PD Weight Based Inventory System - PAR Excellence DRAFT.docx
DOCX document 106 KB Posted
- Attached to
- DA01--PAR Excellence, Phase I (VA-25-00065169)
- Solicitation number
- 36C10B25Q0438
About this file
This document is a Product Description (PD) for a Weight-Based Inventory Management System for the Department of Veterans Affairs (VA), specifically for the John D. Dingell Veterans Affairs Medical Center and its satellite locations. The system will replace the current non-weight-based Point-of-Use inventory tracking method, offering real-time inventory monitoring, automatic tracking, and web-based reporting capabilities. The project involves supplying and installing PAR Software Licenses, Interface Development services, PAR Scale Products, and Storage Products across six VA facilities in Detroit and Pontiac, Michigan.
The contract opportunity is a pre-solicitation Request for Information (RFI) set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a North American Industry Classification System (NAICS) code of 541519 and a size standard of $34 million. Interested vendors must submit a five-page response by July 16, 2025, at 3 p.m. EST, detailing their capabilities, corporate experience, and ability to meet the set-aside requirements. The response must include company details, socioeconomic data, existing contract vehicles, and technical capability to perform the inventory management system implementation, with a focus on software development and production operations support services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B25Q0438_1.docx | DOCX document | |
| Attachment A - Color-Coding Standards.pdf | ||
| 36C10B25Q0438.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Par Excellence, Phase I
VA-25-00065169
PRODUCT DESCRIPTION (PD)
DEPARTMENT OF VETERANS AFFAIRS
Veterans Health Administration
Par Excellence, Phase I John D. Dingell Veterans Affairs Medical Center Satellite Locations and Community Based Outpatient Clinics
Date: July 10, 2025
VA-25-00065169
PD Version Number: 1.2
Contents
| 1.0 | BACKGROUND | 3 |
| 2.0 | PRODUCT REQUIREMENTS | 3 |
| 2.1 | WEIGHT BASED INVENTORY MANAGEMENT SYSTEM | 5 |
| 2.1.1 | SALIENT CHARACTERISTICS | 5 |
| 2.1.2 | LICENSING | 7 |
| 2.1.3 | INSTALLATION | 7 |
| 2.1.4 | ACCESS | 7 |
| 2.2 | SUPPORT | 7 |
| 2.3 | TRAINING | 8 |
| 2.4 | PERFORMANCE MONITORING | 8 |
| 2.5 | PROJECT MANAGEMENT | 8 |
| 2.5.1 | DELIVERY ORDER KICKOFF MEETING | 8 |
| 3.0 | SECURITY REQUIREMENTS | 9 |
| 4.0 | GOVERNMENT FURNISHED EQUIPMENT (GFE) | 9 |
| 5.0 | RISK CONTROL | 9 |
| 6.0 | NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) PROCUREMENTS (SECTION 508) | 9 |
| 6.1 | SECTION 508 – INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STANDARDS | 10 |
| 6.2 | COMPATABILITY WITH ASSISTIVE TECHNOLOGY | 10 |
| 6.3 | ACCEPTANCE AND ACCEPTANCE TESTING | 10 |
| 7.0 | INFORMATION TECHNOLOGY USING SUSTAINABLE PRODUCTS AND SERVICES | 11 |
| 8.0 | SHIPMENT OF HARDWARE OR EQUIPMENT | 11 |
| 8.1 | SPECIAL SHIPPING INSTRUCTIONS | 11 |
| 9.0 | GENERAL REQUIREMENTS | 12 |
| 9.1 | VA TECHNICAL REFERENCE MODEL | 12 |
| 9.2 | ZERO TRUST – VA CRITICAL SECURITY CONTROLS | 12 |
| 9.3 | SOCIAL SECURITY NUMBER (SSN) REDUCTION | 12 |
| 9.4 | INTERNET PROTOCOL VERSION 6 (IPV6) | 13 |
| 9.5 | SOFTWARE AND LICENSING REQUIREMENTS | 13 |
| 9.6 | TRUSTED INTERNET CONNECTION (TIC) | 13 |
| 9.7 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 14 |
| ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/ PRIVACY LANGUAGE | 15 | |
| Notes to the Contracting Officer | 32 |
BACKGROUND
Historically, the Detroit VAMC has used a non-weight-based Point-of-Use (POU) system for inventory management. The facility has realized this system is not efficient as it requires staff to continuously scan the inventories to track changes. The facility leadership researched how similar-sized facilities were able to gain better inventory tracking systems, reduce stockouts, and reduce costs. The facilities that have been the most successful in these transitions have moved to weight-based inventory management systems that automatically track the inventory.
PRODUCT REQUIREMENTS
The Weight-Based Inventory Management System shall produce an accurate real-time reading of quantities on-hand accessible by a web-based program and provide data mining capabilities that shall include at a minimum: current stock levels, recommended order points, average usage levels per item and ability to track medical supply usage per patient treated at the Detroit VAMC, Satellite and its CBOC locations.
The Weight-Based Inventory System shall be interfaced with the Generic Inventory Package (GIP). The primary purpose of the interface is to identify out of balance on-hand quantities and values between GIP and the Weight-Based Inventory System.
The Weight-Based Inventory System shall identify an out of balance on hand quantities and values, accounting for any due outs or due ins. If the out of balance condition is caused by a pending due in or due out, it shall be displayed separately to easily identify. The Weight-Based Inventory System due-ins and due-outs shall automatically be removed when GIP due-ins and due-outs are “cleared”.
The Weight-Based Inventory Management System shall have color-coded stickers for item identification based on standard color-coding system shown in Attachment A.
Installed equipment shall have a one-year full equipment replacement for defects or damage not caused by VA personnel. Install does not include disassembly of existing storage devices.
Tasks under this PD shall be performed at the following VA facilities:
Primary Location:
1. John D. Dingell VAMC (Comp/Pen, IE 136), 4646 John R St, Detroit, MI 48201 Secondary Locations:
2. Detroit VAMC – Valor Center (IE 323), 3245 E Jefferson Ave, Detroit, MI 48207
3. Veterans Community Resource and Referral Center (VCRRC) (IE 197), 301 Piquette Ave, Detroit, MI 48202
4. Pontiac VA Clinic (IE 208), 44200 Woodward Ave, Ste 208 Pontiac, MI 48341
5. Pontiac VA Clinic (IE 425), 44200 Woodward Ave, Ste 208 Pontiac, MI 48341
6. Downriver VA Clinic (IE 422), 1640 Fort Street, Ste D, Trenton, MI 48183
Travel for this effort shall be built into the Contractor’s firm fixed price. Work May be performed at remote locations with prior concurrence from the Contracting Officer’s Representative.
The Contractor shall supply and install the following items at the specified locations, including any ancillary components that may be required for the system to be fully operational:
PAR Software Licenses
| Software License (required for each period of performance) |
| UOM |
| Est. Qty |
| Location(s) |
| PX9110_101-300 PAR Secondary Facility License 101-300 Beds |
| EA |
| 1 |
| N/A |
| PX9120U PAR Client Unlimited |
| EA |
| 1 |
| N/A |
| PX9176 PAR Vision Facility License |
| EA |
| 1 |
| N/A |
| PX9186 PAR Bins Replenish License |
| EA |
| 6 |
| John D. Dingell VAMC (1), Detroit VAMC – Valor Center (1), Veterans Community Resource and Referral Center (VCRRC) (1), Pontiac VA Clinic (IE 208) (1), Pontiac VA Clinic (IE 425) (1), Downriver VA Clinic (1) |
Interface Development and Services
| Interface Development |
| UOM |
| Est. Qty |
| Location(s) |
| PX9295-GIP GIP Interface (VA) |
| EA |
| 1 |
| N/A |
Services
PX9809-PMFR Project Management Flat Rate
| 1 |
| N/A |
PAR Scale Products
| PAR Scale Products |
| UOM |
| Est. Qty |
| Location(s) |
| Small & Medium Platform Scales |
| EA |
| 120 |
| John D. Dingell VAMC (4), Detroit VAMC – Valor Center (10), Veterans Community Resource and Referral Center (VCRRC) (66), Pontiac VA Clinic (IE 208) (17), Pontiac VA Clinic (IE 425) (9), Downriver VA Clinic (14) |
Controller, Replenish, Ethernet
| 6 |
| John D. Dingell VAMC (1), Detroit VAMC – Valor Center (1), Veterans Community Resource and Referral Center (VCRRC) (1), Pontiac VA Clinic (IE 208) (1), Pontiac VA Clinic (IE 425) (1), Downriver VA Clinic (1) |
PX3273 PAR Bins Scale, Lg Platform 50 Kg (CA = 4)
| 20 |
| Pontiac VA Clinic (IE 208) (20) |
PX3950C PAR Bins Setup Kit
| 2 |
| Pontiac VA Clinic (IE 208) (2) |
Storage Products
| Third Party Storage Products |
| UOM |
| Est. Qty |
| Location(s) |
| Plastic Storage Bins |
| LOT |
All
Bridge Allocation (unit plus sides/front)
| 10 |
| John D. Dingell VAMC (1), Detroit VAMC – Valor Center (1), Veterans Community Resource and Referral Center (VCRRC) (5), Pontiac VA Clinic (IE 208) (1), Pontiac VA Clinic (IE 425) (1), Downriver VA Clinic (1) |
| QS-LR36 qwikSIGHT Mobile Louvered Panel Units, 36" |
| EA |
| 26 |
| John D. Dingell VAMC (2), Detroit VAMC – Valor Center (6), Veterans Community Resource and Referral Center (VCRRC) (4), Pontiac VA Clinic (IE 208) (5), Pontiac VA Clinic (IE 425) (3), Downriver VA Clinic (6) |
| QS-LR18 qwikSIGHT Mobile Louvered Panel Units, 18" |
| EA |
| 6 |
| John D. Dingell VAMC (1), Detroit VAMC – Valor Center (1), Veterans Community Resource and Referral Center (VCRRC) (1), Pontiac VA Clinic (IE 208) (1), Pontiac VA Clinic (IE 425) (1), Downriver VA Clinic (1) |
WEIGHT-BASED INVENTORY MANAGEMENT SYSTEM
SALIENT CHARACTERISTICS
The Weight-Based Inventory Management System shall have the following physical, functional and performance characteristics:
1. Shall be weight based
2. Easily calibrated and accurate
3. Provide real-time visibility to our Secondary Inventory locations
4. Shall be able to interface with GIP package in IFCAP
5. Shall be capable of tracking, adjusting, and reporting comprehensive real time information pertaining to the inventory of a secondary location
6. It is imperative that depletion of stock triggers “pick” tickets based on Periodic Automatic Replacement (PAR) levels, Re-order points, and Emergency Stock Levels
7. Software shall be intuitive and easy to train on
8. Software shall be able to utilize multiple users with different levels of permissions
9. Reports generated by software shall be relevant to APICS Principles of Inventory Management
10. Shall be able to handle a wide range of products based on size, thickness, and weight.
11. Complete generic identification: Weight-based inventory Supply Chain Solution
12. Applicable model/make/catalog number: PAR Express weight-based automation by PAR Excellence
13. Communication about system status including system failures
14. Materials Management Status –
a. Open Orders
b. Emergency/Critical Item Levels
c. Negative Quantities on-Hand
15. Item Locator
16. Customer Item Requisition
17. PAR Level Analysis
18. Current Levels –
a. Level recommendations by cost and usage demand SKU reduction recommendations
b. Items over par level
c. Stock outs and critical hits Par level value over time
19. Consumption
a. Average monthly usage
b. Consumption analysis including time
c. Consumption deviation
d. Consumption over time
20. Reports
a. Activity detail (sales, receipts, adjustments, etc.) to include time inventory on hand changed
b. Quantity on-hand Value on-hand
c. Department transactions
d. Cycle count sheet
e. Out of balance with GIP – on hand Due-ins
f. Due outs
g. Issue multiple discrepancy between GIP and Par Bin
h. Emergency levels
21. Orders
a. Existing orders
b. Order preview
22. Items
a. Item master Item history
b. Item classification Reconciliation history
c. Most recent reconciliation per item
LICENSING
One-year license agreement for use of Weight-Based Inventory Management System and related support. Automatic software upgrades of the installed program and software. Web-based program shall be available on any computer and/or mobile device for reporting purposes and evaluation of inventory levels for an unlimited number of users.
INSTALLATION
Installation shall occur during normal business hours, 7:30AM to 4:30PM local time.
The Contractor shall provide notification to the VA Project Team 10 days prior to starting on-site activities. The Contractor shall coordinate with site escorts for installation.
Install on two (2) VA owned laptops software package used for system set-up, installation, and management. This includes adding, deleting, and editing items stored in the bins/platforms to manage inventory and levels at each designated facility. Install and prepare VA owned server for transmission of information between Contractor and VA for maintenance and monitoring of equipment in use.
Installation shall begin no later than 30 days after contract award date. Installation shall be phased by location and begin at the Primary Location, John D. Dingell VAMC. Installation and setup to be completed no later than 180 days after contract award.
ACCESS
The Contractor shall ensure that VA staff are able to access the weight-based inventory management system, and that VA staff are able to provision additional users themselves.
SUPPORT
Support to include continuous monitoring by means of a minimum of four remote checks of equipment functionality by Contractor personnel every 24 hours. Notification and maintenance support from Contractor personnel in the event of a problem with equipment or software. Contractor personnel shall respond to service calls no later than 24 hours after being notified of a problem with either equipment or installed software. Equipment and related hardware shall be replaced within 48 hours of notification of a problem if user is not at fault for damage or defect.
TRAINING
The Contractor shall conduct two (2) in person training sessions for five (5) VA staff members on the Weight-Based Inventory Management System. The Contractor shall train the VA employees for the web-based program that shall have unlimited user access and provide reports and data mining capability of current inventory including but not limited to current stock levels, recommended order levels, and average usage levels. The system shall be capable of producing reports in Excel or text delimited format using commercially available software. Training shall include but is not limited to:
1. Adding items
2. Removing items
3. Assigning items
4. Weighing items
5. Editing items
6. Troubleshooting
7. Reporting functions
8. Par Vision
9. Process definition
PERFORMANCE MONITORING
Completion of the install will be verified by POC or designated personnel. Functionality and accuracy of the installed equipment will be continuously monitored by Logistics staff to ensure equipment is functioning properly and providing accurate and timely information for inventory and reordering purposes. Installed equipment and software is monitored by Contractor employees by daily check-ins that shall occur remotely at least four (4) times every 24 hours. Contractor support to be provided for any defects or functionality problems by contacting Contractor via email or telephone within time frames designated in Section 2.2 of this PD. The Contractor will meet (e.g. in person, telephone, etc.) with the POC monthly to address any unresolved issues. Any unresolved and/or continuous issues will be addressed to the Contracting Officer for corrective action.
PROJECT MANAGEMENT
DELIVERY ORDER KICKOFF MEETING
The Contractor shall conduct a virtual Delivery Order (DO) Kickoff Meeting with the VA Program Team, Contracting Officer (CO), Contract Specialist (CS) within five (5) business days of contract award. The Contractor shall provide a DO Kickoff Meeting Agenda no later than (NLT) two (2) business days prior to the DO Kickoff Meeting to the VA PM, COR, and Contract Specialist. The agenda shall include all topics to be discussed for successful contract execution. The Contractor shall provide DO Kickoff Meeting Minutes NLT three (3) business days after the DO Kickoff Meeting that summarizes the meeting and includes the primary contact information of all parties in attendance.
The VA Project Team will provide the VA Project Team email distribution list to the Contractor at the DO Kickoff Meeting.
Deliverables:
A. DO Kickoff Meeting Agenda B. DO Kickoff Meeting Minutes
SECURITY REQUIREMENTS
Vendor owned software and/or program (PAR Excellence) to be installed on VA owned server, laptop and desktop computer. Other access to vendor website and programs (PAR Vision) will be permitted by vendor from any desktop computer using the World Wide Web.
Contractor personnel performing installation may be required to complete the Department of Veterans Affairs security screening. General Contractor’s employees shall not enter the work area without the appropriate badge. The Contractor shall wear a Contractor’s badge during the set-up of the system and any other on-site work. They may be subject to inspection of their personal effects when entering or leaving the work area.
GOVERNMENT FURNISHED EQUIPMENT (GFE)
The VAMC will furnish one (1) server and two (2) laptops for installation of vendor owned software and related programs needed to make the installed equipment operational.
RISK CONTROL
Employees of contractors responsible for installation and setup will have background check completed or show proof of background check completed no longer than one (1) year ago, from date of award including fingerprint analysis. Contractor employees shall always obtain VA badge and wear on their person above their waist and visible.
The Contractor may be installing a supply storage and tracking system in an area under construction. The Contractor will need to be cognizant of staff movements, equipment and a plethora of activity during certain periods of the workday. The Contractor shall be accompanied by an escort during on-site activities. Installation staff shall have no patient contact or access to sensitive patient information. COR will be available for risk intervention should the need arise.
NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) PROCUREMENTS (SECTION 508) On January 18, 2017, the Access Board issued a final rule that updated accessibility requirements covered by Section 508 and refreshed guidelines for telecommunications equipment subject to Section 255 of the Communications Act. The final rule went into effect on January 18, 2018. The revisions and updates to the Section 508-based standards and Section 255-based guidelines are intended to ensure that information and communication technology (ICT) covered by the respective statutes is accessible to and usable by individuals with disabilities.
SECTION 508 – INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STANDARDS
The Section 508 standards established by the Access Board are incorporated into, and made part of all VA orders, solicitations and purchase orders developed to procure ICT. These standards are found in their entirety at: Revised 508 Standards and 255 Guidelines (access-board.gov). A single PDF file version of the Revised Section 508 Standards and 255 Guidelines will be supplied upon request or can be obtained from the Access Board website. Federal agencies must comply with the Rehabilitation Act of 1973, as amended.
The Contractor shall comply with “508 Chapter 2: Scoping Requirements” for all electronic ICT and content delivered under this contract. Specifically, as appropriate for the technology and its functionality, the Contractor shall comply with the technical standards marked here:
| ☒ | E205 Electronic Content – (Accessibility Standard -WCAG 2.0 Level A and AA Guidelines) |
| ☒ | E204 Functional Performance Criteria |
| ☒ | E206 Hardware Requirements |
| ☒ | E207 Software Requirements |
| ☒ | E208 Support Documentation and Services Requirements |
COMPATABILITY WITH ASSISTIVE TECHNOLOGY
The standards do not require installation of specific accessibility-related software or attachment of an assistive technology device. Section 508 requires that ICT be compatible with such software and devices so that ICT can be accessible to and usable by individuals using assistive technology, including but not limited to screen readers, screen magnifiers, and speech recognition software.
ACCEPTANCE AND ACCEPTANCE TESTING
Deliverables resulting from this solicitation will be accepted based in part on satisfaction of the Section 508 Chapter 2: Scoping Requirements standards identified above.
The Government reserves the right to test for Section 508 Compliance before delivery. The Contractor shall be able to demonstrate Section 508 Compliance upon delivery.
INFORMATION TECHNOLOGY USING SUSTAINABLE PRODUCTS AND SERVICES
Not Applicable.
SHIPMENT OF HARDWARE OR EQUIPMENT
All hardware shall be shipped to the Primary Location, John D. Dingell VAMC, and then distributed to the Secondary Locations as identified in Section 2.0 of this PD.
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
Ship To and Mark For:
Primary
Alternate
| Name: |
| John D Dingell VAMC |
| Name: |
| John D Dingell VAMC |
| Address: |
| 4646 John R St, Detroit, MI 48201 |
| Address: |
| 4646 John R St, Detroit, MI 48201 |
| Voice: |
| 313-576-3358 |
| Voice: |
| 313-576-1675 |
| Email: |
| Timothy.Scheidsr@va.gov |
| Email: |
| Matoka.Johnson@va.gov |
SPECIAL SHIPPING INSTRUCTIONS
Prior to shipping, Contractor shall notify Site POCs, by phone followed by email, of all incoming deliveries including line-by-line details for review of requirements. The Contractor shall not make any changes to the delivery schedule at the request of Site POC.
Contractors shall coordinate deliveries with Site POCs before shipment of hardware to ensure sites have adequate storage space.
All shipments, either single or multiple container deliveries, shall bear the VA IFCAP Purchase Order number (if applicable) on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA IFCAP PO or Contract number shall indicate total number of containers for the complete shipment (e.g. “Package 1 of 2”), clearly readable on manifests and external shipping labels.
Packing Slips/Labels and Lists shall also include the following:
IFCAP PO # or Contract No.: ____________ (e.g., 166-E11234 (the IFCAP PO number is in block #20 of the SF 1449)) Project Description: (e.g. Tier I Lifecycle Refresh)
Total number of Containers: Package ___ of ___. (e.g., Package 1 of 3)
GENERAL REQUIREMENTS
VA TECHNICAL REFERENCE MODEL
The Contractor shall comply with the VA OIT Technical Reference Model (VA TRM). Compliance with the VA TRM is achieved by using only technologies and standards that are listed as approved for use in the VA TRM. The Contractor shall provide all necessary information requested by VA to ensure TRM approval is obtained prior to use on VA’s network.
ZERO TRUST – VA CRITICAL SECURITY CONTROLS
VA has established minimum mandatory security requirements and requires that any network connected software system or service must meet the VA Critical Security Controls as outlined in the VA Memorandum, “VA Security Controls”, https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010. VA Critical Security Controls identify the minimum mandatory requirements that must be implemented across all VA enterprise infrastructure, cloud computing environments, information systems, networks, and specialized devices (medical devices/systems, special-purpose systems, and research scientific computing devices) that process, store, and/or transmit VA data. Effective July 1, 2025, the Contractor shall implement these VA Critical Security Controls, within any network connected software system or service prior to being authorized for use in the VA. This functional requirement is not negotiable, and Plan of Action & Milestones (POAM) will not be accepted in the event these controls cannot be implemented for new systems. Critical Security Controls are intended to increase VA’s security posture and provide security and privacy risk visibility into the VA network and is not a new requirement. The Contractor’s failure to maintain these VA Critical Controls after implementation will result in VA discontinuing the use of the system.
SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the Integrated Control Number (ICN) in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support IPv6-Only based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). Which defines IPv6-only as the state of an operational system or service when IPv4 protocol functions (addressing, packet forwarding) are not in use. The NIST USGv6 profile defines technical requirements for a product to be capable of operating in IPv6-Only environments. IPv6-Only technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6” (https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices, applications, and systems shall support all applicable functionality on native IPv6-Only as well as dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g., web, email, DNS, ISP services, etc.) shall support native IPv6-Only and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall support using native IPv6-Only and dual stack (IPv6 / IPv4) for all functionality and operations.
SOFTWARE AND LICENSING REQUIREMENTS
The Contractor shall be responsible for the provision of all software licenses and any associated licensing maintenance required for any development, delivery, integration, operation, and/or maintenance associated with its proposed application(s), software products, software solution, and/or system including, but not limited to, any and all application(s), software and/or software products that comprise, are a part of, or integrate with the Contractor’s proposed application(s), software products, software solution, and/or system for the life of any resulting contract.
TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents.)
POSITION/TASK RISK DESIGNATION LEVEL(S)
In accordance with VA Handbook 0710, Personnel Security and Suitability Program, the position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Service Task/Item Number Service Task / Item Number
| Tier1 / Low Risk |
| Tier 2 / Moderate Risk |
| Tier 4 / High Risk |
| 2.0 | |
| ☒ | |
| ☐ | ☐ |
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/ PRIVACY LANGUAGE
NOTE: In the event of a conflict, VAAR Security Clauses take precedence over the language in this Addendum B.
APPLICABLE SECTIONS FROM: VA NOTICE 24-12, APRIL 22, 2024, UPDATE TO VA HANDBOOK 6500.6, CONTRACT SECURITY, APPENDIX C VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE, FOR INCLUSION INTO CONTRACTS, AS APPROPRIATE
GENERAL
This entire section applies to all acquisitions requiring any Information Security and Privacy language. Contractors, contractor personnel, Subcontractors and subcontractor personnel will be subject to the same federal laws, regulations, standards, VA directives and handbooks, as VA personnel regarding information and information system security and privacy.
VA INFORMATION CUSTODIAL LANGUAGE
a. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General. The primary clause used to define computer software license (not data/intellectual property first produced under this Contractor or order) is FAR 52.227-19, Commercial Computer Software License.
b. Information made available to the Contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The Contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
c. VA information will not be co-mingled with any other data on the Contractor’s information systems or media storage systems. The Contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization.
d. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of Contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The Contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to Contractor and Subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG), and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.
e. The Contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies.
f. The Contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service.
g. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contractor.
h. The Contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The Contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations.
i. The Contractor’s firewall and web services security controls, as applicable, shall meet or exceed VA’s minimum requirements.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the Contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The Contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response.
k. Notwithstanding the provision above, the Contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality-assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the Contractor is in receipt of a court order or other requests for the above-mentioned information, the Contractor shall immediately refer such court order or other requests to the VA CO for response.
l. Information made available to the Contractor by VA for the performance or administration of this contract or information developed by the Contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service.
m. Any data destruction done on behalf of VA by a Contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.
n. The Contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the Contractor shall return all Federal Records to VA for disposition.
o. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA. The Contractor shall hold the appropriate material until otherwise directed by the Contracting Officer’s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140-2 (or its successor) and NIST 800-52. If mailed, the Contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the Contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract.
p. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the Contractor at the end of lease, loan, or trade-in. Exceptions to this paragraph will only be granted with the written approval of the VA CO.
ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS
a. A Contractor/Subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and subcontractors only to the extent necessary to perform the services specified in the solicitation or contract. This includes indirect entities, both affiliate of Contractor/Subcontractor and agent of Contractor/Subcontractor.
b. Contractors and subcontractors shall sign the VA Information Security Rule of Behavior (ROB) before access is provided to VA information and information systems (see Section 4, Training, below). The ROB contains the minimum user compliance requirements and does not supersede any policies of VA facilities or other agency components which provide higher levels of protection to VA’s information or information systems. Users who require privileged access shall complete the VA elevated privilege access request processes before privileged access is granted.
c. All Contractors and Subcontractors working with VA information are subject to the same security investigative and clearance requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors shall be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office of Human Resources and Administration/Operations, Security and Preparedness (HRA/OSP) is responsible for these policies and procedures. Contract personnel who require access to classified information or information systems shall have an appropriate security clearance. Verification of a Security Clearance shall be processed through the Special Security Officer located in HRA/OSP. Contractors shall conform to all requirements stated in the National Industrial Security Program Operating Manual (NISPOM).
d. All Contractors and subcontractors shall comply with conditions specified in VAAR 852.204-71(d); Contractor operations required to be in United States. All Contractors and Subcontractors working with VA information must be permanently located within a jurisdiction subject to the law of the United States or its Territories to the maximum extent feasible. If services are proposed to be performed abroad the Contractor must state where all non-U.S. services are provided. The Contractor shall deliver to VA a detailed plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the COR/CO in writing prior to access being granted.
e. The Contractor shall notify the COR/CO in writing immediately (no later than 24 hours) after personnel separation or occurrence of other causes. Causes may include the following:
(1) Contractor/Subcontractor personnel no longer has a need for access to VA information or VA information systems.
(2) Contractor/Subcontractor personnel are terminated, suspended, or otherwise has their work on a VA project discontinued for any reason.
(3) Contractor believes their own personnel or Subcontractor personnel may pose a threat to their company’s working environment or to any company-owned property. This includes Contractor-owned assets, buildings, confidential data, customers, employees, networks, systems, trade secrets and/or VA data.
(4) Any previously undisclosed changes to Contractor/Subcontractor background history are brought to light, including but not limited to changes to background investigation or employee record.
(5) Contractor/Subcontractor personnel have their authorization to work in the United States revoked.
(6) Agreement by which Contractor provides products and services to VA has either been fulfilled or terminated, such that VA can cut off electronic and/or physical access for Contractor personnel.
f. In such cases of contract fulfillment, termination, or other causes; the Contractor shall take the necessary measures to immediately revoke access to VA network, property, information, and information systems (logical and physical) by Contractor/Subcontractor personnel. These measures include (but are not limited to): removing and then securing Personal Identity Verification (PIV) badges and PIV – Interoperable (PIV-I) access badges, VA-issued photo badges, credentials for VA facilities and devices, VA-issued laptops, and authentication tokens. Contractors shall notify the appropriate VA COR/CO immediately to initiate access removal.
g. Contractors/Subcontractors who no longer require VA accesses will return VA-issued property to VA. This property includes (but is not limited to): documents, electronic equipment, keys, and parking passes. PIV and PIV-I access badges shall be returned to the nearest VA PIV Badge Issuance Office. Once they have had access to VA information, information systems, networks and VA property in their possessions removed, Contractors shall notify the appropriate VA COR/CO.
TRAINING
a. All contractors and subcontractors requiring access to VA information and VA information systems shall successfully complete the following before being granted access to VA information and its systems:
(1) VA Privacy and Information Security Awareness and Rules of Behavior course (Talent Management System (TMS) #10176) initially and annually thereafter.
(2) Sign and acknowledge (electronically through TMS #10176) understanding of and responsibilities for compliance with the Organizational Rules of Behavior, relating to access to VA information and information systems initially and annually thereafter; and
(3) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system or information access [to be defined by the VA program official and provided to the VA CO for inclusion in the solicitation document – i.e., any role-based information security training].
b. The Contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the required training is complete.
SECURITY INCIDENT INVESTIGATION
a. The Contractor, Subcontractor, their employees, or business associates shall immediately (within one hour) report suspected security / privacy incidents to the VA OIT’s Enterprise Service Desk (ESD) by calling (855) 673-4357 (TTY: 711). The ESD is OIT’s 24/7/365 single point of contact for IT-related issues. After reporting to the ESD, the Contractor, Subcontractor, their employees, or business associates shall, within one hour, provide the COR/CO the incident number received from the ESD.
b. To the extent known by the Contractor/Subcontractor, the Contractor/Subcontractor's notice to VA shall identify the information involved and the circumstances surrounding the incident, including the following:
(1) The date and time (or approximation of) the Security Incident occurred.
(2) The names of individuals involved (when applicable).
(3) The physical and logical (if applicable) location of the incident.
(4) Why the Security Incident took place (i.e., catalyst for the failure).
(5) The amount of data belonging to VA believed to have been compromised.
(6) The remediation measures the Contractor is taking to ensure no future incidents of a similar nature.
c. After the Contractor has provided the initial detailed incident summary to VA, they will continue to provide written updates on any new and relevant circumstances or facts they discover. The Contractor, Subcontractor, and their employes shall fully cooperate with VA or third-party entity performing an independent risk analysis on behalf of VA. Failure to cooperate may be deemed a material breach and grounds for contract termination.
d. VA IT Contractors shall follow VA Handbook 6500, Risk Management Framework for VA Information Systems VA Information Security Program, and VA Information Security Knowledge Service guidance for implementing an Incident Response Plan or integrating with an existing VA implementation.
e. In instances of theft or break-in or other criminal activity, the Contractor/Subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG, and the VA Office of Security and Law Enforcement. The Contractor, its employees, and its Subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The Contractor/Subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
f. The Contractor shall comply with VA Handbook 6500.2, Management of Breaches Involving Sensitive Personal Information, which establishes the breach management policies and assigns responsibilities for the oversight, management and reporting procedures associated with managing of breaches.
g. With respect to unsecured Protected Health Information (PHI), the Contractor is deemed to have discovered a data breach when the Contractor knew or should have known of breach of such information. When a business associate is part of VHA contract, notification to the covered entity (VHA) shall be made in accordance with the executed BAA.
h. If the Contractor or any of its agents fails to protect VA sensitive personal information or otherwise engages in conduct which results in a data breach involving any VA sensitive personal information the Contractor/Subcontractor processes or maintains under the contract; the Contractor shall pay liquidated damages to the VA as set forth in clause 852.211-76, Liquidated Damages—Reimbursement for Data Breach Costs.
INFORMATION SYSTEM DESIGN AND DEVELOPMENT
a. Information systems designed or developed on behalf of VA at non-VA facilities shall comply with all applicable Federal law, regulations, and VA policies. This includes standards for the protection of electronic Protected Health Information (PHI), outlined in 45 C.F.R. Part 164, Subpart C and information and system security categorization level designations in accordance with FIPS 199, Standards for Security Categorization of Federal Information and Information Systems and FIPS 200, Minimum Security Requirements for Federal Information Systems. Baseline security controls shall be implemented commensurate with the FIPS 199 system security categorization (reference VA Handbook 6500 and VA Trusted Internet Connections (TIC) Architecture).
b. Contracted new developments require creation, testing, evaluation, and authorization in compliance with VA Assessment and Authorization (A&A) processes in VA Handbook 6500 and VA Information Security Knowledge Service to obtain an Authority to Operate (ATO). VA Directive 6517, Risk Management Framework for Cloud Computing Services, provides the security and privacy requirements for cloud environments.
c. VA IT Contractors, Subcontractors and third-party service providers shall address and/or integrate applicable VA Handbook 6500, VA Handbook 6517, Risk Management Framework for Cloud Computing Services and Information Security Knowledge Service specifications in delivered IT systems/solutions, products and/or services. If systems/solutions, products and/or services do not directly match VA security requirements, the Contractor shall work though the COR/CO to identify the VA organization responsible for governance or resolution. Contractors shall comply with FAR 39.1, specifically the prohibitions referenced.
d. The Contractor (including producers and resellers) shall comply with Office of Management and Budget (OMB) M-22-18 and M-23-16 when using third-party software on VA information systems or otherwise affecting the VA information. This includes new software purchases and software renewals for software developed or modified by major version change after the issuance date of M-22-18 (September 14, 2022). The term “software” includes firmware, operating systems, applications and application services (e.g., cloud-based software), as well as products containing software. The Contractor shall provide a self-attestation that secure software development practices are utilized as outlined by Executive Order (EO)14028 and NIST Guidance. A third-party assessment provided by either a certified Federal Risk and Authorization Management Program (FedRAMP) Third Party Assessor Organization (3PAO) or one approved by the agency will be acceptable in lieu of a software producer's self-attestation.
e. The Contractor shall ensure all delivered applications, systems and information systems are compliant with Homeland Security Presidential Directive (HSPD) 12 and VA Identity and Access management (IAM) enterprise identity management requirements as set forth in OMB M-19-17, M-05-24, FIPS 201-3, Personal Identity Verification (PIV) of Federal Employees and Contractors (or its successor), M-21-31 and supporting NIST guidance. This applies to Commercial Off-The-Shelf (COTS) product(s) that the Contractor did not develop, all software configurations and all customizations.
f. The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with VA Handbook 6500, VA Information Security Knowledge Service, IAM enterprise requirements and NIST 800-63, Digital Identity Guidelines, for direct, assertion-based authentication and/or trust-based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV and/or Common Access Card (CAC), as determined by the business need and compliance with VA Information Security Knowledge Service specifications.
g. The Contractor shall use VA authorized technical security baseline configurations and certify to the COR that applications are fully functional and operate correctly as intended on systems in compliance with VA baselines prior to acceptance or connection into an authorized VA computing environment. If the Defense Information Systems Agency (DISA) has created a Security Technical Implementation Guide (STIG) for the technology, the Contractor may configure to comply with that STIG. If VA determines a new or updated VA configuration baseline needs to be created, the Contractor shall provide required technical support to develop the configuration settings. FAR 39.1 requires the population of operating systems and applications includes all listed on the NIST National Checklist Program Checklist Repository,
h. The standard installation, operation, maintenance, updating and patching of software shall not alter the configuration settings from VA approved baseline configuration. Software developed for VA must be compatible with VA enterprise installer services and install to the default “program files” directory with silently install and uninstall.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .