Medical Disability Exams (MDE) Veterans Benefits Administration (VBA) Department of Veterans Affairs (VA) As Authorized by P.L. 104-275 Solicitation Number: 36C10X18R0133 Amendment A00003
| Q # |
| FILE AND SECTION |
| PAGE NUMBER |
| VENDOR QUESTION |
| GOVERNMENT RESPONSE |
| 1 |
| Section 7.5 |
| 11 |
| Can a subcontractor have more than one affiliation with a Prime? |
| Yes. The Government typically has no privity of contract with a subcontractor to the Contractor on any award related to the solicitation (except indirectly by way of contract terms and clauses that automatically flow-down from the Prime to the subcontractor). Accordingly, any subcontractor on the MDE contracts may enter into contracts with one or more Contractors. The Contractors shall honor all terms, conditions, and clauses in the contract, so if any subcontracting relationship a Contractor enters into otherwise conflicts with a contract requirement, this may establish grounds for termination or other corrective action by the Government against the Contractor. For example, Section 7.3 of the PWS, Section E (Basis for Award; Proposal Submission Instructions), and Attachment Y describe limitations regarding the affiliation of Contractors within a given geographic region under the MDE contracts. |
| 2 |
| Section 8.5 |
| 17 |
| Are inspections required for all MDE sites including single practitioner sites? |
| Yes. The Contractor is required to inspect all MDE sites including single practitioner sites. |
| 3 |
| Section 9.15 |
| 23 |
| What is the timeframe associated with “priority processing?” |
| While there is no specific timeframe associated with “priority processing” cases, the Government requests expeditious processing for these case types. |
For additional information, see the Government responses to other questions within this list of questions regarding “priority processing”.
| 4 |
| Section 9.19 |
| 23 and 24 |
| What is the estimated number of ACEs anticipated per region? |
| ACE examinations are not a claim type, but instead is a process that can be used to complete examinations. The Government estimates that 10%-20% of the examination requests the Contractor receives could be completed using the ACE process. |
See Amendment A00003 to the solicitation, which revises the Addendum to FAR 52.212-2, Instructions to Offerors, to permit Offerors to propose a discount percentage for ACE Eligible Exams. Also, see amended Attachment AA, which makes conforming changes to the Pricing Spreadsheet.
| 5 |
| Section 9.20 |
| 24 |
| Can automated technology be used for Veteran appointment notification or reminders? |
| Yes. The use of automated technology is acceptable as the provisions outlined in 9.20 are met to include documented contact with the Veteran. |
| 6 |
| Section 9.23 |
| 26 |
| If a Contractor is providing Saturday and Sunday appointments, is the Contractor also required to provide access to administrative offices on Saturday and Sunday? |
| No. The requirement is outlined in Section 9.23. However, the Contractor should ensure administrative support to Veterans is available for weekend appointments. The PWS will be updated to reflect this change. |
| 7 |
| A. Basis for Award |
| 102 |
| This section states that offers may submit proposals for any or all of the five regions listed in Section 6.0 (Scope of Work). However only 4 regions are listed in section 6.0, please clarify. |
| The correct number of geographic regions is Four, not Five. Amendment A00003 of the RFP revises the Addendum to FAR 52.212-2, Instructions to Offerors to make this correction. |
| 8 |
| Section B.2 PWS Section |
6.4
| 9 |
| The Regional Office list for Region 3 (Midwest) includes Albuquerque, Portland, and Ft. Harrison which are part of Region 4 according to the Map in Section 6.1 (page 8). Please clarify which Region they belong to and if the Maximum Order volume per Region would change due to this clarification. |
| Albuquerque, Portland, and Ft. Harrison are all part of Region 4 (Pacific). See Amendment A00003 which revises PWS Sections 6.4 and 6.5 to correct this error. This will not affect the volume projections for either Region 3 (Midwest) or Region 4 (Pacific) as the Government’s estimates for the maximum order volume included these offices in the correct regions. |
| 9 |
| Section B.2 PWS Section 8.2.f and 8.2.g |
| 13-14 |
| It is our assumption that providers/examiners do not require background investigations. Is that assumption correct? If not, please clarify. |
| Exam providers (clinicians) are not required to undergo background investigations in order to provide exams under the contract; however, all exam providers (clinicians) shall have a current, unrestricted license to practice their profession, and shall not be barred or suspended from practicing in any State, the District of Columbia, or a Commonwealth, territory, or possession of the United States. |
| 10 |
| Section B.2 PWS Section 8.4.a. |
| 15 |
| When the Government refers to “site” for report sorting purpose, does this mean by ordering VA Regional Office, by the jurisdictional Regional Office based on the residence of the Veteran or the State of residence of the Veteran. Please explain. |
| The Government defines “site” as the jurisdictional VA Regional Office based on the residence of the Veteran. |
| 11 |
| Section B.2 PWS Section 8.4.a.xi.e |
| 17 |
| This section refers to Attachment J as the format for the monthly saturation report. Please clarify the information that is to be entered into this spreadsheet. What are the column headings and what information needs to be entered into each row and column? |
| Amendment 0002 includes a revised Attachment J, which illustrates the required information to be included in each Contractor’s monthly saturation report. The column headings are as follows: |
· Column A- Zip Code of coverage location
· Column B- Audiology Provider Total
· Column C- Dental Provider Total
· Column D- Ophthalmologist /Optometrist (Eye) Provider Total
· Column E- Gynecological (GYN) Provider Total
· Column F- Mental Health Provider Total
· Column G- Prisoner of War (POW) Protocol Provider Total
· Column H- Sleep Disorders Provider Total
· Column I- Traumatic Brain Injury (TBI) Provider Total
· Column J- General Provider Total
The rows should reflect the provider total counts by zip code.
| 12 |
| Section B.2 PWS Section 8.4.a.xi.f |
| 17 |
| Assuming that as much as 15% or more of a Vendor’s work in progress may be over 20 days old at that end of any given month, is it an expectation that a mitigation plan be provided for each case over 20 days old? What would VA expect in the way of a mitigation plan? |
| See Amendment A00003, which updates the “Timeliness” Section of PWS Section 12.0 to revise the expected standard of performance to require completion of 75%-85% of total inventory within 20 calendar days for DBQ/C&P Examinations, other than for Incarcerated Veterans and Agency Priority Reviews. |
In response to inventory that does not meet the expected standard of performance, the Government reserves the right to reduce/offset that Contractor’s percentage of their incoming inventory (examination requests) commensurate with the percentage of inventory pending greater than 20 days. The Government will also may request more frequent status reports identifying all cases pending greater than 20 days. Attachment W has been updated to reflect the required format and necessary information.
| 13 |
| Section B.2 PWS Section 8.4.a.xi.g |
| 17 |
| In what format will the noted “reconciliation reports” be expected? Specifically, for which VA systems would this report be utilized or are multiple reports and systems to be reconciled? |
| During contract performance, should the Government require a “reconciliation report”, or any other report, from the Contractor that is not a required deliverable under the existing contract terms, the Government will negotiate the details and associated pricing for adding such reports to the set of required deliverables. |
| 14 |
| Section B.2 PWS Section 9.2 |
| 19 |
| How will the RAD date be provided to Vendors to determine eligibility for travel reimbursement? |
| The RAD date is provided in the examination request. |
| 15 |
| Section B.2 PWS Section 9.12.vii |
| 22 |
| Please clarify the diagnostic test as a CBC is not a lipid panel. |
| See Amendment A00003, which updates PWS Section 9.12.vii to show CBC and lipid panel as separate diagnostic tests. |
| 16 |
| Section B.2 PWS Sections 9.16, 9.17, 9.18 |
| 23 |
| PWS Sections 9.16 through 9.18 identifies multiple types of claims which are to receive priority processing. How are these identified to the Contractor? Are there specific data elements in the exam request? |
| See Amendment A00003 to the RFP, which updates PWS Section 9.18 to clarify this requirement. |
| 17 |
| Section B.2 PWS Sections 9.16, 9.17, 9.18 |
| 23 |
| PWS Sections 9.16 through 9.18 identifies multiple types of claims which are to receive priority processing. What percentage of all claims is expected in these categories? |
| See Amendment A00003 to the RFP, which updates PWS Section 9.18 to clarify this requirement. |
Priority processing requests are expected to be approximately 15% of the total exam request volume.
See Amendment A00003 to the RFP, which removes reference to the “Fully Developed Claim” (or FDC) program, which is currently in development by VBA and may be negotiated into the Contract at a later date once the FDC program is ready to roll out by VBA.
| 18 |
| Section B.2 PWS Sections 9.16, 9.17, 9.18 |
| 23 |
| PWS Sections 9.16 through 9.18 identifies multiple types of claims which are to receive priority processing. PWS Section 12.0 defines the timeliness performance standard and requires an average of less than 20 days (approximately 15-16 days) in order to achieve the expected performance level. The ability to manage all cases in inventory is essential to a Contractor’s performance and can be negatively impacted by priority processing for a subset of the inventory. Please clarify the actions/results expected for “priority processing.” How will VA accommodate for an impact to the timeliness metric due to priority claims? |
| The performance standards required under Section 12.0 of the PWS apply to exams identified by the COR or on the exam request for priority processing; however, the Contractor shall take steps to prioritize such requests to ensure the timeliness standard is not only met, but when reasonably possible, completed faster than required by the minimum performance standard. |
The Government estimates that approximately 50% of its inventory includes Fully Developed Claims (FDC). The remaining priority requests make up approximately 15% of the total inventory and may overlap with FDC claims.
| 19 |
| Section B.2 PWS Section 9.16.h |
| 23 |
| It is our understanding that IDES claims are not in scope. Please clarify this item. |
| IDES claims are not within the scope of this acquisition. See Amendment A00003, which updates PWS Section 9.16.h to remove this claim type. |
| 20 |
| Section B.2 PWS Sections 9.22, 9.28, 10.4 |
| 26, 34 |
| Attachment N is referenced in PWS Sections 9.22 and 10.4 regarding tests to accompany an exam and referenced in PWS Section 9.28 regarding CAATS. Please clarify Attachment N and provide the actual attachment file as Attachment N was not provided with the RFP. |
| See Amendment A00003 which updates PWS Sections 9.22 and 10.4 to reflect Attachments O and P. Also, see updated Section 9.28 which refers to Attachment L. |
| 21 |
| Section B.2 PWS Section 9.28.2.a.i |
| 28 |
| By what means shall the Vendor notify the COR of exam requests that are in an invalid format or do not pass validation? |
| VA will provide this information and the appropriate format upon contract award. |
| 22 |
| Section B.2 PWS Section 9.28.2.b.ii.A |
| 29 |
| Please clarify the mechanism to respond to DAS with an error code in this situation. It does not appear to be defined within the IEPDs. |
| VA will provide this information and the appropriate format upon contract award. |
| 23 |
| Section B.2 PWS Section 9.28.2.b.ii.C |
| 29 |
| Please clarify the method to provide this notification to the COR in a secure manner. |
| VA will provide this information and the appropriate format upon contract award. |
| 24 |
| Section B.2 PWS Section 9.28.2.c.ii, 9.37.c.i |
| 29, 37 |
| It is our assumption that the following will also occur: If Contractor cancels all scheduled appointments in expectation of the entire ExamRequest being cancelled, and sends a Clarification Request to Cancel the ExamRequest, the ExamRequest will be considered to be in Triage from a Clarification POV and should the VA request the ExamRequest to be re-activated, this will also reset the timeliness clock to zero when the Clarification Response is received. Is this assumption correct? If yes, recommend adding to PWS. If no, please clarify. |
| See Amendment A00003 which revises PWS Section 9.28.2.c.ii to reflect the following: |
In cases of clarifications that take place during triage, the timeliness clock is stopped and restarted at the time Contractor receives the Clarification Response from the VA.
PWS Section 9.37.c.i has been revised by Amendment 00002 to reflect the following:
In cases of clarifications that take place during triage before any appointments have been scheduled the timeliness clock is stopped and restarted at the time Contractor receives the Clarification Response from the VA.
| 25 |
| Section B.2 PWS Section 9.29 |
| 29-30 |
| Please clarify if the “UUID” information is required for VBMS exams. |
| PWS Section 9.29 has been revised to clarify that for invoices for scheduling requests sent from VBMS once VBMS-EMS Integration is fully implemented, contention UUID(s) shall be included. With the electronic monthly invoice file for VBMS exam scheduling requests, the Contractor shall also provide a summary roll of numbers and information as identified in items a through d of Task Four. |
| 26 |
| Section B.2 PWS Section 10.3 |
| 33 |
| Endoscopy is a required diagnostic test for claims of Gastritis and the corresponding DBQ, is the Vendor expected to request permission to perform this diagnostic for all Gastritis claims? |
| The Contractor shall request permission from the COR prior to performing this test. The diagnosis of gastritis requires endoscopic confirmation. If testing is of record and is consistent with the Veteran's current condition, repeat testing is not required. |
| 27 |
| Section B.2 PWS Section 10.16 |
| 37 |
| The 5 quality criteria and the 13 item check list (12 used for rating) described in Attachment X do not align. The 13 item checklist relies on subjective assessment to answer many of the checklist questions. Which criteria will be used to assess quality (5 or 12)? Are the Vendors to assume that if any question on the Attachment X checklist is answered “No” that that DBQ is considered insufficient for rating purposes? |
| The checklist provided in Attachment X is the tool utilized by the Government to evaluate the accuracy of a completed DBQ. The five criteria noted in Section 10.16 are encompassed within the questions on the quality review checklist are equally important. Please note that Questions 1 and 13 are not used to calculate DBQ accuracy. |
Furthermore, if “No” is answered for any question 2 through 12, the DBQ is considered an error. Our quality review assesses accuracy based upon contractual requirements, and does not assess sufficiency for rating purposes.
| 28 |
| Section B.2 PWS Section 10.17 |
| 37 |
| Please provide examples of what these “special focus reviews” might entail. |
| An example of a Special focused reviews might entail (but is not limited to) the following: |
· A review at a specific DBQ-type;
· A review on a specific provider; or
· A review on a topic at the request of a third party.
Findings noted from a special focused review will be provided to the Vendor for feedback and corrective action and monitoring, if warranted. Compliance with corrective actions and monitoring will be required. Example of corrective action may include, but are not limited to, re-examination based upon deficiencies found, refresher training requirements, monitoring of a provider’s work to ensure corrected behavior.
| 29 |
| Section B.2 PWS Section 10.18.b.ii |
| 38 |
| Can the Contractor also perform the coordination with the Veteran and the Veteran Crisis Line? |
| Yes – The Contractor can assist with the coordination in addition to following the established procedure. |
| 30 |
| Section B.2 PWS Section 10.18.C |
| 38 |
| It is our assumption that this information can be included in the appointment packet as in this situation the homeless Veteran has been contacted. Is this assumption correct? If not, please clarify. |
| No – The exam provider shall provide this information to the Veteran at the time of the appointment and note provision of the information on the exam worksheet. |
| 31 |
| Section B.2 PWS Section 10.23.b.iii |
| 43 |
| It is our understanding that the SHA is not in scope. Please clarify. |
| Separation Health Assessment (SHA) is not within the scope of this acquisition and PWS Section 10.23.b.iii has been revised accordingly. |
| 32 |
| Section B.2 PWS Section 10.23. j |
| 44 |
| The PWS states that the Contractor shall discount DBQ pricing for ACE Evaluations based on a negotiated discount rate of 15% and a specific example with pricing is cited. As the discount is stipulated in the PWS it is not a negotiated rate. Should the Offerors propose a discount for ACE Evaluations? Please clarify. |
| See Amendment A00003 to the solicitation, which revises PWS Section 10.23 to permit Offerors to propose a discount percentage for ACE Eligible Exams. Also, see amended Attachment AA, which allows Offerors to propose a percentage discount rate for ACE Eligible exam types. |
| 33 |
| Section B.2 PWS Section 11.c |
| 46 |
| It is our assumption that the Contractor shall distribute the survey cards to Veterans. If the Contractor uses various methods (i.e. hardcopy and electronic) to distribute appointment information, and survey cards are used, it is our assumption that the Contractor can use the survey card information within its method (e.g. create a web-based survey, re-create on different paper stock)? Is this assumption correct? If not, please clarify. |
| The Government currently utilizes a 3rd party Vendor to provide review and processing of Veteran survey cards. The third-party Vendor provides hard copies survey cards and web based survey. PWS Section 11.c has been revised to clarify MDE Contractors will be required to provide the third-party Vendor’s hard copy survey cards to Veterans in their appointment packages. See Amendment A00003 which updates the PWS Section 11.c. More detailed procedures will be be provided by the Government following contract award. |
| 34 |
| Section B.2 PWS Section 12.0 |
| 49 |
| The performance standard for compliance on timeliness is based on the total inventory as measured by the total pending requests and total completed requests for the calendar month. To achieve the expected level of performance, 81-85% of all delivered and in-progress exam requests must be under the target of 20 days for C&P cases. Compliance of 81-85% to the target timeliness is extremely difficult to achieve given the historical data and the complexity of the VBA MDE exams and therefore presents a high probability that all Contractors will fail to meet the standard. This increases This increases risk and costs in order for Contractors to use various methods to minimize non-performance. In order to achieve the standard as defined, Contractors must achieve an average of 15 days. This represents a significant demand on Contractor resources and a corresponding significant increase in price to obtain and maintain the necessary capabilities to meet the standard (15 days compared to 20 days represents a change in magnitude of 25%). Recommend reconsideration of the definition of the timeliness performance standard to support more competitive pricing. If retained, recommend use of a compliance range of 60-65%. |
| See Amendment A00003 to PWS Section 12.0 which reflects the following: |
The expected standard of performance requires each Vendor to complete 75%-85% of total inventory within 20 calendar days for DBQ/C&P Examinations, other than for Incarcerated Veterans and Agency Priority Reviews.
| 35 |
| Section B.2 PWS Section 12.0 |
| 49 |
| Please explain how “Total pending inventory of Veteran requests for the calendar month” is captured? Total pending inventory, which can also be defined as the total number of active Veteran requests in the process of being worked by a Vendor and pending completion, is a fluid number which can change minute-by-minute as new Veteran requests are received daily, and aged requests are completed real-time throughout the day. Any type of pending inventory aging analysis can only be done after taking a “snapshot” of the pending inventory in any given time. Will the VA being taking inventory “snapshots” daily in order to calculate this metric? And is VA contemplating requiring daily compliance? Will the VA wait for the final day of a calendar month and take the snapshot once per month to calculate this metric? Please clarify the entire daily/monthly/quarterly VA process to measure and communicate timeliness to a Vendor. This clarification is important as the cost basis required to build a service delivery model to ensure daily compliance to this measure is very different than achieving this measure on the final day of a calendar month. |
| Total pending inventory of Veteran requests will be captured as of the last day of the month. Months will be based on the initial period of performance following the ramp up period. For example, if the Ramp up period ends September 14th, and exam requests begin to be ordered on September 15th, the monthly evaluation for pending inventory would be on September 30th. |
See Amendment A00003 which updates PWS Section 12.1 as follows:
12.1 Performance evaluation:
Timeliness will be evaluated by measuring the pending inventory on a monthly basis for purposes of section 12.8. Timeliness (based on completed inventory), quality, and Veteran satisfaction survey will be evaluated quarterly for purposes of incentives and disincentives, with a monthly teleconference for feedback and informational purposes.
| 36 |
| Section B.2 PWS Section 12.0 |
| 49 |
| In the definition of “Total Inventory” in the Timeliness column of the PRS, the Government notes that “examinations cancelled due to a Vendor’s inability to complete the examination in a timely fashion will be counted against timeliness, with date of cancelled = date completed.” Please define by days what is considered “a timely fashion.” |
This requirement where a date of cancelled examination is given the same credit as date completed examination can misrepresent a Vendor’s actual performance. Without a clear definition of “a timely fashion” a Vendor can actually manipulate this requirement to improve their timeliness metric which seems inconsistent with the intent of this requirement. As an example, if a Vendor does not have the necessary provider network coverage and/or staff to handle the volume of assigned exam requests, there are no defined objective and reliable management safeguards defined in this PWS to prevent a Vendor from cancelling exam requests within 20 days from date of receipt from VA. Because this requirement counts cancellations in the calculation of the % of total inventory completed within 20 days (C&P), a high number of cancellations under 20 days actually improves the Expected Standard of Performance for a non-performing Vendor.
The Government defines “a timely fashion”, as meeting the expected standard of performance as defined in the Section 12.0 of the PWS. A Contractor’s request to make cancellations associated with the Contractor’s own inability to complete examination requests within the expect standard of performance will be directed by the Government. The VBMS-EMS system does not allow Vendors to cancel examination requests without Government approval.
| 37 |
| Section B.2 PWS Section 12.0 |
| 49 |
| The Timeliness standard states that the two inventory metrics are measured for a calendar month and contractual timeliness rating is provided in the quarterly report. Please provide further insight and details on the mechanics of how VA will measure and communicate timeliness on a monthly and quarterly basis. |
| Total pending inventory of Veteran requests will be captured as of the last day of the month. Months will be based on the initial period of performance following the ramp up period. For example, if the Ramp up period ends September 14th, and exam requests begin to be ordered on September 15th, the monthly evaluation for pending inventory would be on September 30th. |
Section 12.1 of the PWS has been updated as follows:
12.1 Performance evaluation:
Timeliness will be evaluated by measuring the pending inventory on a monthly basis for purposes of section 12.8 Timeliness (based on completed inventory), quality, and Veteran satisfaction survey will be evaluated quarterly for purposes of incentives and disincentives, with a monthly teleconference for feedback and informational purposes.
Pending inventory, which will be measured on a monthly basis is defined as all examination requests in a Vendor’s given inventory that has not been completed. This calculation will exclude examination requests awaiting clarification from the VA. The time clock for this metric begins on the first day of the month and ends on the last day of the respective month.
Completed inventory, which will be measured in a quarterly basis, is defined as all examination requests completed within the quarter. This calculation will exclude all examination requests in a pending status. The time clock for this metric begins on the first day of the quarter and ends on the last day of the respective quarter.
| 38 |
| Section B.2 PWS Section 12.0 |
| 49 |
| The RFP states that the evaluation of quality is completed on a quarterly basis and that the Quality standard rating is provided to the Contractor in the Quarterly Performance Evaluation Report which will be provided to the Contractor within 2 months following the end of the previous quarter. This process does not allow a Contractor to be informed of their quality performance on a timely basis and make any adjustments on an ongoing basis and therefore creates a much higher risk for penalties and contributes to higher prices. For example, VA feedback on a DBQ from an exam done on day one of quarter one would not be received until 5 months later and the Contractor would have used the same process during this time period for all exams using the same DBQ which could have been avoided. It is understood per PWS Section 12.1 that there is a monthly teleconference for feedback and informational purposes though the evaluation, and contractual rating, is performed quarterly. |
A Contractor should not be penalized repeatedly for an error where communication of the error via the quarterly performance report is not timely. More importantly, timely feedback would help to ensure that our Veterans are receiving a higher level of service through the provision of high quality DBQs. Request VA to reconsider the measurement and communication process for the quality standard in order to reduce costs and improve service.
VBA has no current plans to change their quarterly evaluation process. See Section 12.7 of the PWS. The Government provides the following high-level overview of the quality review process:
· Accuracy will be assessed on a quarterly basis, with formal Quarterly Performance Evaluation Reports provided as described.
· Quarterly quality samples will be divided up across the three months in the quarter.
· Samples will be pulled at the beginning of each month for the prior month’s work.
· Informal findings will be provided based upon the monthly samples throughout the quarter via draft reports and monthly quality calls.
· VBA has and does inform the Vendors as needed of any noted error trends through the monthly calls and would certainly contact a Vendor if need be as a recurring exam deficiency was noted.
| 39 |
| Section B.2 PWS Section 12.0, 12.6 |
| 49, 52 |
| It is our assumption that the standard of performance for quality criteria in Section 12.6 applies only to the Government’s DBQ evaluation and the Insufficient Exams, Inadequate Exams and Cancellation Rate in Section 12.0 do not apply to penalties and incentives. Is this assumption correct? If not, please clarify. |
| See updates to Section 12.0 and various subsections, as of Amendment A00003. Specifically, what was previously referenced as 12.6 (Standard of Performance) was a formatting error/typo, and has been corrected as of the amendment. |
Section 12.5 addresses circumstances when a Contractor may qualify for a monetary incentive or disincentive. Insufficient Exams, Inadequate Exams, and Cancellation Rates in Section 12.0 do not apply to penalties and incentives. However, failure to meet the expected standard of performance for Insufficient Exams, Inadequate Exams and Cancellation Rate as indicated in Section 12.0 could be considered failure to perform based on the contract terms.
| 40 |
| Section B.2 PWS Section 12.0 |
| 50 |
| The PRS states “Timeliness Calculation includes accommodation for exclusion of time in defined status/situations.” Please identify the “defined status/situations” and the corresponding PWS Sections. |
| The Government defines “defined status/situations” as an irregular surge in work volume, natural disasters, or other circumstances specifically agreed by the Contract Officer and the Vendor. |
| 41 |
| Section B.2 PWS Sections 12.0, 12.6 |
| 50, 53 |
| The RFP states that “The Government will evaluate timeliness by calculating the average timeliness of all examinations on a quarterly basis over each performance year.” Please explain the purpose of this evaluation. The Expected Standards of Performance defined in the PRS and the Incentive/Disincentive metrics (Section 12.6) of timeliness are all based on the % of total inventory completed within a defined number of calendar days for the month. If the Government is also performing an average timeliness analysis of all examinations on a quarterly basis, what is the expected standard of performance using an average calculation, and will it or will it not have any impact to Incentives/Disincentives and/or allocation of exam requests for the competing Vendors in a given Region? |
| Total pending inventory of Veteran requests will be captured as of the last day of the month. Months will be based on the initial period of performance following the ramp up period. For example, if the Ramp up period ends September 14th, and exam requests begin to be ordered on September 15th, the monthly evaluation for pending inventory would be on September 30th. |
Section 12.1 of the PWS has been updated as follows:
12.1 Performance evaluation:
Timeliness will be evaluated by measuring the pending inventory on a monthly basis for purposes of section 12.8 Timeliness (based on completed inventory), quality, and Veteran satisfaction survey will be evaluated quarterly for purposes of incentives and disincentives, with a monthly teleconference for feedback and informational purposes.
Pending inventory, which will be measured on a monthly basis is defined as all examination requests in a Vendor’s given inventory that has not been completed. This calculation will exclude examination requests awaiting clarification from the VA. The time clock for this metric begins on the first day of the month and ends on the last day of the respective month.
Completed inventory, which will be measured in a quarterly basis, is defined as all examination requests completed within the quarter. This calculation will exclude all examination requests in a pending status. The time clock for this metric begins on the first day of the quarter and ends on the last day of the respective quarter.
| 42 |
| Section B.2 PWS Section 12.3 |
| 52 |
| The RFP indicates that there can be changes to the quality criteria in Attachment X and that the Vendor will have 60 days to meet any new changes. The quality rating criteria are a critical component to the Vendor solution, resources, and performance risk. If the quality criteria are dynamic and significant adjustments are required during operations this increases costs which should be negotiated. Please clarify the process for revisions to the quality criteria. |
| The Government does not anticipate any significant adjustments to the current quality criteria. However, in the event that a change to the quality criteria is necessary, the Government would enter into the formal acquisition process to negotiate a contract modification. |
| 43 |
| Attachment X and Section B.2 PWS Sections 10.16 and 12.0 |
| n/a, 37, 51 |
| Please clarify the application of the twelve criteria for quality rating in Attachment X to the five criteria for quality rating in PWS Sections 10.16 and 12.0. The criteria and process for the rating of the quality performance standard is a critical component to the determination of an Offeror’s response and associated costs. How are the two sets of criteria related and which set takes precedence? Please clarify and reconcile to clearly define a single set of quality review criteria. |
| The checklist provided in Attachment X is the tool utilized by the Government to evaluate the accuracy of a completed DBQ. The five criteria noted in Section 10.16 are encompassed within the questions on the quality review checklist are equally important. Please note that Questions 1 and 13 are not used to calculate DBQ accuracy. |
Furthermore, if “No” is answered for any question 2 through 12, the DBQ is considered an error. Our quality review assesses accuracy based upon contractual requirements, and does not assess sufficiency for rating purposes.
| 44 |
| Section B.2 PWS Section 12.6 |
| 53 |
| It is our assumption that all the Timeliness Criteria which states “ACE/CLCW” should be changed to “CLCW” to align with the PRS in PWS Section 12.0 (i.e. ACE is not included in the 7 day timeliness standard for CLCW cases as ACE is included in the 20 day timeliness standard for DBQ/C&P Examinations, other than for Incarcerated Veterans). Is this assumption correct? If not, please clarify. |
| Yes, your assumption is correct. Section 12.6 of the PWS has been updated to reflect that we are replacing ACE/CLCW with Agency Focus Reviews (AFR). |
| 45 |
| Section B.2 PWS Section 12.6 |
| 53 |
| This Section outlines a minimum of 1% to maximum of 8% penalty for three performance standards. The RFP states that the resulting contracts will be FFP IDIQ contracts under FAR 16.202. It is our understanding that the contracts meet the fixed price incentive contract definition covered by FAR 16.4 which discusses that the incentive, and the penalties, are related to profit. The cumulative penalties in the RFP are relatively large in comparison to typical profits. Based on the contract type and the lack of timely Government reporting on performance standards, the penalties appear large. This situation increases the risk and prices to the Government and request reconsideration in order to support more competitive pricing. |
| See Updated Section 12.5 (previously 12.6) which reduces the maximum disincentive to a total of 3.5% of the Contractor’s quarterly billing amount. |
| 46 |
| Section B.2 PWS Section 12.7 |
| 53 |
| Will the notification of customer satisfaction ratings also be included in the quarterly report as indicated in PSW Section 12.8.b? |
| Yes, the customer satisfaction ratings will be included in the quarterly report. |
| 47 |
| Section B.2 PWS Section 12.8 |
| 54 |
| In this section of the PWS, the Government states that “100% of the total examination request volume will be split equally.” How and at what frequency will the Government split equally? For example, will the Government count the exam assignments real-time to ensure an equal split between Vendors on a daily basis or will there be a daily rotation between Vendors? Please clarify the method for exam allocation between Vendors. |
The answer to this question can have a significant impact to a Vendor’s cost basis. For example, if there is a daily, equal split of exam requests per Vendor, then Vendors can expect to receive consistent daily volume of exam requests. This allows Vendors to develop a staffing construct which is lower cost as a result of the efficiency gained through daily workload predictability and less variability in the highs and lows of exam requests between days. In contrast, if the Government’s method to ensure equal split is through a daily rotation among awarded Vendors and there are three Vendors in a Region, then this creates a significant level of daily variability as a Vendor may not see any work for two days, then receive a much larger download on the third day of the Vendor’s assigned rotation. The daily rotation example may drive up a Vendors cost basis as additional staff may be required to triage cases on the big download day rather than less staff if smaller volumes are received daily.
The functionality of the VBMS-EMS system allows total examination request volume to be split between the Vendors in real time, on an ongoing basis as received by the Government. CAATS exam requests will use the same routing guidance used for exam requests placed through the VBMS-EMS system.
| 48 |
| Section B.2 PWS Section 12.8 |
| 54 |
| The RFP states that “each of the two Contractors will receive, as a minimum quantity, 50% of the total examination volume for that Region if they are both meeting the expected standards of performance as noted above (timeliness, quality, Veteran satisfaction survey).” This implies that exam request reallocation is made based on all three performance standards. In the example under paragraph a.i. of the same section, the Government states that “if Contractor A is not meeting its timeliness expected standard of performance, VBA may redistribute a percentage of examination requests.” These two sections appear inconsistent. |
Will the Government assess all three performance standards or just timeliness or some combination of the three when a decision is made to redistribute exam requests? Additionally, given that the Government will be making these performance assessments every quarter then notifying the Vendor two months after the end of the quarter, it is accurate to assume that exam redistribution will only occur at the end of the quarterly calculation and results notification period? If this is not an accurate assumption, please explain what metrics will be used to redistribute work and at what frequency.
Section 12.1 of the PWS has been updated as follows:
12.1 Performance evaluation:
a. Timeliness will be evaluated by measuring the pending inventory on a monthly basis for purposes of section 12.8
b. Timeliness (based on completed inventory), quality, and Veteran satisfaction survey will be evaluated quarterly for purposes of incentives and disincentives, with a monthly teleconference for feedback and informational purposes.
Section 12.8.a.iii has been updated to address how the Government will handle impacts to timeliness based on the redistribution of work.
Section 12.8.a states that VA reserves the right to redistribute the total examination request volume among the Vendors if any Vendor does not meet the expected standards of performance.
The Government will make performance assessments on timeliness on a monthly basis as indicated in Section 12.1. Vendors will receive performance feedback on a monthly and quarterly basis.
| 49 |
| Section B.2 PWS Section 12.8.i. |
| 54 |
| The logic described in the section for how work will be taken away from a non-performing Contractor A and redistributed to performing Contractor(s) until such time as Contractor A is once again meeting expected standard of performance seems to serve as a disincentive for the performing Contractor(s) in the Region. Most likely, when a Contractor is not performing and allowing cases in their active inventory to age excessively, those aging cases are the most complex, difficult and/or high expense remote locations where the Vendor does not have provider coverage and/or adequate staff. Those are the cases which will then be redistributed to the performing Contractor(s). Although this is “additional business” for the performing Contractor(s), these performing Contractor(s) will experience an unexpected surge of problematic cases which will require a higher cost of completion. This surge may also impact the performing Contractor(s) own performance standards, which may put at risk their quarterly financial incentives. |
In addition, if the VA does not qualify the redistributed work as a “surge” justifying a timeliness waiver, then the performing Contractor(s) is now faced with the additional risk of a financial disincentive. Finally, the performing Contractor(s) may need to make additional resource investments and hire staff to support the work the non-performing Contractor unable to support, only to have that additional work re-allocated back to the non-performing Contractor when they are once again meeting expected standards of performance which can be weeks or months and completely unknown to the performing Contractor(s). The longer it takes for the non-performing Contractor to recover, the more time performing Contractor(s) have to leverage the additional work volume to recoup their additional investments. If the non-performing contactor recovers quickly, then the performing Contractor(s) may have to divest their investments and lay off staff, which again ultimately seems to serve as a disincentive to the performing Contractor(s).
Based on this explanation, will the Government reconsider this methodology? If so, some considerations are: 1) to allow the performing Contractor(s) to maintain the reallocated work until they experience performance problems and not when the non-performing Contractor is able to recover, 2) grant the performing Contractor(s), absorbing the potentially problematic work, to receive an automatic waiver and qualify for the performance incentives for the performance assessment period in which the reallocation of work was made.
The Government intends to mitigate negative or adverse impact to the performing Contractor as a result of the redistribution of work. Section 12.8.a.iii has been updated to address how the Government will handle impacts to timeliness based on the redistribution of work.
| 50 |
| Section B.2 PWS Section 12.8.b |
| 55 |
| Does the VA plan to communicate trends or significant quality issues upon their discovery to ensure immediate remedial action by the Vendor and to ensure Veterans are provided with quality examination reports? |
| The Government will promptly communicate major deficiencies for resolution. Trends and significant quality issues will be based upon the monthly samples provided throughout the quarter, and communicated via draft reports and monthly quality call or more frequently if the circumstances warrant. |
| 51 |
| Section B.2 PWS Sections 12.8.b, 12.0 |
| 55, 52 |
| The RFP states that the Contractor will be notified of its Veteran survey rating by way of a Quarterly Performance Evaluation Report. |
This process does not allow a Contractor to be informed of their Veteran satisfaction performance on a timely basis and make any adjustments on an ongoing basis and therefore creates a much higher risk for penalties and contributes to higher prices. It is understood per PWS Section 12.1 that there is a monthly teleconference for feedback and informational purposes though the evaluation, and contractual rating, is performed quarterly.
A Contractor should not be penalized repeatedly for an error where communication of the error via the quarterly performance report is not timely. More importantly, timely feedback would help to ensure that our Veterans are receiving a higher level of service. Request VA to reconsider the communication process for the Veteran satisfaction standard in order to reduce costs and improve service.
See PWS Section 12.1 which indicates that Vendors will receive monthly feedback regarding all performance elements.
| 52 |
| Section B.2 PWS Section 14.2 |
| 56 |
| Please clarify “*Note 213/218/VHA needs to develop refresher course.” Is there a refresher course that will be required? If yes, please clarify the requirement. |
| See Amendment A00003, which removes this statement/note from the PWS section 14.2. |
| 53 |
| Section B.2 PWS Section 19.4 |
| 64 |
| The RFP states that the Contractor shall not use technologies banned in VA in meeting the requirements of the contract (e.g., Bluetooth-enabled devices). |
Please provide a comprehensive list of the banned devices to ensure compliance.
See Attachment K (TRM Prohibited Decision Type Report as of 06-15-2018), which is added to the RFP as of Amendment A00003. Attachment K provides the current list of unauthorized software. Should any updates be made to the list, whether during the solicitation period or after contract award, an updated list will be provided to all interested parties.
| 54 |
| Section B.2 PWS Sections 19.3 and 19.5 |
| 64, 65 |
| Based on an Offeror’s solution, network providers do not require access to VA site(s) and/or access to VA local area network (LAN) systems and therefore do not require a background investigation. If this is the proposed solution it is our assumption that network providers do not require NACI checks. Is this assumption correct? If not, please clarify. |
And if this assumption is not correct, request reconsideration as requiring a NACI for network providers will have a significant negative impact on the ability to recruit providers for MDEs and increase prices due to Contractor costs for the provider’s time and the NACI itself. The time for the Government to process a very high volume of background investigations does not permit Contractors to be responsive during contract start-up, expansion of the network on an on-going basis, surge situations, and unique situations such as a adding a specialist in a remote area. In addition, VA does not absolutely require a NACI for all providers working at VHA or for all contracts for providers. Alternate additional requirements for credentialing can be used to address specific item(s) of concern in lieu of a NACI.
Network providers that do not have access to VA systems do not require NACI background checks.
| 55 |
| Section B.2 PWS Section 29.2.e |
| 76 |
| Reference to Attachment R as VBMS Exam Management Integration Architecture. Attachment R as provided in the RFP is the Rules for Sleep Apnea and Related Tests. Are the VBMS Exam Management Integration Architecture documents available as an attachment? Please clarify and provide the Architecture document. |
| The Exam Management Integration Architecture document is included as part of the Exam Management IEPD. It is the primary document in the Documentation Folder of the IEPD zip file. The Exam Management IEPD is included in the solicitation as Attachment T. |
| 56 |
| Section B.2 PWS Section 29.2, Section D |
| 76, 97 |
| PWS Section 29.2 identifies Attachment R as VBMS Exam Management Integration Architecture and Section D identifies Attachment R as Rules for Sleep Apnea and Related Tests. Please provide the |
VBMS Exam Management Integration Architecture as it is not included with the RFP and clarify the Attachment naming.
The Exam Management Integration Architecture document is included as part of the Exam Management IEPD. It is the primary document in the Documentation Folder of the IEPD zip file. The Exam Management IEPD is included in this solicitation as Attachment T of this RFP. By way of Amendment A00003, references in the PWS have been updated to reflect the correct source documents.
| 57 |
| Section C.17 52.212-5(b)(18) |
| 91 |
| 52.219-13 Notice of Set-Aside of Orders has been checked. This appears to be in conflict with the designation of this RFP as unrestricted in Block 10 of the SF1449. |
| See Amendment A00003, which unchecks this FAR clause. Task Orders will NOT be considered small business set-asides, regardless of the small business status of the awardees for a given region. |
| 58 |
| Section C.17 52.212-5(c)(1) |
| 94 |
| 52.222-17, Nondisplacement of Qualified Workers. We request the clause be deleted as it is not applicable to the Solicitation as it is not directly applicable given the majority of labor provided is from medical professionals. |
| See Amendment A00003, which unchecks this FAR clause. This FAR clause has been removed because this contract largely consists of professional services. See Amendment A00003. |
| 59 |
| Section C.17 52.212-5(c)(3) |
| 94 |
| 52.222-42, Statement of Equivalent Rates for Federal Hires. This clause has been checked for compliance however the Government has not provided the necessary information on Employee Class and Wage/Fringe. We request the clause be deleted as it is not applicable to the Solicitation as it is not directly applicable given the majority of labor provided is from medical professionals. |
| See Amendment A00003, which unchecks this FAR clause. This FAR clause has been removed , because this contract largely consists of professional services. See Amendment A00003. |
| 60 |
| Section C.17 52.212-5(c)(8) |
| 94 |
| 52.222-55 Minimum Wages Under Executive Order 13658. Request deletion of this term. The Scope of work requires medical professionals to perform MDEs. These services require exempt employees. |
| See Amendment A00003, which unchecks this FAR clause. This FAR clause has been removed to the RFP, because this contract largely consists of professional services. See Amendment A00003. |
| 61 |
| Section C.17 52.212-5(c)(9) |
| 94 |
| 52.222-62, Paid Sick Leave Under Executive Order 13706. Request deletion of this term. The Scope of work requires medical professionals not service employees. |
| See Amendment A00003, which unchecks this FAR clause. This FAR clause has been removed through an amendment to the RFP, because this contract largely consists of professional services. See Amendment A00003. |
| 62 |
| Section D |
| 97 |
| Several of the listed Attachments (Attachments C, H, I, Q, and R) do not have a callout/reference within the PWS. Please clarify the pertinent PWS Sections for each of these Attachments. |
| See Amendment A00003 which updates the PWS to incorporate each of the Attachments as indicated below: |
· Attachment C: Section 9.22
· Attachment H: Section 10.19.b.i
· Attachment I: Section 10.18.b.ii
· Attachment Q: Section 9.13
· Attachment R: Section 9.13
| 63 |
| Section E.1.B.2.1.a |
| 104 |
| It is our assumption that both Arial and Times New Roman fonts may be used within the documents. Is that assumption correct? If not, please clarify. |
| Yes – Either Arial or Times New Roman font may be used, or any combination of these two fonts. |
| 64 |
| Section E.1.C.3 |
| 105-106 |
| Please clarify if the Vendor name should be used in all file names for all volumes versus only for Volumes I and II. |
| Vendor Name should be used in all file names, including Volumes I-V. See Amendment A00003. |
| 65 |
| Section E.1.C.3 |
| 105-106 |