Presolicitation Notice Presolicitation Notice
| SUBJECT* |
| Remove and replace inoperative cooling fan motor in Cooling Tower #1 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 20006 |
| SOLICITATION NUMBER* |
| 36C10E23R0010 |
| RESPONSE DATE/TIME/ZONE |
| 02-15-2023 12:00PM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| Z2NB |
| NAICS CODE* |
| 238220 |
| PLACE OF PERFORMANCE |
| VBA St Petersburg Regional Office |
9500 Bay Pines Blvd
St Petersburg FL
| POSTAL CODE |
| 33744 |
| COUNTRY |
| USA |
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Veterans Benefits Administration Acquisition Division 1800 G. Street N.W.
Washington DC 20006
POINT OF CONTACT*
Contract Specialist Tiffany Garfield tiffany.garfield@va.gov 813-631-2818
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
STATEMENT OF WORK
REPAIR OF COOLING TOWER SERIAL #17-812588
1. BACKGROUND
The St Petersburg Regional Office has 2 Evapco cooling towers & 2 400-ton magnetic bearing chillers that were installed brand new in 2017. The system provides chilled water to 2 buildings, #46 & #47cooling approximately 204,000 square feet.
2. PURPOSE
To remove and replace an inoperable motor, shaft & fan through the top of the cement enclosure around the cooling towers.
3. SCOPE & PERFORMANCE OF OBJECTIVES
To remove and replace a motor, shaft, and fan out of cooling tower #1. A lift plan needs to be established with the COR depending on the weight of the motor shaft and fan. There is plenty of accessibility for a boom truck and or crane.
Contractor will provide all tools & materials necessary to power down cooling tower #1, remove existing motor, shaft, bearings, and fan. Install new OEM motor, shaft, bearings & fan. Power up unit and verify proper operation.
4. PERIOD & PLACE OF PERFORMANCE
Period of performance Monday – Sunday. 0600-1800hrs. Cooling towers are in the main parking lot behind Bldg. 46 & 47. Period of performance should be 48hrs with all materials and equipment on site. Work can commence once all parts & materials are on site. Job site is: 9500 Bay Pines Boulevard St Petersburg Florida 33744. VA Regional Office.