Z2NB--Remove and replace inoperative cooling fan motor in Cooling Tower #1
Solicitation number
36C10E23R0010
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presolicitation Notice Presolicitation Notice

SUBJECT*
Remove and replace inoperative cooling fan motor in Cooling Tower #1

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
20006
SOLICITATION NUMBER*
36C10E23R0010
RESPONSE DATE/TIME/ZONE
02-15-2023 12:00PM EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Z2NB
NAICS CODE*
238220
PLACE OF PERFORMANCE
VBA St Petersburg Regional Office

9500 Bay Pines Blvd

St Petersburg FL

POSTAL CODE
33744
COUNTRY
USA

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Veterans Benefits Administration Acquisition Division 1800 G. Street N.W.

Washington DC 20006

POINT OF CONTACT*

Contract Specialist Tiffany Garfield tiffany.garfield@va.gov 813-631-2818

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

STATEMENT OF WORK

REPAIR OF COOLING TOWER SERIAL #17-812588

1. BACKGROUND

The St Petersburg Regional Office has 2 Evapco cooling towers & 2 400-ton magnetic bearing chillers that were installed brand new in 2017. The system provides chilled water to 2 buildings, #46 & #47cooling approximately 204,000 square feet.

2. PURPOSE

To remove and replace an inoperable motor, shaft & fan through the top of the cement enclosure around the cooling towers.

3. SCOPE & PERFORMANCE OF OBJECTIVES

To remove and replace a motor, shaft, and fan out of cooling tower #1. A lift plan needs to be established with the COR depending on the weight of the motor shaft and fan. There is plenty of accessibility for a boom truck and or crane.

Contractor will provide all tools & materials necessary to power down cooling tower #1, remove existing motor, shaft, bearings, and fan. Install new OEM motor, shaft, bearings & fan. Power up unit and verify proper operation.

4. PERIOD & PLACE OF PERFORMANCE

Period of performance Monday – Sunday. 0600-1800hrs. Cooling towers are in the main parking lot behind Bldg. 46 & 47. Period of performance should be 48hrs with all materials and equipment on site. Work can commence once all parts & materials are on site. Job site is: 9500 Bay Pines Boulevard St Petersburg Florida 33744. VA Regional Office.