This solicitation seeks replacement of six aging dehumidification units on the roof of a Veterans Benefits Administration building. The scope of work requires removal of the old units and installation of new like-for-like units that will interface with the existing chiller lines, electrical conduits, and building automation system. Offerors must complete the work within 12 weeks, installing one unit per weekend, and be available for programming and commissioning during weekday business hours. Additional requirements include training HVAC staff on the new units, developing a project schedule, and complying with all safety and environmental regulations. The period of performance is 12 weeks following delivery of the first unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10D23R0004 0003.docx | DOCX document | |
| Site visit 2-22 (1).pdf | ||
| 36C10D23R0004 0002.docx | DOCX document | |
| P07 FL20230222 01.13.2023 02.pdf | ||
| zS02 St Pete Flooring - PAST OR PRESENT PERFORMANCE SURVEY.pdf | ||
| S02 current list DH Unit Equipment list (1).pdf | ||
| 36C10D23R0004_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI QUESTIONS -Solicitation # 36C10D23R0004 Replace Dehumidification units
• Dehumidification units were designed specialty for the VBA, the company is no longer in business and no one makes anything close to the weight & size & power of the old units.
All new units, are longer, wider and heavier with a higher power requirements. Does VBA have any architectural, engineering drawings for load calculation on the existing roof to handle a larger unit?
We do not have any architectural drawings or engineered drawings for load calculation.
• The new RTU’s power requirement is more than the existing RTU, can the breakers be upgraded to meet the power required?
We could upgrade breakers, if necessary.
• Existing units are about 5000 pounds new units are about 10,000, this would require engineering and new roof penetrations for the larger units is the VA good with roof penetrations?
No new roof penetrations
• With existing cabinets being surprisingly very good shape, Will the VA be opposed to value engineering/refurbish the existing units with new parts?
1. Compressors
2. Coils
3. Controls
4. Relocate dx evaporator to be in first in the airstream. We will not get quite as low a dew point as the original design, but be a far more reliable system.
5. leave existing blower and replace blower motor.
We would not be opposed to refurbishing/using the old cabinets as long as everything is removed and replaced with NEW Motors, coils, compressors, UV lighting, controls, door handles, seals for doors and limit switches that control lighting etc.