36C24121Q0412_1.docx

DOCX document 36 KB Posted

Attached to
H345--Boiler Plant Controls Calibration Services.
Solicitation number
36C24121Q0412
Issued by

View the file

Other files

File Type Posted
36C24121Q0412 0003_1.docx DOCX document
36C24121Q0412 0002_1.docx DOCX document
36C24121Q0412 0001_1.docx DOCX document
P07 WD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Combined Synopsis/Solicitation Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice H345 Boiler Plant Controls Calibration and Testing Services.

05009 36C24121Q0412 05-06-2021

10:00 AM

EASTERN TIME, NEW YORK, USA

N

SDVOSBC

238220 Department of Veterans Affairs VAMC White River Junction 215 North Main Street White River Junction VT 05009 Contract Specialist Krisanne Dernago Department of Veterans Affairs VA Medical Center 200 Springs Road Bedford MA 01730

USA

Krisanne.Dernago@va.gov Krisanne Dernago, Contract Specialist Combined Synopsis Solicitation – VA Medical Center, Bedford MA. Semi-Annual calibrations, combustion testing and Safety Device Testing of Boiler Plant Controls and Instrumentation

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

(ii) The solicitation number is 36C24121Q0412 and the solicitation is issued as a request for quotation (RFQ).

(iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-07.

(iv) This requirement is being issued as an open market, Service-disabled veteran-owned and Veteran Owned small business set-aside. The associated NAICS code is 238220 Plumbing, heating and Air conditioning Contractors – and small business size standard is $16.5 million.

(v) The Government intends to award a firm-fixed price award for Boiler Plant Calibrations and testing for the Bedford, MA VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission.

PRICE/COST SCHEDULE

(vi) The Contractor shall provide all resources necessary to perform Boiler Calibrations and testing per the attached Performance Work Statement. Please see the attached PWS for full requirement details.

(vii) The Place of Performance as outlined in the PWS is:

Department of Veterans Affairs VA Medical Center 200 Springs Road Bedford, MA

(viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda’s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008).

(ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement.

Submission of Quotes:

(1)Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered.
(2)Offerors shall submit their quotes electronically via email to Krisanne.Dernago@va.gov
(3)Questions: Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is May 3,2021 10:00AM EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers.
(4)Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.

Evaluation Process:

Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process.

Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The contracting techniques associated with FAR Part 15 are not mandatory.

The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Price (Follow these instructions):

a.Offeror shall complete the attached Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.
b.Ensure your representations and certifications are complete in the System for Award Management (SAM)(https://www.beta.sam.gov). Otherwise, you will need to fill out solicitation Clause 52.212-3 "Offeror Representation and Certifications -Commercial Items” and submit with the quote. Federal Acquisition Regulations require that federal contractors register in the SAM database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quotation.
Past Performance:
a.Provide (3) references of work, similar in scope and size with the requirement detailed in the Performance Work Statement. References must include contact information; brief description of the work completed, and contract # (if relevant). Please utilize Attachment 1 – Past Performance Worksheet for your references and please submit as part of your quote submission. References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources.
Technical: The offeror’s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the Performance Work Statement in a timely efficient manner.
a.Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the Performance Work Statement.
b.Contractor shall demonstrate that their technicians meet the qualification standards stated in the Performance Work Statement.
c.Contractor shall submit any applicable certification for the State of Connecticut
d.If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort.

(x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy.

(xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition in addition to the following addenda’s to the clause: 52.252-2 Clauses Incorporated by Reference (FEB 1998), 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

852.212-70 Provisions and Clauses Applicable to VA Acquisitions of Commercial Items (APR 2020)

•852.203-70 Commercial Advertising
•852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside
•852.232-72 Electronic Submission of Payment Requests
•852.273-70 Late Offers

852.219-74 Limitations on Subcontracting – Monitoring and Compliance (JUL 2018)

(xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.204-10, 52.204-14, 52.209-6, 52.219-28, 52.222-3, 52.222-21, 52-222-26, 52.222-36, 52.222-50, 52.223-18, 52.225-3, 52.225-13, 52.232-33, 52.222-41 (Wage Determination Applicable (West Haven Connecticut – New Haven County) and (Newington Connecticut, Hartford County), 52.222-42, 52.222-55, 52.222-62

(xiii) All contract requirement(s) and/or terms and conditions are stated above.

(xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement.

(xv) RFQ responses are due May 6, 2021 10:00 AM EST. RFQ responses must be submitted via email to: Krisanne.Dernago@va.gov. Hand deliveries shall not be accepted.

(xvi) The POC of this solicitation is Krisanne Dernago See attached document: P09_PWS See attached document: P07_Wage Determination 2015-4047 Revision 13

PERFORMANCE WORK STATEMENT

Semi-Annual calibrations, combustion testing and Safety Device Testing of Boiler Plant Controls and Instrumentation.

SCOPE:

Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers and other plant equipment. Contractor shall have a laptop computer and required software to plug into & back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor. Contractor shall not be accessing any Sensitive VA Information Systems; these are boiler controls only. Control devices will include but are not limited to the following, Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens & Johnson Controls. Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations. Contractor shall provide a list of line items that require parts/replacement and the costs required to repair/replace those items. Any additional work will require approval from the contracting officer. See attached list of controls & instrumentation to be calibrated.

THE FOLLOWING IS A LIST OF DEVICES THAT WILL REQUIRE CALIBRATION:

PLANT MASTER PCIII:

OUTSIDE AIR TEMP

PLANT STEAM FLOW

DISTRIBUTION STEAM FLOW

PLANT DEMAND

STEAM HEADER PRESS HI/LO & ALARMS

OIL PRESSURE TRANSMITTER & ALARMS

PROPANE PILOT GAS TRANSMITTER & ALARMS

MAIN GAS PRESSURE TRANSMITTER & ALARMS

CONTROL AIR PRESSURE TRANSMITTER & ALARMS

LOW MAIN GAS PRESSURE ALARM

HIGH MAIN GAS PRESSURE ALARM

EXPLOSIVE GAS & CARBON MONOXIDE DETECTION SYSTEM

DA PCIII:

HIGH OIL HEADER PRESS ALARM

LOW OIL HEADER PRESS ALARM

DA STEAM PSI

DA TEMP

DA LEVEL

HIGH DA LEVEL ALARM

LOW DA LEVEL ALARM

COND PCIII:CONDENSATE TANK LEVEL

CONDENSATE TANK HIGH LEVEL ALARM

CONDENSATE TANK LOW LEVEL ALARM

CONDESATE TANK TEMP

CONDESATE TANK MAKE UP VALVE

#1& #2 BOILER MASTER PCIII

PLANT DEMAND

BOILER DEMAND

FIRING RATE

STEAM FLOW

ECONOMIZER FLUE TEMP IN

#1 & #2 DRAFT PCIII

OXYGEN TRANSMITTER

DAMPER %

OUTLET TEMP

JACKSHAFT POSITION

EFFICIENCY

#1 & #2 FUEL FLOW PCIII

BOILER GAS FLOW

BOILER OIL FLOW

FLUE GAS TEMP MONITOR CALIBRATION

FLUE GAS TEMP HI & LOW TEMP ALARMS

#1 & #2 ECONOMIZER FW TEMP IN & OUT

#3 BOILER:

STEAM FLOW

OIL FLOW

GAS FLOW

OXYGEN TRANSMITTER

WATER FLOW

FW PRESS

FW TEMP

ECONOMIZER TEMP IN/OUT

BOILER WATER TEMP

BOILER OXYGEN

#1,#2 and #3 FEEDWATER PUMP VARIABLE FREQUENCY DRIVE UNITS Note; there are new DA High and Low-level alarms and Condensate High and Low-level alarms installed separate from the PCCIII alarms. Separate testing and calibration will be required for these beginning with the first calibration cycle of this contract.

Semi-Annual Combustion Testing of Boilers Contractor shall provide all labor and materials required to perform burner calibration on 3 Cleaver Brooks CB700LE boilers. Each burner assembly will be inspected & adjusted to manufacturer’s settings. Each boiler shall be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Plant Supervisor. Contractor will provide burner calibration printouts for each pin on the gas and oil cams (12 for Boilers 1 & 2) & (20 on #3 CB Hawk). Settings will be as close & safe as possible for max input for gas & oil firing at high fire as per the inputs listed on the boiler plate. Contractor shall calibrate the burners and not exceed the requirements of this facilities permit for emissions. Vendor will perform a smoke test on boilers at customers’ request. Contractor is responsible for providing all tools and specialized equipment required to perform the work.

Safety Device Testing A) Contractor shall provide all labor, tools, and all testing equipment required to perform Semi-Annual Safety Device testing on 3 ea. Cleaver Brooks LE fire-tube boilers, and other plant equipment as identified in the VHA Boiler Plant Safety Device Testing Manual, Fifth Edition. Testing shall be in accordance with the procedures outlined in the VHA Boiler Plant Safety Device Testing Manual Fifth Edition or the most current edition if updates have been made. Testing manual will be available upon request.

B) Contractor shall provide a detailed report including a picture of each device as installed on the system and all other information required by the Safety Device Testing Manual 5th Edition. Safety Device Testing shall be scheduled with the Boiler Plant Supervisor.

C) Contractor shall furnish all tools, parts and specialized equipment to accomplish this.

Devices tested shall include, but not be limited to the list below as changes may be made to the Safety Device Testing Manual 5th Edition.

1. High-steam pressure cut-out (recycle), High-steam pressure cut-out (non-recycle).

2. Steam safety valves (raise boiler pressure until valves lift and reset).

3. Check gas vent for leaks.

4. High-gas fuel pressure cut-off.

5. Low-gas fuel pressure cut-off.

6. Gas fuel safety shut off valves proof of closure.

7. Leak test fuel oil safety shut off valves.

8. Check operation of Liquid Propane Gas pilot.

9. Low-pilot gas pressure cut-out.

10. Forced draft fan motor interlock.

11. Forced draft fan damper wide open for purge.

12. Boiler outlet damper wide open for purge.

13. Purge air flow interlock.

14. Timing for pre-purge.

15. Timing for post-purge.

16. Igniter timing.

17. Leak test gas fuel safety shut off valves.

18. High-fuel oil temperature cut-off (heated fuel, N/A).

19. Low-fuel oil temperature cut-off (heated fuel, N/A).

20. Low-atomizing pressure for fuel oil (hh) Low fire position interlock.

21. Combustion air interlocks.

22. Main flame out; i.e., time to close valves.

23. Ignition flame out; i.e., time to close valves.

24. Minimum igniter flame test.

25. Scanner not sensing ignition spark.

26. Low-oxygen alarm and/or cut-out.

27. Pre-purge setting of flue gas recirculation damper.

28. Interlock of building outside air damper with burner control.

29. High-fuel oil pressure cut-off.

30. Low fuel oil pressure cut-off.

31. DA tank high- and low-level alarms.

32. DA tank overflow device.

33. DA tank high pressure alarm.

34. DA tank safety valve.

35. Condensate Receiver tank high- and low-level alarms.

36. Economizer safety valve.

Building #70 Boiler Maintenance, Inspection and Tune Up

1. Contactor shall open the boilers water and firesides, for 2 HB Smith, 14 section, cast iron, low pressure boilers.

2. Contractor shall prepare the boiler and its auxiliary devices for an internal inspection by a Contractor supplied ASME Board Certified Inspector.

3. Contractor shall perform all required safety device testing per the Safety Device Testing Manual 5th Edition and the Low-Pressure Steam and Hot Water Boiler ES 2018-001.

4. Upon completion of the inspection, if any repairs are required at that time, a written quote will be provided to the facility. No repairs will be made unless approved separately by the Contracting Officer.

5. Once the boiler is inspected and/or repaired, the Contractor shall put the boiler back together, fill with water, fire up the unit, and perform an operational and combustion test on oil and gas, making any adjustments needed for proper operation.

6. Contractor shall be responsible for any gaskets & seals that may be required to put boiler back together after inspection such as inspection port gaskets, low water cutout gaskets.

7. Contractor shall provide a service report and all combustion printouts to the Facility POC or designated representative upon completion of work.

8. Contractor is responsible to provide any specialized tools or equipment to perform the work.

9. Contractor shall sign in/out at the Main Boiler Plant, building #22, and will be escorted to the work site.

10. No changes to this Statement of Work can be made without prior written approval of the Contacting Officer

Note: there is a contract to replace the burner management systems on boilers 1&2 with CB Hawk controls. In addition, the SCADA system is being replaced/upgraded at the same time. This work will most likely happen during this contract. If it does, a modification may need to be added to this contract.

See attached document: P07 WD.