36C24118Q0376-001.docx

DOCX document 122 KB Posted

Attached to
SB Fire/Smoke Damper Services
Solicitation number
36C24118Q0376
Issued by

About this file

36C24118Q0376 36C24118Q0376.docx

View the file

Other files

File Type Posted
36C24118Q0376-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24118Q0376

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a

. THIS

CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE.

CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________.

YOUR

OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C24118Q0376 05-25-2018 Stephen Clements 603-624-4366x5860 06-25-2018

08:00 AM

90C Department of Veterans Affairs Network Contracting Office 1 (NE) VAMC Manchester 718 Smyth Road, BST Suite 105 Manchester NH 03104 X X 561621 $20.5 Million X N/A X Department of Veterans Affairs VAMC Manchester 718 Smyth Road Manchester NH 03104 90C Department of Veterans Affairs Network Contracting Office 1 (NE) VAMC Manchester 718 Smyth Road, BST Suite 105 Manchester NH 03104

All Invoices from the Contractor shall be submitted electronically as per VAAR Clause 852.232-72 Electronic Submission of Payment Request http://www.fsc.va.gov/einvoice.asp 877-353-9791 See CONTINUATION Page This solicitation is a request for quote (RFQ) for Fire Damper services.

The government intends to award a firm fixed price IDIQ for up to 5 years. Contractor shall provide all necessary personnel, supervision, labor, equipment, materials and disposal necessary to provide the services at Manchester VAMC per the SOW.

Quoters should carefully follow instructions included in 52.

212-1 and for evaluation criteria specified in 52.212-2.

Pricing should be identified in the Price/Cost Schedule.

Wage Determination#2015-4019 Rev#6 1/10/2018 www.wdol.gov All quotes shall be emailed to stephen.clements3@va.gov.

Any quote not compliant with the RFQ will not be considered.

See CONTINUATION Page X X Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)3
B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)4
B.4 STATEMENT OF WORK5
B.5 PRICE/COST SCHEDULE11
ITEM INFORMATION11
SECTION C - CONTRACT CLAUSES12
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)12
C.2 52.216-18 ORDERING (OCT 1995)12
C.3 52.216-19 ORDER LIMITATIONS (OCT 1995)12
C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)13
C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)13
C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)14
C.7 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)14
C.8 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)14
C.9 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)14
C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)14
C.11 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)15
C.12 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)16
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS22
SECTION E - SOLICITATION PROVISIONS23
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017)23
E.2 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION)26
E.3 VAAR 852.273-70 LATE OFFERS (JAN 2003)26
E.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)27
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017)27

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C241 Stephen Clements Department of Veterans Affairs Network Contracting Office 1 (NE) VAMC Manchester 718 Smyth Road, BST Suite 105 Manchester NH 03104

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] After task completion

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

All Invoices from the Contractor shall be submitted electronically as per VAAR Clause 852.232-72 Electronic Submission of Payment Request http://www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)

This solicitation includes FAR 52.219-6 Notice of Total Small Business Set-Aside. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.

B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)

This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the contract. To that end, the support contractor(s) may require access to the contractor's business records or other proprietary data to review such business records regarding contract compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.

B.4 STATEMENT OF WORK

Fire/Smoke Damper Inspection, Testing, and Repair

1. GENERAL

The work to be performed is for the inspection and testing of all fire dampers, creation of damper inventory, and providing fire damper maintenance and repair work as requested by the Manchester VAMC (VAMC) on an Indefinite Delivery/Indefinite Quantity (IDIQ) basis for up to 5 years, at the determination of the Contracting Officer (CO). Additional inspections and work related to fire dampers may be ordered off the resulting IDIQ without further competition at the sole discretion of the CO. No other person is authorized to obligate money or order work off this contract.

Contractor shall provide professional services, to include all labor, transportation, materials, tools, equipment and permits necessary to inspect and test approximately 75 known, documented fire dampers and an estimated 50 unknown and undocumented dampers, located in Buildings 1 and 15, VA Medical Center, 718 Smyth Rd. Manchester, NH 03104. No change order will be considered for credit or additional cost, unless there is more than a 10% variation from the above stated number of fire dampers

2. PROJECT SCOPE OF WORK

After award, but prior to the start of any field work, the contractor shall contact the Contracting Officer’s Representative (COR) to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, above ceiling and wall penetration permits, hot work permits and the contractor’s site-specific safety plan. Field work shall not commence until these plans have been submitted, accepted and/or approved as detailed below.

TASKS

1. Locate all fire dampers, and once located, operate them, or otherwise identify inoperable dampers. Medical Center furnished data will be used as a guide for location. This consists of drawings and previous inspection reports. A few new dampers are located in newly renovated spaces and will require more research. As stated above, there are approximately 75 known, documented fire dampers and an estimated 50 unknown and undocumented dampers.

2. Conduct Periodic Test and Maintenance described in NFPA 80 2016 edition section 19.4, 19.5 and 19.6 including but not limited to:

3. Remove and reset fusible links on dampers to verify that each damper fully closes, and if necessary, replace any fusible link that is compromised.

4. Lubricate all moving parts on each damper, as necessary.

5. Clear each damper of any debris that would impede the damper’s normal operation.

6. Replace or repair springs and/or access handles for the fire dampers as necessary.

7. If there is no access to a Damper, then properly-sized access doors will be installed to facilitate inspection. Provide a separate per unit cost, including mechanical contractor support (if required), for installing doors, if necessary.

8. Each fire damper shall be identified with an identification tag and documented on an inventory spreadsheet. Inventory spreadsheet, supplied by the contractor shall be in Microsoft Excel format and include all damper identification numbers, locations, and date inspected.

9. Attend a meeting with the Safety Specialist and provide a final report, including, but not limited to, identifying all special repair requirements.

10. Work to be performed under this contract includes (but is not limited to) inspection and testing of the fire dampers, routine maintenance and documenting same, including repair recommendations and cost estimates (see below).

11. Provide separate per unit quotes for repair services, including mechanical contractor support, to correct problems with any damper that does not operate properly and fails to pass inspection, or to correct any access problems that are caused by lack of access doors, or improperly sized or located access doors.

3. SUBMITTALS

In regard to this solicitation, the following should be submitted:

· Signed first page of the solicitation

· Past Performance references

· Statements of technical ability, licenses, certifications, and plans regarding the approach that may be used in performing the work specified

· Pricing (in the Price/Cost Schedule) for the one-time job to perform a total inspection and testing of all estimated fire dampers, the creation of a comprehensive inventory, and the submission of needed reports.

· Pricing for hourly rates and material cost mark-up (in the Price/Cost Schedule) to establish pricing for possible future Task Orders after the performance of the one-time job mentioned above.

· If not self-performing all labor, a description of the prime-subcontractor relationship proposed and which party will be performing which services.

Prior to commencing any work, the Contractor shall submit and receive approval from the COR for the following:

· Certification from the Contractor/Installer that their inspectors have 5 or more years of fire damper inspection experience.

· Site specific Safety Plan.

Upon completion of construction work and before submitting invoice for final payment, provide the following:

· Certification from the Contractor/Installer that the system specified meets all identified code and insurance requirements as required by the Government.

· Provide the VA with one (1) set of marked up drawings that indicate the location and identification tag designation of new fire dampers. Electronic copies of the floor plans will be provided to the successful contractor so that the new inventory information can be placed on AUOTCAD drawings. The contractor will provide electronic copies of the drawings to the VA for record purposes.

· Based upon the inspection and testing results, create an inventory report, using Microsoft EXCEL in accordance with VA requirements. Provide the VA with one (1) hard (paper) copy of the inventory report along with one electronic copy of the inventory report spreadsheet file and the drawings discussed above.

· Using the testing and inspection report, provide the VA a price quote, per unit, for needed repairs, installation or replacement of fire dampers.

1. CODE REQUIREMENTS

All inspection and testing shall be in accordance with NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems and NFPA 80, 2016 edition, for Fire Doors and Other Opening Protectives, chapter 19, and NFPA 72, National Fire Alarm and Signaling Code, and NFPA 105.

2. PROPOSED SCHEDULE

Normal work hours for this project are 7:00 AM to 4:30 PM, Monday through Friday, holidays excepted, unless other times are arranged in advance and approved by the COR or designee. Any work to be performed outside of regular business hours must be approved by the COR or designee.

Work shall commence upon receipt of a Notice to Proceed from the government and shall be completed within 45 calendar days after receipt of Notice to Proceed.

3. WORK LOCATION RESTRICTIONS

When the contractor’s work interferes with VAMC functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall work at other than normal hours and as directed by the COR or designee.

4. IDENTIFICATION, PARKING, SMOKING AND VA REGULATIONS

1. The Contractor's FSEs shall wear visible identification at all times while on the premises of the VAMC.

2. It is the responsibility of the Contractor to park in the appropriate designated parking areas. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.

3. Smoking is prohibited inside any buildings at the VAMC. Smoking, on VA property is only permitted in designated areas.

4. Possession of illicit drugs, alcohol, and weapons are prohibited. Enclosed containers, including tool kits, shall be subject to search.

5. Proper PPE shall be worn, as necessary to the task being performed and/or the area, where work is being conducted.

6. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state or municipal court and immediate dismissal from the site.

STORAGE OF EQUIPMENT & MATERIALS

The contractor shall arrange with the COR, for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be given to the contractor for their storage needs. Additionally, no space will be made available for the placement of a contractor trailer for this project. The Contractor should schedule delivery of materials to limit the amount of storage space and time.

5. DEBRIS REMOVAL

The Contractor/Installer shall be required to remove waste materials and debris daily from the campus. Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators, and facilitate their salvage, reuse, and recycle. Documentation of all waste removed from the VA will be provided to the COR. This will include waste type/description, weight, disposal method, disposal location, and associated costs or savings for each waste stream.

6. SITE UTILITIES

The Contractor/Installer should note that this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. The contractor shall note any obstruction, utility, or condition that may hinder or interfere with the execution of this contract and the contractor shall make provisions in their contract price to resolve such interferences and other conditions that may hinder the proper completion of the work. All proposed utility relocations, reallocations, and shutdowns shall be approved by FMS and the COR, prior to commencing such work. The contractor shall verify all existing utility installations and take appropriate action prior to working around any potential utility installation.

In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least 2 weeks in advance) and approved by FMS and the COR. All utility shutdowns must be reviewed and approved by the VA.

Contractor shall submit a site-specific Safety Plan that provides project-and site-specific activity hazard analyses, equipment specific Lock Out-Tag Out (LOTO) procedures and accident prevention plans. The Contractor’s site-specific Safety plan shall be submitted to the VA for information purposes. The Safety Plan shall conform to the requirements of FAR 52.236-13 and shall include, as a minimum, provisions for the following:

1. Site access and control to restrict access by unauthorized persons and allow for separation of VA staff, patients and visitors from construction personnel.

2. Site security to restrict unauthorized entry by contractor personnel into areas of building 1 determined by the VA to be non-accessible; and to address the need for identification badges to be worn by construction personnel; key control; and loading/unloading of materials and wastes.

3. The contractor’s substance abuse policy and training requirements

4. Contractor’s plan for site safety and health inspections

5. Contractor’s plan for safety and health training

6. Contractor’s site-specific fall protection program

7. Contractor’s site-specific electrical safety plan (LOTO)

8. Contractor’s requirements for use of personal protective equipment (PPE).

9. Contractor’s accident reporting and investigation program. The contractor shall submit a written incident report to the VA Project Manager within 24 hours after any accident, injury, occupational illness, or other safety-related incident occurs, regardless of how minor the nature of the incident.

10. Contractor’s emergency action plan and fire prevention and protection plan, to include training of contractor personnel in the provisions of these plans.

11. Contractor’s minimum safely training requirements for its personnel and the personnel of its sub-contractors.

12. Contractor’s requirements for sub-contractor conformance to the site-specific Safety Plan

13. Identity of the Contractor’s designated “Competent Person” as defined by 29 CFR 1926 (OSHA Construction Industry Regulations). The contractor shall provide a Competent Person who shall be on the project site during activities when the expertise of the designated Competent Person is required.

14. Contractor’s protocol for inspections by regulatory agencies.

7. PENETRATIONS OF FIRE AND SMOKE BARRIERS

a. Prior to any installation of equipment, cables, power connections, conduit, piping or other work that penetrates a smoke or fire barrier, all such work must be approved by Facilities Management Service (FMS) of the VAMC Manchester. A penetration permit must be secured from FMS prior to disturbing the integrity of the barrier. The permit must be available for inspection at the project location. After the work is completed, the penetration must be repaired (sealed) according to accepted practice and utilizing materials (including UL/FM-listed through penetration fire stopping materials) that meet the original barrier construction requirements in order to restore the designed specifications for smoke and fire compartmentalization. All penetrations and miscellaneous openings must be protected according to NFPA 101, Chapter 8.

b. Ensure that all penetrations made in fire resistance assemblies of the existing facility, to include smoke barriers, fire separation assemblies, and fire walls, are properly fire stopped within 4 hours after making the penetration.

c. Identify through-penetration fire stop systems with pressure-sensitive, self-adhesive, preprinted vinyl labels. Attach labels permanently to surfaces of penetrated construction on both sides of each fire stop system installation where labels will be visible to anyone seeking to remove penetrating items or fire stop systems. Include the following information on labels:

1. The words: "Warning -Through Penetration Fire stop System-Do Not Disturb. Notify Building Management of Any Damage."

2. Contractor's Name, address, and phone number.

3. Through-Penetration fire stop system designation of applicable testing and inspecting agency.

4. Date of Installation.

5. Through-Penetration fire stop system manufacturer's name.

6. Installer's Name.

d. Upon completion of any penetration fire stopping, a visual inspection for approval must be requested from, and completed by FMS.

8. LIFE SAFETY PROTECTION MEASURES

At a minimum, contractor shall comply with the following requirements of life safety and fire protection measures, while performing work at VAMC Manchester. If a life safety system or means of egress is compromised, due to work being performed, the contractor will work with the VA to institute an ILSM (Interim Life Safety Measure).

A. Ensure exits provide free and unobstructed egress for all building occupants. If required by contractor’s operations, establish and mark alternate means of egress for all building occupants.

B. Contractor shall maintain escape facilities from the work area for construction workers at all times. Means of egress in construction areas will be inspected daily.

C. Ensure free and unobstructed access to all areas of the project site for emergency services and for emergency forces.

D. Ensure that means of egress and existing fire alarm, detection, and suppression systems are not impaired by contractor’s operations.

E. Provide written procedures and guidelines for construction personnel and post in the immediate areas of construction detailing what to do and who to call in the event of fire or emergency.

F. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations.

G. All temporary construction shall be built of noncombustible/fire retardant materials and shall be smoke tight.

H. Ensure that all penetrations made in fire resistance assemblies of the existing buildings, to include smoke barriers, fire separation assemblies, and fire walls, are properly fire stopped within 4 hours after making the penetration.

12. MATERIAL & WORKMANSHIP QUALITY

All materials and workmanship shall comply with all codes, standards, and recommendations of all Authorities Having Jurisdiction (AHJ). All work shall be done in a first class manner, according to the best trade practices and to the satisfaction of the COR.

13. SECURITY

Upon arrival, at the VA Manchester campus, all contractor personnel shall report to Building 6 and sign into the contractor log and obtain a short-term identification badge, issued by Facility Service-Engineering section. Such badge shall be worn by the individual and prominently displayed at all times while on VA property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. All contractor identification badges shall be returned to building 6, at the end of each work shift.

All contractor personnel are subject to inspection of personal effects when entering or leaving the property.

B.5 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM#
DESCRIPTION OF SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
Complete inspection, testing, and creation of damper inventory Job
1.00
JB
0002
Hourly Rate

Contract Period: Base POP Begin: 06-01-2018 POP End: 05-31-2019

0.00
HR
0003
Material Cost Mark-Up %
0.00
EA
1001
Hourly Rate

Contract Period: Option 1 POP Begin: 06-01-2019 POP End: 05-31-2020

0.00
HR
2001
Hourly Rate

Contract Period: Option 2 POP Begin: 06-01-2020 POP End: 05-31-2021

0.00
HR
3001
Hourly Rate

Contract Period: Option 3 POP Begin: 06-01-2021 POP End: 05-31-2022

0.00
HR
4001
Hourly Rate

Contract Period: Option 4 POP Begin: 06-01-2022 POP End: 05-31-2023

0.00
HR

GRAND TOTAL

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

FAR Number
Title
Date
52.212-4
CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS
JAN 2017

ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

The following clauses are incorporated into 52.212-4 as an addendum to this contract:

C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Clause)

C.2 52.216-18 ORDERING (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the effective of the contract through the last day of the effective period.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of Clause)

C.3 52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor—

(1) Any order for a single item in excess of $50,000;

(2) Any order for a combination of items in excess of $100,000; or

(3) A series of orders from the same ordering office within 3 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause)

C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 30 after the end of the effective period.

(End of Clause)

C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 days.

(End of Clause)

C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 10 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 10 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

(End of Clause) C.7 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984) The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.

(End of Clause)

C.8 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)

The bidder or offeror agrees that if a contract is awarded to him/her, as a result of this solicitation, he/she will not advertise the award of the contract in his/her commercial advertising in such a manner as to state or imply that the Department of Veterans Affairs endorses a product, project or commercial line of endeavor.

(End of Clause)

C.9 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)

The offeror agrees, if awarded a contract, to use the service-disabled veteran-owned small businesses or veteran-owned small businesses proposed as subcontractors in accordance with 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, or to substitute one or more service-disabled veteran-owned small businesses or veteran-owned small businesses for subcontract work of the same or similar value.

(End of Clause)

C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)

(a) Definitions. As used in this clause—

(1) Contract financing payment has the meaning given in FAR 32.001.

(2) Designated agency office has the meaning given in 5 CFR 1315.2(m).

(3) Electronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.

(4) Invoice payment has the meaning given in FAR 32.001.

(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.

(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.

(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:

(1) VA’s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)

(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.

(d) Invoice requirements. Invoices shall comply with FAR 32.905.

(e) Exceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:

(1) Awards made to foreign vendors for work performed outside the United States;

(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;

(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;

(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or

(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.

(End of Clause)

C.11 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984)

The contractor shall obtain all necessary licenses and/or permits required to perform this work. He/she shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees fault or negligence, and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of New Hampshire. Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there from.

(End of Clause)

FAR Number
Title
Date
52.232-40
PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS
DEC 2013

(End of Addendum to 52.212-4) C.12 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(3) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) (Pub. L. 109–282) (31 U.S.C. 6101 note).

[] (5) [Reserved] [] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).

[] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

[] (10) [Reserved] [] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

[] (ii) Alternate I (NOV 2011) of 52.219-3.

[] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[] (ii) Alternate I (JAN 2011) of 52.219-4.

[] (13) [Reserved] [X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

[] (ii) Alternate I (NOV 2011).

[] (iii) Alternate II (NOV 2011).

[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

[] (ii) Alternate I (Oct 1995) of 52.219-7.

[] (iii) Alternate II (Mar 2004) of 52.219-7.

[] (16) 52.219-8, Utilization of Small Business Concerns (NOV 2016) (15 U.S.C. 637(d)(2) and (3)).

[] (17)(i) 52.219-9, Small Business Subcontracting Plan (JAN 2017) (15 U.S.C. 637(d)(4)).

[] (ii) Alternate I (NOV 2016) of 52.219-9.

[] (iii) Alternate II (NOV 2016) of 52.219-9.

[] (iv) Alternate III (NOV 2016) of 52.219-9.

[] (v) Alternate IV (NOV 2016) of 52.219-9.

[] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

[] (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

[] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

[X] (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C 632(a)(2)).

[] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (DEC 2015) (15 U.S.C. 637(m)).

[] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (DEC 2015) (15 U.S.C. 637(m)).

[X] (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

[] (26) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2018) (E.O. 13126).

[X] (27) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (28) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).

[] (29) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212).

[X] (30) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

[] (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

[] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (33)(i) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[] (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[] (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[] (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (OCT 2015) of 52.223-13.

[] (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-14.

[] (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007)(42 U.S.C. 8259b).

[] (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) [] (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[] (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[] (45) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[] (ii) Alternate I (JAN 2017) of 52.224-3.

[] (46) 52.225-1, Buy American—Supplies (MAY 2014) (41 U.S.C. chapter 83).

[] (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[] (ii) Alternate I (MAY 2014) of 52.225-3.

[] (iii) Alternate II (MAY 2014) of 52.225-3.

[] (iv) Alternate III (MAY 2014) of 52.225-3.

[] (48) 52.225–5, Trade Agreements (OCT 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[] (50) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[] (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

[] (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

[] (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[] (54) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[X] (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).

[] (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

[] (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[] (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

[] (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).

[] (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[] (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[] (1) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

[X] (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

[X] (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

Employee Class
Monetary Wage-Fringe Benefits
Fire Protection Inspector
$21.90 per hour

[X] (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[] (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

[] (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).

[] (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).

[X] (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).

[X] (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.