This document is a combined synopsis/solicitation for Architect-Engineer services to support seismic upgrade projects at four buildings located at the Raymond G. Murphy Medical Center in Albuquerque, New Mexico. Key details include the following scope of work: architectural, structural, mechanical, electrical, and civil engineering design services; construction documentation; construction administration support; and project management. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and responses are due by February 5, 2024. Evaluation criteria focus on specialized experience in healthcare facility design, professional qualifications of key personnel, past performance, schedule and capacity, knowledge of locality, and interviews. The contract is expected to be awarded in the third quarter of fiscal year 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10F24R0016.pdf | ||
| Attachment 1 Past Performance Questionnaire.docx | DOCX document | |
| 36C10F24R0016.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
A0001
003C4E
Department of Veterans Affairs Office of Construction and Facilities Management 400 Mare Island Way, Suite 100 Vallejo CA 94590
To all Offerors/Bidders
36C10F24R0016
01-26-2024
X
X X
X 1
The purpose of this amendment is to provide RFI 1-9 responses. See SF30 continuation page for RFI responses.
The VA believes that the majority of the work will be performed by Engineering Services. The North American Industrial Classification System Code of 541330 will be used for this requirement which has a size standard of $26.5M in average annual receipts.
Proposal due date remains the same at February 5, 2024 at 4:00 PM Pacific Time. No further changes.
FERDINAND D. GAWARAN
Contracting Officer
VA-CFM-2023-0018
RFI - 36C10F24R0016 – Q & A
1. Typically CPARS/PPQs and SF330 Part II's do not count against the page limitations. Can we assume that is the case here for the subject project RFI/RFQ?
See Solicitation Notice Section IV.3.b “Past performance information including Past Performance Questionnaires and Contractor Performance Assessment Reporting System (CPARS) reports will not count towards the page limitation.”
2. With combined construction values of between $90M- $190M is it possible this will go under the purview of USACE? Once the value gets above $50M doesn't it move out of CFM hands and into the Corps of Engineers?
The threshold to transition from CFM to USACE purview is $100M per building. Construction value building included in the solicitation do not exceeds this threshold. Determinations will be made at SD-2 (35% design) where construction budget is revised and baselined.
3. The SOW seems to indicate a number of stopping points and options. Will each option require a separate fee negotiation?
No. All options will be priced options at the moment of award.
4. Who were the firms involved in the "Project Book" effort for these 4 buildings?
The Project Book A-E firm and its consultants/subcontractors are prohibited from competing for this A-E contract. This includes Anderson Engineering of MN, LLC was the Project Book prime, it will also disqualify IMEG, Triple-C, , Oculus, Inc., CPMI, Force Protect, Spack Consulting
5. Is there a file size limit for the SOQs emailed to you? The file size allowed for email attachment is 25MB.
6. The solicitation document states “Except as otherwise permitted below, firms must use the fillable version of SF 330 available on the U.S. General Services Administration website at https://www.gsa.gov/portal/forms/download/116486, using the space available and font settings embedded in that document. “
Would it be acceptable to submit a pdf version of the SF330 form that was created in Microsoft Word if the layout and fields remain the same and the font requirements, etc. are met?
If there are NO visible formatting that can be construed as an advantage to the offeror, it will be allowed.
https://www.gsa.gov/portal/forms/download/116486
7. Should a quality control, technical and/or management approach be included in the Block H?
It is not required to include a quality control, technical and/or management approach in the SF330 Form Extra Section Block H
8. In reviewing the provided Combined Synopsis/Solicitation Notice, it appears that a great deal of the work required for this contract would be engineering-related. Would the government consider changing the NAICS code to 541330?
The VA believes that the majority of the work will be performed by Engineering Services therefor the North American Industrial Classification System Code of 541330 will be used for this requirement which has a size standard of $26.5M in average annual receipts.
9. Please let us know if you still believe the NAICS code should be determined by who the government believes should be the lead or who is doing the majority or the work?
The VA believes that the majority of the work will be performed by Engineering Services
File details come from the government source that posted it. Updated .