36C24122R0138 0001.docx

DOCX document 24 KB Posted

Attached to
H346--650-23-106 Existing Water, Stormwater, & Sewer Utilities Investigate
Solicitation number
36C24122R0138
Issued by

View the file

Other files

File Type Posted
Attach 1 -SOW Sewer Water Survey 6-29-22.docx DOCX document
36C24122R0138.docx DOCX document
Attach 2 - PPQ - Sew Water Survey.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modification to a Previous Notice Modification to a Previous Notice

SUBJECT*
650-23-106 Existing Water, Stormwater, & Sewer Utilities Investigate

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
03104
SOLICITATION NUMBER*
36C24122R0138

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE
07-22-2022 14:30 EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
C213
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VAMC Manchester 718 Smyth Road Manchester NH 03104 Manchester NH 03104

POINT OF CONTACT*

Contract Specialist Pearl Wray Pearl.Wray@va.gov

(401) 273-7100 x14129

PLACE OF PERFORMANCE

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
Pearl.Wray@va.gov
EMAIL DESCRIPTION
Pearl.Wray@va.gov

DESCRIPTION

CONTINUATION PAGE

36C24122R0138, AMENDMENT 0001

Q1: In Section 2, Specialized Experience and Technical Competence, the solicitation states that “a detailed and specific narrative of up to three (3) (Maximum) relevant Contracts or Projects completed within the last three (3) to five (5) years.” Please confirm that these projects should be presented in Section F. Also, can the Contracts or Projects be 90% complete?

A1: Yes. Please use Section F of the SF330 Form to present projects related to “Specialized Experience and Technical Competence.” In addition, Firms may use continuation pages if additional space is needed to fully describe/present information (keep in mind page limitations).

Yes. Firm’s can include relevant projects that are 90% completed. However, to the maximum extent possible, Firm’s should use projects that have been completed.

Q2: Given the scope of work, please clarify whether resumes for Mechanical Engineering, Structural Engineering, and Architecture disciplines are required.

A2: The Mechanical Engineering, Structural Engineering, and Architecture disciplines are disciplines that the VA believes should be included to successfully carry out services described in the Scope of Work. However, Firm’s may propose disciplines that are relevant, similar, and/or equivalent in order to carry out the Scope of Work requirements. Provided that proposed disciplines meet the educational, certification requirements, years of experience, described in the SF330 Notice and SOW. Resumes of proposed key project personnel are required to be submitted, regardless of name of discipline.

Q3: Please confirm that resumes included within Section E of the SF 330 are excluded from the page limit.

A3: Yes. Resumes presented within section E of SF 330 are excluded from page limitations.

Q4: Please confirm Part IIs are excluded from the page limit.

A4: The following are excluded from the page limitation:

· Cover letter must be letter signed by a representative of the Prime with authority to Bind Firm.

· Resumes

· Past Performance Questionnaire submittals

· Drawings may be submitted with SF 330 submittal, and do not count against total page limitation. Drawings should be substantive and must support other proposed SF330 information.