This document appears to be an amendment to a federal solicitation for the interior stairwell resurfacing project at the Manchester VAMC in New Hampshire, solicitation number 36C24124B0049.
The key details are:
- The purpose of this amendment is to provide answers to Requests for Information (RFIs) and to include the Pre-Award Contractor Evaluation Form as an attachment.
- The solicitation requires the contractor to bid on each stairwell independently, as the VA will award one or more based on factors such as funding and timing. The contractor can provide a single proposal with each stairwell listed as an alternate deduct.
- The VA provided clarification on the scope of work, specifying that the contractor should assume all walls and ceilings will be replaced, with the ability to provide partial deducts as appropriate.
- The VA also provided additional details on the square footage of the floors and ceiling heights to be used for pricing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| 36C24124B0049 0005.docx | DOCX document | |
| 36C24124B0049 0004.docx | DOCX document | |
| 608-24-115 Bid Site Walk Check-in.pdf | ||
| 36C24124B0049 0003.docx | DOCX document | |
| 36C24124B0049 0002.docx | DOCX document | |
| 36C24124B0049 0001.docx | DOCX document | |
| 608-24-115 Stairwell Wall Repair SOW.pdf | ||
| 36C24124B0049_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 608-24-115 Department of Veterans Affairs VAMC Manchester 718 Smyth Road Manchester
NH
03104 Department of Veterans Affairs VAMC Manchester 718 Smyth Road Manchester
NH
03104 To all Offerors/Bidders
36C24124B0049
X
The purpose of this amendment is to provide answers to RFIs and PRE-AWARD CONTRACTOR EVALUATION FORM (see attachment).
All other terms and conditions remain the same.
The purpose of this amendment is to provide answers to RFIs.
Response to RFIs In page 8 of 68 paragraph EMR there is a requirement to submit the PRE-AWARD CONTRACTOR EVALUATION FORM and it states that the form is attached. No form is attached.
See attachment Pre-Award Contractor Evaluation Form, this document will be provided as part of this amendment.
The Scope paragraph 3.0 states: “Contractor to bid each stairwell independently, and VA will award one or more, depending on a number of factors (funding, timing, etc.)” Does that mean you need 4 sets of proposals? SF 1442 and the solicitation does not have a itemized bid form to place the price for each stairwell. Please clarify.
We require one proposal with each stairwell listed as an alt-deduct. It is also fine to provide on price for everything and then break out each stairwell in the narrative.
The RFI response on the quantity’s states 200 S.F. per floor. Does it mean floor footprint or wall/ceiling SF area to be replaced. If floor footprint, please clarify how many linear feet of wall and how high per floor or just how many SF of plaster per floor needs to be replaced. After a takeoff from drawings it results almost 19,000 S.F. of plaster walls and ceiling to be replaced. In the meantime, after the site visit Staircases No. 2 and No. 4 do not show much damaged surfaces to be replaced. Staircase No. 1 has a lot of scrapped, primed, and even painted areas previously damaged and all need is patching and painting. Staircase No. 3 seems to be heavily damaged including the murals specially in floors Basement-3rd. For the VA to receive a correct and good bid, please provide square footage of areas that you do indeed need to replace for each staircase as part of the scope of work and what kind of repair are you looking for on each of those areas.
The floors are all roughly 9’6” x 17”, rounded up to 200 ft² to account for slope down the stairs. Bid based on 10 ft ceiling heights. But assuming that all walls will be replaced, which will allow for partial alt-deducts if necessary.
See attached document: S02 PRE-AWARD CONTRACTOR EVALUATION FORM.