36C24118Q0116-001.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24118Q0116
About this file
36C24118Q0116 P09 - Statement of Work.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24118Q0116-003.pdf | ||
| 36C24118Q0116-002.docx | DOCX document | |
| 36C24118Q0116-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Semi-Annual Calibrations of Boiler Plant Controls and Instrumentation and Semi-Annual Combustion Testing of Boilers 36C241-18-Q-0006
1. GENERAL: Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of boiler plant controls and instrumentation for three boilers and other plant equipment. Contractor will also provide all labor and materials required to perform burner calibration on 3 Cleaver Brooks CB700LE boilers.
1.1 Description of Services/Introduction
i) Contractor must have a laptop computer and required software to plug into & back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor.
ii) Contractor will not be accessing any Sensitive VA Information Systems, these are boiler controls only.
iii) Control devices will include but are not limited to the following, Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens & Johnson Controls.
iv) Contractor shall also supply to customer, calibration reports for each piece of equipment, indicating date, settings, pass/fail, technical data, and name of technician performing calibrations.
v) Contractor will provide a list of line items that require parts/replacement and the costs required to repair/replace those items.
vi) Any additional work will require approval from the Contracting Officer.
vii) See the following list of controls & instrumentation to be calibrated in sections 1.2.
1.2 Work Specifications for the Calibrations of Boiler Plant Controls:
THE FOLLOWING IS A LIST OF DEVICES THAT WILL REQUIRE CALIBRATION:
PLANT MASTER PCIII:
OUTSIDE AIR TEMP
PLANT STEAM FLOW
DISTRIBUTION STEAM FLOW
PLANT DEMAND
STEAM HEADER PRESS HI/LO & ALARMS
OIL PRESSURE TRANSMITTER & ALARMS
PROPANE PILOT GAS TRANSMITTER & ALARMS
MAIN GAS PRESSURE TRANSMITTER & ALARMS
CONTROL AIR PRESSURE TRANSMITTER & ALARMS
LOW MAIN GAS PRESSURE ALARM
HIGH MAIN GAS PRESSURE ALARM
EXPLOSIVE GAS & CARBON MONOXIDE DETECTION SYSTEM
DA PCIII:
HIGH OIL HEADER PRESS ALARM
LOW OIL HEADER PRESS ALARM
DA STEAM PSI
DA TEMP
DA LEVEL
HIGH DA LEVEL ALARM
LOW DA LEVEL ALARM
COND PCIII:
CONDENSATE TANK LEVEL
CONDENSATE TANK HIGH LEVEL ALARM
CONDENSATE TANK LOW LEVEL ALARM
CONDESATE TANK TEMP
CONDESATE TANK MAKE UP VALVE
#1& #2 BOILER MASTER PCIII
PLANT DEMAND
BOILER DEMAND
FIRING RATE
STEAM FLOW
ECONOMIZER FLUE TEMP IN
#1 & #2 DRAFT PCIII
OXYGEN TRANSMITTER
DAMPER %
OUTLET TEMP
JACKSHAFT POSITION
EFFICIENCY
#1 & #2 FUEL FLOW PCIII
BOILER GAS FLOW
BOILER OIL FLOW
FLUE GAS TEMP MONITOR CALIBRATION
FLUE GAS TEMP HI & LOW TEMP ALARMS
#1 & #2 ECONOMIZER FW TEMP IN & OUT
#3 BOILER:
STEAM FLOW
OIL FLOW
GAS FLOW
OXYGEN TRANSMITTER
WATER FLOW
FW PRESS
FW TEMP
ECONOMIZER TEMP IN/OUT
BOILER WATER TEMP
BOILER OXYGEN
#3 FEEDWATER PUMP VARIABLE FREQUENCY DRIVE UNIT
Note; there will be new DA High and Low level alarms and Condensate High and Low level alarms installed separate from the PCIII alarms. Separate testing and calibration will be required for these beginning with the first calibration cycle of this contract.
1.3 Work Specifications for Combustion Testing of Boilers:
| i) | Contractor will provide all labor and materials required to perform burner calibration on 3 Cleaver Brooks CB700LE boilers. |
| ii) | Each burner assembly will be inspected & adjusted to manufacturer’s settings. |
| iii) | Each boiler will be calibrated on gas and oil firing twice a year, approximately 6 months apart, as scheduled by the Plant Supervisor. |
| iv) | Contractor will provide burner calibration printouts for each pin on the gas and oil cams (12 for Boilers 1 & 2) & (20 on #3 CB Hawk). |
| v) | Settings will be as close & safe as possible for max input for gas & oil firing at high fire as per the inputs listed on the boiler plate. |
| vi) | Vendor will calibrate the burners and not exceed the requirements of this facilities permit for emissions. |
viii) Vendor is responsible for providing all tools and specialized equipment required to perform the work.
ix) All work will be performed during normal business hours, Monday through Friday.
No changes to this SOW will be made without the Contracting Officer’s written consent.