03-03 SOW Attachment - Landscape Scope Map.pdf
PDF 1 MB Posted
- Attached to
- C211--402-24-006P | A&E 5 Year Landscape Master Plan Federal contract opportunity
- Solicitation number
- 36C24124R0072
About this file
This document is a Special Notice for a federal contract opportunity from the Department of Veterans Affairs (VA) for a 5-Year Landscaping Master Plan at the Togus VA Medical Center in Augusta, Maine.
The VA is seeking professional landscape architectural services to develop a 5-year landscaping master plan to beautify the Togus VA campus. The scope includes reviewing existing plantings and trees, providing arborist recommendations, and designing new low-maintenance landscaping features such as flower beds and minor hardscaping. The work is to be broken into two zones based on level of complexity, with Zone A allowing for more extensive design and Zone B limited to inspection and minor improvements. The master plan is to prioritize the most critical areas in the first year. This is a Firm Fixed Price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Statements of Qualifications (SF-330) are due by June 10, 2024, and the contract will be negotiated with the top-rated firm.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF330 36C24124R0072.docx | DOCX document | |
| 01 - AE Design SOW - 5 Year Landscape Design Revised.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Year 1 – Horseshoe and Welcome Sign
Blue – Review of existing plantings and trees only. Recommendations of tree remediation by arborist, pruning or removal. No new hardscape or garden bed designs.
Red – Review or existing plantings and trees. Recommendations of tree remediation, pruning or removal by arborist. Open to flower bed and minor hardscape concepts. New plantings to be low maintenance.
Year 2 – Chapel to B205, entrance, B200 Court Yard
Blue – Review of existing plantings and trees only. Recommendations of tree remediation by arborist, pruning or removal. No new hardscape or garden bed designs.
Red – Review or existing plantings and trees. Recommendations of tree remediation, pruning or removal by arborist. Open to flower bed and minor hardscape concepts. New plantings to be low maintenance.
Year 3 – B206 & B207
Black – Not in scope
Blue – Review of existing plantings and trees only. Recommendations of tree remediation by arborist, pruning or removal. No new hardscape or garden bed designs.
Red – Review or existing plantings and trees. Recommendations of tree remediation, pruning or removal by arborist. Open to flower bed and minor hardscape concepts. New plantings to be low maintenance.
Year 4 – Back Entrance
Blue – Review of existing plantings and trees only. Recommendations of tree remediation by arborist, pruning or removal. No new hardscape or garden bed designs.
Red – Review or existing plantings and trees. Recommendations of tree remediation, pruning or removal by arborist. Open to flower bed and minor hardscape concepts. New plantings to be low maintenance.
Year 5 – open ended