36C10F19R0033-008.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Merrick Log House/English Barn/Stone House located at Upper Makefield Township Newtown, Bucks County, PA
- Solicitation number
- 36C10F19R0033
About this file
36C10F19R0033 S02 Price Attachment.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10F19R0033-0001001.pdf | ||
| 36C10F19R0033-0001000.docx | DOCX document | |
| 36C10F19R0033-009.pdf | ||
| 36C10F19R0033-007.docx | DOCX document | |
| 36C10F19R0033-006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| QUOTE TABULATION |
| Location: Washington Crossing national Cemetery, Newtown, Bucks County, PA 18940 |
| Project Name: Merrick Log House/English Barn/Stone House |
CONTRACTOR NAME:
| Ref # | Quote Item # | Item Description | Qty. | Unit Cost for Log House Relocation | Unit Cost for Wagon Shed Stabilization | Total Amount |
| 1 | 1.001 | Demolition | ||||
| 2 | 1.002 | Temp Fence | ||||
| 3 | 1.003 | Move existing fence. Posts only | ||||
| 4 | 1.004 | Foundation Excavation | ||||
| 5 | 1.005 | Foundation Footing | ||||
| 6 | 1.006 | Curtain Drains | ||||
| 7 | 1.007 | Culverts | ||||
| 8 | 1.008 | Swales | ||||
| 9 | 1.009 | Backfill | ||||
| 10 | 1.010 | Compaction | ||||
| 11 | 1.011 | Top Soil | ||||
| 12 | 1.012 | Finish Grading | ||||
| 13 | 1.013 | Seeding/Sod | ||||
| 14 | 2.001 | Footings/Pads | ||||
| 15 | 2.002 | Foundation walls/stem walls/grade beams | ||||
| 16 | 2.003 | Slabs ‐ Foundation, Basement, Garage | ||||
| 17 | 2.004 | Steel Reinforcing | ||||
| 18 | 2.005 | Anchor Bolts, Hold Downs | ||||
| 19 | 2.006 | BuLkheads | ||||
| 20 | 2.007 | Sub‐Slab Vapor Barrier | ||||
| 21 | 2.008 | Sump Pump | ||||
| 22 | 2.009 | Crawlspace Vapor Barrier | ||||
| 23 | 2.010 | Crawlspace Vents | ||||
| 24 | 2.011 | Foundation Windows | ||||
| 25 | 2.012 | Damproofing, Water‐proofing | ||||
| 26 | 2.013 | Foundation Drain Board | ||||
| 27 | 2.014 | Slab insulation: Edge/Blow | ||||
| 28 | 2.015 | Exterior Foundation Insulation | ||||
| 29 | 2.016 | Exterior Insulation Coating/ Protection | ||||
| 30 | 3.001 | Patios | ||||
| 31 | 3.002 | Exterior Stairs | ||||
| 32 | 3.003 | Masonry Chimneys footing | ||||
| 33 | 3.004 | Fireplaces/Hearths | ||||
| 34 | 3.005 | Driveway | ||||
| 35 | 3.006 | Walkways | ||||
| 36 | 4.001 | Abatement | ||||
| 37 | 4.002 | Steel/Wood Carrying Beam, Lolly Columns | ||||
| 38 | 4.003 | Floor Framing | ||||
| 39 | 4.004 | Exterior & Interior Walls, Rough Stairs | ||||
| 40 | 4.005 | Sheathing, Subflooring | ||||
| 41 | 4.006 | Roof Framing/Trusses | ||||
| 42 | 4.007 | Subfascia | ||||
| 43 | 4.008 | Steel Framing Connectors | ||||
| 44 | 4.009 | Nails, Screws, Fasteners | ||||
| 45 | 4.010 | Contingency | ||||
| 46 | 5.001 | Trailer and sanitary | ||||
| 47 | 5.002 | Alares Rep on site | ||||
| 48 | 5.003 | Per diem & Vehicle | ||||
| 49 | 5.004 | Mobilization | ||||
| 50 | 5.005 | Engineering | ||||
| 51 | 5.006 | Project Management | ||||
| 52 | 5.007 | Administration | ||||
| Total Base Quote | ||||||
| Overhead and Profit | ||||||
| Bond Amount | ||||||
| Total Amount |