This is a Performance Work Statement (PWS) for IT Control and Material Weakness Remediation services for the Department of Veterans Affairs, Office of Information and Technology (OIT). The contract is designated VA-27-00001285 and addresses remediation of Office of Inspector General-identified material weaknesses, control deficiencies, and cybersecurity maturity improvements across VA's IT enterprise. The PWS establishes a 12-month base period (consisting of a two-month transition-in plus ten months of core services) with four optional 12-month renewal periods and six optional task areas, for a maximum contract duration of 62 months. Performance shall be delivered on a Firm-Fixed-Price basis with cost-reimbursable travel, with work performed either at Contractor facilities, remotely, or at VA Government facilities as specified.

The scope encompasses comprehensive ISSO (Information System Security Officer) support for up to 1,200 FISMA-reportable systems, including authorization package preparation, vulnerability and configuration management, continuous monitoring, incident response planning, contingency planning, privacy documentation, and audit remediation support. Additional core service areas include cyber workforce readiness training program support (encompassing training content development, compliance tracking, and workforce framework maintenance for 6,000+ OIT staff), and Electronic Health Record Modernization (EHRM) system support covering authorization monitoring, continuous compliance, and training center operations. The PWS emphasizes automation and AI-driven solutions throughout all services, with the Contractor required to establish baselines within 30 days of transition completion and achieve 50% reductions in turnaround time and manual effort by the end of the base period while maintaining accuracy at or above baseline levels. Optional Task Six provides transition support services, while Optional Tasks One through Five address enterprise vulnerability remediation, OIT dashboards and reporting, enterprise litigation hold and eDiscovery support, printer security management, and baseline configuration management.

View the file

Other files

File Type Posted
RFI VA-27-0001285_IT Control and Material Weakness Remediation.pdf PDF
36C10B27Q0144.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

DEPARTMENT OF VETERANS AFFAIRS

Office of Information & Technology (OIT) Office of Information Security (OIS)

Information Technology (IT) Control and Material Weakness Remediation

Date: November 23, 2026

VA-27-00001285

PWS Version Number: 1.1

IT Control and Material Weakness Remediation

Contents

1.0 BACKGROUND

2.0 APPLICABLE DOCUMENTS

3.0 SCOPE OF WORK

3.1 ORDER TYPE

4.0 PERFORMANCE DETAILS

4.1 PERFORMANCE PERIOD

4.2 PLACE OF PERFORMANCE

4.3 TRAVEL

5.0 SPECIFIC TASKS AND DELIVERABLES

5.1 PROJECT MANAGEMENT

5.1.1 CONTRACTOR PROJECT MANAGEMENT PLAN

5.1.2 REPORTING REQUIREMENTS

5.1.3 VA MANDATORY TRAINING

5.1.4 TECHNICAL KICKOFF MEETING

5.1.5 TRANSITION-IN

5.1.6 ONBOARDING AND OFFBOARDING

5.1.7 AUTOMATION AND AI DELIVERY

5.2 INFORMATION SYSTEM SECURITY OFFICER SUPPORT

5.2.1 AUTHORIZATION PACKAGE PREPARATION

5.2.2 VULNERABILITY MANAGEMENT AND CONFIGURATION COMPLIANCE

…………………………………………………………………………………….22

5.2.3 MOU/ISA AND INTERCONNECTION AGREEMENT SUPPORT

5.2.4 CONTINUOUS MONITORING SUPPORT

5.2.5 INCIDENT RESPONSE PLAN (IRP) DEVELOPMENT AND

MAINTENANCE

5.2.6 CONTINGENCY PLANNING SUPPORT

5.2.7 PRIVACY DOCUMENTATION SUPPORT

5.2.8 TRAINING AND RULES OF BEHAVIOR COMPLIANCE TRACKING

5.2.9 IT EXTERNAL SERVICE SECURITY REVIEW

5.2.10 ESECC SUPPORT

5.2.11 CUSTOMER SERVICE SUPPORT

5.2.12 PROGRAM MANAGEMENT SUPPORT

5.2.13 RESEARCH SYSTEM SECURITY AND ISSO SUPPORT (JOHN SCOTT

HANNON ACT)

5.2.14 AUDIT EVIDENCE COLLECTION AND VALIDATION

5.2.15 AUDIT REMEDIATION SUPPORT

5.2.16 PROACTIVE AUDIT PREPAREDNESS AND CAP IMPLEMENTATION .. 32

5.3 CYBER WORKFORCE READINESS SECURITY TRAINING PROGRAM

SUPPORT

5.4 OFFICE OF ELECRONIC HEALTH RECORD MODERNIZATION (OEHRM)

SUPPORT

5.4.1 OEHRM & INTERAGENCY OPERATIONS - AUTHORIZATION

MONITORING AND SUPPORT (OIO-AMS EHRM SUPPORT):

5.4.2 RMF AND ISSO SUPPORT OF MEDMOD (MEDICAL AND SPECIAL

PURPOSE SYSTEMS)

5.4.3 CURRENT AND ACCURATE KEY SECURITY DOCUMENTATION

ACROSS FISMA-REPORTABLE EHRM SYSTEMS

5.4.4 TIMELY CLOSURE OF HIGH AND VERY HIGH AGED POA&MS

5.4.5 AUTOMATED AND PROACTIVE ATC COMPLIANCE MONITORING

5.4.6 CONTINUOUS MONITORING AND CONFIGURATION FOR EHRM

SYSTEMS

5.4.7 SUPPORTED EHRM TRAINING ENVIRONMENTS AND HARDWARE

SECURITY

5.4.8 TIMELY ERA ANNUAL REVIEWS SUPPORTING MEDICAL DEVICE

NETWORK CONNECTIVITY

5.4.9 KNOWLEDGE TRANSFER AND TRANSITION READINESS

5.5 EHRM TRAINING CENTER SUPPORT

5.5.1 TRAINING-READY HARDWARE DEPLOYED AT EACH VA SITE ON

SCHEDULE

5.5.2 SECURE AND COMPLIANT TRAINING HARDWARE THROUGHOUT

THE TRAINING LIFECYCLE

5.5.3 OPERATIONAL VIRTUAL PRIVATE NETWORK KITS SUPPORTING

OFFSITE TRAINING ROOMS

5.5.4 MINIMIZED TRAINING DOWNTIME THROUGH RESPONSIVE

TECHNICAL SUPPORT

5.5.5 EFFICIENT HARDWARE PACKAGING AND LOGISTICS BETWEEN

TRAINING SITES

5.5.6 SCALABLE SUPPORT MODEL RESPONSIVE TO EHRM GO-LIVE

SCHEDULE CHANGES

5.5.7 COORDINATED PROJECT MANAGEMENT SUPPORTING ALL

TRAINING SITE OPERATIONS

5.6 CYBER REMEDIATION OPTIONAL TASKS

5.6.1 OPTIONAL TASK 1: ENTERPRISE VULNERABILITY REMEDIATION FOR

END USERS

5.6.2 OPTIONAL TASK 2: OIT DASHBOARDS, VISIBILITY, AND FRONT END

REPORTING

5.6.3 OPTIONAL TASK 3: ENTERPRISE LITIGATION HOLD AND

eDISCOVERY DATA PRESERVATION SUPPORT

5.6.4 OPTIONAL TASK 4: PRINTER SECURITY MANAGEMENT

5.6.5 OPTIONAL TASK 5: ENTERPRISE BASELINE CONFIGURATION

MANAGEMENT SUPPORT FOR SYSTEMS ENGINEERING

5.7 OPTIONAL TASK SIX: TRANSITION SUPPORT SERVICES

6.0 GENERAL REQUIREMENTS

6.1 ENTERPRISE AND IT FRAMEWORK

6.1.1 VA TECHNICAL REFERENCE MODEL

6.1.2 ZERO TRUST – VA CRITICAL SECURITY CONTROLS

6.1.3 FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT

(FICAM)

6.1.4 INTERNET PROTOCOL VERSION 6 (IPv6)

6.1.5 TRUSTED INTERNET CONNECTION (TIC)

6.1.6 STANDARD COMPUTER CONFIGURATION

6.1.7 VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT

LINE MANAGEMENT (PLM)

6.1.8 PROCESS ASSET LIBRARY (PAL)

6.1.9 AUTHORITATIVE DATA SOURCES

6.1.10 ENTERPRISE SOCIAL SECURITY NUMBER (SSN) REDUCTION

6.1.11 SOFTWARE AND LICENSING REQUIREMENTS

6.1.12 GENERATIVE ARTIFICIAL INTELLIGENCE REQUIREMENTS

6.1.12.1 AI SYSTEM/LLM DEVELOPMENT AND OPERATION

DOCUMENTATION REQUIREMENTS

6.1.12.2 MONITORING, REPORTING, AND CORRECTIVE ACTION

6.1.12.3 AI MODEL UPDATES AND CHANGE DISCLOSURES

6.1.13 SOURCE CODE HARMONIZATION AND REUSE IN INFORMATION

TECHNOLOGY (SHARE IT Act)

6.2 SECURITY AND PRIVACY REQUIREMENTS

6.2.1 POSITION/TASK RISK DESIGNATION LEVEL(S)

6.2.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

6.3 METHOD AND DISTRIBUTION OF DELIVERABLES

6.4 PERFORMANCE METRICS

6.5 FACILITY/RESOURCE PROVISIONS

6.6 GOVERNMENT FURNISHED PROPERTY

ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED

ADDENDUM B – VA CYBERSECURITY AND PRIVACY LANGUAGE FOR

INCLUSION IN ACQUISITIONS

1.0 BACKGROUND

The Department of Veterans Affairs (VA), Office of Information and Technology (OIT) serves as a Veteran-centric provider of secure, innovative, and cost-effective technology services. OIT partners with VA business units to deliver a seamless, unified experience for Veterans through modern Information Technology (IT) solutions and agile service delivery. As VA’s largest technical directorate, OIT comprises over 6,000 IT professionals nationwide, responsible for enterprise-level infrastructure engineering, system implementation, production operations and IT service management.

OIT’s mission continues to evolve to meet emerging cybersecurity threats, modernization mandates, and the growing demand for digital services. The Office of Information Security (OIS) plays a critical role in safeguarding VA’s information assets and ensuring compliance with federal cybersecurity directives. Current priorities include implementing Zero Trust Architecture (ZTA), strengthening risk-based cybersecurity practices, and accelerating Development, Security and Operations adoption to embed security throughout VA’s software development lifecycle.

This procurement supports VA’s efforts to remediate material weaknesses, enhance cyber resilience, and maintain a proactive risk-based security posture across OIT. It provides a flexible response platform to address evolving policies, executive mandates, and technology initiatives that reduce risk and improve operational agility. The effort emphasizes sustained cybersecurity readiness, system authorization support, and risk-based remediation, leveraging industry standards, intelligent automation, and emerging technologies to strengthen the security and resilience of VA information systems.

In order to achieve and maintain the lowest cyber risk and promote maximum flexibility, this Task Order (TO) is intended to support a broad range of VA offices including, but not limited to, OIS, End User Services, Office of People Science, Infrastructure Operations Service, Electronic Health Record Modernization Integration Office, etc.

Further information regarding VA OIT structure and organization can be found at the following link. https://digital.va.gov/office-of-information-and-technology

2.0 APPLICABLE DOCUMENTS

In the performance of the tasks associated with this Performance Work Statement (PWS), the Contractor shall comply with the following:

1. “Federal Information Security Modernization Act of 2014”

2. Federal Information Processing Standards (FIPS) Publication 140-3, “Security Requirements for Cryptographic Modules”, March 22, 2019

3. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004 https://digital.va.gov/office-of-information-and-technology

4. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006

5. FIPS Pub 201-3, “Personal Identity Verification of Federal Employees and Contractors,” January 2022

6. 10 U.S.C. § 2224, "Defense Information Assurance Program", as amended

7. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”

8. Public Law 109-461 (P.L. 109-461), Veterans Benefits, Health Care, and

Information Technology Act of 2006, as amended, Title IX, Information Security Matters

9. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”, as amended

10. VA Directive 0710, “Personnel Vetting Program,” September 8, 2025, https://www.va.gov/vapubs/index.cfm

11. VA Handbook 0710, “Personnel Vetting Program,” September 8, 2025, https://www.va.gov/vapubs/index.cfm

12. VA Directive 6102, “Internet/Intranet Services,” August 5, 2019

13. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” as amended

14. Office of Management and Budget (OMB) Circular A-130, “Managing Federal

Information as a Strategic Resource,” July 28, 2016

15. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed

Services (CHAMPUS)”, as amended

16. NIST SP 800-66 Rev. 2, “Implementing the Health Insurance Portability and

Accountability Act (HIPAA) Security Rule: A Cybersecurity Resource Guide,” February 2024

17. 45 C.F.R Parts 160 and 164, Subparts A and E, the Standards for Privacy of Individually Identifiable Health Information (“Privacy Rule”); and 45 C.F.R.

Parts 160 and 164, Subparts A and C, the Security Standard (“Security Rule”); as amended

18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended

19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004

20. VA Directive 6500, “VA Cybersecurity Program,” September 22, 2026

21. VA Handbook 6500, “Risk Management Framework for VA Information

Systems VA Information Security Program,” February 24, 2021 (see VA Notice 25-01, dated October 15, 2024, “Update to VA Handbook 6500 Risk Management Framework for VA Information Systems VA Information Security Program”, VA Notice 25-16, dated September 15, 2025, “Amending VA Handbook 6500 to Replace Enterprise Mission Assurance Support Services Tool With Office of Information Technology Governance Risk Compliance Tool, and VA Notice 25-17, dated September 22, 2025, “Rescission Of Office Of Information Security (OIS) Deputy Assistant Secretary (DAS) Memorandum – Requirements of Proper Plan of Action and Milestones (POA&M) Completion)

22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” June 30, 2023

23. VA Handbook 6500.6, “Acquisition Cybersecurity,” October 2, 2026 https://www.va.gov/vapubs/index.cfm https://www.va.gov/vapubs/index.cfm http://www.va.gov/vapubs http://www.va.gov/vapubs

24. VA Handbook 6500.8, “Information System Contingency Planning,” March 25, 2025

25. VA Handbook 6500.10, “Mobile Device Security Policy,” August 24, 2026

26. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017

27. OIT Process Asset Library (PAL), OIT Process Asset Library.

28. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)

29. VA Directive 6508, “Implementation of Privacy Threshold Analysis and

Privacy Impact Assessment,” October 15, 2014

30. VA Directive 6510, “VA Identity, Credential and Access Management,”

September 3, 2024

31. VA Handbook 6510, “VA Identity, Credential and Access Management,”

September 27, 2024

32. VA Directive and Handbook 6513, “Secure External Connections,” October

12, 2017

33. VA Directive 6300, “Records and Information Management,” September 21,

34. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010

35. NIST SP 800-37 Rev 2, “Risk Management Framework for Information

Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018

36. NIST SP 800-53 Rev. 5.2.0 “Security and Privacy Controls for Information Systems and Organizations,” August 27, 2025

37. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12), Personal Identity Verification, Credential Management Program,” September 19, 2025

38. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD- 12), Personal Identity Verification, Credential Management Program,” September 18, 2025

39. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005

40. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019

41. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008

42. Federal Identity, Credential, and Access Management (FICAM) Architecture, June 30, 2023 (FICAM Architecture (idmanagement.gov))

43. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018

44. NIST SP 800-63 Rev 4, 800-63A-4, 800-63B-4, 800-63C-4, “Digital Identity Guidelines,” August 1, 2025

45. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014

46. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy

Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896 https://digital.va.gov/process-asset-library/ https://www.va.gov/trm/TRMHomePage.aspx https://www.idmanagement.gov/arch/#:~:text=FICAM%20is%20the%20federal%20government%E2%80%99s%20enterprise%20approach%20to,identity%20processes%2C%20practices%2C%20policies%2C%20and%20information%20security%20disciplines.

https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896

47. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents

48. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019

49. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008

50. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (P.L. 110–140), December 19, 2007

51. Section 104 of the Energy Policy Act of 2005, (P.L. 109–58), August 8, 2005

52. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August

2, 2001

53. Executive Order 14148, “Initial Rescissions of Harmful Executive Orders and

Actions,” dated January 20, 2025

54. VA Directive 0057, “VA Environmental Management Program,” October 25,

55. OIS VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

56. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103

57. “Veteran Focused Integration Process (VIP) Guide 4.0,” March 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371

58. VA Memorandum “Proper Use of Email and Other Messaging Services,”

January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

59. “Product Line Management Transformation Playbook” version 3.1, August 2023, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946

60. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020

61. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol

Version 6 (IPv6),” November 19, 2020

62. Social Security Number (SSN) Fraud Prevention Act of 2017

63. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23,

64. C.F.R Title 15 Part 7, “Securing the Information and Communications

Technology and Services (ICTS) Supply Chain”, as amended

65. Executive Order 14028, “Executive Order on Improving the Nation's

Cybersecurity,” May 12, 2021, https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/

66. OMB Memorandum M-22-09, “Moving the U.S. Government Toward Zero Trust Cybersecurity Principles”, January 26, 2022, https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf.

67. NIST SP 800-52 Revision 2, “Guidelines for the Selection, Configuration, and Use of Transport Layer Security (TLS) Implementations

68. OMB M-26-05, “Adopting a Risk-based Approach to Software and Hardware Security,” January 23, 2026 https://www.cisa.gov/publication/tic-30-core-guidance-documents https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946 https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/ https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf

69. OMB M-21-31, “Improving the Federal Government’s Investigative and Remediation Capabilities Related to Cybersecurity Incidents,” August 27,

70. NIST SP 800-88 Revision 2 “Guidelines for Media Sanitization,” September 26, 2025

71. CISA BOD 23-01: Improving Asset Visibility and Vulnerability Detection on Federal Networks.” Cybersecurity & Infrastructure Security Agency (CISA), BOD 23-01: Improving Asset Visibility and Vulnerability Detection on Federal Networks | CISA

72. CISA BOD 26-04: Prioritizing Security Updates Based on Risk, June 10,

73. VA Directive 6550, Pre-Procurement Assessment and Implementation of Medical Devices/Systems, June 03, 2019

74. VA Memorandum, “VA Security Controls,” January 17, 2025, https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010

75. E.O. 13960, “Promoting the Use of Trustworthy Artificial Intelligence in the Federal Government,” December 3, 2020

76. E.O. 14319, “Preventing Woke AI in the Federal Government,” July 23, 2025

77. OMB Memorandum M-25-21, “Accelerating Federal Use of AI through

Innovation, Governance, and Public Trust,” April 3, 2025

78. OMB Memorandum M-25-22, “Driving Efficient Acquisition of Artificial

Intelligence in Government,” April 3, 2025

79. OMB Memorandum M-26-04, “Increasing Public Trust in Artificial Intelligence

(AI) Through Unbiased AI Principles,” December 11, 2025

80. OMB Memorandum M-26-10, “Reinforcing Transparency, Accountability, and

Oversight of Federal Technology”, March 31, 2026

The Contractor shall comply with the most recent version of any of the documents listed above. Additionally, the Contractor shall comply with any newly issued rules, regulations, instructions, handbooks, memoranda, or other Federal documents relating to security and privacy.

3.0 SCOPE OF WORK

The Contractor shall provide comprehensive IT enterprise support services to innovate OIT operations to resolve the Office of Inspector General (OIG) identified material weakness, control deficiencies, and innovate overall cybersecurity maturity. The Contractor shall assist with initiatives that consolidate, modernize, innovate and secure VA’s IT environment and provide security oversight support for VA’s ongoing cloud adoption efforts. To achieve VA’s transformation objectives, the Contractor shall leverage innovative modernization techniques, including Artificial Intelligence/Super Intelligence (AI/SI), automation, and digital platforms to deliver outcome-based services that maximize efficiency, security, and value.

Performance requirements may evolve throughout the life of the contract to address emerging mandates, technology advancements, and enterprise transformation https://www.cisa.gov/news-events/directives/bod-23-01-improving-asset-visibility-and-vulnerability-detection-federal-networks https://www.cisa.gov/news-events/directives/bod-23-01-improving-asset-visibility-and-vulnerability-detection-federal-networks https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010 https://www.whitehouse.gov/wp-content/uploads/2025/02/M-25-21-Accelerating-Federal-Use-of-AI-through-Innovation-Governance-and-Public-Trust.pdf https://www.whitehouse.gov/wp-content/uploads/2025/02/M-25-22-Driving-Efficient-Acquisition-of-Artificial-Intelligence-in-Government.pdf https://www.whitehouse.gov/wp-content/uploads/2025/12/M-26-04-Increasing-Public-Trust-in-Artificial-Intelligence-Through-Unbiased-AI-Principles-1.pdf?_bhlid=c0113a16495d987bc33f63e3dccf35c28d6bfd15 objectives. Any such requirements will be supported by the applicable optional task, if exercised.

3.1 ORDER TYPE

The effort shall be proposed on a Firm-Fixed-Price (FFP) basis with a Cost Reimbursable travel line.

4.0 PERFORMANCE DETAILS

4.1 PERFORMANCE PERIOD

The Period of Performance (PoP) shall be 12 months from date of award, consisting of a two-month Transition-In period under PWS Section 5.1.5 followed by a 10-month period covering the tasks described in PWS Sections 5.1 and 5.2-5.5, with four 12-month option periods and six optional tasks, if exercised by the Government. The Transition Support Optional Task, if exercised by VA, shall have a 60 day PoP. The overall PoP for this contract shall not exceed 62 months, inclusive of all options.

Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).

There are 11 Federal holidays set by law (United State Code (USC) Title 5 Section 6103) that VA follows:

Under current definitions, five are set by date:

New Year's Day January 1 Juneteenth June 19 Independence Day July 4 Veterans Day November 11 Christmas Day December 25

If any of the above falls on a Saturday, then Friday shall be observed as a holiday.

Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.

The other six are set by a day of the week and month:

Martin Luther King's Birthday Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Labor Day First Monday in September Columbus Day Second Monday in October Thanksgiving Fourth Thursday in November

4.2 PLACE OF PERFORMANCE

Tasks under this PWS shall be performed at Contractor facilities or remotely (offsite).

The Contractor shall identify the Contractor’s place of performance in their proposal submission. In addition, tasks may be performed at VA Government facilities (onsite).

The required onsite support is identified in Sections 5.1 through 5.5, as applicable. If onsite is not identified, then offsite support is anticipated.

The Contractor shall provide support to any of the VA facilities as required which is subject to change throughout the life of the TO PoP.

4.3 TRAVEL

The Government anticipates travel under this effort to perform the requirements associated with the effort.

Travel and per diem shall be in accordance with the Federal Travel Regulations (FTR) and requires advanced concurrence by the Contracting Officer’s Representative (COR).

Each Contractor invoice shall include copies of all receipts that support the travel costs claimed in the invoice. The Government will not reimburse local travel, which is travel within a 50-mile radius of an assigned duty location.

Requests for travel approval shall:

a. Be prepared in a legible manner.

b. Be summarized by traveler.

c. Identify the Contract Line Item Number (CLIN) and PWS task associated with the travel.

5.0 SPECIFIC TASKS AND DELIVERABLES

The Contractor shall perform tasks under PWS Sections 5.1 through 5.5, including all Subsections, in the Base Period and each Option Period (except 5.1.4 and 5.1.5), if exercised. The Contractor shall perform tasks under PWS Optional Task Sections 5.6 and 5.7, if exercised.

Before beginning an authorized task, the Contractor shall coordinate with the Contracting Officer’s Representative (COR) and VA Program Manager (PM) to confirm the systems, findings, outcomes, deliverables, Government dependencies, acceptance criteria, and schedule applicable to that task. The Contractor shall coordinate with the COR/VA PM to review the Contractor’s Program Management Plan (CPMP) and its contents in accordance with Section 5.1.1 below for completing each deliverable and performing each task, prior to commencement of the task.

The Contractor shall provide personnel that are fully trained in their assigned technical field of expertise and maintain technical proficiency and currency during the TO PoP. At a minimum, the Contractor shall provide qualified personnel with current skills in Federal Risk Management Framework (RMF), National Institute of Standards and Technology (NIST) SP 800-53 and 800-53A, VA cybersecurity requirements, the VA-designated Governance, Risk, and Compliance (GRC) platform, security engineering and audit evidence management, as applicable to assigned tasks. If the Contractor requires or requests training to maintain professional or technical certifications, the acquisition of this training shall be the Contractor’s responsibility at no cost to the Government. All personnel performing work shall possess experience in the disciplines and technical areas described in each task, which are related to the design, analysis, engineering, operation, maintenance, and security of the OIT managed enterprise IT network. It is the responsibility of the Contractor to provide Contractor support personnel and subcontractors who have the required educational background, experience, VA or Department of War security clearance, and access authorization or combination thereof to perform under this PWS.

All tasks and deliverables under this contract shall be executed with a focus on innovation, automation, and AI-driven solutions, ensuring continuous improvement and sourcing efficiency. The Contractor shall proactively identify and propose opportunities to embed AI/SI and automation throughout the services described in Sections 5.2 through 5.6, wherever doing so can streamline service delivery, reduce manual effort, accelerate turnaround on recurring analytical or reporting tasks, and lower the overall cost of performance to the Government. AI-driven approaches are expected across the full range of task areas and are not limited to the specific AI-related tasks identified elsewhere in this PWS. The Contractor shall ensure that any proposed or implemented use of AI is consistent with the requirements of Section 6.1.12 (Generative Artificial Intelligence Requirements) and does not compromise the security, accuracy, or auditability of Government data or decision-making. AI-assisted tools may draft or analyze material only when approved under the contract and shall be subject to human quality review, validation, traceability, privacy, and the applicable AI requirements in Section 6.1.12. No AI or automated workflow may grant authorization, approve risk acceptance, close an audit finding, or bypass VA change control. For proposed AI/SI-enabled capabilities, including advanced AI/SI, agentic automation, and predictive analytics, the Contractor shall identify the intended use, anticipated measurable benefit, validation method, human review controls, and required Government approval before implementation. The Contractor shall meet the baseline, improvement, milestone, and demonstration requirements in Section 5.1.7.

5.1 PROJECT MANAGEMENT

5.1.1 CONTRACTOR PROJECT MANAGEMENT PLAN

The Contractor shall provide a PM who shall serve as the Contractor manager of the TO and shall be the Contractor’s primary Point of Contact (POC) for VA CORs and OIT management, and maintain effective program oversight that ensures delivery of all contracted services within scope, on schedule, and in accordance with VA quality standards. The PM shall analyze and resolve programmatic issues, facilitate information exchange, and enhance management coordination as coordinated with the contract COR/VA PM(s). This support shall include managing onsite and offsite Contractor support, any tracking of resources across projects, transitioning and onboarding and offboarding of Contractor support required, and scheduling to ensure support services for OIT supported organizations for resolution of issues. The Government shall have continuous, real-time visibility into program status, risks, and performance without requiring manual inquiry.

The Contractor PM shall:

1. Conduct bi-weekly VA Project Progress Reviews (PPR).

a. The Contractor shall conduct a PPR with the VA PM and COR every two weeks. For each PPR, the Contractor shall provide a briefing covering task and deliverable status against the CPMP, upcoming deliverables, risks and Government dependencies, staffing and onboarding status, and open action items, and shall document decisions and action items (with owners and due dates) in meeting minutes.

2. Provide Monthly Management Reports, see section 5.1.2 for description.

3. Ensure ≥ 95% of deliverables submitted by due date each period.

4. Track deliverables across projects in a consolidated project plan, inclusive of consolidated deliverable and task register with current owner, due date, status, dependencies, with real-time visibility.

5. Notify the COR of critical security, schedule, or mission risks within one business day after the Contractor becomes aware of the risk; suspected incidents remain subject to the shorter incident reporting requirements in Addendum B.

6. Attend status meetings and provide status reports to project stakeholders with VA PM or COR coordination.

7. Ensure ≥ 90% of Government-assigned action items resolved within agreed timelines.

8. Maintain VA-approved collaboration, document management, and project tracking environments (e.g. SharePoint to store documents, ServiceNow Project) to maintain the authoritative task and deliverable record.

9. Track that all Contractor support:

a. Meets all task schedules including non-standard work schedule(s) as required. Schedules include: nights, weekends, and holidays in accordance with OIT requirements a nonstandard work schedule, if required. Work may be required beyond normal duty hours, including nights, weekends, and holidays as necessary.

b. Performance is tracked against the PWS requirements and performance metrics.

10. Coordinate a proportionate program-management function across authorized tasks; this requirement does not prescribe a separate, additional full-time PM Office beyond the resources necessary to meet performance outcomes:

a. Ensure compliance with all contract and government regulations (i.e. Section 2.0 Applicable Documents),

b. Monitor performance/compliance, and

c. Respond to customer data calls.

The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with deliverable schedule of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.

Deliverables:

A. Bi-Weekly VA Project Progress Reviews

B. Contractor Project Management Plan

5.1.2 REPORTING REQUIREMENTS

The Monthly Management Report shall address contract management, schedule, staffing, and deliverable performance. This report shall provide structured reporting that enables the Government to understand the status, progress, risks, and overall performance of all support activities performed under this contract. Reporting shall clearly communicate how Contractor activities contribute to improved cybersecurity posture, operational readiness, and compliance with VA policies and federal mandates.

Reports shall be written in a manner that supports informed decision‑making, highlights areas requiring Government action, and demonstrates traceability to the objectives and functional areas defined throughout this PWS. The report shall distinguish contractor-completed work from actions awaiting Government review, decisions, system access, or third-party remediation, and shall identify the source records supporting reported performance.

These Monthly Reports shall present a narrative of work accomplished during the period, upcoming planned activities, and any issues that may affect the ability to meet established timelines, security objectives, or enterprise priorities. The reporting shall also explain changes in scope, updated dependencies, and any shifts in risk posture that the Government should be aware of. Where applicable, the Contractor shall describe how activities performed align to the CPMP and identify any deviations that require adjustment or additional review.

The Contractor shall ensure that reporting is clear, concise, and actionable. Technical details should be included only where relevant to understanding the cybersecurity impact, avoiding unnecessary depth that does not support mission‑level decision‑making. Reports should emphasize outcomes, such as improved compliance, mitigated vulnerabilities, or enhanced operational stability, rather than the internal mechanics of how the work was performed.

The Contractor shall also provide a Monthly Remediation Report focused on cybersecurity work performed, remediation outcomes, authorization readiness, and supporting evidence. To ensure consistency and predictability, each Monthly Remediation Report shall include, at a minimum, the following content areas:

1. Executive status by authorized service line Information System Security Officer (ISSO) (Authority to Operate (ATO) / Authority to Connect (ATC), material weakness remediation, and any exercised supplemental work), with the status of agreed outcomes.

2. Completed activities, deliverables, and planned milestones for the next reporting period, linked to the integrated schedule and assigned systems or findings.

3. Significant risks, issues, delayed actions, unresolved evidence requests, or blockers that require Government coordination or decision.

4. Control and security posture results: remediation finding status, repeat finding reduction, audit readiness status, control evidence coverage, scan and vulnerability aging, configuration deviations, open POA&M, and required escalation, where applicable to assigned work. This includes updates to cybersecurity compliance or control monitoring (e.g., vulnerabilities, logging, identity, configuration baselines).

5. ATO and audit status: authorization packages and deadlines, audit data requests, corrective action plans, remediation validation results, and repeat-finding trends.

6. Contract performance: deliverable timeliness and acceptance, quality corrections, workload volumes, and contractor-owned action item completion against Section 6.4 performance metrics. This includes deviations from the CPMP or approved technical approaches, with recommended corrective actions.

7. A summary of AI and automation initiatives employed during the reporting period, including the task areas where AI was applied, the specific efficiency, cost, or delivery-time improvements realized or anticipated, and any recommendations for expanding AI-driven approaches to additional task areas in future periods.

The summary shall report results against the approved baseline for turnaround time, manual effort, accuracy, throughput, and cost per accepted result.

8. Summary of deliverables submitted during the reporting period and those anticipated for the next period.

While structured content is required, the Contractor retains flexibility in how analyses, visuals, or summaries are presented, provided the information remains accurate, consistent, and useful to the Government. The Contractor may use dashboards and concise visual summaries as the primary presentation method, but the Government shall receive underlying reproducible data and accessible records sufficient to validate each reported outcome.

Government dependencies include decisions, approvals, access, data, and actions owned by the Government or third parties, such as final POA&M closure, authorization decisions, risk acceptance, change approval, access provisioning, and evidence from system owners. The Contractor shall record each dependency in the Audit Remediation Status and Dependency Register (Section 5.2.15), notify the COR within 2 business days of any dependency that threatens a milestone, and report Government-owned status separately in the Monthly Remediation Report. Contractor performance is measured on results within the Contractor’s control, including complete, accurate, and timely submission of work products and evidence. A delay caused by an unmet Government dependency adjusts the affected milestone date and does not count against Contractor performance, provided the Contractor gave timely notice. Any adjustment to affected milestone dates shall require Government approval.

Deliverable:

A. Monthly Management Report B. Monthly Remediation Report

5.1.3 VA MANDATORY TRAINING

All Contractors are required to have access to the VA network and shall complete all the required VA Talent Management System (TMS) training courses within fourteen (14) days of submitting an onboarding package. The Contractor shall work with its respective onboarding POC and COR, to obtain access to TMS to complete the mandatory training courses.

As an action under the Continuous Readiness in Information Security Program, VA's Assistant Secretary for Information and Technology issued a memorandum requiring all VA Government and Contractor staff to complete information security awareness and applicable role-based training. The Contractor shall submit TMS Training Certificates of completion for VA Privacy and Information Security Awareness, Rules of Behavior (ROB), Health Insurance Portability and Accountability Act (HIPAA). If elevated privileges are required Role-Based trainings will be identified for completion prior to gaining additional access.

Deliverable:

A. TMS Training Certificates

5.1.4 TECHNICAL KICKOFF MEETING

A technical kickoff meeting shall be held in person or virtually within 10 calendar days after contract award. The Contractor shall coordinate the date, time, and location (can be virtual) with the CO, as the Post-Award Conference Chairperson, the VA PM, as the Co-Chairperson, the Contract Specialist (CS), and the COR. The Contractor shall provide a Agenda to the CO and VA PM at least five (5) calendar days prior to the meeting. Upon Government approval of the final agenda, the Contractor shall distribute to all meeting attendees. During the kickoff-meeting, the Contractor shall present and provide a Post Award Kickoff Presentation, for review and approval by the Government, the details of the intended approach, work plan, and project schedule for each effort via a Microsoft Office PowerPoint presentation (PPT). At the conclusion of the meeting, the Contractor shall update the presentation with a final slide entitled “Summary Report” which shall include notes on any major issues, agreements, or disagreements discussed during the kickoff meeting and the following statement “As the Post-Award Conference Chairperson, I have reviewed the entirety of this presentation and assert that it is an accurate representation and summary of the discussions held during the Technical Kickoff Meeting for the IT Control and Material Weakness Remediation effort.”

The Contractor shall submit the final updated presentation to the CO for review and signature within three (3) calendar days after the meeting. The Contractor shall provide and distribute the Post Award Meeting Minutes of the kickoff meeting to the CO, COR and all attendees within three (3) calendar days after the meeting. The Contractor shall obtain concurrence from the CS on the content of the meeting minutes prior to distribution of the document.

Deliverable:

A. Kickoff Meeting Agenda B. Post Award Kickoff Presentation C. Post Award Meeting Minutes

5.1.5 TRANSITION-IN

Following a Government-approved Transition-In Plan, the Contractor shall begin transitioning in task support immediately after completion of the kickoff meeting and remain in effect for no longer than 60 calendar days during the Base Period. The Contractor shall participate in any Phase-In Transition Plan meetings scheduled by the outgoing Contractor or with the VA COR, or VA organizations identified by the COR.

In accordance with the Government-approved Transition-In Plan, which shall include a transition strategy, methodology, and timeline, the Contractor shall plan, coordinate, and execute all activities necessary to assume responsibility for the required services.

Transition-in activities shall include formal coordination with Government and incumbent personnel, knowledge transfer, receipt and validation of applicable documentation and historical information, onboarding and orientation activities, and accountability for Government-furnished resources.

The incoming Contractor shall perform the following activities:

a. Participate in reviews of program documentation.

b. Participate, as an observer, such as desk side knowledge sharing in the day-to-day tasks performed by the outgoing Contractor for the purpose of knowledge sharing, understanding all standard operating procedures, VA stakeholders, meeting attendance, report training, and business workflows and processes.

c. Acquire knowledge of all details on accessing and analyzing of applicable tools and repositories.

d. Provide VA COR with ongoing status of Government-required (on-boarding) training, clearances, access, and certification processes.

e. Provide VA COR and PM with daily status updates on hiring and staffing until such time that full staffing is reached.

The Contractor shall provide a transition timeline that ensures all transition work is completed within a two-month timeframe, after which the Contractor is fully able to assume all work on the material weakness remediation. The timeline should indicate important milestones, key resources, and identify key dependencies.

Deliverable:

A. Transition-In Plan

5.1.6 ONBOARDING AND OFFBOARDING

The Contractor shall support the onboarding and offboarding of its staff. Onboarding includes steps to obtain a VA Personal Identity Verification (PIV) card, network and email account, complete training, initiate background investigations, and obtain Government Furnished Equipment (GFE). In addition, the Contractor shall identify individuals which may require elevated privileges to the necessary development and test environments for the various systems to be developed or enhanced.

A single Contractor Onboarding POC shall be designated by the Contractor that tracks the onboarding status of all Contractor personnel. The Contractor Onboarding POC shall be responsible for accurate and timely submission of all required VA onboarding paperwork to the VA COR or applicable systems used for onboarding. The Contractor shall be responsible for tracking the status of all its staff’s onboarding activities to include the names of all personnel engaged on the task, commercial email address, phone numbers, immediate contract supervisor, onboarding milestone dates, and their initial training date for VA Privacy and Information Security training. The Contractor shall provide a Weekly Onboarding and Offboarding Status Report for review by the COR, VA PM or Government designee. The Weekly Onboarding and Offboarding Status Report shall include, at a minimum, personnel names and assigned roles, onboarding/offboarding status, background investigation and PIV status, mandatory training completion, system access and GFE status, anticipated completion dates, and any outstanding issues or delays requiring Government action.

A. Weekly Onboarding and Offboarding Status Report

5.1.7 AUTOMATION AND AI DELIVERY

The Contractor shall perform the recurring work in Sections 5.2 through 5.5, and any exercised Optional Tasks under 5.6, primarily through automation and AI, so that Contractor and Government personnel focus on review, judgment, and coordination.

This includes automated evidence collection, analysis, authorized remediation, continuous monitoring, and reporting. The approval and review controls in Section 5.1 and Section 6.1.12 apply to all automated work.

The Contractor shall submit an Automation and AI Delivery Plan for each of the areas above, the recurring tasks to be automated, the tools and methods to be used, the validation approach, and the human review points. Within 30 days after completion of the Transition-In (Section 5.2), the Contractor and COR shall document a baseline for each automated task covering turnaround time, manual effort, accuracy, throughput, and cost per accepted result. By the end of the base period, automated tasks shall achieve at least a 50% reduction in turnaround time and manual effort with accuracy at or above baseline. The Contractor shall report the baseline and progress against the improvement targets monthly in the Automation Baseline and Improvement Report, included with the Monthly Management Report (Section 5.1.2)

The Government will accept each capability only after the Contractor demonstrates it operating in the VA environment on VA data using only approved AI platforms. The Contractor shall ensure that the solution does not require contractor maintenance in perpetuity and that the solution can be turned over to government staff to maintain with little effort. The Contractor shall meet the following milestones (each shown in a Milestone Demonstration to the COR):

a. Plan and baseline approved by the COR (within 30 days of completion of Transition-In),

b. Automated evidence collection and reporting demonstrated (by 90 days after completion of Transition-In),

c. Automated analysis and continuous monitoring demonstrated (by 90 days after completion of Transition-In),

d. Automation of authorized remediation demonstrated, where authorized (by 90 days after completion of Transition-In), and

e. Improvement targets met and reported against baseline (by the end of the base period).

Efficiency gains shall benefit the Government. At each annual reassessment/renewal, the Contractor shall reduce the price or labor level of any affected work, or deliver additional accepted output at no added cost, in proportion to the demonstrated gain.

Deliverable:

A. Automation and AI Delivery Plan B. Milestone Demonstrations

5.2 INFORMATION SYSTEM SECURITY OFFICER SUPPORT

The tasks below establish the performance requirements for ISSO and Enterprise Security Operations (ESO) contractor support services in support of VA OIS. The Contractor shall perform all work in accordance with VA Directive 6500, VA Handbook 6500, VA Handbook 6517, ESO program policy, and all applicable NIST standards referenced herein. This PWS defines required outcomes and performance standards.

The Contractor shall determine the methods, staffing, and processes necessary to achieve the stated outcomes, subject to the role constraints in the paragraphs below.

Performance shall be assessed against the completeness, accuracy, timeliness, and traceability of assigned work products; official ISSO, system owner, assessor, and authorizing decisions remain with designated Government officials. The Contractor shall perform recurring ISSO evidence collection, scan analysis, and reporting through the automation required by Section 5.1.7.

This task constitutes the Contractor's complete ISSO and ATO support capability under this PWS; authorization and security officer support for specific customer populations, including Research systems under Section 5.2.13 and Electronic Health Record Modernization (EHRM) systems under Section 5.4, shall be performed in accordance with the requirements of this PWS Section.

In accordance with VA Directive 6500, VA Handbook 6500, and ESO program policy, the Contractor is authorized to perform all ISSO support work up to the point of signature.

The scope of the work in this section, unless specifically called out in a subsection, shall be up to 1,200 Federal Information Security Modernization Act (FISMA) reportable systems or boundaries.

1) The Contractor shall be authorized to perform:

a. All ISSO support work up to the point of signature;

b. GRC support functions, including continuous monitoring, data entry, implementation statements, and control testing;

c. Development and maintenance of Incident Response Plan (IRP), Contingency Plan (CP), Disaster Recovery Plan (DRP), System Security Plan (SSP), Memorandum of Understanding (MOU)/Interconnection Security Agreement (ISA), Business Impact Analysis (BIA), Privacy Threshold Analysis (PTA), Privacy Impact Assessments (PIA), and POA&M documentation;

d. Evidence collection, validation, and organization for audit submission;

e. Organizational policy compliance evaluation and configuration documentation;

f. Training and Rules of Behavior compliance tracking; and

g. Annual document reviews and updates.

2) The Contractor shall not perform, and shall not be authorized to:

a. Sign IRPs, CPs, Assessment and Authorization (A&A) artifacts, PIAs, or any authorization documentation;

b. Move GRC workflows (reserved for Government ISSOs);

c. Review or advise on contracts;

d. Grant or revoke system access;

e. Close POA&Ms, approve compensating controls, or accept residual risk;

f. Make risk acceptance or authorization decisions; or

g. Replace ISSO judgment or oversight authority.

5.2.1 AUTHORIZATION PACKAGE PREPARATION

The Contractor shall perform all GRC-related tasks up to the point of Government ISSO signature and approval.

A&A Artifact Maintenance: The Contractor shall maintain accurate and complete A&A artifacts within the VA GRC tool for assigned systems. This shall include updating security and privacy control implementation statements, ensuring evidence links are current, identifying and flagging all common, hybrid, and system-specific controls

(including Federal Risk and Authorization Management Program (FedRAMP) and

Privacy overlays) with implementation status and responsible entity noted for each, and flagging documentation gaps to the organization immediately upon identification. For each assigned system, the Contractor shall maintain an artifact inventory identifying required documents, current version, evidence source, responsible Government reviewer, next review date, and outstanding deficiencies. Submitted artifacts shall be internally checked for completeness and consistency before Government review.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .