36C24218B0367-004.docx
DOCX document 17 KB Posted
- Attached to
- ROOF REPLACEMENT 11A and 3rd FLOOR, Buffalo, NY VA Medical Center, 3495 Bailey Ave Buffalo, NY 14215
- Solicitation number
- 36C24218B0367
About this file
36C24218B0367 S02 SOW.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218B0367-00001000.docx | DOCX document | |
| 36C24218B0367-001.docx | DOCX document | |
| 36C24218B0367-003.zip | ZIP file | |
| 36C24218B0367-002.zip | ZIP file | |
| 36C24218B0367-005.pdf | ||
| 36C24218B0367-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
2018 Roof Replacement Project Number 528-18-s43 VA Western New York Healthcare System 3495 Bailey Avenue Buffalo, New York 14215
PERIOD OF PERFORMANCE
1. Period of performance shall be 180 days to complete the project.
SCOPE OF WORK
1. Contractor shall provide all labor and materials to replace the roofs on 2nd, 3rd and 11th floor at the VA Medical Center, Buffalo NY.
2. Provide all mobilization and demobilizations services.
3. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the safety plan to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
4. Approximately 20% of the work will need to be done off-hours including plumbing work in ceiling below roofs.
5. Asbestos abatement of existing flashing on the 2nd and 3rd floor roof (refer to spec section 028211).
6. Removal and replacement of roof on 2nd floor, 3rd floor and 11A roof.
7. Provide minimum R24 insulation on roof pitched to roof drains.
8. Replace all existing roof drains and add a secondary drain connected to existing drain piping.
9. Properly dispose of all debris.
10. Hold/attend all project meeting during construction. Take meeting minutes during all project meetings and distribute them to all parties. Number of meetings shall be determined by the COR.