Sources Sought Notice Sources Sought Notice

SUBJECT*
Complete Combined Heat and Power Installation, 608-21-207

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
03104
SOLICITATION NUMBER*
36C24121Q0863
RESPONSE DATE/TIME/ZONE
10-20-2021 4:00pm EASTERN TIME, NEW YORK, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
C1NZ
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VAMC Manchester

718 Smyth Road Manchester NH 03104

POINT OF CONTACT*

Contract Specialist Michael Muller Michael.Muller@va.gov

PLACE OF PERFORMANCE

ADDRESS
VAMC Manchester

718 Smyth Rd

Manchester NH

POSTAL CODE
03104
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

SOURCES SOUGHT:

The VA Medical Center, 718 Smyth Road, Manchester, NH has a requirement for a Firm Fixed Price contract to provide professional Architect/Engineer (A/E) Design for Project Number 608-21-207. The VA Medical Center in Manchester, NH, began construction of Project 608-12-301, Combined Heat and Power (CHP) Plant, in 2013. The project installed a Caterpillar 740 kW gas generator and heat recovery steam generator (HRSG). The project was approximately 90% complete when it was suspended in 2015 to allow Project 608-12-101, Replace Boiler Plant and Emergency Generators, to proceed. The equipment in both projects utilized much of the same infrastructure and it was not feasible for both to proceed simultaneously. The boiler and emergency generator replacement project were prioritized as more critical to facility operations. After several delays to the boiler replacement project, the VA closed out the aging contracts for the CHP project. None of the original contractors (A/E, General Contractor, or Commissioning Agent) are currently involved with the project. The purpose of this project is to evaluate the feasibility of completing the CHP system.

1.0 SCOPE:

The scope of this project consists of Architectural and Engineer (A/E) services required to complete the project, as outlined in Supplements A & B below.

The period of performance for the design is 176 calendar days and shall begin upon issuance of the Notice to Proceed (NTP) by the Contracting Officer.

The VA will not be responsible for any costs incurred by interested parties in responding to this announcement.

This is Request for Qualifications:

The purpose of this notice is to request SF-330 Qualification statements from qualified SDVOSBs that have the experience directed at the requirements of the Statement of work.

The design effort is to be completed by more than 50% SDVOSB and VOSB.

The NAICS code is 541330 and the small business size standard is $16.5 million.

Firms must have valid registration in the System for Award Management (SAM). Visit: beta.SAM.gov to register in this database. SDVOSB firms must be verified in VETBIZ under NAICS 541330. Visit: vip.vetbiz.va.gov

RESPONSE:

Interested SDVOSB firms must provide their qualifications to the Contracting Specialist no later than 4:00pm on 10/20/2021 via email to Michael.Muller@va.gov

The following information is required as a valid response:

1. A positive statement of your intention to submit a proposal in response to a solicitation for this project and include your firm’s DUNS Number, Firms address and Contact information.

1. Evidence of your experience in A/E Services for complete design of Complete Combined Heat & Power Installation at a Medical facility (please provide contract descriptions, contract dollar amounts and telephone numbers for points of contact – no photographs).

1. Qualifications:

a) Professional Qualifications: Minimum Requirement: The A/E firm shall have a minimum of two full-time licensed Professional Engineers with their PE obtained in electrical engineering and a minimum of two full-time licensed Professional Engineers with their PE obtained in mechanical engineering

b) Firm Specialized Experience: Minimum Requirement: The A/E firm shall have completed a minimum of 3 combined heat and power system projects that utilize a reciprocating internal combustion engine and a heat recovery steam generator, either as the designer or commissioning agent.

c) Design Team Specialized Experience: Minimum Requirement: The proposed design team shall include a mechanical engineer and an electrical engineer who have each worked on at least three combined heat and power system projects utilizing a reciprocating internal combustion engine and a heat recovery steam generator. The design team members do not have to have worked on the same projects and the projects may have been completed while working for other firms. Provide a brief project description for any project that was not provided as part of the requirements of paragraph b) above.

d) Past Performance: A/E is required to supply references for at least 2 projects from b) above. Past performance rating will be based on those references and any information available in CPARS or other government performance rating systems.

1. SF-330 Architect- Engineer Qualifications completed for the intent of the project.

1. Evidence that your SDVOSB firm will perform more than 50% of the requirement with a qualified SDVOSB and or VOSB team.

Failure to submit all information requested will result in a contractor not being considered as an interested SDVOSB concern.

EVALUATION FACTORS:

Adjectival
Description
Exceptional
A comprehensive and thorough presentation of extraordinary

merit with one or more significant strengths. Offeror’s response is clearly superior. The response is innovative and exceeds requirements. No deficiency or significant weaknesses exists.

Good
Exceeds all the minimum requirements of the criteria; has an above average probability of success; contains no significant weaknesses and only minor, correctable weaknesses exist.
Acceptable
Meets all the minimum requirements of the criteria; has an average probability of success; no significant weaknesses and any deficiencies can be readily corrected.
Marginal
Fails to meet one or more of the minimum requirements of the criteria; low probability of success; major weaknesses and/or significant number of deficiencies exist.
Unacceptable
Fails to meet any of the minimum requirements of the criteria; very low probability of success.

Neutral (Applies only to Past Performance) Offeror’s performance record, relevant past performance or information on past performance is not available

SELECTION PROCESS:

The A/E selection will be completed in two stages as follows: In Stage I, interested firms will submit SF-330 Qualification Statements of Capabilities. In Stage II, A/E team most qualified will be requested to submit a price proposal for negotiations in an issued Request for Proposal.

PROJECT INFORMATION: The scope of work is attached.

See attached document: AE SOW with Supplements A-B - CHP Revised 2021-09-10.

See attached document: S02 - AE SOW Attachment B 608-12-301 Construction Drawings Marked Up.

See attached document: S02 - AE SOW Attachment C 608-12-301 Specs Marked Up.

See attached document: S02 - AE SOW Attachment D - Facility Standard Items.

*= Required Field
Sources Sought Notice