Appendix A - Combined Red-Line AS-Built Drawings.pdf

PDF 9 MB Posted

Attached to
6835--Medical Grade Liquid Bulk Oxygen
Solicitation number
36C24127Q0001
Issued by

About this file

This document is a 100% Design Submittal for the Relocate Bulk Oxygen Tank System project at the Veterans Administration Hospital located at 830 Chalkstone Avenue, Providence, Rhode Island (Project No. 650-15-129, November 2015).

The design submittal comprises comprehensive architectural and engineering drawings prepared by Woodard Curran and Mechanical Inc. for the relocation of the hospital's bulk oxygen storage system. Key deliverables include site plans showing equipment pad placement and piping routing, civil/site details with grading and utilities, electrical schematics and plans with network architecture and instrument risers, process mechanical drawings with pipe routing and phasing details across multiple installation phases, structural details for equipment pad construction, and instrumentation/control system diagrams. The project involves relocating existing oxygen delivery infrastructure to a new as-built equipment pad location, with detailed specifications for tie-in points, concrete foundations, underground ductbank conduit installation, electrical connections to existing panels (located in kitchen), and integration with emergency oxygen inlet box systems. Construction phasing is depicted across multiple tie-in scenarios to minimize operational disruption. The submittal includes site photographs documenting existing conditions, equipment arrangements, and current oxygen system profiles, along with detailed schedules for ductwork, electrical panel configurations, and light fixture specifications. Design documents are marked as final and include professional engineer stamps and certifications required for federal VA facility improvements.

View the file

Other files

File Type Posted
36C24127Q0001_1.docx DOCX document
Past Performance Worksheet.xlsx XLSX spreadsheet
LOS certification.pdf PDF
WD 2015 4083 RI Rev35.pdf PDF
Appendix B - VAMC Providence - Bulk Oxygen Commissioning Report.pdf PDF
36C24127Q0001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOODARD

CURRAN

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com

JG SC

I-001 kmuldoon Oval kmuldoon Oval kmuldoon Oval kmuldoon Oval kmuldoon Line kmuldoon Typewritten Text Equipment Pad As-Built kmuldoon Typewritten Text kmuldoon Typewritten Text kmuldoon Rectangle kmuldoon Typewritten Text kmuldoon Typewritten Text kmuldoon Stamp ò ò

M-201

POB JAR

WOODARD

CURRAN

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com

BSherblom Callout Existing line left active and not capped. New piping left off for future connection

BSherblom BL Asbuilt

2,,%#-% $0--#+

$,**(/*&+/ " (+/&'-(/3 %-(1& -&.0)/.

+ * $ 0 1 = 6 79 5 >; 9 / ># A - 4 3 6 1 8 " . , $&$&(

)* %#&'%#$&$$ A @ @ @ #@ ; ; 3 1 <3 2 ? <<1 9 #2 ; 8

2,,%#-% $0--#+

$,**(/*&+/ " (+/&'-(/3 %-(1& -&.0)/.

+*$ 01=6795>;9 /># A -43618" ., $&$&(

)*%#&'%#$&$$ A @@@#@;;31<32?<<19#2;8

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com

M-501

POB JAR

BSherblom Callout Not tied in; Left for future tie-in

BSherblom Line

WOODARD

CURRAN

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com

POB JAZ

PFD-101

BSherblom Rectangle

BSherblom Line

BSherblom Rectangle

BSherblom Line

BSherblom Text Box work deleted

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com

POB JAZ

PFD-102

BSherblom Line

BSherblom Line

BSherblom Text Box Work Deleted

XH circuit #13 KA Panel Located in Kitchen KA circuit #2,4 amayer George Stamp mjbelectric Line mjbelectric Line mjbelectric Line mjbelectric Line mjbelectric Line mjbelectric Callout Panel not installed, temporary troph mjbelectric Line mjbelectric Callout Device not installed, temporary wp box mjbelectric Line mjbelectric Line mjbelectric Callout Layout changed.

mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Callout Equipment Rack here

JStratford Typewritten Text Instruments not installed. Wires capped in weather proof junction boxes.

kmuldoon Stamp ò ò

M-201

POB JAR

WOODARD

CURRAN

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Callout Existing Total Alert Junction mjbelectric Rectangle mjbelectric Rectangle mjbelectric Callout Total alert wires spliced in can here.

mjbelectric Callout 2" EMT conduit to KA mjbelectric Callout 2" EMT conduit to XH mjbelectric Callout 1" EMT conduit to Total Alert junction box

COMMITMENT & INTEGRITY DRIVE RESULTS

980 Washington St. | Dedham, MA 02026

781.251.0200 | www.woodardcurran.com mjbelectric Polygonal Line mjbelectric Rectangle mjbelectric Callout Emergency XH Junction mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Polygonal Line mjbelectric Callout Blue line: lighting conduits mjbelectric Text Box

PSL

mjbelectric Text Box

PS

mjbelectric Text Box

LSL

mjbelectric Text Box

LSL

mjbelectric Callout PP1 Normal Power Panel mjbelectric Text Box Ground mjbelectric Text Box Ground mjbelectric Oval mjbelectric Text Box Ground Test Well mjbelectric Callout 1" Conduit from Total Alert Junction Box

G-002
G-001
I-001
C-101
C-102
C-103
C-104
C-105
D-100
Plumbing Asbuilts
Electrical - As-builts
Full Set of Drawings - Copy 10
Full Set of Drawings 13
Pad Conduit Pipes
Sheets and Views
Work
E-001
E-101
E-801
S-001
S-101
S-102