Med Gas RFIs Questions and Answers.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C24125Q0384
About this file
The document is a Questions and Answers file for a medical gas and vacuum systems testing solicitation for the Bedford VA Medical Center. The solicitation (Number 36C24125Q0384) is a small business set-aside for commercial items, seeking a contractor to perform medical gas and vacuum systems inspection, testing, and preventative maintenance across three buildings at the facility. The contract includes a base year and four option years, with testing to be conducted twice annually on medical air, vacuum, and oxygen systems across Buildings 2, 4, and 78.
Key requirements include performing inspections in accordance with NFPA 99 (2012 edition), using technicians with specific certifications including MGPHO Credentialed Medical Gas Verifiers (CMGV), and providing comprehensive documentation of system conditions. The solicitation requires contractors to test multiple system components including bulk oxygen systems, medical/dental air compressors, vacuum systems, zone valves, area alarms, and station outlets. Quotes are due by 4:00 PM EST on 18-April-2025, to be submitted electronically to carissa.sarazin@va.gov, with evaluation based on price, past performance, technical capabilities, and SAM registration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vavle and Outlet Count.pdf | ||
| 36C24125Q0384_2.docx | DOCX document | |
| 36C24125Q0384_1.docx | DOCX document | |
| 36C24125Q0384.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Med Gas RFIs Questions and Answers
1. After review of the SOW, we read that “All inspections and testing shall be conducted by personnel who are MGPHO Credentialed Medical Gas Verifiers (CMGV).”
This is not a requirement we have ever seen on a VA SOW. We do have one person on staff that has this credential, but is this a requirement? It is not typically needed for this work.
Contractor must have a member of their organization who is MGPHO Credentialed.
1. The SOW states that “The work shall include providing a written outline of recommendations from NFPA 99, 2012 Edition.”
I assume this needs to be updated to the 2021 code. Please advise.
2012. Joint Commission does not require us to follow 2021 code.
1. Can you please clarify what this entails? Section C. “Biennial PM Service” This should say Biannual, not Biennial.
1. In the SOW section B. “The scope of work shall include the inspection of the system above on a semi-annual basis. System will be inspected and tested twice a year.”
We have not seen semi-annual testing of all systems in an SOW before, it is typically an annual requirement. Just want to confirm this.
Biannual.
1. Can you provide the accurate count of outlets, zone valves, panels, manifolds and tanks?
| 2 manifolds, 3 bulk oxygen tanks |
| See Attached: Valve and Outlet Count |
1. Will a bid bond be required with our submission?
No
1. Can you provide system manufacturer, model number, serial number and configuration of the following systems below?
BLDG # 2
· Medical Air Compressor Central Supply System
· Beacon Medaes SAS07T-200V-TADZ HOP451700
· Medical-Surgical Vacuum Central Supply System
· Airtech SCS-L100-2TAN-NFPA-HMI 182.204
· Dental Air Compressor Central Supply System
· Amico Q11641 ML10D91A1510
· Dental Vacuum central Supply System
· AirTech 2-DV-1610-11.5-1S-TP 1243
BLDG #4
· Medical Air Compressor Central Supply System
· Beacon Medaes 4107005549 HOP401353?
· Medical-Surgical Vacuum Central Supply System
· Beacon Medaes 4107104463 HOP352375
BLDG #78
· Medical Air Compressor Central Supply System
· Powerex DOS050-120BDD2E/Cat# 61-25-140809 (H)01-13-15-5733384-607
· Medical-Surgical Vacuum Central Supply System
· Ohmeda 6911.9007.143 EAZS00545
1. Section 2.2 lists the inventory of each building, in this it lists all zone valves, all area alarms, all station outlets and inlets and all patient panels. The bottom of section 2.2 states “The scope of work shall include the inspection of the system above on a semi-annual basis. System will be inspected and tested twice a year.” Are you wanting to quote testing of all of the outlets, zone valves and area alarm panels twice a year or just Semi-Annual Medical Gas Pipeline Purity Testing, Semi-Annual Oxygen USP Purity Testing, Semi-Annual Medical Air USP Test Everything will be tested twice a year
1. Please provide the wage decision for this project.
2015-4047 Rev29
1. What kind of pest management is needed?
There is no pest management needed. Please disregard that sentence on the combined synopsis solicitation.