NONE
1st FLOOR SHAFT #2
SCALE: NONE
NORTH
NORTH
KEYED NOTES:
REMOVE EXISTING
" PIPE AND INSTALL GOVERNMENT FURNISHED AIR VENT ON
EXISTING AIR SEPARATOR.
REPLACE EXISTING 30 PSIG SAFETY RELIEF VALVE WITH NEW 95 PSIG SAFETY
RELIEF VALVE, B&G MODEL 1170-95 OR EQUAL.
DRAIN EXISTING EXPANSION TANK AND CLOSE EXISTING ISOLATION VALVE.
CORE DRILL CONCRETE WALL OR FLOOR FOR HORIZONTAL OR VERTICAL PIPE
PENETRATIONS. PROVIDE FIRE-RATED SEAL PER DETAIL 9/MP-501.
NEW GOVERNMENT SUPPLIED/CONTRACTOR INSTALLED (GF/CI) MODULATING
CONTROL VALVE INSTALLED AS SHOWN. ALSO INCLUDE A THERMOMETER,
PRESSURE GAUGE AND WELLS FOR TEMPERATURE SENSORS ON THE SUPPLY
AND RETURN PIPING, AND A CIRCUIT SETTER ON THE SUPPLY. PROVIDE UNIONS
FOR FUTURE REPLACEMENT OF CONTROL VALVE.
CUT FLOOR GRATING AT EACH SHAFT FLOOR LEVEL FOR NEW PIPE RISER
ROUTING. PROVIDE ∠3"x2
"x
" STEEL ANGLE TO BOX PIPING AND SUPPORT
FLOOR GRATING. SEE PIPE RISER SUPPORT DETAIL 6/MP-501.
REPLACE EXISTING 45 PSIG SAFETY RELIEF VALVE WITH NEW 80 PSIG RELIEF
VALVE, B&G MODEL 1170-80 OR EQUAL. LOCATION IS MECHANICAL ROOM BL-20.
CONNECT NEW PIPING TO EXISTING ISOLATION VALVES.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
2. PIPE ANCHORS AND SEISMIC RESTRAINTS TO BE PROVIDED PER
SPECIFICATION 130541.
9th FLOOR
SHAFT TWOSHAFT ONE
8th FLOOR
7th FLOOR
6th FLOOR
5th FLOOR
SUB-BASEMENT
SHAFT FIVE
11th FLOOR
PENTHOUSE
10th FLOOR
HWH-101
P
HX-05
HWS
T
T
F
SHAFT THREE
HX-13
HGS
HGR
HX-23
HGS
HGR
SHAFT FOUR
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
GROUND FLOOR
BASEMENT
C521A
2"
2"
4"
4"
AC-2
HC
C-03
AC-3
HC
C-04
AC-4
HC
HWH-201
C-05
AC-5
HC
C-07
AC-7
HC
C-06
AC-6
HC
HWR
HWS
HWR
HWS
HWS
HWR
HX-06
HWS
HWR
HX-07
HWS
HWR
HX-02
HGS
HGR
HGS
HGR
HGS
HGR
HX-03
HWS
HWR
HGS
HGR
HX-04
HWS
HWR
HGS
HGR
HGS
HGR
6" 8"
6"
(TYP)
6" 8"
8"
8"
6"
5"
4"
4"
4"
4"
4"
4"
4"
4"
3"
5"
B-1 B-2 B-3 B-4
HWP503
HWP504
C-02
HWH-502
HWH-501
FUTURE
AC42
AS
6" 6"
SYSTEM DIFFERENTIAL
AND MINIMUM FLOW
BY-PASS FOR P-503 & P-504
C-13
AC-13
HC
C-23
AC-23
HC
HWH-301
C-09
AC-9
HC
HX-09
HWS
HWR
HGS
HGR
C-08
AC-8
HC
HX-08
HWS
HWR
C-10
AC-10
HC
HX-10
HWS
HWR
4"
6"
FUTURE
172.6 gpm
FUTURE
47.2 gpm
6"
(54.9 gpm)
2-
4"
4"
6"
(581.9 gpm)
6"
C-11
AC-11
HC
HX-11
HGS
HGR
C-12
AC-12
HC
HX-12
HGS
HGR
2" 2"
(77.0 gpm)
6"
3"
(57.0 gpm)
(134.0 gpm)
(459.8 gpm)
2"
HWH-401
(225 gpm)
HWS
HWRHWR
HWS
HWSHWS
HWRHWR
D U
M B
W A
I T
R
E C
H A
N I C
A L
S
H A
F T
HWS
H W
S
H W
R
HWS
HWS
HWR
HWS
HWR
HWS
HWR
HWR
HWR
HWR
HWR
HWS
H W
R
H W
S
H W
R
HWS
H W
S
HWR
HWS
H W
S
H W
R
HWR
HWS
T
(240 gpm)
(219.8 gpm)
(593.8 gpm)
(655 gpm)
(300 gpm)
(90 gpm)
(265 gpm)
(200 gpm)
(325 gpm)
(180 gpm)
(35 gpm)
(740 gpm)
(2570 gpm)
(130 gpm)
(190 gpm)
(75 gpm)
HWP-505
HWP-506
H W
R
H W
S
HWR
HWS
4"
SYSTEM DIFFERENTIAL
AND 2-
" MINIMUM
FLOW BY-PASS FOR
P-505 & P-506
T
F
BTU METER
ET-1
ET-2
CW MAKE-UP
HWR
HWS
PD
2"
3"
2"
HGS
HGR
HGS
HGR
VFDVFD
ELEV 259.17'
ELEV 259.17'
ELEV 222.36'
ELEV 244.82'
ELEV 210.44'
ELEV 199.44'
ELEV 187.52'
ELEV 174.92'
ELEV 163.92
ELEV 141.92'
ELEV 130.00'
ELEV 118.08'
ELEV 112.58' TO
ELEV 104.58
ELEV 152.92'
SHAFT THREE
(374 gpm - 594 FUTURE)
1st FLOOR
2nd FLOOR
3rd FLOOR
4th FLOOR
D-417
(635.9 gpm)
GAS METER
ASSEMBLY
N G
NG
4"
6"
REFER TO SHEET MP-102
FOR PIPE ROUTING THRU
SUB-BASEMENT & BASEMENT
6"
EXISTING
15,000 GAL
FUEL OIL TANK
EXISTING
6,000 GAL FUEL
OIL TANK
TO GENERATOR
ROOM CL61
TO GENERATOR
ROOM CL60
FOS
FOR
FUEL OIL
PUMP
6-WAY
SELECTOR
VALVE
F O
S
F O
S
N G
F O
S
F O
S
N G
DAY
TANK
NG
(3601.6 gpm)
6"
H W
R
H W
S
HWR
HWS
6"
C-25
AC-25
HC
HWS
HWR
HGS
HGR
CL55
C-15
AC-15
HC
HWH-601
(75 gpm)
HWH-602
HWS
HWR
(90 gpm)
FUTURE
106.5 gpm
C-26
AC-26
HC
HWS
HWR
HGS
HGR
FUTURE
66 gpm
HX-26
HX-25
DG-24
6"
(FUTURE)
3"
SUB-BASEMENT
D-WING
H X
A
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
9th FLOOR
8th FLOOR
7th FLOOR
6th FLOOR
5th FLOOR
BASEMENT
GROUND
FLOOR
CONNECT TO EXIST. E.D.
VAV HWR IN B-03, SEE
PIPING PLAN 1/MP-103
56 GPM
2-
" PIPING RUN @
GROUND FLOOR
INTO SHAFT #2
2-
" PIPING RUN IN
BASEMENT DIRECTLY
UNDER GROUND
FLOOR GRATING
2-
" FUTURE
55 GPM TO
AC-21A & AC-48
EXIST.
PHARMACY
VAV LOOP
HWS & HWR TO
PHARMACY VAV
HWR
HWS
11th FLOOR
PENTHOUSE
10th FLOOR
ADD NEW
ISOLATION
VALVES
5"
3"
HWS
HWR
FUTURE
FOR D417
HWS
HWR
2-
3"
4"
TO CHP
SYSTEM
GF/CI
GF/CI
GROUND FLOOR
BASEMENT
5th FLOOR
4th FLOOR
3rd FLOOR
2nd FLOOR
1st FLOOR
6"
HWR
HWS
SUB-BASEMENT
HWS
HWR
2-
6"
HWS
HWR
GF/CI
6"
H W
S
H W
R
(25 gpm)
1 RFI #001 ADDENDUM 03-05-13
o n e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
BOILER PIPING SCHEMATIC EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-401
BOILER PIPING SCHEMATIC
SCALE: NONE
KEYED NOTES:
ALL CONTROLS BY OWNER EXCEPT INSTALLATION OF THE
GOVERNMENT FURNISHED, CONTRACTOR INSTALLED (GF/CI)
CONTROL VALVES.
EXISTING HWS AND HWR PIPING UTILIZE GROOVED CONNECTIONS.
THE NEW ADDED ISOLATION VALVES ON THE FEED TO SHAFT 3
SHALL BE GROOVED TYPE. CONTRACTOR OPTION FOR GROOVED
OR WELDED CONNECTIONS FOR ALL OTHER PIPING.
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE
CHANGES IN ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND
CONDUITS.
CONVERTER
STEAM CONTROL VALVE(S)
TEMP SENSOR
(TYP 2)
HWP
TYP COIL
HGR
HGS
CONVERTER
HOT WATER CONTROL VALVE
T
T
TEMP SENSOR
(TYP 2)
T
T
CONVERTER
STEAM CONTROL VALVE
HWPHWP
TYP. RADIANT OR REHEAT LOADS PER FLOOR
ΔP
HOT WATER CONTROL VALVE
MAKE-UP
WATER
HWR
HWS
RELOCATE
TEMP SENSOR
T
RELOCATED
TEMP SENSOR
MODULATING DIFFERENTIAL
PRESSURE CONTROL VALVE (ZERO
TO 20% FLOW)
DIFFERENTIAL PRESSURE
SENSOR (FOR PUMP SPEED
CONTROL)
AAV
HOT WATER STATION
HWR
HWS
PROVIDE DDC CONTROLS AND SEQUENCE OF OPERATION:
HEATING COILS (AC-8, 9, 10, 11 AND 12):
1. WHEN HOT WATER OPERATION IS ENABLED, MODULATE HOT WATER CONTROL VALVE AS PRIMARY HEAT
SOURCE TO MAINTAIN HEATING COIL LAT SET POINT.
2. MODULATE STEAM CONTROL VALVE AS SECONDARY HEAT SOURCE TO MAINTAIN SYSTEM HEATING COIL LAT SET
POINT IF HOT WATER VALVE FAILS TO MAINTAIN SET POINT.
3. MONITOR HGS & HGR TEMPERATURES
4. DURING HW MODE OPERATION ALL OTHER EXISTING SEQUENCES ASSOCIATED WITH THIS EQUIPMENT REMAIN IN
EFFECT.
5. ON A RETURN TO STEAM MODE CLOSE HOT WATER CONTROL VALVE AND MODULATE STEAM VALVE TO MAINTAIN
HEATING COIL LAT SET POINT.
PROVIDE DDC CONTROLS AND SEQUENCE OF OPERATION:
HOT WATER STATIONS (HWH-301 AND 401):
1. WHEN HOT WATER OPERATION IS ENABLED, MODULATE HOT WATER CONTROL VALVE AS PRIMARY HEAT SOURCE
TO MAINTAIN SYSTEM HWS TEMPERATURE SET POINT.
2. MODULATE STEAM CONTROL VALVE AS SECONDARY HEAT SOURCE TO MAINTAIN SYSTEM HWS TEMPERATURE
SET POINT IF HOT WATER VALVE FAILS TO MAINTAIN SET POINT.
3. MONITOR HWS & HWR TEMPERATURES
4. DURING HW MODE OPERATION ALL OTHER EXISTING SEQUENCES ASSOCIATED WITH THIS EQUIPMENT REMAIN IN
EFFECT.
5. ON A RETURN TO STEAM MODE CLOSE HOT WATER CONTROL VALVE AND MODULATE STEAM VALVE TO MAINTAIN
HWS SET POINT.
PROVIDE DDC CONTROLS AND SEQUENCE OF OPERATION:
BTU MONITORING:
1. PROVIDED BTU MONITOR INCLUDING FLOW METER, LOCAL DISPLAY AND
TEMPERATURES SENSORS.
2. CALCULATE BTU OUTPUT OF HOT WATER SYSTEM USING HWS&R TEMPERATURES
AND SYSTEM FLOW RATE. DISPLAY DATA IN REALTIME AND RECORD LOGS.
2" BY-PASS (NC)
o n e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
BOILER CONTROLS
(NOT IN CONTRACT -
FOR REFERENCE ONLY)
EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-402
P F
H X
PROVIDE THE FOLLOWING DDC CONTROLS:
HOT WATER PUMPS (HWP-505 & HWP-506):
1. WHEN HOT WATER BOILERS ARE ENABLED AND THERE IS A CALL FOR HOT WATER
BY HWS OR AC ON THE SYSTEM ENABLE THE PUMPS. SELECT EITHER HOT WATER
OR STEAM AS THE PRIMARY SOURCE FOR NEW AND EXISTING HEATING COILS AND
HOT WATER STATIONS CONNECTED TO THE SYSTEM.
2. WHEN HOT WATER PUMPS HWP-505 AND HWP-506 ARE ENABLED. STAGE PUMPS TO
RUN CONTINUOUSLY IN PARALLEL UNLESS SYSTEM IS AT MINIMUM FLOW
CONDITION, THEN OPERATE SINGLE PUMP. MAINTAIN SYSTEM DIFFERENTIAL
PRESSURE BY VARYING NUMBER AND SPEED OF PUMPS USING ASSOCIATED VFD'S
AND SYSTEM BYPASS.
3. MONITOR PUMP STATUS AND ALARM IF PUMP FAILS.
HOT WATER STATION CONTROL SCHEMATIC
SCALE: NONE
HOT WATER HEATING COIL CONTROL SCHEMATIC
SCALE: NONE
REMOVE
PIPING
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
NOT IN CONTRACT
THIS SHEET IS FOR REFERENCE ONLY
e e i g h t h i n c e f o o t
C
D t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
DRAWING TITLE
APPROVED PROJECT DIRECTOR
PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISIONS DATE
SYRACUSE VA
MEDICAL CENTER
ENGINEERING
DEPARTMENT
ISSUED DATE
800 IRVING AVE. SYRACUSE, NY 13210
DWG.
FRANI, CHRISTOPHER
SCHEDULES & DETAILS EXTEND HEATING HOT
WATER TO D-WING &
SHAFT #2
5/25/2018 MA JD
528A7-20-779
MP-501
SYMBOLS
PROPOSED
EXISTING
EXISTING TO BE REMOVED
CONNECT TO EXISTING
UNION
FLANGE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
STRAINER
STRAINER (WITH BLOW DOWN)
MANUAL AIR VENT
ISOLATION VALVE (SEE SPECS)
GLOBE VALVE
BALL VALVE (HOSE END & CAP)
SWING CHECK VALVE
BALL VALVE
LUBRICATED PLUG VALVE
TRIPLE DUTY VALVE
RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
BALANCING VALVE (CIRCUIT SETTER)
PRESSURE GAUGE
THERMOMETER
THERMOSTAT
TEMPERATURE SENSOR
PRESSURE SENSOR
FLOW SENSOR
HUMIDITY SENSOR
PUMP
LEGEND
2-P TWO-POSITION
ACCU AIR COOLED CONDENSING UNIT
AEAD AUTOMATIC EXHAUST AIR DAMPER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AOAD AUTOMATIC OUTDOOR AIR DAMPER
ARAD AUTOMATIC RETURN AIR DAMPER
AS AIR SEPARATOR
B BOILER
CA COMPRESSED AIR
CFM CUBIC FEET OF AIR PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DAC DUCTLESS AIR CONDITIONER
DACCU DUCTLESS AIR CONDITIONING CONDENSER UNIT
EA EXHAUST AIR
EAT EXHAUST AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
FCU FAN COIL UNIT
FTR FIN TUBE RADIATION
GPM GALLONS PER MINUTE
HVACU HEATING VENTILATING AIR CONDITIONING UNIT
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
KEF KITCHEN EXHAUST FAN
SAT SUPPLY AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MUAU MAKE UP AIR UNIT
PC PUMPED CONDENSATE
PCR PROCESS COOLING RETURN
PCS PROCESS COOLING SUPPLY
PD PRESSURE DROP
PRE POWER ROOF EXHAUST FAN
PRV POWER ROOF VENTILATOR
PTAC PACKAGED TERMINAL AIR CONDITIONER
RA RETURN AIR
RHG REFRIGERANT HOT GAS
RHR REHEAT RETURN
RHS REHEAT SUPPLY
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
VAV VARIABLE AIR VOLUME BOX
VFD VARIABLE FREQUENCY DRIVE
CCEC CLOSED CIRCUIT EVAPORATIVE COOLER
CH CHILLER
COOLING TOWERCT
CUH CABINET UNIT HEATER
HP HEAT PUMP
HPC HIGH PRESSURE CONDENSATE
HPS HIGH PRESSURE STEAM
LPC LOW PRESSURE CONDENSATE
LPS LOW PRESSURE STEAM
P PUMP
PR PERIMETER RADIATION
VRV VARIABLE REFRIGERANT VOLUME TERMINAL
VRVCU VARIABLE REFRIGERANT VOLUME COMPRESSOR UNIT
MAT MIXED AIR TEMPERATURE
T
E
S
P
L
U
G
H
A
T
T
U
R
N
E
X
T
E
N
D
F
O
G
R
T
H
E
R
M
O
S
T
A
T
I
I
V
N
T
C
O
N
T
R
L
V
E
B
Y
P
A
S
S
H
G
S
P
I
G
H
T
U
P
P
L
Y
SENSOR
TEMPERATURE
RETURN
TEMPERATURE
SUPPLY
SENSOR
RETURN
SCROLL RESET PROGRAM
POWER
FLOW DIRECTION
SUPPLY
ELECTROMAGNETIC FLOW METER
REFER TO THE TABLE FOR
UPSTREAM DISTANCE
5 DIA
1. BASIS OF DESIGN: ONICON F-3500 SERIER INSERTION ELECTROMAGNETIC FLOW METER.
2. PROVIDE TEMPERATURES SENSORS AS REQUIRED TO MONITOR TEMPERATURE
DIFFERENTIAL. EXISTING TEMPERATURE SENSORS MAY BE UTILIZED BUT MUST BE RECALIBRATED.
NOTE:
1. WHERE HEAT EXCHANGER CAN NOT BE MOUNTED HIGH, PROVIDE STEEL RACK
WITH SADDLE SUPPORT ANCHORED TO THE FLOOR OR STRUCTURAL STEEL
CROSS MEMBERS
B
A
L
A
N
L
V
E
B
A
L
A
N
L
V
E
S
T
R
A
I
N
B
L
O
W
D
O
W
N
G
L
O
B
L
V
E
30 DIA
30 DIA
30 DIA
20 DIA
15 DIA
10 DIA
10 DIA
OBSTRUCTION
PIPE SIZE REDUCTION / EXPANSION IN STRAIGHT RUN
UPSTREAM
MIN. UPSTREAM STRAIGHT RUN REQ. FOR SENSOR PLACEMENT
SINGLE BEND PRECEDED BY < 9 DIAMETERS OF
STRAIGHT PIPE RUN
OUTFLOWING TEE / PUMP OUTFLOW
SINGLE BEND PRECEDED BY > 9 DIAMETERS OF
STRAIGHT PIPE RUN
MULTIPLE BENDS OUT OF PLANE
INFLOWING TEE
CONTROL / MODULATING VALVE
HGR HOT GLYCOL RETURN
HGS HOT GLYCOL SUPPLY
MPS MEDIUM PRESSURE STEAM
MPC MEDIUM PRESSURE CONDENSATE
VALVE TAG
PLATE AND FRAME HEAT EXCHANGER SCHEDULE
COLD SIDE
WPD
(PSI)
TOTAL
HEAT
EXCHANGED
(MBH)
MANUFACTURER MODEL
BASIS OF DESIGN
HEAT
TRANSFER
PLATE
MIXTURE
FLOODED
WEIGHT
(LB)
FLOW
RATE
(GPM)
FLUID
TYPE
PASSES/
CHANNELS
WPD
(PSI)
LWT
(°F)
EWT
(°F)
FLOW
RATE
(GPM)
FLUID
TYPE
ROOM
SHAFTFLOOR
TAG
LOCATION HOT SIDE
WATERWATERDG-24BASEMENTHX-602A
LWT
(°F)
EWT
(°F)
NOT USED
SCALE: NONE
NOT USED
SCALE: NONE
GF/CI GOVERNMENT FURNISHED/CONTRACTOR INSTALLED
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø = S+1/16"
PIPE ANCHOR
SCHEDULE
D P C N S
4"
4"
BOLT PATTERN
3"
4"
2"
4"
4"
4"
D=PIPE O.D.
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM & CONDENSATE
D+3 3/4"
D+1 1/2"
5/16"
NOTE:
a.WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR
P
D
STL PIPE OR
COPPER TUBE
NOTE a
C
D+2 1/2"
D+4 3/4"
D+[25]
MM
IN
MMMMMMMM
13 13
191916
10 10
10 10
10 6
[8]
D+1"
DRILL Ø = S+[2]
D+[38]
D+[95]
D+[64]
D+[121]
ININININ
NOTES:
a.INSTALL WALL PLATE FIRST THEN
WELD ON REMAINING ASSEMBLY.
ONE WALL PLATE FOR BOTH
CHILLED WATER S.&R. IS OPTIONAL.
NOTE a
T
E
D=PIPE O.D.
P
T
L
L+3"[76]
L+4" [101]
L+8" [203]
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø S+1/8"[3.175]
D+4"[101]
D+8"[230]
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM & CONDENSATE
PIPE ANCHOR SCHEDULE
D L P T E N S
6" 8
4"
BOLT PATTERN
8"
4"
10"
12"
14"
16"
18"
12"
14"
16"
18"
20"
1"
4"
4"
4"
4"
6"
1"
IN
MM MM MM MM MM MM MM
102610
IN IN IN IN IN IN
" 13
10" 254
SMALL PIPE ANCHOR (1-1/2" - 4")
SCALE: NONE
LARGE PIPE ANCHOR (6" - 18")
SCALE: NONE
NOTES:
1. PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
2. EXTEND SLEEVE ABOVE
FLOOR WHERE SPECIFIED.
INSULATION
BOLT (TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPE
PIPE SLEEVE WHERE
SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP. BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY.
ELEVATION
PLAN
RISER
CLAMP
PIPE RISER SUPPORT / ANCHOR
SCALE: NONE
---- 90.12 150.00 130.00 2.84 1 / 33 887.73 BELL & GOSSETT
GPX
AP19
581TMTL-8890.00 125.00 145.00 2.72 1 / 34
5 FT
6 8 10
9 1110 12
1312 14
1614 17 2219 23
2725 28 3230
20 2418 14 16128
1064 532 2 1/2 1 1/2
1 1 1/4
THRU 3/4
7 7
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR 2"x2"x1/4"
ANGLE
1/2" DIA.
HANGER RODS WITH
36" MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
M
A X
PIPE HANGERS
SCALE: NONE
CONCRETE
EQUIPMENT PAD;
SEE DETAIL 8/MP-501
A
D
F
R
I
L
E
R
F
R
A
D
I
L
E
R
TEST PLUG (TYP)
PLATE AND FRAME HEAT EXCHANGER
SCALE: NONE
CONCRETE PAD:
3000 PSI AT 28 DAYS
AIR-ENTRAINED CONCRETE
#4 WWM @ 12"
EACH WAY
EDGE OF EQUIPMENT
FIN. FLOOR
6" CLEAR
ALL AROUND
(TYP)
6"
NOTE:
LENGTH AND WIDTH DIMENSIONS OF THE CONCRETE PAD SHALL
BE 6" [150mm] GREATER THAN THE BASE OF THE EQUIPMENT.
PROVIDE #3 BARS 12" O.C.
EACH WAY x 2" DEEP IN THE
CONCRETE PAD, DOWEL
PAD TO THE FLOOR
1" CHAMFER ALL
AROUND PAD (TYP)
CONCRETE EQUIPMENT PAD DETAIL
SCALE: NONE
PROVIDE ANCHOR BOLTS
WITH HEX NUT AND
WASHER AS REQUIRED
TO SUIT EQUIPMENT
NOTE:
UL SYSTEM W-J-5048
KEYED NOTES:
1. WALL ASSEMBLY - MINIMUM 6 IN THICK LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE OR MASONRY WALL. THE
ANNULAR SPACE RANGE IS 0 INCH (POINT CONTACT) TO 1-5/8 INCH.
2. STEEL WIRE MESH (NOT SHOWN) - FOR CMU WALLS ONLY. CYLINDRICAL SLEEVE FABRICATED FROM NO. 8 STEEL WIRE
MESH AND HAVING A MINIMUM 1 INCH LAP ALONG THE LONGITUDINAL SEAM. CENTER SLEEVE WITHIN THE OPENING.
3. METALLIC PIPE - MAXIMUM NOMINAL 10 INCH DIAMETER OR HEAVER STEEL PIPE OR CAST IRON PIPE OR MAXIMUM 4
INCH NOMINAL DIAMETER COPPER PIPE OR TUBING.
4. PIPE INSULATION - NOMINAL 2 INCH THICK (OR THINNER) FIBERGLASS OR MINERAL WOOL PIPE INSULATION. THE T
RATING IS 2HR. FOR 1-1/2 INCH FIBERGLASS INSULATION AND 1-1/2HR FOR 2 INCH THICK FIBERGLASS INSULATION.
5. FORMING MATERIAL - TIGHTLY PACK 4PCF MINERAL WOOL BATT INSULATION TO FILL THE ANNULAR SPACE BETWEEN
THE STEEL WIRE MESH SLEEVE AND THE INSULATED PIPE. RECESS 1/2 INCH FROM BOTH SURFACES OF THE WALL.
6. SEALANT - APPLY OVER THE FORMING MATERIAL TO A MINIMUM 1/2 INCH DEPTH, FLUSH WITH BOTH SURFACES OF THE
WALL. AT AREAS OF POINT CONTACT, APPLY A 1/4 INCH BEAD AT THE INTERFACE BETWEEN THE PIPE AND THE WALL.
RATED WALL PENETRATION-INSULATED PIPE
SCALE: NONE
T
T
T
T
T
T
T
T
P
P
P
P
THERMOMETER (TYP)
TEMP WELL, TRANSMITTER BY OWNER (TYP)
PRESSURE GAUGE (TYP)
STRAINER (TYP)
ISOLATION VALVE (TYP)
UNION (TYP)
PLATE & FRAME HEAT
EXCHANGER (SEE
SCHEDULE)
GENERAL DRAWING NOTES:
1. PIPE PATHS ARE APPROXIMATE AND DO NOT SHOW ALL OF THE CHANGES IN
ELEVATION AND OFFSETS TO AVOID EXISTING PIPING AND CONDUITS.
N.I.C. NOT IN CONTRACT
P
TEMPERATURE TRANSMITTER
TT
PASSES/
CHANNELS
DRAIN (TYP)
" CONTROL VALVE (GF/CI)
CIRCUIT SETTER
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text
| Sheets and Views |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-01_GI-001 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-02_MP-101 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-03_MP-102 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-04_MP-103 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-05_MP-401 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-06_MP-402 |
| 528A7-20-779_ADD HHW-ED&D-WING_05-25-2018-07_MP-501 |
File details come from the government source that posted it.