Z2NB--Remove and replace inoperative cooling fan motor in Cooling Tower #1
Solicitation number
36C10E23R0010
Issued by

View the file

Other files

File Type Posted
Cooling tower site visit attendees 2-27-2023.pdf PDF
Cooling tower specs sent 2-23-2023.pdf PDF
36C10E23R0010 - Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

VA

1 3

0001 3-8-2023

None

00101

Department of Veterans Affairs

Veterans Benefits Administration

Acquisition Division

1800 G. Street N.W.

Washington DC 20006

00101

Department of Veterans Affairs

Veterans Benefits Administration

Acquisition Division

1800 G. Street N.W.

Washington DC 20006

To all Offerors/Bidders

36C10E23R0010

02-22-2023

X

X X

X 1

The purpose of this Amendment is to incorporate the Request For Information (RFI) that were submitted .

Refer to the attached questions and answers with their associated attachments.

The proposal due date remains unchanged and are due no later than 12:00pm EST on March 22, 2023

Solicitation 36C10E23R0010

St. Petersburg Cooling Tower

Questions and Answers – March 7, 2023

1. During the site visit. It was mentioned that the VBA's wanted to take possession of the old parts ( Motor & Fan ), Is this correct?

Yes

2. If so, will the VBA have something available to load the fan & motor on to next to site? To avoid remobilization of the Crane.

Yes, we have flat rolling carts for the equipment

3. During the site visit. It was mentioned that this would be weekend work, the SOW has it

Monday - Sunday 0600 to 1800. Can this be done during regular business hours, Monday - Friday from 0700 to 1800 to keep the cost down?

Yes this can be accomplished as stated in SOW

4. In the SOW, it is not mentioned to balance the New Fan and Motor. It is always our recommendation to have everything laser balance, to avoid having a new motor go bad that has not being balance correctly on site. Does the VBA want to have everything laser balanced? Or installed without being balanced?

We prefer the fan to be balanced as part of the installation using whatever the industry standard would be to balance a cooling tower fan.

5. Are you replacing just the motor and re-using the shaft, fan and bearing?

we are replacing the Motor, shaft, bearings and fan with new OEM parts.

6. Please clarify the project scope. During the walk thru Monday, it was discussed that only the fan motor was to be replaced. The solicitation states remove and replace, motor, shaft and fan.

Replace the motor, shaft, bearings and fan with new OEM Parts

7. Please advise if a motor manufactured by the Evapco cooling tower vendor is acceptable, w/out Evapco name brand

It does not have to be an Evapco name brand motor : Replacement parts catalog states the following” Totally enclosed ball bearing type motors with 1.15 service factor specifically designed for evaporative cooling applications. All motors equipped with double sealed non-relubricable bearings, double dip and bake windings and cast iron frames with corro-duty paint

8. Is it possible to obtain the list of attendees for the recently held site visit for this project?

Yes see attached

9. The contract has a value of $25,000, but the cost of the parts alone exceeds $27,000.

Additionally, does the estimated cost of labor need to be considered in determining whether the contract price will be increased to cover the additional cost of both parts and labor? In other words, will the overall cost of the contract be adjusted to reflect the combined cost of parts and labor, which exceeds the original contract value of $25,000?

Thank you.

Please provide a cost breakdown to support your proposal. Your cost breakdown will include all costs that result in your overall proposal price.

10. Are there any type of drawings or specs you can provide?

See attached

11. Can you provide the Site Visit attendees?

See attached