This document is an amendment to a solicitation for shredding services at the Bedford VA Medical Center. Amendment 001 modifies the original solicitation 36C24127Q0037 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The amendment addresses updates or clarifications to the shredding contract requirements for the Bedford facility, though the specific substantive changes contained within this amendment are not detailed in the available information provided.
Potential bidders should review this amendment in conjunction with the original solicitation to understand the complete scope of work, timeline requirements, pricing terms, and all technical specifications for the shredding services contract. All amendment provisions supersede conflicting language in the base solicitation and must be incorporated into any proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24127Q0037 0003.docx | DOCX document | |
| 36C24127Q0037 0001.docx | DOCX document | |
| 36C24127Q0037.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
11-17-2026
Department of Veterans Affairs Network Contracting Office 1 (NE Contracting Officer (90C) 940 Belmont Street Brockton MA 02301 Jeffrey S. Fleming Jeffrey.Fleming@va.gov
Department of Veterans Affairs Network Contracting Office 1 (NE Contracting Officer (90C) 940 Belmont Street Brockton MA 02301 To all Offerors/Bidders
36C24127Q0037
X
The purpose of this amendment is to provide answers to questions and a current Wage Determination list.
There is no change in submission time or date.
All other terms and conditions remain the same.
Jeffrey S. Fleming Contracting Officer
1. Service frequency at Bedford VAMC. The price schedule line items (0001 and 0002) describe bi-weekly service at Bedford, while Section 1.f of the Performance Work Statement states weekly pick-up at the VAMC campus. Which frequency should quoters use for pricing the base and option years?
Bi Weekly- see new Price schedule.
2. This is paper products to shred, this will done in the premise
Remove from the Bedford VA Medical Center premises and transport to an appropriate location to be pulped if needed, must be shredded on premises according to the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization
3. Do I need clearance-
No Clearance, but a Business Associate Agreement will be completed.
Employees will be badged.
4. Do I need store any document?
Document storage is not included.
5. What will be frequency?
See price Schedule- Amendment 2 bi-weekly- and monthly pick-ups at each remote locations-per PWS
6. May the three comparable references from the past three years and the corporate-experience requirements in E.2 be satisfied by the identified performing subcontractor's experience, or must these be the prime's own projects?
The intent is to evaluate the vendor past performance for Shredding or similar size and scope by the prime. Subcontractor performance may be used to enhance the Past Performance of the prime.
7. B.2 lists biweekly Bedford service for 12 65-gallon containers and 115 32-gallon consoles. B.3 paragraphs 1.b-d list 106 consoles and 30 64-gallon totes, while 1.f requires weekly pickup. Which quantities and frequency govern pricing, and does biweekly mean every two weeks?
Bi-weekly, yes, every two weeks- See Price Schedule amendment 0002.
8. B.3 paragraph 1.a requires on-site destruction to no larger than 1 x 5 mm, or a disintegrator with a 3/32-inch security screen, and mentions classified information. Please confirm whether that exact destruction standard must be achieved on-site at all four locations and whether national-security classified records are actually included. If so, what facility/personnel clearances or additional handling requirements apply?
VA Directive 6371 is the policy that guides the destruction of paper material. The standard is that the material must no longer be readable or reconstructable. The original version of that Directive required that any shredders must meet the cut-size prescribed by NIST. However, in the subsequent version of the Directive, this was changed to be the standard of no longer readable or reconstructable and a specific cut-size for shredders was removed. As long as a shredder can produce a level of shredding that renders the material to be no longer readable or reconstructable, it would be acceptable for use. My suggestion is that facilities only rely upon shredders as a means of interim destruction unless the material is verifiably destroyed according to VA Directive 6371.
9. Pickup frequency at the Bedford campus. The price schedule lists the Bedford consoles and containers as "Bi-Weekly", while the Statement of Work reads "f. Weekly pick-up of the material collected in each container located throughout the VAMC campus". Which frequency should offers be priced on?
(bi-weekly and monthly pick-ups at each remote locations)
10. Console count. The schedule lists "115 - 32 gallon capacity, front feed lockable consoles", while the Statement of Work says there will be no additional charge "for changes in the number of consoles up to a maximum total quantity of 106". Should the maximum read 115 or more, or should offers be priced on 106 consoles?
See revised Price schedule Amendment 002, 20 64 Gallon and 125-32 gallon
11. Totes. The schedule lists "12 - 65-gallon, rollout, high-capacity waste containers", while the Statement of Work says "The Contractor will provide 64 gallon, lockable, wheeled totes ... Estimated quantity is 30." How many totes should offers be priced on?
Estimated is removed, and see new price schedule
12. Container quantities: The pricing schedule specifies 115 lockable consoles and 12 large containers at Bedford, while the Statement of Work specifies 106 consoles and 30 large totes. Which quantities should bidders use for pricing?
See new price schedule
13. Pickup frequency: The pricing schedule specifies biweekly service at Bedford, while the Statement of Work requires weekly pickups. Which frequency should bidders follow?
Bi Weekly
14. Shredding specifications: Can you confirm whether the required particle size of 1 × 5 mm applies to all documents, or whether alternative destruction methods meeting VA security requirements are acceptable?
Two acceptable methods, the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization: Shredded material will be no larger than 1 x 5 mm in size or will be pulverized/ disintegrated using disintegrator device equipped with 3/32 inch security screen. accomplish destruction services on-site and transport to an appropriate location to be pulped if needed, must be shredded on premises according to the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization. Certification documentation can be in the form of a letter, memo, or any format attesting to its complete destruction. This certification is not considered a valid certification of destruction if completed and submitted prior to the final destruction of the records. The certification should contain sufficient information to attest to the final destruction of the temporary paper records – what temporary records were destroyed, the date when they were destroyed, what destruction method was used, where they were destroyed, and who was responsible for their final destruction.
15. Additional services: How should bidders price additional pickups and bulk document destruction, since these services may be required but are not separately listed in the pricing schedule?
This service would not be required
16. Subcontracting: Can the prime contractor use a qualified local shredding subcontractor to perform on-site destruction services, provided all contractual, security, and HIPAA requirements are satisfied?
Yes
17. Past performance and corporate experience (E.2): if a small business prime quotes with a named shredding subcontractor that will perform the work, will the Government evaluate the subcontractor's references and experience under the Past Performance and Technical factors?
The intent is to evaluate the vendor past performance for Shredding or similar size and scope by the prime. Subcontractor performance may be used to enhance the Past Performance of the prime.
18. Are three references a minimum requirement, or will an offeror with fewer than three references of its own be rated neutral on past performance?
A neutral rating will be issued, this evaluation is Comparative analysis past performance has relevancy.
19. The notice shows no set-aside, but C.5 includes 52.219-6, Notice of Total Small Business Set-Aside. Please confirm this is a total small business set-aside, and whether 52.219-14, Limitations on Subcontracting, applies. If it does, does work performed by a similarly situated small business subcontractor count toward the prime's share?
See Amendment 0001 set aside to SB.
20. The PWS states an estimated 106 consoles, while the price schedule lists 115 32-gallon consoles serviced bi-weekly. Which quantity and frequency should quotes be priced on?
See price schedule Amendment 0002
21. The D.3 Past Performance survey form refers to 36C24127Q0027.
| Please confirm it should read 36C24127Q0037, and that references may email | completed surveys directly to you. |
| Yes the D.3 Past performance survey is for 36C24127Q0037. Emailed to | Jeffrey.Fleming@va.gov. |
22. Who is the current contractor, what is the current contract number, and what monthly weight or volume has been collected over the last 12 months?
| 36C24122P0001 NORTHEAST RECORD RETENTION NORTH, LLC |
| There is no weight or volume records, it is a per pick up requirement. |
23. At the Bedford campus, will VA staff bring the paper to a loading dock for shredding, or will the contractor need to empty the consoles and totes where they're located?
Vendor is to pick up consoles and totes at their position in the building.
24. The statement of work and the price schedule appear to differ on container counts and pickup frequency. The work statement describes about 106 consoles and about 30 sixty-four-gallon totes with weekly campus pickup, while the schedule lists 115 consoles and 12 sixty-five-gallon totes with service every two weeks. Which counts and which frequency should offerors use for pricing?
See new Price Schedule, Amendment 0002
25. Could you share the approximate monthly weight currently collected under the existing contract, if that information is available?
This is a per service requirement, there is no weight requirement.
26. Is there a deadline for submitting questions?
Yes in block 20 of the SF1449 11/16/2026 13:00hrs EST.
27. The presolicitation noted that prospective firms should be registered in the SBA VetCert Vendor Information Pages (VIP) database. Is VIP registration required of all offerors, or only those claiming veteran-owned status for evaluation under VAAR 852.215-70?
Those claiming vet status, although this is set aside for Small business amendment 1.
28. Does FAR 52.219-14, Limitations on Subcontracting, apply to this small-business set-aside, and if so at what percentage?
If quote is over SAT.
29. Should we price Bedford campus service weekly or every other week? The statement of work and pricing schedule appear to list different frequencies.
See Price schedule, Amendment 0002
30. We understand the contractor is responsible for supplying containers. How many consoles and rolling totes must the incoming contractor provide at each location when service begins? Will any existing containers be available for the incoming contractor to use?
All consoles and totes, no existing.
31. If available for release, could you share the current contractor's name, contract or purchase order number, and price for the current contract year? A breakdown between the Bedford campus and outpatient clinics would be helpful if available.
| 36C24122P0001 NORTHEAST RECORD RETENTION NORTH, LLC |
| $129,672.00 base plus 4 options. |
32. The price schedule says pickups are bi-weekly and 115 consoles, but the SOW says weekly with 106 consoles and 30 totes. Which is correct?
Bi-weekly see new price schedule. Amendment 002
33. Service frequency: the price schedule (CLINs) lists Bedford service every two weeks, while the Statement of Work says weekly. Which frequency should we price?
See new Price schedule Amendment 002
34. Container counts: the Statement of Work lists 115 32-gallon consoles and 12 65-gallon rollout bins at Bedford, but also says the contractor will provide up to 106 consoles and 30 64-gallon totes at no cost. Should we plan to service 115 consoles and 12 bins, and how many consoles and totes should we plan to supply?
See new price schedule, Amendment 002
35. Item 0002: Bedford, Bi-Weekly 115 – 32-gallon capacity, front-feed lockable consoles.
However, Section B.3 of the Statement of Work indicates:
- An estimated quantity of 106 consoles.
- A maximum total quantity of 106 consoles without additional charges or contract modifications.
Could you please confirm whether the required quantity is 106 or 115 consoles?
See new price schedule, See Amendment 002.
36. Bedford Pickup Frequency
The pricing schedule describes Bedford services as bi-weekly pickups.
However, Section B.3, Paragraph 1(f), states that weekly pickups are required for materials collected in containers throughout the Bedford VA Medical Center campus.
Could you please confirm whether Bedford requires weekly or bi-weekly pickups?
Biweekly
37. The RFQ is a total small business set-aside (52.219-6), but FAR 52.219-14, Limitations on Subcontracting, does not appear in the clauses. Does the 50 percent limit for services under 13 CFR 125.6 apply to this award?
If quotes exceeds the Simplified Acquisition threshold it will apply
38. If it applies, will a subcontractor that is small under NAICS 561990 be treated as a similarly situated entity, so that its work counts toward the prime contractor's share?
Yes, if the prime assigns the subcontract a NAICS code under which the subcontractor qualifies as small.
39. Section B.3, 1.h requires vehicles to be identified with the contractor name. If a subcontractor performs the shredding, is a truck marked with the subcontractor's company name acceptable?
Vendor must notify COR/CO of vendors and markings.
40. Will references from a proposed subcontractor count toward the three past performance references in 52.212-2?
The intent is to evaluate the vendor past performance for Shredding or similar size and scope. Subcontractor performance may be used to enhance the Past Performance of the prime.
41. CLINs 0001 and 0002 list bi-weekly service at Bedford, while Section B.3, 1.f calls for weekly pickup on the VAMC campus. Which frequency should quotes be based on?
Bi weekly
42. CLIN 0002 lists 115 consoles at Bedford (118 including the three CBOCs), while Section B.3, 1.b and 1.c estimate 106 consoles with a maximum of 106 at no added charge. CLIN 0001 lists twelve 65-gallon containers, while 1.d estimates thirty 64-gallon totes. Which quantities should quotes be based on?
Use new price schedule, Amendment 002
43. Can you share the monthly weight (in pounds) collected over the past 12 months, and how often bulk purges under 1.g have been requested? Since there is no separate CLIN, should bulk purges be included in the monthly price?
This is a pick up per quote there is no weight data.
The bulk Puges language shall be removed form PWS.
44. Section B.3, 1.a(6) requires on-site destruction at the Bedford VAMC "and attached properties." Must the material at the Haverhill, Gloucester and Lynn CBOCs be shredded on-site at each clinic, or may it be collected and shredded on the truck at Bedford?
Yes
45. Are the containers now in place owned by the current contractor? Can you share the current contract number for these services?
Owned by current contractor
36C24122P0001 NORTHEAST RECORD RETENTION NORTH, LLC
$129,672.00 base plus 4 options
46. Section D.2 lists seven wage determinations. Which one applies to the shredding truck driver and operator, and were the current contractor's employees covered by a collective bargaining agreement?
Vendor is to determine the applicable wage determination based on the descriptions and duties assigned to their employees. Amendment 002 places the locations next to the Wage Determination.
We are not aware of a Collective Bargaining Agreement.
47. Please confirm that quotes should be emailed to this address and is the official submission method of this bid.
| Submission information is in RFQ. |
| Jeffrey.Fleming@va.gov |
48. Submission: the solicitation doesn't say where or how to send the quote. Should it be emailed to you, and is there a file size limit?
Email to Jeffrey.Fleming@va.gov no size limit
49. Pickup frequency: the statement of work says weekly service at Bedford, while the price schedule shows bi-weekly. Which should we price?
Bi weekly see new price schedule.
50. Volume and history: could you share an estimate of the monthly volume (pounds or bins filled per pickup), and whether there is a current contractor, with the current contract number?
This is a per pickup Firm Fixed Price service.
| 36C24122P0001 NORTHEAST RECORD RETENTION NORTH, LLC |
| $129,672.00 base plus 4 options |
51. Submission: How should the quotation be submitted — by email to you, or as a signed paper package delivered to the issuing office in Brockton, MA — and by the December 7, 1:00 PM EST deadline?
| Emailed Jeffrey.Fleming@va.gov |
| Submission time has not changed. |
52. Past performance and technical experience: The quotation requires three references, a Past Performance Worksheet, and technical demonstrations (VA Directive 6371 compliance, final-destruction plan, PII experience, Quality Control Plan). WE would prime the contract with the performing firm carrying out the shredding. May the performing firm's references and technical experience satisfy those factors?
The intent is to evaluate the vendor past performance for Shredding or similar size a nd scope. Subcontractor performance May be used to enhance the Past Performance of the prime.
53. Frequency and quantities: The Statement of Work describes weekly pickup at the Bedford campus with an estimated 106 consoles, while Section B.2 prices bi-weekly service with 115 consoles at Bedford (plus 12 rollout containers vs. 30 totes in the Statement of Work).
| Which frequency and quantities govern pricing? |
| See pricing new schedule, amendment 002 |
54. Subcontracting and BAA: FAR 52.219-14, Limitations on Subcontracting, does not appear in the posted solicitation — will it apply to the awarded contract? And must a signed HIPAA Business Associate Agreement accompany the quotation, or is it entered into after award as the Statement of Work states?
| The BAA will occur after the award. |
| FAR 52.219-14 if quote is above the SAT. |
55. How often is Bedford to be serviced, and which frequency should bidders' price? The location list indicates biweekly service, while Section B.3.1(f) specifies weekly pickups.
See pricing new schedule, amendment 002
56. What are the correct container quantities and sizes for each location? The scope lists 106 consoles and 30 totes, while the Bedford location list shows 115 consoles and 12 rollout containers. Please confirm the quantities and sizes bidders should use for pricing.
See pricing new schedule, amendment 002
57. Is the approximate shredding volume available for each location? Estimated monthly weights or historical collection volumes would help us develop accurate pricing.
This is a per pickup Firm Fixed Price service. There is no historical weights.
58. Bedford VAMC Pickup Frequency (Weekly vs. Bi-Weekly):
Section B.2 (Price/Cost Schedule, CLINs 0001–4002) specifies Bi-Weekly service at Bedford VAMC, whereas Section B.3.1.f (Scope) states Weekly pick-up throughout the VAMC campus. Could you confirm whether offerors should price for bi-weekly or weekly pickups at the Bedford campus?
See pricing new schedule, amendment 002
59. Container Quantities (Section B.2 vs. Section B.3):
Section B.2 lists 12 65-gallon containers and 115 32-gallon consoles at Bedford VAMC (plus 1 console each at Haverhill, Gloucester, and Lynn CBOCs, for 130 total containers). Section B.3.1.b–d estimates 106 36" consoles and 30 64-gallon totes (136 total). Which container count should govern our firm-fixed-price quote?
See pricing new schedule, amendment 002
60. Shred Particle Size Standard (1 x 5 mm):
Section B.3.1.a specifies shredded material no larger than 1 x 5 mm (or pulverized with a 3/32-inch screen) per NIST SP 800-88. Does the VA strictly require 1 x 5 mm micro-cut on-site mobile destruction, or is standard commercial cross-cut acceptable under VA Directive 6371?
Yes, these are two acceptable methods, the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization: Shredded material will be no larger than 1 x 5 mm in size or will be pulverized/ disintegrated using disintegrator device equipped with 3/32 inch security screen. accomplish destruction services on-site and transport to an appropriate location to be pulped if needed, must be shredded on premises according to the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization. Certification documentation can be in the form of a letter, memo, or any format attesting to its complete destruction. This certification is not considered a valid certification of destruction if completed and submitted prior to the final destruction of the records. The certification should contain sufficient information to attest to the final destruction of the temporary paper records – what temporary records were destroyed, the date when they were destroyed, what destruction method was used, where they were destroyed, and who was responsible for their final destruction.
61. Incumbent & Historical Volume:
Can you share the approximate average monthly tonnage/poundage collected across all four locations under the current contract, as well as the current contract number?
This is a per pickup Firm Fixed Price service. There is no historical weights.
36C24122P0001
62. Is shredding done on site in a truck, or is material taken away?
See directive 6371.
63. Is NAID AAA certification required, or just certificates of destruction?
Yes, the contractor should be NAID AAA Certified and provide monthly written certificate of destruction to COR.
64. Bedford service frequency
| The pricing schedule and location listing describe Bedford service as biweekly, | while | the SOW calls for weekly pickup throughout the VAMC campus. |
| means once every two weeks. |
See Price Shedule, Amendment 002
65. Container quantities and sizes
| The SOW identifies an estimated 106 lockable consoles and a maximum of 106 | without additional charges. The Bedford listing identifies 115 consoles, plus one | console at each of the three clinics. |
| Please confirm: |
· The required number of consoles at Bedford and each clinic.
· The total maximum console quantity included in the fixed price.
· Whether the required consoles are 36-inch-tall units, 32-gallon units, or units meeting both descriptions.
· Whether the 12 Bedford wheeled totes must be 64-gallon or 65-gallon units, since both sizes appear in the documents.
· How increases beyond the confirmed included quantities would be handled.
See Price Shedule, Amendment 002
3. Destruction standard
| The SOW specifies shredded material no larger than 1 × 5 millimeters, or | pulverization/disintegration using a 3/32-inch security screen. | ||||
| Please confirm whether these are two acceptable alternative methods and | whether all destruction must be completed onsite before the contractor leaves | each | location. Please also identify any required equipment certification or | technical | evidence offerors should submit to demonstrate compliance. |
Yes, these are two acceptable methods, the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization: Shredded material will be no larger than 1 x 5 mm in size or will be pulverized/ disintegrated using disintegrator device equipped with 3/32 inch security screen. accomplish destruction services on-site and transport to an appropriate location to be pulped if needed, must be shredded on premises according to the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization. Certification documentation can be in the form of a letter, memo, or any format attesting to its complete destruction. This certification is not considered a valid certification of destruction if completed and submitted prior to the final destruction of the records. The certification should contain sufficient information to attest to the final destruction of the temporary paper records – what temporary records were destroyed, the date when they were destroyed, what destruction method was used, where they were destroyed, and who was responsible for their final destruction.
4. Applicable wage determination The solicitation states that the applicable wage determination will be applied at award. Could you please identify or provide the wage determination number and revision offerors should use when pricing Bedford, Haverhill, Gloucester and Lynn?
Amendment 002 places the locations next to the Wage Determination. Current as of 11/17/2026.
66. What was last year's total weight in pounds?
This is a per pickup Firm Fixed Price service. There is no historical weights.
67. Frequency: SOW Section 1.f states weekly pickup at Bedford, while the price schedule and SOW Section 1.e state bi-weekly. Which frequency should we price — weekly or bi-weekly?
See Price Schedule, Amendment 002
68. Console count: The SOW states a maximum total quantity of approximately 106 consoles; the price schedule lists 115 x 32-gallon consoles. Which quantity should we price?
See Price Schedule, Amendment 002
69. Wage determinations: Which of the seven listed wage determinations applies at each site? Bedford is in Middlesex County, but WD 2015-4055
| (Middlesex) does not list Bedford among its covered localities — does the area- | wide WD 2015- | 4047 apply at Bedford, and which wage determinations | apply at Haverhill, Gloucester, and Lynn? |
| See revised WD list with locations in bold Amendment 002 |
70. Submission method: How should quotes be submitted — by email to you, and if so, to which address — or by another method? What is the required subject line?
Email response to: Jeffrey.Fleming@va.gov, reference the RFQ number.
71. Questions deadline: Is there a deadline for questions, and if so, when? Will answers be posted by amendment?
As stated in RFQ 11/16/2026 13:00 hrs. EST questions answered by amendment.
72. FAR 52.219-14: The solicitation does not include FAR 52.219-14.
| Does the statutory limitation on subcontracting still apply to this set-aside service | award — that is, must the prime perform at least 50% of the personnel | costs | with its own employees unless the subcontractor is similarly situated? |
| If over the SAT, it will apply. 50% is correct. |
73. NAID: Must the performing contractor hold current NAID AAA certification, or will a contractor meeting VA Directive 6371's minimum standards (bonded, insured, with the required safeguards) be acceptable?
Yes, the contractor should be NAID AAA Certified
74. Reference typo: The D.3 Past Performance Survey cites solicitation
| 36C24127Q0027 — please confirm the correct number is 36C24127Q0037 so | our references address it correctly. |
| 36C24127Q0037 |
75. Is the Agency allowing a question-and-answer period before the due date?
Block 20 of RFQ. See amendment 001 Questions shall be submitted no later than 11/16/2026 13:00 EST
76. Has this been marketed for Services Disabled Veteran Owned Set Aside?
No, Market research determined Small Business set aside.
77. Who is the incumbent?
NORTHEAST RECORD RETENTION NORTH, LLC
78. Past Performance (Sections D.3 and E.2)
| The Past Performance Survey appears to reference solicitation 36C24127Q0027. | Please | confirm whether this is the applicable form. | |||
| Correct to 36C24127Q0037 | |||||
| For a newly established offeror, may relevant experience of a proposed | subcontractor | or key personnel be considered for the reference requirements and | technical evaluation? | If not, how would an offeror without corporate past | performance be evaluated? |
| A neutral rating will be issued, this evaluation is Comparative analysis past | performance has relevancy. |
79. Subcontracting Limitations
| Please clarify the subcontracting limitations applicable to this procurement and how | work performed by a similarly situated subcontractor would be treated. |
| Subcontracting limitations addresses non-similarly situated subcontractors. |
80. Equipment Quantities (Sections B.2 and B.3)
| The solicitation identifies 118 consoles versus an estimated 106, and 12 containers | of 65 | gallons versus 30 totes of 64 gallons. |
| Please confirm the applicable quantities and capacities for pricing, including the | provision allowing changes to 106 consoles without additional charges. |
See pricing new schedule, amendment 002
81. Pickup Frequency and Additional Services (Section B.3)
| Bedford pickup frequency is described as both "bi-weekly" and "weekly." Please | confirm the required schedule. | |
| Please confirm the estimated monthly shredding volume, if available, and clarify | whether additional pickups and bulk records disposal are covered by the fixed | monthly price, or require separate pricing. |
| See pricing new schedule, amendment 002 |
82. Applicable Guidance, Records Classification and Access (Section B.3) Please clarify:
· Whether the reference to VHA Handbook 1907.01 refers to VHA Directive 1907.01.
The VHA Health Information Management Publications page provides access to Department of Veterans Affairs policy documents, where VHA Handbook 1907.01 (Health Information Management and Health Records) was previously issued and has since been updated and converted into VHA Directive 1907.01(1)
· Whether "classified" refers to national security classified information or to sensitive and confidential VA records.
"classified" strictly refers to national security classified information, while Department of Veterans Affairs (VA) records are categorized as sensitive personal information or Controlled Unclassified Information (CUI)
· Whether materials in buildings accessible only by stairs must be collected from interior locations or will be brought to accessible pickup points.
Contractor will have to pick up at the locations specified.
83. Business Associate Agreement (Section D.1)
| The BAA references White River Junction, Vermont, while the PWS identifies | Bedford VA Medical Center, Massachusetts. Please confirm which facility | identification | and BAA version apply to this procurement. |
| This will be for Bedford. |
84. Section C.3, FAR 52.217-9 Option to Extend the Term of the Contract, paragraph (c) says the total duration of the contract, including options, shall not exceed one (1) year. The price schedule in Section B.2 shows a base year of 01/01/2027 to 12/31/2027 and four option years through 12/31/2031. Could you confirm the intended total duration for paragraph (c), and that offerors should price the base year and all four option years as shown in B.2?
See Price schedule in Amendment 0002 This is a Base pluse 4 options
85. Section B.2 lists the Bedford VAMC campus as bi-weekly service for 115 front feed consoles (32 gallon) and 12 rollout containers (65 gallon). The Statement of Work in B.3 calls for weekly pickup on the campus (paragraph 1.f), an estimated 106 consoles (paragraphs 1.b and 1.c) and an estimated 30 wheeled totes of 64 gallons (paragraph 1.d). Could you confirm the required pickup frequency for the Bedford campus, and the container counts and sizes offerors should price?
See price schedule Amendment 0002
3. SOW paragraph 1.a requires shredded material no larger than 1 x 5 mm, or disintegration with a 3/32 inch security screen, performed on-site in a mobile shredding vehicle. Is that particle size required for all paper collected under this contract, or is standard NAID AAA certified on-site shredding acceptable for the paper records described?
Yes, these are two acceptable methods, the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization: Shredded material will be no larger than 1 x 5 mm in size or will be pulverized/ disintegrated using disintegrator device equipped with 3/32 inch security screen. accomplish destruction services on-site and transport to an appropriate location to be pulped if needed, must be shredded on premises according to the most recent NIST Special Publication 800-88 Guidelines for Media Sanitization. Certification documentation can be in the form of a letter, memo, or any format attesting to its complete destruction. This certification is not considered a valid certification of destruction if completed and submitted prior to the final destruction of the records. The certification should contain sufficient information to attest to the final destruction of the temporary paper records – what temporary records were destroyed, the date when they were destroyed, what destruction method was used, where they were destroyed, and who was responsible for their final destruction.
4. SOW paragraph 1.f calls for pickup of the material collected in each container throughout the VAMC campus, and the summary notes some buildings are accessible only by stairs. Will VA staff consolidate console contents into the 65 gallon rollout containers at central points, or must the contractor service each console directly at its location?
Contract will pick up at the bin location
5. SOW paragraphs 1.f and 1.g mention additional pickups and bulk records disposal as needed. Section B.2 has no line item for either. How should offerors price these services?
This will be removed from the PWS.
6. SOW paragraph 3.a requires destruction to be witnessed by a Federal employee or an authorized contract employee. Will VA provide a witness for each scheduled service, or should the contractor plan for its own employee to witness?
This will be coordinated with the COR.
D.2 WAGE DETERMINATION RATES
The following Wage Determinations Apply to this Contract Wage Determinations can be reviewed at: https://beta.sam.gov/.
If a wage determination is not listed the contactor shall notify the Contracting Officer to incorporate the appropriate Wage Determination.
Massachusetts:
| County |
| Wage Determination |
| Revision |
| Dated |
| Essex, Rockingham NH- Haverhill |
| 2015-4029 |
| 35 |
| 08/17/2026 |
| Essex- Gloucester |
| 2015-4049 |
| 36 |
| 08/17/2026 |
| Middlesex- Bedford |
| 2015-4047 |
| 35 |
| 08/17/2026 |
| Essex- Lynn |
| 2015-4065 |
| 36 |