36C24127Q0080.docx

DOCX document 107 KB Posted

Attached to
J041--Chiller System Maintenance
Solicitation number
36C24127Q0080
Issued by

About this file

This is a Statement of Work for a sole source chiller system maintenance procurement. The Department of Veterans Affairs, Networking Contracting Office (NCO 01) in Brockton, MA intends to award a firm-fixed price task order to TRANE for comprehensive preventive maintenance services on chiller systems and Ensemble controls equipment located at the VA Medical Center in West Roxbury, MA (1400 VFW Parkway). The contract will consist of a base year plus four option years. The contractor must provide all supervision, personnel, materials, parts, equipment, supplies, labor, and transportation necessary to perform preventive maintenance in accordance with the task order terms and conditions and accepted quotation. The scope includes periodic maintenance services as defined in the accompanying documentation (Attachment A).

The procurement is conducted under FAR 6.302-1 sole source authority, indicating that TRANE has been determined to be the only source capable of satisfying the requirement. The statement of work establishes key definitions and roles including the Contracting Officer (CO), Contracting Officer's Technical Representative (COTR), and procedures for Contract Discrepancy Reports (CDRs) to address unsatisfactory performance. The COTR will be responsible for quality assurance, inspection, surveillance, documentation, and acceptance of contractor performance, with designation details to be provided separately.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Chiller System Maintenance

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
02301
SOLICITATION NUMBER*
36C24127Q0080
RESPONSE DATE/TIME/ZONE
11-25-2026 12PM EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
PRODUCT SERVICE CODE*
J041
NAICS CODE*
238220
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VA Boston Healthcare System Contracting Officer (90C) 940 Belmont Street Brockton MA 02301

POINT OF CONTACT*

Contracting Officer Issa Shawki issa.shawki@va.gov

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Special Notice Special Notice

DESCRIPTION

*= Required Field
Special Notice

Special Notice

The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement:

STATEMENT OF WORK

SCOPE OF WORK

The Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation.

Period of Performance: This will be a firm-fixed price, base year plus four option years task order.

DEFINITIONS/ACRONYMS

Contract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.

Contracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.

Contracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.

Preventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.

To clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer’s specifications.

Repair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance.

Time: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.

Rework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government.

ESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.

Acronyms. Commonly used acronyms are listed below

FSE:Field Service Engineer
AQL:Acceptable Quality Level

IAW: In Accordance With

QA: Quality Assurance

QC: Quality Control

WS: Performance Work Statement

VA: VA Medical Center

CO: Contracting Officer

COTR:Contracting Officer’s Technical Representative FES: Facilities and Engineering Service

PREVENTIVE MAINTENANCE REQUIREMENTS

Within 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit.

The following is the scope of services to be performed on Covered Equipment. Items marked with an “X” are included in this contract.

Services Included
Cooling Seasonal Service
Services Included
Heating Seasonal Service
X
Seasonal Start-up

Seasonal Start-up

X
Operating Inspections Qty

Operating Inspections Qty

X
System Shutdown

System Shutdown

X
Annual Seasonal Maintenance

Annual Seasonal Maintenance

Services Included
Labor and Materials for Covered Equipment
X
Scheduled Maintenance Labor
X
Scheduled Maintenance Parts and Materials
X
Repair Labor: Repairs will be performed on covered equipment during Trane

regular business hours – Select Agreement

Repair Parts and Materials – Select Agreement

X
Overtime Repair Labor for Emergency Failures (outside Trane regular business
X
Refrigerant Monitor Inspection. Testing and Calibration once per year

Refrigerant Replacement 0% of Charge per unit per year

X
Refrigerant Usage Reporting

Other

Services Included
Predictive Testing and Analysis for Covered Equipment Chiller(s) Only
X
Spectrographic Oil Analysis – Trending oil analysis provides insight into potential
X
Refrigerant Analysis – Provides early warning of internal failure
X
KestrelView™ Analysis – Requires Trane laptop and Trane software
X
Oil Removal and Disposal by Trane in accordance with EPA Guidelines
X
Oil Change
Services Included
Additional Services
X
Air-cooled condenser coil cleaning once per year
X
Clean Cooling Tower(s) once per year
X
Condenser Tube Cleaning & Evap Tube Cleaning once per year
X
Starter Maintenance ≤600 voltvolt starter
X
Eddy Current Test of tubes every 2 years

Other

Chiller overhaul every 5 years was included in the current contract SOW Equipment Maintenance Procedures:

TRANE CENTRIFUGAL CHILLERS

(Low Pressure Units)

COMPREHENSIVE ANNUAL INSPECTION SERVICE – TRANE CTV-512

· Report in with the COTR and sign log with name, date and time.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· Inspect for leaks and report leak check results to the customer. Provide reports at the end of each visit.

· Repair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit.

· Calculate refrigerant loss rate and report to COR. Provide report at end of each visit.

· Replace the filter / drier on the motor cooling line, in accordance with mfg specifications.

· Test the security of mounting points; tighten all major points.

Controls and Safeties

· Inspect control panel for cleanliness.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Verify the working condition of all indicator/alarm lights.

· Verify the operation of all timing devices.

· Verify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR.

· Verify the operation of the low oil temperature safety device. Calibrate and record setting.

· Test the high discharge pressure safety device. Calibrate and record setting.

· Test the high suction temperature switch. Calibrate and record setting.

· Test the high discharge temperature safety device. Calibrate and record setting.

· Test the low suction pressure safety device. Calibrate and record setting.

· Test the low pressure override switch. Calibrate and record setting.

· Test the low leaving water temperature control device. Calibrate and record setting.

Lubrication System

· Pull oil sample for spectroscopic analysis.

· Change oil

· Test oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test.

· Inspect oil pump motor terminals for tightness and signs of overheating and discoloration.

· Measure and record oil pump motor voltage and amperage.

· Verify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater.

Motor and Starter

· Clean the starter and cabinet.

· Inspect the wires and starter components for tightness and signs of overheating and discoloration.

· Verify the operation of the transition/system timer.

· Check the condition of the contacts for wear and pitting.

· Check the contactors for free and smooth operation.

· Check the mechanical linkages for wear, security, and clearances.

· Verify the operation of the electrical interlocks.

· Check the dash pots oil for level, rust, and/or moisture.

· Meg the motor and record readings.

· Check the motor terminals for cracks and/or leaks.

· Measure voltage and record reading. Voltage should be nominal voltage ±10%.

STARTUP / CHECKOUT PROCEDURE CTV-520

· Verify the operation of the oil heater and that the oil temperature is at least 110°F before starting the chiller.

· Verify full water systems, including the cooling tower, the condenser and the evaporator.

· Verify clean cooling tower and strainers.

· Start the condenser water pump, chilled water pump, and cooling tower fan(s).

· Verify flow rates through the condenser and the evaporator.

· Test all flow-proving devices on the chilled water and condenser water circuits.

· Start the chiller.

· Verify the starter operation.

· Verify the operation of all timing devices.

· Check the load limit relay for set point, hunting, and unloading capability.

· Check the mechanical limits on both vane arms. Verify smooth movement of vane arms.

· Check the set point and sensitivity of the chilled water temperature control device. Verify the operation.

· Verify the operation of the condenser water temperature control device.

· Verify the motor cooling operation.

· Shut down the chiller.

· Check the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.)

· Re-start chiller and log the operating conditions after the system has stabilized.

· Review operating procedures with operating personnel.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

MID-SEASON RUNNING INSPECTION CTV-530

· Check the general operation of the unit.

· Log the operating temperatures, pressures, voltages, and amperages.

· Check the operation of the purge unit.

· Check the operation of the control circuit.

· Check the operation of the lubrication system.

· Check the operation of the motor and starter.

· Analyze the recorded data. Compare the data to the original design conditions.

· Review operating procedures with COTR.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

SEASONAL SHUT-DOWN PROCEDURE CTV-550

· Check the general operation of the unit.

· Shut down the chiller, pumps and auxiliary equipment.

· Drain the condenser and chilled water piping.

· Turn off equipment power as necessary.

· Review operating procedures with COTR.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

CONDENSER CLEANING

WATER-COOLED CONDENSERS BRUSH TUBES

(600 Tubes/Day) CDS-210

· Pull easy end head, both ends

· Brush tubes.

NOTE: The term “easy end head” refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit’s having marine boxes.

LUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130

· Change the oil and filter, using factory-recommended oil and filter every year.

COOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210

· Report in with the COTR.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· STRUCTURE

· Disassemble all screens and access panels for inspection.

· Inspect the conditions of the slats.

· Inspect the condition of the tower fill.

· Inspect the condition of the support structure.

· Inspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs to basins and replace nozzles if any issues.

Page 1 of

· Verify clean basins and strainer(s).

· Verify the condition and operation of the basin fill valve system.

· Fill basin

MECHANICAL

· Inspect gear box for leaks.

· Inspect drive and coupling for condition and security

· Inspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).

Lubrication

· Lubricate motor bearings.

· Check gear box oil level.

Motor and Starter

· Clean the starter and cabinet.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Check condition of the contacts for wear and pitting.

· Check contactor(s) for free and smooth operation.

· Meg the motor and record reading.

· Check disconnect terminal block for wear, tightness and signs of overheating and discoloration.

· Check the condition and operation of the basin heater contactor(s).

STARTUP / CHECKOUT PROCEDURE CLT-220

· Fill the basin and verify float level.

· Verify the operation of the basin heaters.

· Verify the operation, set point, and sensitivity of the basin heater temperature control device.

· Start the condenser water pumps.

· Verify the balance of the return water through the distribution boxes.

· Verify proper operation of the bypass valve(s), if applicable.

· Operate the fan(s) and verify smooth operation.

· Log operation after the system has stabilized.

· Review operating procedures with COTR.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

MID-SEASON RUNNING INSPECTION CLT-230

· Check the general condition of the tower.

· Verify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection.

· Verify proper water level in the basin.

· Verify proper operation of the water level control device.

· Verify smooth operation of the fan(s).

· Verify proper operation of the bypass valve(s).

· Review operating procedures with COTR.

· Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.

DIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110

· Report in with the COTR

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· Check motor shaft and pump shaft for alignment.

· Inspect the coupling for wear.

· Verify that the shaft guard is in place and tight.

· Verify water flow through the pump.

· Check for leaks on the mechanical pump seals.

· Verify proper drip rate on the pump seal packing.

· Verify smooth operation of the pump.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

Lubrication

· Lubricate the motor bearings as necessary.

· Lubricate the pump bearings as necessary.

Motor and Starter

· Clean the starter and cabinet.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Meg the motor.

· Verify tight connections on the motor terminals.

· Check the condition of the contacts for wear and pitting.

· Check the contactors for free and smooth operation.

· Verify proper volts and amps.

PUMP RUN INSPECTION PMP-111

· Verify smooth operation of the pump.

· Check for leaks on the mechanical pump seals.

· Verify proper drip rate on the pump seal packing.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

VARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130

· Report in with the COTR.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

· Clean the heat sinks.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Visually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.

· Verify proper operation of the unit.

· Verify proper DC buss voltage.

TRANE CENTRIFUGAL CHILLERS W-C

(CVHE/F Style Units)

COMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210

· Report in with the Customer Representative.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with customer for operational problems and trends.

General Assembly

· Check and record refrigerant level.

· Inspect for leaks and report leak results (yearly).

· The refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels.

· In order to use EPA-recommended methods, certain conditions must be met:

· The isolation valves on the chilled water and condenser water lines must shut off the circulation completely.

· The temperature of the equipment room should be 70°F or higher.

· Access connections to the condenser water and chilled water circuits must be provided (customer’s responsibility).

· If these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement.

· Calculate refrigerant loss and report to the COTR.

· Repair minor leaks as required (e.g., valve packing, flare nuts).

· Visually inspect condenser tubes for cleanliness.

· Check internal vanes for free and smooth operation.

· Check mechanical linkages for wear.

Purge

· Check purge unit controls for proper operation.

· Check and clean purge drum as required.

· Clean the condenser coil.

· Clean strainers or replace filters as required.

· Check the purge compressor assembly for leaks as required.

· Check the purge unit for proper operation.

Controls and Safeties

· Verify all settings in the electronic control panel.

· Inspect the control panel for cleanliness.

· Inspect wiring and connections for tightness and signs for overheating and discoloration.

· Verify the operation of the vane control system:

· Verify the working condition of all indicator/alarm lights and LED/LCD displays.

· Verify the operation of the oil sump temperature control device.

· Test high condenser pressure safety device. Calibrate and record setting.

· Test low evaporator temperature safety device. Calibrate and record setting.

· Test low oil pressure safety device. Calibrate and record setting.

· Test high motor temperature safety device. Calibrate and record.

· Test operation of chilled water pump and condenser water pump starter auxiliary contacts.

Lubrication System

· Pull oil sample for spectroscopic analysis.

· Check oil for acid content and discoloration. Make recommendations to the customer based on the results of the test.

· Measure and record the oil pump voltage and amperage.

· Verify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater.

· Change the oil and oil filter.

· Verify the oil level.

Motor and Starter

· Clean the starter and cabinet.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Check condition of the contacts for wear and pitting.

· Check contactors for free and smooth operation.

· Check the mechanical linkages for wear, security, and clearances.

· Check tightness of the motor terminal connections.

· Meg the motor and record reading.

· Verify the operation of the electrical interlocks.

STARTUP / CHECKOUT PROCEDURE CTV-220

· Verify the operation of the oil heater and that the oil temperature is at least 110°F before starting the chiller.

· Verify full water systems, including the cooling tower, condenser and evaporator.

· Verify clean cooling tower and strainers.

· Start the condenser water pump, chilled water pump, and cooling tower fan(s).

· Test all flow-proving devices on the chilled water and condenser water circuits

· Verify the flow rates through the condenser and the evaporator.

· Start the chiller.

· Verify the operation of all timing devices.

· Verify the operation of the current control device.

· Check the set point and sensitivity of the chilled water temperature control device. Verify the operation.

· Verify the operation of the condenser water temperature control device.

· Check the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation.

· Check the starter operation.

· Verify the motor cooling operation.

· Check the purge operation.

· Shut down the chiller.

· Check the oil and refrigerant levels, provide leak rate calculation report if levels are low.

· Re-start the chiller and log the operating conditions after the system has stabilized.

· Review operating procedures with the operating personnel.

· Provide a written report of completed work, operating log, and indicate any deficiencies detected.

MID-SEASON RUNNING INSPECTION CTV-230

· Check the general operation of the unit.

· Log the operating temperatures, pressures, voltages, and amperages.

· Check the operation of the purge unit.

· Check the operation of the control circuit.

· Check the operation of the lubrication system.

· Check the operation of the motor and starter.

· Analyze the recorded data. Compare the data to the original design conditions.

· Review operating procedures with operating personnel.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

SEASONAL SHUT-DOWN PROCEDURE CTV-250

· Shut down the chiller, pumps, and auxiliary equipment.

· Drain the condenser and chilled water piping as required.

· Turn off equipment power as necessary.

· Review operating procedures with operating personnel.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

Air-Cooled Rotary Chillers ACR-1

· Review operation logs with COTR for any problems and trends.

· Check and record refrigerant level, provide leak rate calculation report if levels are low.

· Inspect for leaks, conduct leak check using EPA-recommended methods, and report leak results.

· Calculate refrigerant loss.

· Repair all minor leaks as required such as valve packing, flare nuts, etc.

· Visually inspect condenser coil for cleanliness.

· Check the condenser fans for clearances and free operation.

· Check tightness of condenser fan motor mounting brackets.

· Check the set screws on the fan shafts.

· Verify the performance of the fan control inverter VFD.

· Grease fan bearings as required.

· Annually, clean the condenser coil.

· Verify all settings in the electronic control panel.

· Inspect the control panel for cleanliness.

· Inspect controls and safety wiring and connections for tightness and signs of overheating and discoloration.

· Verify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required.

· Test the oil pressure safety device. Calibrate and record setting.

· Test high motor temperature safety device. Calibrate and record setting.

· Test operation of chilled water pump and condenser water pump starter auxiliary contacts.

· Pull one oil sample per year for spectroscopic analysis.

· Annually, check oil for acid content and discoloration. Change oil if out of normal parameters.

· Verify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters.

· Clean the starter cabinet and starter components.

· Start the unit if not already in operation.

· Inspect motor and starter wiring and connections for tightness and signs of overheating and discoloration.

· Check condition of contacts for wear and pitting.

· Check contactors for free and smooth operation.

· Check the mechanical linkages for wear, security, and clearances.

· Check tightness of the motor terminal connections.

· Annually, meg the motor and record reading.

· Verify the operation of the electrical interlocks.

· Measure and record voltages.

· Provide function test—loss of normal operation and automatic emergency start up

· Once per year, pull a refrigerant sample for spectrographic analysis for contaminants.

a. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July)

· Log the operating temperatures, pressures, voltages, and amperages.

· Check the operation of the control circuit.

· Check the operation of the lubrication system.

· Check the operation of the motor and starter.

· Analyze the recorded data and compare to the original design conditions for the equipment.

· Review operating procedures with COTR and VA staff.

CENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110

· Report in with the COTR.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· Inspect the unit for cleanliness.

· Inspect the fan wheel and shaft for wear and clearance.

· Check the sheaves and pulleys for wear and alignment.

· Check the belts for tension, wear, cracks, and glazing.

· Verify tight bolts, set screws, and locking collars.

· Check dampers for wear, security and linkage adjustment.

· Verify clean condensate pan.

· Verify proper operation of the condensate drain.

· Verify clean air filters.

· Verify clean coils.

· Verify proper operation of the spray pump, if applicable.

· Verify smooth fan operation.

· Log operating conditions after system has stabilized.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

· Lubricate the fan shaft bearings, if applicable.

· Lubricate the motor bearings, if applicable.

Controls and Safeties

· Test the operation of the low temperature safety device, if applicable.

· Test the operation of the high static pressure safety device, if applicable.

· Test the operation of the low static pressure safety device, if applicable.

· Check the thermal cutout on electric heaters, if applicable.

· Check the step controller, if applicable.

· Check and record supply air and control air pressure, if applicable.

· Verify the operation of the control system and dampers while the fan is operating.

Motor and Starter

· Clean the starter and cabinet.

· Inspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable.

· Check the condition of the contacts for wear and pitting.

· Check the contactors for free and smooth operation.

· Meg the motor and record readings.

SCHEDULED RUNNING INSPECTION AHU-130

· Check the general condition of the fan.

· Verify smooth fan operation.

· Check and record supply and control air pressure, if applicable.

· Function test loss of normal operation and emergency start up

· Verify the operation of the control system.

· Log the operating conditions after the system has stabilized.

· Review operating procedures with operating personnel.

· Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected.

VANE AXIAL FANS – TRANE COMPREHENSIVE ANNUAL INSPECTION – EXHAUST FANS

FAN-130

Page 1 of Page 1 of

· Report in with the COTR

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the COTR for operational problems and trends.

General Assembly

· Inspect fan wheel for wear, security, and clearance.

· Inspect sheaves and pulleys for wear and alignment.

· Inspect belts for tension, wear, cracks, and glazing.

· Verify tight bolts, set screws, and locking collars.

· Verify smooth operation of the fan.

· Log operating conditions after the system has stabilized.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

· Lubricate the fan bearings.

· Lubricate the motor bearings, if applicable.

Motor and Starter

· Clean the starter and cabinet.

· Inspect the wiring and connections for tightness and signs of overheating and discoloration.

· Check the condition of the contacts for wear and pitting.

· Check the contactor for free and smooth operation.

· Meg the motor and record the readings.

· Check and record volts and amps of the motor.

PURGE SYSTEMS PURIFIER PURGE PRG-130

· Clean the condenser on the purge refrigeration unit.

· Check purge unit controls for proper operation.

· Check and clean purge drum.

· Clean strainers or replace filters.

· Check purge compressor assembly for leaks.

· Check the purge unit for proper operation.

LEAK CHECK (HIGH PRESSURE)

WATER COOLED High Pressure Leak Check LCK-11O

· Inspect for leaks and report results.

· Repair minor leaks as required (e.g. valve packing, flare nuts).

· Calculate refrigerant loss rate and report to the customer.

CONDENSER CLEANING

WATER-COOLED CONDENSERS BRUSH TUBES

(600 Tubes/Day) CDS-210cds

· Pull both heads.

· Eddy Current test every 2 years.

· Brush tubes as necessary.

NOTE: The term “easy end head” refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit’s having marine boxes.

LUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130

· Change the oil and filter, using factory-recommended oil and filter.

REFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320

· Report in with the COTR.

· Record and report abnormal conditions.

· Check chassis mounting in enclosure.

· Check operation of Clear Language Display.

· Replace sampling filter element /elements at sensing points.

· Provide Zero and Span calibration to accuracy within 1 PPM.

· Visually check photo-acoustic sensing device.

· Check periodic re-zeroing.

COOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210

· Report in with the COTR.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· STRUCTURE

· Disassemble all screens and access panels for inspection.

· Inspect the conditions of the slats, if applicable.

· Inspect the condition of the tower fill.

· Inspect the condition of the support structure.

· Inspect the condition of the basins (upper and lower) and/or spray nozzles.

· Verify clean basins and strainer(s).

· Verify the condition and operation of the basin fill valve system.

· MECHANICAL

· Inspect gear box for leaks.

· Inspect drive and coupling for condition and security

· Inspect fan assembly for condition, security, and clearances (e.g. blade tip clearance).

Lubrication

· Lubricate motor bearings.

· Check gear box oil level.

Motor and Starter

· Clean the starter and cabinet.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Check condition of the contacts for wear and pitting.

· Check contactor(s) for free and smooth operation.

· Meg the motor and record reading.

· Check disconnect terminal block for wear, tightness and signs of overheating and discoloration.

· Check the condition and operation of the basin heater contactor(s).

STARTUP / CHECKOUT PROCEDURE CLT-220

· Fill the basin and verify float level.

· Verify the operation of the basin heaters.

· Verify the operation, set point, and sensitivity of the basin heater temperature control device.

· Start the condenser water pumps.

· Verify the balance of the return water through the distribution boxes.

· Verify proper operation of the bypass valve(s), if applicable.

· Operate the fan(s) and verify smooth operation.

· Log operation after the system has stabilized.

· Review operating procedures with COTR.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

MID-SEASON RUNNING INSPECTION CLT-230

· Check the general condition of the tower.

· Verify clean basins and strainers (upper and lower) and/or spray nozzles.

· Verify proper water level in the basin.

· Verify proper operation of the water level control device.

· Verify smooth operation of the fan(s).

· Verify proper operation of the bypass valve(s).

DIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110

· Report in with the COTR

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

General Assembly

· Check motor shaft and pump shaft for alignment.

· Inspect the coupling for wear.

· Verify that the shaft guard is in place and tight.

· Verify water flow through the pump.

· Check for leaks on the mechanical pump seals.

· Verify proper drip rate on the pump seal packing.

· Verify smooth operation of the pump.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

· Lubricate the motor bearings as necessary.

· Lubricate the pump bearings as necessary.

Motor and Starter

· Clean the starter and cabinet.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Meg the motor and record results.

· Verify tight connections on the motor terminals.

· Check the condition of the contacts for wear and pitting.

· Check the contactors for free and smooth operation.

· Verify proper volts and amps.

PUMP RUN INSPECTION PMP-111

· Verify smooth operation of the pump.

· Check for leaks on the mechanical pump seals.

· Verify proper drip rate on the pump seal packing.

· Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.

VARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130

· Report in with the COTR.

· Record and report abnormal conditions, measurements taken, etc.

· Review customer logs with the customer for operational problems and trends.

· Clean the heat sink.

· Inspect wiring and connections for tightness and signs of overheating and discoloration.

· Visually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture.

· Verify proper operation of the unit.

· Verify proper DC buss voltage.

A. Each inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately.

B. For each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection.

C. All work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates.

D. All inspection work must be coordinated through the COTR who is:

EMERGENCY SERVICE

Emergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately.

CONTRACTOR PERSONNEL

A. Personnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor’s personnel and refuse them permission to work on VA equipment.

B. Conduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.

C. Identification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office.

HOURS OF OPERATION

E. Normal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections.

F. Federal Holidays. Federal Holidays observed by the VA are:

New Years Day; Martin Luther King Day; President’s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.

CONTRACTOR QUALITY CONTROL

The Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.

INSPECTION AND ACCEPTANCE

A. Final inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.

B. Unsatisfactory service will be reported in writing by the VA CO to the Contractor.

C. Telephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.

REMOVAL AND/OR DISPOSAL

A. Removing Government-Owned Material: All property removed remains the property of the U.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.

B. Salvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract.

C. Inventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the

Contractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.

FIRE PREVENTION AND PROTECTION

The Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.

ENERGY CONSERVATION

The Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.

CLEANING UP

The Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.

HAZARDOUS CONDITIONS

During the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.

CLEANLINESS

The area immediately around the equipment provided for the Contractor’s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor’s employees.

SERVICE MANUALS

The VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.

INSURANCE

A. Worker compensation and employer’s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker’s Compensation and occupational disease statutes.

B. General Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

C. Property Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.

D. Contractor shall provide proof of liability insurance within five (5) days after contract award.

SMOKING POLICY

Smoking is prohibited inside all buildings except in designated areas.

BILLING AND PAYMENT

A. Each invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment’s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.

B. Payment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number.

PRICING SUBMITTAL

The annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract.

VENDOR REQUIREMENTS

1. The contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract.

2. The contractor must have at least 5 years’ experience satisfactorily performing such maintenance on comparable units, equipment, or systems.

3. The contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work.

4. The contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.

EQUIPMENT COVERED BY THIS CONTRACT

BUILDING # 1

VA ID#
MANUFACTURER
ITEM NAME
MODEL #
SERIAL#
SCHEDULE
LOCATION
Trane (MICU) Back-Up
Air-Cooled Chiller
CGAM070F2Y03AXD2A1
U22A00424
ACR-1
WR-B1- 4B128
Trane (CCU)
Air-Cooled Chiller
CGAM070F2Y03AXD2A1
U22A00422
ACR-1
WR-B1- A4-01

BUILDING # 2

Trane
Centrifugal Chiller
CVHF0910
L03M08522
CTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130
WR-B2-AB- 13
Trane
Centrifugal Chiller
CVHF0910
L03M08531
CTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130
WR-B2-AB- 13
Marley
Cooling Tower-1
NC-8309 GZBS
NC-241518-A2
CLT-210, CLT-230, CLT-220
WR-B2-A4-01
Marley
Cooling Tower-2
NC-9309 GZBS
NC-241518-A1
CLT-210, CLT-230, CLT-220
WR-B2-A4-01
Trane
(OR- Back-Up) Air-Cooled Chiller
RTAA0804YR01A301GBFC
U06B06111
ACR-1
WR-B2-A4-01
Trane
(GI) Air-Cooled Chiller
CGAFC304AK01A00000
C06A00249
ACR-1
WR-B2-A4-01
Trane
(S5C) Air-Cooled Chiller
RTAC1404
U10F07753
ACR-1
WR-B2-A4-01
Trane (Artic Chiller)
Chiller Modular -1
PACVMV0400D4-MM-VS1
A10001137
Running Inspection
WR-B2-PH
Trane (Artic Chiller)
Chiller Modular -2
PACVMV0400D4-MM-VS1
A101011417
Running Inspection
WR-B2-PH
Trane (Artic Tower)
Tower Modular-2
TP00004075
A101011517
Tower Cleaning & Running Inspection
WR-B2-PH
Trane
SPS Condenser
RAUJ804A132BDF01D
C10J04548
ACR-1
WR-B2-POOL ROOF
Trane
S5C AHU
MCCB05ONBFOSDAA
K08B22619
AHU-110, AHU-130
WR-B2-A4-01
Trane
(OR-S5) AHU
MCCB05OUA0AOUB
K09D83236A
AHU-110, AHU-130
WR-B2-A4-01
Trane
AHU-1A
CSAA012UBL00
K17C26642
AHU-110, AHU-130
WR-B2-ROOF
Trane
AHU-1B
CSAA0100
K17C26621
AHU-110, AHU-130
WR-B2-ROOF
Carrier
(S8-Elv Mch Rm) Air Cooled Chiller
38ARZ008-601CA
3806G50045
ACR-1
WR-B2-ROOF
Trane
(CTIR) Air Cooled Chiller
TTA09044DAA02BS010001
23193610YA
ACR-1
WR-B2-ROOF
Trane
(CTIR) Dry Cooler
TR-SCS-120-SSA
10331148
ACR-1
WR-B2-ROOF
Barry Blower
Exhaust Fan
EM2515T-G
76-2902
FAN-130
WR-B2-PH
Cook MFG
Exhaust Fan
195CPS
N/A
FAN-130
WR-B2-AB- 13
Vaneaxial Fan
Exhaust Fan E-5
N/A
N/A
FAN-130
WR-B2-A4-01-PH
Vaneaxial Fan
Exhaust Fan GE-1
N/A
N/A
FAN-130
WR-B2-A4-01-PH
Baldor Reliance
2-SCHW-Pump-1
EM3313T-G
37J839L868G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-SCHW-Pump-1 Frame
E-1510
C331015-01A22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-SCHW-Pump-2
EM3313T-G
37J839L868G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-SCHW-Pump-2 Frame
E-1510
C331015-01G22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-SCHW-Pump-3
EM3313T-G
37J839L868G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-SCHW-Pump-3 Frame
E-1510
C331015-01C22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-SCHW-Pump-4
EM3311T-G
37J839L863G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-SCHW-Pump-4 Frame
E-1510
C331016-01B22
PMP-110, PMP-111
WR-B2-AB- 13
Trane TR200
2-SCHWP-1 VDF
174Z4893
988204Y252
MSC-130
WR-B2-AB- 13
Trane TR200
2-SCHWP-2 VDF
174Z4893
525204Y182
MSC-130
WR-B2-AB- 13
Trane TR200
2-SCHWP-3 VDF
174Z4893
525204Y182
MSC-130
WR-B2-AB- 13
Trane TR200
2-SCHWP-4 VDF
174Z4893
771804Y222
MSC-130
WR-B2-AB- 13
Baldor Reliance
2-PCHW-Pump-1
EM2539T-G
40E245X166G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-PCHW-Pump-1 Frame
VSC
C331009-01D22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-PCHW-Pump-2
EM2539T-G
40E245X166G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-PCHW-Pump-2 Frame
VSC
C331009-03C22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-PCHW-Pump-3
EM2539T-G
40E245X166G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-PCHW-Pump-3 Frame
VSC
C331009-01D22
PMP-110, PMP-111
WR-B2-AB- 13
Trane TR200
2-PCHWP-1 VDF
174Z4898
986904Y252
MSC-130
WR-B2-AB- 13
Trane TR200
2-PCHWP-2 VDF
174Z4898
986804Y252
MSC-130
WR-B2-AB- 13
Trane TR200
2-PCHWP-3 VDF
174Z4898
986604Y252
MSC-130
WR-B2-AB- 13
Baldor Reliance
2-CW-Pump-1
EM2555T-4G
44E227W390G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-CW-Pump-1 Frame
VSC
C331008-02D22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-CW-Pump-2
EM2555T-4G
44E227W390G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-CW-Pump-2 Frame
VSC
C331008-01D22
PMP-110, PMP-111
WR-B2-AB- 13
Baldor Reliance
2-CW-Pump-3
EM2555T-4G
44E227W390G1
PMP-110, PMP-111
WR-B2-AB- 13
Bell & Gossett
2-CW-Pump-3 Frame
VSC
C331008-03D22
PMP-110, PMP-111
WR-B2-AB- 13
Trane TR200
2-CWP-1 VDF
174Z4902
271004Y292
MSC-130
WR-B2-AB- 13
Trane TR200
2-CWP-2 VDF
174Z4902
270804Y292
MSC-130
WR-B2-AB- 13
Trane TR200
2-CWP-3 VDF
174Z4902
270904Y292
MSC-130
WR-B2-AB- 13
Strainer
CW Strainer-1
10" ASTM A126 GR.B
N/A
Clean Strainer
WR-B2-AB- 13
Strainer
CW Strainer-2
10" ASTM A126 GR.B
N/A
Clean Strainer
WR-B2-AB- 13
Strainer
CW Strainer-3
10" ASTM A126 GR.B
N/A
Clean Strainer
WR-B2-AB- 13

BUILDING # 3

Trane
Centrifugal Chiller
CVHE0450
L09A05825
CTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130
WR-B3-3C101
Trane
Centrifugal Chiller
CVHE0450
L09A05826
CTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130
WR-B3-3C101
Trane
(B3-Cross Connect )Air-Cooled Chiller
RTAC
U22A00455
ACR-1
WR-B3-ROOF
Evapco
Cooling Tower
LST-10-183T
879038
CLT-210, CLT-220, CLT-230
WR-B3- ROOF
Evapco
Cooling Tower
LST-10-183T
879039
CLT-210, CLT-220, CLT-230
WR-B3- ROOF
ABB
Cooling Tower-1 VFD
ACH550-UH-045A-4
2090602672
MSC-130
WR-B3-3C101
ABB
Cooling Tower-2 VFD
ACH550-UH-045A-4
2090602674
MSC-130
WR-B3-3C101
Baldor Reliance
3-PCHW-Pump-1
EM2531T
40G048W943
PMP-110, PMP-111
WR-B3-3C101
Baldor Reliance
3-PCHW-Pump-2
EM2531T
40G048W943
PMP-110, PMP-111
WR-B3-3C101
Baldor Reliance
3-PCHW-Pump-3
EM2531T
40G048W943
PMP-110, PMP-111
WR-B3-3C101
ABB
3-PCHW-Pump-1 VFD
ACH550-UH-038A-4
2090602676
MSC-130
WR-B3-3C101
ABB
3-PCHW-Pump-2 VFD
ACH550-UH-038A-4
2090602673
MSC-130
WR-B3-3C101
ABB
3-PCHW-Pump-3 VFD
ACH550-UH-038A-4
2090602675
MSC-130
WR-B3-3C101
Strainer
Bldg-3-CW Strainer-1
10" Keckley Style A 125lbs
N/A
Clean Strainer
WR-B3-3C101
Strainer
Bldg-3-CW Strainer-2
10" Keckley Style A 125lbs
N/A
Clean Strainer
WR-B3-3C101
Strainer
Bldg-3-CW Strainer-3
10" Keckley Style A 125lbs
N/A
Clean Strainer
WR-B3-3C101
Baldor Reliance
3-PCW-Pump-1
EM2528T
40G048X120
PMP-110, PMP-111
WR-B3-3C101
Baldor Reliance
3-PCW-Pump-2
EM2528T
40G048X120
PMP-110, PMP-111
WR-B3-3C101
Baldor Reliance
3-PCW-Pump-3
EM2528T
40G048X120
PMP-110, PMP-111
WR-B3-3C101
ABB
3-PCW-Pump-1 VFD
ACH550-UH-031A-4
2090602687
MSC-130
WR-B3-3C101
ABB
3-PCW-Pump-2 VFD
ACH550-UH-031A-4
2090602685
MSC-130
WR-B3-3C101
ABB
3-PCW-Pump-3 VFD
ACH550-UH-031A-4
2090602688
MSC-130
WR-B3-3C101

BUILDING # 20 & 21

Trane Arctic
Chiller Mod 1
TPWCCMV0300D4-MM
A022047224
Running Inspection
WR-B20
Trane Arctic
Chiller Mod 2
TPWCCMV0300D4-MM
A022047124
Running Inspection
WR-B20
Trane Arctic
Chiller Mod 3
TPWCCMV0300D4-MM
A022047024
Running Inspection
WR-B20
Trane
Condenser Unit
RAUJC604BA03AOD
C10B00682
ACR-1
WR-B21
Trane
Condenser Unit
RAUJC604BA03AOD
C10B00681